HomeMy WebLinkAbout7th Change Order 06/05/2026 PROJECT TITLE: Taxiway A Extension and Mitigation CHANGE ORDER NO: 7 INITIATION DATE: O5/22/2O2G TO CONTRACTOR: Charley Toppino& Sons CONTRACT DATE: 11/170O2i The Contract is changed asfollows: The original Contract Sum ... ........... ....................'.. ................ .......'..$7.310.999.66 Net change by previously authorized Change Order ...... .......... ....... .......------�$8A8.i5G75 The Contract Sum prior tothis Change order waa---------------'---.$8.109.156.41 The Contract Sum is increased by this Change Order.... —.......................... --- ......1@.43O.24 The Revised Contract Sum including this Change Order ...------- ........ ----18.117.588fB Change Order No. 7 is issued to incorporate additional costs associated with asbestos abatement identified after execution of Change Order No. 5. At the time of Change Order No. 5, asbestos testing had not yet been completed; thenafora, provisions were included allowing for a future adjustment should asbestos-containing mabahe|s (ACM) be confirmed. Subsequent testing results confirmed the presence of asbestos within the project area, See attached for detailed findings from the Contractor. In accordance with these findings, the Contractor obtained a proposal from a licensed environmental subcontractor for the removal and proper disposal of identified ACM, including approximately 300 square feet of asbestos-containing floor tile. This Change Order includes the Contractor's costs for asbestos abetement, associated overhead and profit, and related project costs as supported by the submitted and reviewed quotations, totaling $8,430.24. This adjustment is necessary to address unforeseen hazardous materials encountered during the work and to ensure compliance with applicable environmental regulations and project requirements. Net change to contract Change Order 7: $8.430.24 This Change Order 7 does not increase contract time. Contractor agrees to accept the increase in monetary compensation and hereby waives and na|aames any and all claims for any additional compensation related tothese bid items. This Change Order 7 represents ¢.116896 mf the original contract price. Not valid until approved by Owner,Architect(if applicable), and Contractor Robeft B. Aydin,P.E. CONTRACTOR iP (e7zbl� V e -pe at AIRPORTS DIRECTOR QQZ3�,21026 Digitally signed by Christine D,6te yHurley COUNTY/ASSISTANT ADMINISTRATOR n�F Date ONROE COUNTY ATTORNEY Change Order Attachment per Ordinance No. 004-1999 • Change Order was not included in the original contract specifications. Yes ❑ No If Yes, explanation: • Change Order was included in the original specifications. Yes ❑ No If Yes, explanation of increase in price: • Change Order exceeds $100,000 or 5%of contract price (whichever is greater). Yes ❑ No If Yes, explanation as to why it is not subject for a calling for bids: • Project engineer/architect approves the change order. Yes ® No ❑ If No, explanation of why: • Change Order is correcting an error or omission in design document. Yes ❑No Should a claim under the applicable professional liability policy be made? Yes ❑ No Explain: qm Change Order Attention: Jacobs DATE: 5/14/26 200 W.Forsyth St Suite 1520 Jacksonville,FL 32202 ITEMIZED QUANTITIES Location: 3491 S Roosevelt Blvd,Key West FL 33040 Scope: KWIA Taxiway A Extension and Mitigation-Demolition-Asbestos Abatement Item Description Quantity Units Cost per Unit Line Item Cast Notes 1 Asbestos Abatement 1.0 LS $ 7 527.00 $ 7 527.00 Subtotal $ 7,527.00 2 Overhead and Profit 10% 1.0 LS $ 752.70 $ 752.70 3 Performance/Payment Bonds $20.00/Thousand 1.0 ITS $ 150.54 $ 150.54 4 Mobilization/Demobilization 1.0 LS 5 General Conditions 1.0 ITS Total: $ 8,430.24 Notes: Exclusions: Prepared by: w.aaw Estimator !Charley Toppino&Sons,Inc. Sheet 1 of 1 Date: 5114/26 Signature: Date: Simpson ENVIRONMENTAL Services,LLC. ENVIRONMENTAL NFRASTRIJI07",LME SOiWTIO COMPANY 1 i r 1111 I 1 r, r� I r / W , / �r l r a 1J � n ,, v170�i�;.,,„•ti � /F '�d^iNv�ilt°E�'d'd60�. I A r ,r MIA i elm r�- G d Revised20260204 � � 1114/1 F" Simpson = is S ENVIRONMENTAL SOLUTIONS AN EIS COMPANY Quote Proposal Submitted to Owner Quote Number: Company: Charles Toppino and Sons, Inc. TRI0004187 Attn: Loreta Alvarez-Fraga, Project Coordinator Project Short Name: Address: 129 Toppino Industrial Drive, Key West, FL 33040 Toppino @ Key West International Airport Phone: 305.296.5606 Date: Email: LoretaF@charleyToppino.com 5/12/2026 PROJECT: Key West International Airport Abandoned Structure#1 PROPOSED SCOPE OF WORK: Simpson Environmental Services, LLC dba EIS—Environmental Infrastructure Solutions ("EIS") hereby proposes to: Remove and dispose of a total of approximately 300 square feet of asbestos-containing floor tile located in the office area of shed#1. NOTES TO THE SCOPE OF WORK—This Proposal is subject to and provided based upon the following assumptions: 1. This proposal is based on the premise Charley Toppino and Son, Inc. (Toppino)will provide all necessary water and power for the project. 2. Simpson's proposal is based on completing the work in one mobilization. 3. Simpson's offer does not include any provisions for any Davis Bacon, Florida Prevailing wages, or overtime. 4. This proposal is for the removal of accessible ACM only. Simpson's proposal does not include any demolition or disassembly which may be necessary to gain access to ACM that is trapped, concealed, or otherwise inaccessible. 5. This offer is based on the premise that the structure is sound and does not pose a safety hazard to Simpson employees. 6. This proposal is provided on the premise that the structure is to be demolished following completion of the abatement work, therefore, Simpson's proposal does not include any protection, temporarily or otherwise, of the building or its contents following removal of the ACM. 7. Simpson's offer is based on being provided access to park both a truck and trailer proximal to the structure. Proposal#: TRIQ004187 Project:Toppino @ Key West International Airport Page 2 of 6 SIMPSONENV.COM �Disaster 1114/1 = is S ENVIRONMENTAL SOLUTIONS AN EIS COMPANY Quote 8. With regards to the movable objects, Simpson's proposal includes provisions for miscellaneous trash to be relocated but does not include disposal. 9. Simpson will utilize the most expedient method of tile method without regards to the structured based on the premise that it is schedule for demolition upon completion of the work. 10. Simpson's offer does not include any weather or security protection. 11. Simpson's proposal includes air monitoring for contractor's OSHA compliance only. Toppino shall be responsible for all other air monitoring. Toppino's air monitor/consultant shall provide Simpson with copies of all air monitoring data generated on this project at no additional charge to Simpson. 12. Simpson will dispose of all ACM waste generated on this project at a landfill authorized to accept asbestos wastes; Owner will receive a waste manifest(within a few weeks of the projects' completion)to evidence the proper disposal of the ACM generated on this project. 13. All asbestos work will be completed using all federal, state, local regulations as well as Simpson's standard operating procedures. EXCLUSIONS—This Proposal is subject to and provided based upon the following exclusions: 1. Daily air monitoring and final clearances. 2. Badging and Airport Security Check 3. Performing this work under a specification DOCUMENTS INCORPORATED BY REFERENCE, if any: NESHAP Pre-Demolition Survey performed by Gallagher Bassett(GBTS Project:26007-0050)and dated May 8, 2026, PROPOSED DURATION OF WORK: Simpson anticipates a complete project duration of approximately two working days. CONTRACT PRICE—"EIS" proposes to provide the above-described Scope of Work for the sum of: $7,527.00 UNIT PRICES—"EIS"offers unit rates to cover any additional materials found during the abatement process: N/A See next page for Terms and Signatures. Proposal#: TRIQ004187 Project:Toppino @ Key West International Airport Page 3 of 6 SIMPSONENV.Com �Disaster 1114/1 F" Simpson = is S ENVIRONMENTAL ENVURONMENTAL F services,LLC. SOLUTIONS AN EIS COMPANY Quote Additional Terms Unless noted otherwise above,the following items apply:"EIS",the Contractor,proposes to provide supplies,materials,equipment,documentation,environmental insurance, labor, supervision, and disposal to complete this project. State notification fees are excluded for this proposal, as well as third party consulting fees. The contractor requires the following to be provided by the Owner or Client:access,electricity,water,third party consulting services,location for equipment/supply storage/trailer, and parking,as needed. Bonds and applicable sales and use taxes are not included in pricing, unless specifically noted above. Performance and Payment Bonds can be added at a rate of 2.5%.A mobilization fee equal to 10%of the total contract value will be invoiced at project start to cover initial project setup, materials,staffing, and logistics.All invoices issued under this agreement, including mobilization, progress, and final invoices, are subject to the payment terms stated herein.Payment is due thirty(30)days from submission of invoice.If payment is not received in full within thirty(30)days of the due date,Contractor reserves the right to file a Mechanic's Lien or any other legal claim against the property, in accordance with state lien laws.In the event payment is not made as required herein,the Contractor is entitled to recover all costs of collection, including, but not limited to, reasonable attorney fees.The obligation of payment to the Contractor is independent of the Prime/Owner payment to the Client.The Client remains responsible for full payment within the agreed upon terms regardless of any delay or non-payment from the Prime/Owner.A 3%processing fee will apply to credit card payments.The Client and Contractor may agree to changes in the Scope of Work.Any modifications to the Scope of Work must be approved in writing by both Parties.Any alterations or deviation from the above specifications involving extra costs will be executed only upon written orders and will become an extra charge over and above the estimate. Any claim for damages or back charges, including but not limited to those arising from alleged delays, defects, or deficiencies in performance, must be submitted to the Contractor in writing within five(5)business days of the occurrence giving rise to the claim. Failure to provide written notice within this period shall constitute a waiver of such claims.No back charges shall be accepted without prior written approval from the Contractor.Any retainage will be paid within thirty(30)days of completion of the Scope of Work as defined above. Owner must carry fire, tornado, or other necessary loss insurance. The Contractor is not the generator of waste—Owner is the generator of waste and hereby gives the Contractor authority to sign waste disposal documents on Owner's behalf. Owner also gives the Contractor the authority to sign asbestos/renovation/demolition notifications on behalf of the owner.To the extent this proposal is incorporated by reference into or conflicts with other project or contract documents,this agreement will take precedence. This Proposal shall be incorporated into any final agreement signed by the parties in furtherance of performing the work contemplated herein. If any provision of the final agreement entered into by the parties conflicts with any provision set forth in this Proposal,the provision of this Proposal shall control and prevail. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------ Authorization Acceptance of Proposal (Owner/Client): Submitted by Simpson Environmental Services, LLC dba The above terms and conditions are satisfactory and hereby EIS—Environmental Infrastructure Solutions accepted. "EIS" is authorized to do the work as described. Payment Printed Name:Angel Luis Magobet will be made as specified above. Please sign and return via email. Title: Operations Manager Authorized Signature: Phone:954-826-9185 Printed Name: Address:Simpson Environmental Services, LLC Title: 8607 Gall Boulevard,Zephyrhills, FL 33541 Date: Robert B.Aydin, D,A1y11gn dbyk.bm1B Ayd,,,PE BN:<n R-11B.Aydln,PE,c US Authorized Signature: P.E. Da 2o2185e2143143- W NOTE:This proposal will be deemed withdrawn by"EIS"if not accepted within thirty(30)days. Proposal#: TRI0004187 Project: Page 4 of 6 ■ ■ J 4- 6_ CAPABILITIES STATEMENT E N h lJ R P I r,,J M E J I� I f ir,�.... INFRASTRUCTURE SOLUTIONS � ' � At the EIS Family of Companies, we understand the critical difference between serving customers and providing exceptional customer service. As a leader in -FURNK Y ENWONMENTAL turnkey Environmental Consulting & Compliance, Surface & Subsurface, and C . N UUT'IN , B _F EINT, Facilities & infrastructure Solutions we are committed to going beyond expectations. YOU can trust us to listen to your concerns, respond promptly to REME I d , & your requests„ stay true to our promises, and address your d4lenges with DEMOLITION SOLU"HONS integrity and honesty. Our dedication to accountability and excellence is reflected in the positive feedback we consistently receive through outstanding customer service surveys,which reinforce the quality and reliability of our work. THE EIS FAMILY OF COMPANIES a J ,y L_l. _ o xwra trn�rvi �ou ha5u�r s�3ak" nodh A ] 1PR ,6111 .-Ny rm- ^� Mi rk 25,11E.JnlvorslRyD 331LJC)VVLst44R,hAve 4028 Dale;yAve 19()'IS.r,t 1117hvr97705 NorthrshnrpPI 8309A13hemickCOLK N cicNiix,AZ 85a34 4AdPreot Ridgr,CC)BOC133 Font Werth,TX701'80 Des Mvi IE"s,IA 50316 Nnithi l ittle Fork,A9 72'1'13 jcswjp,PAD 26794 Fi V2.)2reJ 196C) (30 3)413 6E179 ., L817).9 l-I o796 (515)264 04 01 C6'33)353-26L16 (!3 I 11 i2f3-f9r,"6C) '�"�'1 f lu(e)rri�Pt(peflrly; 7r , ft'Enl 595 0790, 4 .F A @I5 LICENSED STATES AACh OFFICE LOCATIONS ' ' cis a,I:, I I SERVICES AET &A0AIM rr r� r gs $, ENG IRONMEhTAL HT OFFICE LOCATIONS (VC)I50lhAve 1301svlarlaRl"d Rd 3°J/Gall Boulevard 12: 7'T aN'N• .EJR6FC3 I� s..t„�,.... Ca°,urimerro C rty,CC 80022 h3uilclu'u3 2,au4c 2550 Alhaaroy,GA 31701 Zr:phyrNfls,FL 33541 Pompano Bpi-h,!'"L 33069 (303)991 1280 We�,lake,IX7E262 (800)989a298 (352)583,2509 (95,1)202-9226 888)347-3060 WHERE WE ARE ARIZONA FLORIDA GEORGIAr TENNESSEE JacksonvillePhoem + DC Nashville ARKANSAS Miami Atlanta NORTH CAROLINA TEXAS Bentonvdle Orlando IOWA Charlotte Dal as Little Rock Pensacola D Pompano Beach Houston COLORADO Tallahassee LOUISIANA OKLAHOMA BatonDenver Tampa r Oklahoma NATIONWIDE SERVICES SOLUTIONS CONSUIL,TNG & COMPLllANCE FACIUNTMS & NNFRASTRUCIP`�,,JRE ° Phase N| Environmental Site Assessments ° Asbestos Abatement ° Environmental ComplianceAudits ° Lead Abatement ° Pollution Liability insurance Assistance - k»o|dRemediaiion ° Brownfield Redevelopment Support = Structural Demolition ° Comprehensive Due Diligence Services ° Selective&Interior Demolition ° StormwaterManagemeni/NPDES = Chemical&Biological Decontamination ° Spi|| Prevention Control&[buntermeasures ~ Air Duct Cleaning (5PC[)Response Plans ° Indoor Ali-Quality Services ^ Remedial Design Services ~ Bridge Painting&Overcoat Systems ° Environmental Permitting ° industrial Facility Painting ° Air Permitting&Compliance ~ Surface Cleaning&Restoration ° Monthly/Annual Compliance Inspections ° Above/Underground Storage Tank(AST/UQ) ° State Reimbursement P^ogmmSupport Construction Services " Tank Cleaning Services Waste ree r[h de i o /�� \ �������� �� ��������������� ° za on anagemen ° Dewa(ering ° Sail and Rmon6wnherAssessments/5amp|ing ° 4ir/SoiyVVak*rSamp|iny ° Fuel Quality Sampling&yma|ysis ~ PFA3 Sampling, Remediation,and Disposal ° Fuel Cleaning/Restoration Services ° Above/Underg round Storage Tank(A � ° Disa�erResponse&5uppo��T/D� Closure Assessment ° Remedial System Construction ° Remedial System Operation&Maintenance �Uvl WAX Cl ° Mobile Remedia|Trailer Rentals ° Soi| Source Removal Qualified NmVW k|m32 States ° Environmental Drilling • |n-Siiu Injection Remediaiion 2024l of 0.82 ° Vac Truck Services ~ Emergency Response 1200+Employees Across AWBrands 50,000*Projects,Completed Contact'Us Today for All Your Environmental NA|CS Codes: Service Solutions. 2 38320~238910,238912,2389901, �~ (888)3473060 onacs�� C � tU BSH o|di"go�oom 541620� � � ����������Vl°� 2219 562910,562998 IMEmergency Line: (888)347-6690