Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Sugarloaf Blvd. Bridge Replacement #904153 06/10/2026
GVS COURTq° o: A Kevin Madok, CPA - �o ........ � Clerk of the Circuit Court& Comptroller Monroe County, Florida �z cooN DATE: June 11, 2026 TO: Judith Clarke, PE, Director Engineering/Roads & Bridges ATTN: Clarke Briggs, Senior Project Administrador FROM: Brynn Morey, Deputy Clerk SUBJECT: June 10, 2026 BOCC Meeting The following item has been executed and added to the record: C11 Approval of a task order with Kisinger Campo &Associates for engineering design and permitting services for the Sugarloaf Blvd Bridge #904153 Replacement Project in the not to exceed amount of$296,704.57 plus $6,400 in estimated expenses for a total of$303,104.57. The work will be funded by Fund 318 infrastructure sales surtax revenue bond series 2025 funds. This task order is being awarded under the On Call contract for Professional Engineering Services. Should you have any questions please feel free to contact me at(305) 292-3550. cc: County Attorney Finance File KEY WEST MARATHON PLANTATION KEY 500 Whitehead Street 3117 Overseas Highway 88770 Overseas Highway Key West, Florida 33040 Marathon, Florida 33050 Plantation Key, Florida 33070 TASK ORDER FOR ENGINEERING DESIGN AND PERMITTING SERVICES BETWEEN MONROE COUNTY AND KISINGER CAMPO & ASSOCIATES, CORP. FOR SUGARLOAF BLVD BRIDGE #904153 REPLACEMENT PROJECT In accordance with the Continuing Contract for On Call Professional Engineering Services made and entered on the 28th day of January, 2026 between Monroe County hereinafter referred to as the "County" and Kisinger Campo &Associates, Corp., hereinafter referred to as "Consultant" where professional services are allowed if construction costs do not exceed "$7.5 million, as adjusted each July 1 thereafter by the June-to-June Consumer Price Index for All Urban Consumers in accordance with F.S. 287.055 (as amended per Chapter 2020-127). All terms and conditions of the referenced Contract for On Call Professional Engineering Services apply to the Task Order, unless the Task Order modifies an Article of the Agreement which will be specifically referenced in this Task Order and the modification shall be precisely described. This Task Order is effective on the 10th Day of June, 2026 and shall expire 60 days after construction is complete. Article II Scope of Basic Services, Paragraph 2.1 is amended as follows: The scope of services for the Sugarloaf Blvd Bridge #904153 Replacement Project will include updating existing construction plans to meet current specifications and design standards, complete all environmental investigations, reapply for all required permits, and support during the bidding of the project required for the replacement of the Sugarloaf Blvd Bridge and associated roadway reconstruction. The scope of services will include delivering a Record Set of plans in both CAD and PDF format. The Design for Construction shall include, but shall not necessarily be limited to, plans and specifications which describe all systems, elements, details, components, materials, equipment, and other information necessary for construction. The Design for Construction shall be accurate, coordinated and in all respects adequate for construction and shall be in conformity, and comply with all applicable laws, codes, permits, and regulations. Products, equipment and materials specified for use shall be readily available unless written authorization to the contrary is given by the County. Details of the scope of services are outlined below and included in the Consultant's proposal that is attached to this task order as Exhibit A. 2.0 CONSTRUCTION DOCUMENTS PHASE 2.1 The Consultant shall update current construction plans to meet current specifications and design standards for approval by the Florida Department of Transportation and the County. Construction Documents consisting of Drawings and Specifications setting forth in detail the requirements for the construction of the project. Construction documents shall conform to the standards contained in the most current version of the following: 1. Florida Department of Transportation Design Manual. 2. Florida Department of Transportation Design Standards Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 1 of 7 3. Florida Department of Transportation Surveying Procedure 4. Florida Department of Transportation Drainage Manual 5. Florida Department of Transportation Soils and Foundations Handbook 6. Florida Department of Transportation Structures Manual (625-020-018) including Temporary Design Bulletins 7. Manual of Uniform Traffic Control Devices (MUTCD). 8. American Disabilities Act 9. Florida Department of Transportation Pavement Coring and Evaluation Procedure 10. Florida Department of Transportation Flexible Pavement Design Manual 11. Florida Department of Transportation Rigid Pavement Design Manual 12. Federal Highway Administration Checklist and Guidelines for Review of Geotechnical Reports and Preliminary Plans and Specifications 13. Florida Department of Transportation Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways 14. Florida Statutes 15. Florida's Bicycle Facilities Planning and Design Handbook. 16. AASHTO Guide for the Development of Bicycle Facilities 17. Florida's Quality/Level of Service Handbook for Planning 18. A Policy on Geometric Design of Highways and Streets, American Association of State Highway and Transportation Officials (AASHTO Green Book) (GDHS-5 AASHTO Bookstore). 19. The Highway Capacity Manual (Transportation Research Board) 20. FDOT Standard Specifications for Road and Bridge Construction (with supplemental specifications). 21. Facilities Design Manual (Topic No. 625-020-016-a) 22. AASHTO Load and Resistance Factor Design (LRFD) Bridge Design Specifications 23. Right of Way Mapping Procedure (Topic No. 550-030-015-e) 24. Project Development and Environmental Manual Parts 1 and 2 (Topic No. 650- 000-001). Where FDOT design standards cannot be met the Consultant will request a design variance or exception. Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 2 of 7 2.2. The Consultant shall provide Drawings and applicable Technical Special Provisions to the County for the County's review (the Florida Department of Transportation Standard Specifications will be incorporated by reference) at the 100%, and Final stages of the project. The Florida Department of Transportation and the County will review the plans at the 100% and Final plans stages. The Consultant shall respond to questions resulting from Florida Department of Transportation and County review and incorporate any required revisions to the construction drawings and specifications. Design calculations package will be submitted with the 100% phase construction drawings. 2.3 The Consultant will provide a construction cost estimate and a project schedule at each phase submittal. 2.4 Upon completion of the Construction Documents Phase, the Consultant shall provide Construction Documents for the County's approval. Upon approval by the County the Consultant shall provide the County electronically, Construction Documents that have been signed and sealed by the Consultant. 2.5 The Consultant shall assist the County in the preparation of the necessary bidding information for the production of bidding forms, the Conditions of the Contracts, and the forms of Agreements between the County and the Contractors by providing supporting information as to the projects scope, bid items, estimated quantities and construction duration. The County shall prepare all Bidding Forms, Conditions of the Contract, and Forms of Agreement. 2.6 The Consultant's construction documents (plans, specifications, etc.) will conform to all codes and regulations of the federal government, county, state, municipalities, agencies and state departments, in effect at the date of this Agreement, and shall be of such completion as to be acceptable for review and ruling by said agencies when permits are applied for. The Consultant shall use due care in determining permit requirements and shall meet with regulatory agencies as necessary to coordinate specific permit requirements. The Consultant shall document all meetings and conversations with said regulatory agencies. If permits are denied for incompleteness or for lack of following said codes or regulations, or permit requirements, then the Engineer will conform the construction documents in such manner to receive permits upon such plans. Work required by the Consultant to conform documents to federal, state, city, county, or agency specifications to allow them to be approved shall be completed at no charge or cost to the County, unless said requirements are changed during the course of the project. 2.7 The Consultant shall file (through the County) all documents required for the approval of governmental authorities having jurisdiction over the project. The Consultant shall file (through the County) the necessary documents to obtain Environmental Resource Permits and all other permits required for construction. The Consultant will pay permit application fees out of the expenses and invoice the county accordingly. 2.8 As needed by the County, the Consultant will provide clarification and answers to questions from prospective bidders during the construction bid process. Answers will be provided in a timely manner in order to facilitate bidding. 3.0 CONSTRUCTION DOCUMENTS PHASE REQUIREMENTS Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 3 of 7 To satisfactorily perform the Construction Documents phase requirement, the Engineer must complete the tasks set forth in items 3.1 through 3.4. 3.1 Construction Plans — This consists of, at a minimum, Key Sheet, Summary of Pay Items and Quantities, Drainage Map, Project Layout, Plan and Profile sheets, Typical Sections, Detail sheets, General Notes, Environmental Notes, Traffic Control Plan. Construction plans shall be in accordance with FDOT Design Manual. 3.2 Specifications —specifications will conform to the most recent version of the Florida Department of Transportation (FDOT) Standard Specifications for Road and Bridge Construction or the Manual of Uniform Minimum Standards for Design, Construction and Maintenance for Streets and Highways (Florida Greenbook). Comprehensive, abbreviated methods, materials and systems descriptions in tune with the drawings will be developed as necessary with Technical Special Provisions. 3.3 Schedules — Prepare an estimate of the Construction Time. 3.4 Estimate of Construction Cost — Estimate of anticipated cost in accordance with the Construction Documents. 4.0 CONSTRUCTION COST Contemporaneously with the submission of each phase of the Design, the Consultant shall submit to the County in writing its final estimate of the contractor's anticipated bid price for constructing the Project. Once submitted, the final anticipated price estimate shall be adjusted by the Engineer to reflect any increase or decrease in anticipated price resulting from a change in Design. 4.1 The Construction Cost shall be the total estimated bid cost to the County of all elements of the Project designed or specified by the Engineer. 4.2 The Construction Cost shall include the cost at current market rates of labor and materials and Equipment designed, specified, selected or specially provided for by the Engineer, plus a reasonable allowance for Contractor's overhead and profit. 4.3 Construction cost does not include compensation of the Consultant and the subconsultants, the costs of land, rights-of-way, financing or other costs which are the responsibility of the County. 5.0 CONSTRUCTION PHASE The Consultant shall, without additional compensation, promptly correct any errors, omissions, deficiencies, or conflicts in the work product of the Consultant or its consultants or both. The Consultant must reimburse the County for any "added costs" paid by the County for additional construction costs that were incurred as a direct result of any error, omission, deficiency, or conflict in the work product of the Consultant, its consultants, or both. "Added costs" is defined as the cost incurred from any additional work required on the project that was necessitated solely by the error, omission, deficiency, or conflict in the work project. The added cost is limited to the increase to the construction cost for additional work and does not include costs that are normally incurred as part of the project or would have been incurred had no error, Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 4 of 7 omission, or deficiencies occurred, and addressed by a change order of already established unit costs. The Consultant shall not be held responsible for additional deficiencies found due to a delay in the construction of the project or for those hidden deficiencies that could not reasonably be determined through a review of documentation or physical inspection of the site by the Consultant. Article VII Compensation, Paragraph 7.1 is amended to read: The Consultant shall be paid monthly. The total not to exceed lump sum fee of $296,704.57.00 in accordance with the rates in the On Call Agreement, and estimated expenses of $6,400.00 (actual itemized amount) will apply and is estimated as follows: KCA FEE Project Management $35,067.00 Roadway/MOT $24,499.00 Drainage $28,291.00 Structures $79,289.00 Environmental Permitting $125,597.00 TOTAL $292,743.00 SUBCONSULTANT FEE Geotech —Tierra South Florida $3,961.57 TOTAL DESIGN FEE $296,704.57 ESTIMATED EXPENSES Project Manager (County Meetings, Site Visits) $3,200.00 Structures $800.00 Environmental/Permitting $2,400.00 TOTAL $6,400.00 TOTAL FEE GRAND TOTAL $303,104.57 Remainder of page left intentionally blank Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 5 of 7 ATTACHM ENT A CONSULTANT DETAILED SCOPE OF SERVICES/PROPOSAL Sugarloaf Blvd Bridge Replacement Task Order Kisigner Campo&Associates,Corp. June 2026 Page 7 of 7 I(CA �1�"ISIPJ ER CAM IPO 201 N.Franklin Street I' 813.871.5331 +ASSOCIATES Suite 900 : 813.871.5135 Tampa,FL33602 r,., April 17, 2026 Monroe County Attn: Ms. Judith S. Clarke, P.E. Director of Engineering Services 1100 Simonton Street Key West, Florida 33040 Project Description: Monroe County on Call Professional Engineering Services Contract Re: WO 2-Sugarloaf Boulevard Bridge Replacement- Final Plans and Permitting Updates Dear Ms. Clarke: Kisinger Campo&Associates(KCA) is pleased to submit this Scope of Services and Fee Estimate for the final design and plans forthe Sugarloaf Boulevard Bridge Replacement.The original design was started in 2013 with Final Plans completed in 2020. The project was placed on hold at that time, awaiting construction funding. Since the project inception, Florida Department of Transportation (FDOT) criteria has changed which requires significant modifications to the plans, specifications, and quantities. In addition,the permits and environmental surveys have expired and will need to be updated to meet agency and FDOT requirements. Based on the federal construction funding,this projectwill be procured through the FDOT Local Agency Program. The original design and plans will be updated to meet current FDOT standards. Project Design and Plans: KCA will revise the roadway, structural, geotechnical, and drainage design and update the construction plans to satisfy current FDOT requirements and reflect changes to applicable standards and specifications since the original project was completed. Required updates include, but are not limited to, thefollowing: • Implementation of FDOT Design Manual requirements • Update stormwater drainage analysis in accordance with current FDOT criteria • Update barrier shape and affected bridge/roadway geometry to allow for current FDOT single- slope barrier • Updated bridge geometry and finish grade elevations • Redesign of substructure components to incorporate fiber-reinforced polymer(FRP) reinforcing bars in accordancewith the FDOT Structures Design Guidelines • Provide minimum tip stability analysis for end bents including revised predrilling elevations and quantities • Addition of foundation pay items (predrilling, pile inspection, pile driving analyzer (PDA) testing, etc.)required by the current FDOT Standard Specifications for Road and Bridge Construction • Updated phased construction overhang analysis and temporary deck support design A 100% plans submittal will be provided to FDOT for review through the Electronic Review Comments (ERC) system. Following receipt and resolution of review comments, the plans and calculations will be revised for the Final Plans submittal. The Final Plans package will include all information necessary for bidding and construction of the Sugarloaf Boulevard Bridge Replacement,andwill encompass Engineer's cost estimates, utility coordination, FDOT specifications, and required FDOT LAP Certification Letters. Environmental Permitting and PD&E: KCA will perform a field investigation within the project right-of-way (ROW) to identify wetlands and protected species. The field investigation will include a seagrass and submerged (benthic) resource survey sufficient to support environmental permitting and clearances for the project. The submerged resource survey will include mapping the location of corals within the proposed impact area to facilitate coordination with the Florida Keys National Marine Sanctuary (FKNMS). KCA will establish a wetland jurisdictional line within the project limits and ROW. KCA will prepare a report summarizing the results of the field investigation.This report will be used to coordinate with environmental regulatory and resource agencies during the permitting phase of the project. KCA will prepare permit applications for the SFWMD, the U.S. Army Corps of Engineers(USACE), and the U.S. Coast Guard (USCG). It is anticipated that construction of the proposed structure will meet the requirements of a SFWMD General Permit(Rule 62-330.443, F.A.C.).The proposed replacement structure is also anticipated to meet the criteria of a USACE Nationwide Permit (most likely a NWP 13, Bank Stabilization, or NWP 15, U.S. Coast Guard Approved Bridges). Additionally, a USCG Bridge Permit or Amendment will be required. KCA will coordinate with the FKNMS to obtain the required Letter of Authorization(LOA)forthe project. This Scope of Services is exclusive of preparation of environmental mitigation plans for wetlands, mangroves, seagrasses, corals, or protected species. KCAwill coordinate with environmental regulatory and resource agencies regarding mitigation. Mitigation for unavoidable impacts to seagrasses and mangroves (and other wetlands) is anticipated to be done by the COUNTY through purchase of credits from the Keys Restoration Fund. Mitigation for unavoidable impacts to coralswill be done bythe COUNTY through payment to the FKNMS coral nursery program or similar method. Relocation of corals potentially impacted by the project is not included in this scope of services at this time. KCA will prepare a Natural Resources Evaluation (NRE) and a Benthic Resources Assessment Technical Memorandum forthe project. KCAwill prepare agency transmittal letters to obtain NRE concurrence from the U.S. Fish and Wildlife Service (USFWS), National Marine Fisheries Service (NMFS; Section 7 ESA and Essential Fish Habitat), and Florida Fish and Wildlife Conservation Commission (FWC). Coordination with the Florida Department of Transportation(FDOT) is included and KCAwill assist the COUNTY and FDOT to prepare a Type 1 Categorical Exclusion Checklist by providing supporting information for NEPA compliance. Formal consultation with federal resource agencies (USFWS and NMFS) and preparation of Endangered Species Biological Assessments (BAs) or detailed evaluation of Essential Fish Habitat (EFH) are not included. Consultant Fee: We have estimated the level of effort required for all engineering services described above. Our total estimated lump sum fee amounts to $296,704.57. This fee includes all KCA efforts and sub-consultant efforts, coordination, QA/QC and supervision. The fee estimate is based on the hourly rates which were previously approved for this contract. Our expenses were estimated separately and are not included in the lump sum fee estimate. Our total estimated expenses amount to$6,400.00 and will cover the permit fee for SFWMD and travel expenses as necessary. We sincerely appreciate the opportunity to continue our working relationship with you on this project. Please feel free to contact me if you have any questions or need any additional information. Best Regards, Austin Black, P.E. Project Manager File: 1250214.02(KCA) TOTAL FEE SUMMARY Sugarloaf Boulevard Bridge Replacement (Bridge No. 904153) KCA FEE Project Management $35,067.00 Roadway/MOT $24,499.00 Drainage $28,291.00 Structures $79,289.00 Environmental Permitting $125,597.00 TOTAL $292,743.00 SUBCONSULTANT FEE Geotech -Tierra South Florida $3,961.57 TOTAL DESIGN FEE TOTAL DESIGN FEE $296,704.57 ESTIMATED EXPENSES Project Manager(County Meetings, Site Visits) $3,200.00 Structures $800.00 Environmental $2,400.00 TOTAL $6,400.00 ESTIMATE OF WORK EFFORT AND COST-PRIME CONSULTANT Name of Project. Sugarloaf Boulevard Bridge Replacement(Bridge#904153) Consultant Name'. KCA County. Monroe County Consultant No.'. FPN'. 0 Date'. 4/23/2026 FAP No N/A Estimator'. Senior Hours From Project Senior SeniorProject Project Engine Senior Engineering Environmental SH Salary Average Staff Cl ossificationSH Manager Chief Engineer Engineer Engineer Engineer Internr Designer Technician Chief Scientist Environmental Specialist 0 Summary- Specialist By Cost By Rate Per F V1,1.00 $'189.00 $'105.00 $268.00 $218.00 $161.00 $215.00 $128.00 $'116.00 $210.00 $109.00 LA Activity Activity Task 3.Pmject General and Pmject Common Tasks 111 26 1 33 20 13 33 0 0 0 0 0 0 111 111,61 1115.M 4.Roadway Analysis 59 0 3 12 12 12 15 6 0 0 0 0 0 60 $14346 $239.10 5.Roadway Plans 46 0 2 5 7 9 9 9 5 0 0 0 0 46 $10153 $220;2 6e.Dminage Analysis 85 0 4 17 17 17 21 9 0 0 0 0 0 M $20295 $238 M 6b.Dminage Plans 36 0 2 4 5 7 7 7 4 0 0 0 0 36 $1096 $222.11 1.Utilities 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 8.Envimnmentel Permits,Gampliance&Clearances 603 0 0 0 0 0 0 0 0 157 271 175 0 603 $125,597 $208.29 9.SUuctures-Misc.Tasks,Dwgs,Nan Tech. 137 14 7 34 14 14 27 14 14 0 0 0 0 138 $33�50 $244.57 10.Stmctums-Bridge Development Repoli 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 A IA' 11.Stmctums-Temporary Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 12.Stmctums-Short Span Concrete Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 13.Stmctures-Metlium Span Concrete Britlge 15H 8 8 32 24 24 32 16 16 0 0 0 0 160 $37840 $236.50 14.Stmctares-Structural Steel Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 15.Stmctares-Segmental Cm-1.Bridge 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 16.Stmctares-Movable Span 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 11.Stmctares-Retaining Wells 32 2 2 6 5 5 6 3 3 0 0 0 0 32 $1699 $240.59 18.Stmctares-Miscellaneous 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 A IA' 19.Signing&Pavement Marking Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 20.Signing&Pavement Marking Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 21.Signalizetian Analyses 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 A Iw' 22.Signalizetian Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 23.fighting Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 24.fighting Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 25.Landscape Archdectum Ana Iy is 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 A IA' 2, .Landscape Archdectum Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 21.Survey(Field&Office Support) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 28.PhaNgrammetry 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIA' 29.Mapping 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 30.T.,stria)Mobile LOAR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 31.Architecture Development 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 32.Noise Barriers Impact Design Assessment 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIA' 33.Intelligent Transportation Systems Analysis 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 34.Intelligent Transpartatian Systems Plans 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/m 35.Geated meal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 36.3D Motleling 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $0 #DIV/01 Total Staff Hours 1,288 50 35 143 104 101 150 64 42 151 211 115 0 1 292 Total Staff Cost $16050.00 $1340500 $43615.00 $21872.00 $22,018.00 $24150.00 $13,760.00 $5376.00 $49612.00 $56010.00 $19075.00 $0 00 $292,743.00 $226.56 MI- $292 743.00 Survey Fieltl Days by Subconsultant SALARY RELATED COSTS. $292 743.00 4-Person Grew: OVERHEAD 1 0" $0 00 OPERATING MARGIN 0" $0 00 Notes FCCM(Facilities Capital Gast Money)'. 0.009b $0 00 1.This sheetto be used by Pnme Consultantto calculate tie Grand Total fee. EXPENSES. 0.009b $0 00 4-person ere 2.Manually anted.,fmm each subconsultant.Unused subconsultant rows may be hidden. Serve Field-Lb Pnme 0 de /de $0 00 SUBTOTAL ESTIMATED FEE: $292,743.00 Subconsultant. TSF $"96151 Subconsultant. Sub 6 $0 00 Subconsultant. Sub 7 $0 00 Subconsultant. Sub 8 $0 00 Subconsultant. Sub 9 $0 00 Subconsultant. Sub 10 $0 00 Subconsultant. Sub 11 $0 00 Subconsultant. Sub 12 $0 00 SUBTOTAL ESTIMATED FEE: $296,704.57 Geotechnical Fieltl antl Lab Testin $0 00 SUBTOTAL E STIMATED FEE: $296,704.57 Optional Services $0 00 GRAND TOTAL ESTIMATED FEE 1 $296,704.57 Sugarloaf_Stcu Hoe AM, Fee Sheet-Pnme Page 1 of 1 4/23/2026 8.41 AM SUGARLOAF BOULEVARD BRIDGE REPLACEMENT-PLAN REVIEW AND UPDATE(GEOTECHNICAL SUPPORT) STAFF HOURS,COMPENSATION&METHOD OF PAYMENT Staff Classification Chief Engineer Project Engineer Intern Senior Project Project Engineer Intern Chief Scienlist Senior Scienlist Staff Hou rs By Salary Cost By Average Rate Per Manager Engineer Engineer Activity Activity Task Staff Unit Rate 333933.!31 33326.:336 3191.:334 31.00 31.00 31.00 31.00 31.00 A.Review Design,Report,Plans,and Update per latest 3 5 6 0 0 0 0 0 14 $3,961.57 $282.97 Specifications 0 $0.00 0 $0.00 otal Staff Hours 3 5 6 0 0 0 0 0 otal Staff, 81 Fee $1,1 .73 $1,631.80 $1,148.04 $0.00 So.00 $0.00 $0.00 So.00 TOTAL LABOR AND HOURS otal Classification Hours 3 51 6 1 0 1 0 1 0 1 0 1 0 11 14 otal Classification Fee $1,181.73 $1,631.80 1 $1,148.04 1 $0.00 1 $0.00 1 $0.00 1 $0.00 1 $0.00 $3,961.57 Geotechnical Support Total $3,961.57 https://kisi,gerc.mp..sharep.i,t.c../teams/1250214/Shared Documents/WOX-Sugarloaf Blvd Bridge Replacement/Adrnm/Work Order Proposal/Original/Sugarloaf_Plan Update Staff Hours_Geotech.xlsx 71/13/2026 E(MM/DD/YYYY) A�" CERTIFICATE OF LIABILITY INSURANCE THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Greyling COI Specialist Edgewood Partners Ins. Center PHONE FAX 3780 Mansell Rd. Suite 370 A/C No Ext: 770.552.4225 A/C,No): E-MAlpharetta GA 30022 ADDRESS: greylingcerts@greyling.com INSURER(S)AFFORDING COVERAGE NAIC# INSURERA:Admiral Insurance Company 24856 INSURED KISICAMP INSURER B: Kisinger Campo&Associates, Corp. 201 N Franklin St Ste 900 INSURERC: Tampa FL 33602-5218 INSURERD: INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER:1270957425 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY EFF POLICY EXP LIMITS LTR INSD WVD POLICYNUMBER MM/DD MM/DD COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ CLAIMS-MADE OCCUR DAMAGE TO RENTED PREMISES Ea occurrence $ MED EXP(Any one person) $ PERSONAL&ADV INJURY $ GEN'L AGGREGATE LIMIT APPLIES PER: GENERALAGGREGATE $ POLICY❑ PRO- ❑ JECT LOC PRODUCTS-COMP/OP AGG $ OTHER: $ AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ Ea accident ANY AUTO t6�kS^p T BODILY INJURY(Per person) $ OWNED SCHEDULED BY -y,;,' ^�—�'^' BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS "' 1 14.26 HIRED NON-OWNED 6��+'I"f-„,„,,,�.,--- �- --""— PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY WAIMR Xyt&— Per accident $ UMBRELLALIAB OCCUR EACH OCCURRENCE $ EXCESS LAB CLAIMS-MADE AGGREGATE $ DED RETENTION$ $ WORKERS COMPENSATION PER OTH- AND EMPLOYERS'LIABILITY Y/N STATUTE ER ANYPROPRIETOR/PARTNER/EXECUTIVE ❑ E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? N/A (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ A Professional/Pollution Liability Y E000002720512 10/1/2025 10/1/2026 Per Claim $5,000,000 Aggregate $5,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Monroe County,On Call Professional Engineering Services Contract/KCA#1250214.00 CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. Monroe County 1100 Simonton Street AUTHORIZED REPRESENTATIVE Key West FL 33040 @ 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016103) The ACORD name and logo are registered marks of ACORD DATE(MM/DD/YYYY) A�" CERTIFICATE OF LIABILITY INSURANCE 01/13/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT- If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Vicky Van Wormer NAME: Brown&Brown Insurance Services,Inc. a/CNr o EXt: (727)461-6044 a/c,No): (727)442-7695 140 Fountain Parkway N E-MAIL Vicky.VanWormer@bbrown.com ADDRESS: Suite 600 INSURER(S)AFFORDING COVERAGE NAIC# St.Petersburg FL 33716 INSURERA: The Charter Oak Fire Insurance Company 25615 INSURED INSURER B: The Travelers Indemnity Company of America 25666 Kisinger Campo&Associates,Corp.KCCS,Inc.,DBA:Campo& INSURER C: Travelers Property Casualty Company of America 25674 201 N Franklin St,Suite 900 INSURER D: Travelers Casualty and Surety Company of America 31194 INSURER E: Tampa FL 33602 INSURER F: COVERAGES CERTIFICATE NUMBER: Master 25-26 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCEAUULbUbK POLICY EFF POLICY EXP LTR INSD WVD POLICYNUMBER MM/DD/YYYY MM/DD/YYYY LIMITS X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000,000 CLAIMS-MADE FX OCCUR PREM SDAMAGES Ea oNcurrDence $ 300,000 MED EXP(Any one person) $ 10,000 A Y 630-8254A604 10/01/2025 10/01/2026 PERSONAL&ADV INJURY $ 1,000,000 MOTHER LAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY PRO ❑ LOC PRODUCTS-COMP/OP AGG $ 2'000'000 JECT: Employee Benefits $ 1,000,000 AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ 1,000,000 Ea accident X ANYAUTO BODILY INJURY(Per person) $ B OWNED SCHEDULED Y 810-5N338364 10/01/2025 10/01/2026 BODILY INJURY(Per accident) $ AUTOS ONLY AUTOS HIRED NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident Uninsured motorist $ 1,000,000 UMBRELLA LIAB X 2,000,000 OCCUR EACH OCCURRENCE $ C EXCESS LIAB CLAIMS-MADE CUP-7J748484 10/01/2025 10/01/2026 AGGREGATE $ 2,000,000 DED I X1 RETENTION $ 10,000 $ WORKERS COMPENSATION X1 STER EORH AND EMPLOYERS'LIABILITY Y/N 500,000 ANY PROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $ D OFFICER/MEMBER EXCLUDED? N/A UB-7J070308 10/03/2025 10/03/2026 (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 500,000 If yes,describe under 500,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) Certificate holder is an additional insured with respect to general liability&auto liability when required by written contract.Endorsements available upon request. t Monroe County,On Call Professional Engineering Contract,KCA#1250214.00 T BY_- 'Jkl CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,NOTICE WILL BE DELIVERED IN Monroe County ACCORDANCE WITH THE POLICY PROVISIONS. 1100 Simonton Street AUTHORIZED REPRESENTATIVE Key West FL 33040 ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD Additional Named Insureds Other Named Insureds Campo & Associates, PLLC Doing Business As Campo & Associtates LLC Campo & Associtates, PLLC KCCS, Inc. OFAPPINF(02/2007) COPYRIGHT 2007,AMS SERVICES INC ADDITIONAL COVERAGES Ref# Description Coverage Code Form No. Edition Date Employee Benefits AGG Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium 2,000,000 Ref# Description Coverage Code Form No. Edition Date Rental Reinbursement Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date PIP-Basic PIP Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Statutory Ref# Description Coverage Code Form No. Edition Date Medical payments MEDPM Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium 5,000 Ref# Description Coverage Code Form No. Edition Date Underinsured motorist combined single limit UNCSL Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium 1,000,000 Ref# Description Coverage Code Form No. Edition Date Experience Mod Factor 1 EXP01 Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date Increased employer's liability INEL Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium Ref# Description Coverage Code Form No. Edition Date Limit 1 Limit 2 Limit 3 Deductible Amount Deductible Type Premium rOFADTLCV Copyright 2001,AMS Services,Inc.