Loading...
Resolution 011-1965 ~ RESOLUTION NO. 11-1965 SECONDARY ROADS ~ WHEREAS, the Board of County Commissioners of Monroe County, Florida desires to issue bonds, payable out of Monroe County, Florida Secondary Road Funds, to finance the construction of secondary road pro- jects in said County, and this Resolution is an expression of said desire and said Boardts intention, and WHEREAS, said Board deems it in the best interests of the citizens of said County and for the public welfare and convenience of said citbens, to issue said bonds to construct said projects, and WHEREAS, said Board, by Resolution No. 7-1965, Secondary Roads, dated March 23rd, 1965, previously requested the State Road Department to issue said bonds in accordance with attached schedule furnished by said State Road Department, and WHEREAS, said Board now desires to request the State Road Depart- ment to approve the list of projects, their priorities and estimated cost, as shown on the attached list, and to request said State Road Department to prepare the initiating Resolution for adoption by said Board, now, therdore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY J FLORIDA, that the Stat.e Road Department be, and it is hereby requested to approve the list of projects, their priorities and estimated cost, as shown on the attached list of Monroe County Secondary Gas Tax Bond Issue Projects, and to prepare the initiating Resolution for adoption by said Board of County Commissioners. BE IT FURTHER RESOLVED BY SAID BOARD that the Clerk of said Board be, and he is hereby authorized to forward certified copies of this Resolution to the State Road Department for appropriate action. Dated May 4th, 1965. MONROE COUNTY SECONDAR Y GAS TAX BOND ISSUE PROJECTS Prior- ity Estimated Cost Location - Description Length Miles. 2 3 4 5 5 6 6 7 7 7 7 7 County-wide r/w Acquisition 1 Duck Key - All streets in Duck Key (5-82) and new bridge from Duck Key to U. S. 1 (Presently in Secondary Budget for preliminary engineering) 9.0 Key West - Resurface Streets: 2.53 Elizabeth Street from Angela to Truman Windsor Lane from Angela to Truman Eisenhower Drive from Palm Avenue to Truman George Street from Flagler Ave. to N. Roosevelt Blvd. First St. from Flagler Ave. to N. Roosevelt Blvd. Fourth St. from Roosevelt Blvd. to Patterson McMillan Drive from Roosevelt Blvd. to Flagler Seventh St. from Roosevelt Blvd. to Flagler Key West - Resurface Eaton Street from Whitehead St. to Palm Avenue and rebuild Palm Ave. inc1uding drainage and sidewalks 1. 1 Stock Island - Rebuild McDonald Avenue from Old 4-A to Peninsula Avenue including drainage, curbs and sidewalks 1.16 Big Torch Key - New Road from Middle Torch Key, west to Big Torch Key, then north to and through Rainbow B~ach Subdivision (Previously in Secondary Budget for preliminary engineering) 5.5 Little Torch Key - Pirates Road, La Grande Road, Black Beard Road and LaFitte Road in Jolly Roger Estates (5 -34) - New construction 2.21 Spanish Harbor - Boat Ramp, AccesS Road, Park, fill to come from 40r x 5' channel connecting-Bogie Chan- nel to Big Spanish Channel (Presently in S.condary Budget for preliminary engineering) No Name Key - -Rebuild Old 4-A 1.5 Big Pine Key - Bridge to No Name Key (Presently in Secondary Budget for preliminary engineel'ing) 0.4 Big Pine Key - Build new road from SR 5 north to Palm Villa Subdivision to Old 4-A {PrevIously in Secondary Budget 64/65} Big Pine Key - Rebuild Tarpon St. in Sea ~ew {1-94} 1.6 0.44 Big Pine Key - Sunrise Drive, Prince Roa~ Hardin Road, Flamingo Lane, Heron Lane, Fal:on La~e, Killdeer Lane, Warbler Lane, Eagle Lae, J1~~k' ........., Lane and Egret Lane Big Pine Key - Roads in EdenPirtes SllbdlVBion (Presently in SecondaJ;yBudgl';l.tior prel~inary engineering) 1.1 2.05 -1- " $235,000 $645,000 $ 55,000 $ 85,000 $200,000 $475,000 $100,000 $ 90, 000 $ 75,000 $690,000 $ 68,000 $ 18,000 I $ 50,000 $ 75,000 Prior- ity Location - Description 8 8 8 8 8 8 8 8 8 8 8 Length Miles 8 Marathon - Low level slab bridge across Vaca Channel No. 1 and Vaca Channel No.2, Royal Palm Drive, Little Venice Sub. No.2 (3-26) (Presently in Secondary Budget for preliminary engineering) 8 Marathon - Road and low level slab bridge at Clark Avenue (25th Street) Harbor Isles Section "A" O. 13 8 Marathon - Low level slab bridge across canal at Reef Drive, Little Venice Sub. No.2 (3-26) 8 Marathon - Rebuild Sailfish Boulevard, Sawfish Boulevard and Reef Drive, Little Venice Sub. (3-7, 3-26) 0.39 8 Marathon - Rebuild 33rd Street and pave parking lot and boat ramp at Chamber of Commerce 0.18 8 Marathon - Rebuild 1st Street (41st Street), 2nd Street (39th Street) and Louisa Street in Marathon Beach Sub. (2 -16, 2 - 2 1 ) O. 74 8 Marathon - Rebuild Old 4-A between 33rd St. & 35th St. 0.15 Marathon - Rebuild Airport Boulevard from SR 5 N. & E. to Key Colony Drive in Key Colony Sub. (4-23) 1.91 Key Colony Beach - 1st St., Rullman Ave., Shepard Blvd. and Foster Blvd. in Key Colony Beach (4-11, 4-94, 3-120) - New construction 1. IS Marathon - Rebuild Vaca Road (50th St.) in Vaca Village Sub. (2-106) 0.23 Marathon - Rebuild Days Ave. (64th St. in Days Sub. (3-15) 0.19 Marathon - Rebuild Marlin Drive and Shark Drive in North Marathon Shores (3-30) 0.34 Marathon - Rebuild, including drainage, Lynmead Blvd. in Maramead Sub. (3-134) 0.34 Grassy Key - Peachtree Avenue, Tropical Avenue and Ferreire St. from Guava Avenue to Peachtree Avenue in Craints Sub. (1-51) - New construction 1. 13 Marathon - Rebuild Oleander Drive and Shark Street in Stirrup Key Bight Sub. (3-168) Marathon - Rebuild Old 4-A (11th St. ) from SR 5 to Old Ferry Landing Marathon - Rebuild Sea Crest Avenue (92nd St. ) in Sea Crest Heights (3-60) Marathon - Rebuild Palmette Avenue (69th St.), Sea Crest 1st Addn. (3-19) 0.14 0.12 0.12 0.24 -2- Estimated Cost $ 70,000 $ 40,000 $ 33,000 $ 17,500 $ 13,500 $ 35,000 $ 3,000 $ 90,000 $ 50,000 $ 10,000 $ 9,000 $ -1.5, 000 $ 15,000 $105,000 $ 7,000 $ 5,000 $ 5,000 $ 10,000 Prior - ity 8 8 8 8 8 8 8 8 9 9 9 9 9 9 9 Location - De scription Length Miles 8 Marathon - Rebuild unnamed road connecting to S-931 in SW 1/4, Sec. 15-66-32 0.27 8 Marathon - Rebuild Brian Road, Charles Road, Robert Road in Key Colony Sub. No. 2 (3 -152) 0.27 8 Marathon - Rebuild Virginia Road, Brian Road and Robert Road in Key Colony Sub. No.4 (4-23) 0.42 8 Marathon - Resurface Marathon Avenue (30th St.) in Sombrero Sub. (2-93) 0.23 Marathon - Resurface Loggerhead Lane in Crane Hammock Sub. (3-51) 0.09 Shelter Key - Resurface Yacht Harbor Drive in Eber- harter Sub. (3-128) 0.13 Grassy Key - Rebuild Morton Street, Bailey Street, Gibson Street, Goodley Street, Dennison Street and Parrish Drive in Sunset Bay Sub. (5-46) 0.87 Marathon - Rebuild Lime Lane (94th St. ) 0.19 Marathon - Rebuild Buttonwood Lane in Buttonwood Acres (4-160) 0.18 Marathon - Avenida Primavera, Calzada de Bougain- villea, Calle Ensenada, Camino Vinentos to Bulevar de Palmas and Bulevar de palmas in Waloriss Sub. (3-113) 1. 37 Grassy Key - Rebuild Dorsett Drive in Dorsett Sub. (2-153) 0.16 Grassy Key - Kyle Blvd. extension to SR 5 (previously in Secondary Budget 64/65) 0.4 Plantation Key - Ocean Drive in Tropical Atlantic Shores 1st Addn. (5-31) - New construction 0.38 Plantation Key - Bessie Road, Cidy Road, Sonny Road, Johnny Road and Elba Road in Boatmen1s Colony (3-90); New construction 0.47 Plantation Key - Rebuild extension of Coconut Palm Blvd. , Bougainvillea Street, Jasmine Street, Hibiscus Street and extension of Azalea Street in Plantation Key Colony (3-182, 4-4, 4-64, 5-16) 1.67 Plantation Key - Rebuild Fountain Drive and Riviera Drive in Fountain Lake Estates (5 -8) 0.41 Islamorada - Rebuild Maderia Road in StrattonJs Sub. (2-38) O. 38 lslamorada - Rebuild North and South Hammock Road in The Hammock Sub. (3-50} 0.33 Islamorada - Unnamed road on west side of ball diamond north of SR 5 in Bernard Russell Development - New construction 0.16 -3- Estimated Cost $ 12,500 $ 12,500 $ 19,000 $ 5,000 $ 2,000 $ 2,000 $ 40,000 $ 8,500 $ 8,000 $ 60,000 $ 7,000 $ 30,000 $ 16,000 $ 30,000 $ 69,000 $ 17,000 $ 15,500 $ 14,000 $ 7,000 Prior - ity Estimated Cost 9 9 9 9 9 9 9 9 9 9 9 9 9 9 Location - Description Length Miles 9 Plantation Key - Rebuild Ridge Road in Plantation Ridge (3-43) 0.30 9 Plantation Key - Rebuild Royal Lane, Coconut Lane and Orange Lane in Plantation Beach (2-76) 0.54 9 Plantation Key - Rebuild Apache Street, Navajo Street, Pueblo Street, Sioux Street, Mohawk Street and Te- questa Street in Indian Harbor (3-178) and lndian Waterways (4-29) 1. 87 9 Plantation Key - Rebuild Plantation Drive and Harbor Drive in Tropical Atlantic Shores (4-97) 0.68 Islamorada - Resurface Matecumbe Avenue, Jerome Avenue, Palm Avenue and rebuild Bay Street and Gulf Street in Grove Park (I-ll1 L 0.61 Islamorada - Resurface Beach Road, Preston Street and Catherine Street in Matecumbe Beach (1-153) 0.62 Lower Matecumbe - Resurface Sandy Cove Avenue and rebuild Sapodilla Drive in Matecumbe Sandy Beach (3-127)..,0.46 Plantation Key - Plantation Avenue and Sunshine Blvd. in Sunshine Estates (4-63, 5-28) - New Construction 0.57 Plantation Key - Rebuild Coral Avenue in Edenaire (4-32) 0.38 Plantation Key - Rebuild Gumbo Limbo Road and Bay Road in Bayridge (3-23) 0.50 Plantation Key - Woods Avenue in Lake Harbor (4-84) New construction O. 34 Lower Matecumbe - Cortez Drive and Columbus Drive in Matecnrnbe Ocean View (4-102) - New construction 0.63 Tavernier - Rebuild Broadway and extend Ocean Blvd. to SR 5 in Largo Beach 0.35 Tavernier - Rebuild Lowe Street and Ocean Avenue in Tavernier Beach (1-201) 0.37 Tavernier - North Sunrise Drive in Sngleton's Addition to Tavernier Cove (1-135) - New construction 0.22 Tavernier - Rebuild Tavern Drive, Atlantic Circle Drive, Ocean Trail and Tarpon Street in Tavernier No.2 (2-8) 0.50 Tavernier - Rebuild Tavernier Street, Florida Avenue, Georgia Street and Marine Avenue in Tavernier (1-105) and Barton's Addn. (2-82) 0.63 Tavernier - Rebuild Dickie Way and Point View Road in Tavernier Harbor Heights (2-36) 0.38 -4- $ 12,500 $ 22,000 $ 77,000 $ 28,000 $ 19,000 $ 12,000 $ 18,500 $ 24,000 $ 16, 000 $ 21,000 $ 30,000 $ 25,000 $ 15,000 $ 16,000 $ 10,000 $ 20,000 $ 25,000 $ 16,000 Prior - ity 9 9 9 9 9 9 9 9 9 9 9 9 9 Location - Description L engt h Miles 9 Tavernier - Extend Harbor View Drive to SR 5 in Tavernier Park (3-169) 0.1 9 Tavernier - Rebuild unnamed road separating Tavernier Bend (2-74) and Bohnert Sub. (2-102) 0.18 9 Key Largo - Park Avenue, 2nd St., Dove Lake Drive, East Beach Road, Caribbean Avenue in Ocean Park Village (4-14) and Harris Ocean Park - New construction 1.0 9 Key Largo - Rebuild Seaside Avenue, Lime Street and Coconut Drive in Seaside (1-97, 2-10, 3-59) 0.5 9 Key Largo - Grouper, Bonito, Lobster and Snapper Lanes in Sunrise Point (3-11, 4-41) - New construction 0.89 Key Largo - Dove Road, Heron Road and Mocking Bird Road in Lime Grove Estates (5 -54) - New construction 0.6 Key Largo - Rebuild East 1st Street and resurface 1st and 2nd Avenues and ,East 2nd Street in Mandalay (1-194) 0.53 Key Largo - Jean LaFitte Drive, Jolly Roger Drive, Anne Bonny Drive and Long Ben Drive in First Addn. to Pirate'a Cove (3 -87) - New construction 0.77 Key Largo - Rebuild unnamed road in Point Pleasant (2-23) 0.24 Key Largo - Rebuild Estall, Grand and Almay Streets in Rock Harbor Estates (3-187) 0.41 Key Largo - Bay Drive in Buttonwood Shores Addn. (3-52), Lazy Lagoon (2-126) - New construction 0.2 Key Largo - E. Shore Drive in Buttonwood Shores (3-3) New construction 0.33 Key Largo - Oleander Drive, Holiday Blvd. in Holiday Homesites (2-168) - New construction 0.31 Key Largo - Jenny Lane in Largo Gardens (4-38) - New construction 0.3 Key Largo - Road and Bridge across Newport Bay to island - extension of La Paloma Drive - New construc- tion 0.5 Key Largo - Gibralter Road, Ponce de Leon Blvd. , Tamarind Road (Ponce de Leon to Mahogany Drive) in Bahia Mar Estates (4-79) and Pamela Villa (3-125) New construction 0.66 North Key Largo - Rainbow and Atlantic Drives in Knowl- son Colony, First Addn. (3-110) - New construction 0.54 Key Largo - Snapper Lane in Largo Sound Park (3-111) New construction 0.4 -5- Estimated Cost $ 5,000 $ 7,500 $ 41,000 $ 21,000 $ 36,500 $ 25,000 $ 9,000 $ 31,500 $ 10,000 $ 17,000 $ 8,000 $ 13,500 $ -13,000 $ 12,500 $ 90,000 $ 27,500 $ 22,500 $ 16,500 Prior- itv Location - Description Length Miles 9 9 9 9 10 11 11 11 11 12 13 13 14 15 16 Key Largo - Rebuild Loquat Drive and Atlantic Blvd. from Loquat Drive to Garden Cove Drive in Key Largo City Sub. (1-176, 1-157, 1-195) Long Key - Layton Drive, Sands Lane, Primrose Lane, Buttonwood Avenue, Zane Grey Creek Drive and Long Key Lake Drive in Long Key Estates (3-103, 3-104) City of Layton (Previously in Secondary Budget 64/65) 1.0 Lower Matecumbe - Roads in White Marlin Beach Sub. (Previously in Secondary Budget 64/65) 1.6 North Key Largo - Road from ocean to bay across section 22, 23 and 24, T59S, R40E - New construction 3.0 Key West - Parking facility including public restrooms and bulkhead along N. Roosevelt Blvd. at Garrison Bight Sugarloaf Key - State Road S-939A E. & N. to SR 5 (Previously in Secondary Budget 64/65) 4.1 Sugarloaf Key - Road in Sec. 12, Twp. 67S, Rge 27E including canal from Sugarloaf Sound to ocean with bridge over canal at S-939A 2.9 Sugarloaf Key - Rebuild Canal Road in Perez Sub. (3-147) 1.0 Sugarloaf Key - Rebuild Crane Road from U. S. 1 to its present terminus and than extend as new construction NWtly to bay 3.29 Indian Key Fill - Bridge and causeway from SR 5 to Lignumvitae Key 1. 1 Saddlebunch Key - Rebuild Old 4-A from Sugarloaf Creek to W. for 1 mile including bridge over Sugarloaf Creek 1.0 Cudjoe Key - Roads in Cudjoe Gardens )Previously in Secondary Budget 64/65) 1. 3 Summerland Key - Build new road from Northside Drive {Snug Harbor Sub.} to north to tip of island 1.7 Ramrod Key - Road and Bridge (Presently in Secondary Budget for preliminary engineering) 3.15 Key West - Bulkhead fill on Roosevelt Blvd. from Key Wester to Boat Docks {Previously in Secondary Budget 64/65} -6- Estimated Cost $ 18,000 $ 35,000 $ 65,000 $400,000 $250,000 $110,000 $245,000 $ 26,000 $265,000 $520,000 $100,000 $ 55,000 $120,000 $408,000 $300,000