Resolution 008-1966
RESOLUTION NO. 8-1966-SECONDARY ROADS
STATE OF FLORIDA
COUNTY RESOLUTION ON USE
of
80% SEVENTIl CENT GAS TAX
and
OTHER SECONDARY ROAD FUNDS
YEAR
1966
COUNTY
Monroe
WHEREAS, under Section 208.44 Florida Statutes, known as the
"Secondary Road Assistance Act of 1949" and Section 339.08 Florida Statutes,
the State Road Department will receive 80% of the proceeds of this county's
pro-rata share of the Seventh Cent gasoline tax, to be used as prescribed by
regulations of the said Department within this County, as requested by resolu-
tion of this Board of County Commissioners and approved by the Department for
one or more of the following purposes: Construction, reconstruction, main-
tenance and repair of State roads and bridges, the lease or purchase of bridges
connecting State roads, the acquisition of rights of way for State roads, and
the reduction of road and bridge indebtedness; and
WHEREAS, The State Road Department has requested this County Board
to recommend the purpose for which, and the roads on which, this County's 80%
surplus gas tax and Federal Aid Secondary allocations should be spent for
construction and improvement; and
WHEREAS, the State Road Department requires this information so that
it may be considered in the preparation of the Annual Budget of the State Road
Department; and
WHEREAS, this Board conferred with the State Road Department con-
cerning the projects to be selected and the specifications with respect thereto,
NOW THEREFORE, BE IT RESOLVED THAT the State Road Department is hereby
requested to use such funds for construction (including rights of way acquisition:
surveys, plans maintenance, etc.) of the following roads:
No.
I
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
DESCRIPTION OF PROJECT OR USE OF SECONDARY ROAD FUNDS POR 196 6
Location
Ramrod Key
Key Lar go
Cros s Key
Stock Island
Crawl Key
Raccoon Key
Key West
Key West
Cudjoe Key
Raccoon Key
Middle Torch
Sugarloaf
Cros s Key
Big Coppitt
Key West
Key Largo
Summerland
Key West
Description
Coral Ave., Bay Shore Dr., Mako
Ave., Old S. R. 4-A
Ocean Bay Dr. & Seagate Blvd.
Extend Job #90506-3601 to water
Extension of Cross Street
Extension to Banana Blvd.
Key Haven Rd. Extension & pave
Beechwood Dr., Bougainvilla Ave. ,
Birchwood Dr. & Bamboo Tr.
Flagler Ave. - Landscaping
Sidewalks - Duval St.
Extend Job #90600-3604 to Gopher
Key
Thru Marathon & Islamorada - R/W
Roads in Key Haven 7th & 8th Addns.
(P. B. 5 pgs. 53 & 61) Cypress Ave.,
Cactus Dr., Coconut Dr., Cypress
Terr., W. Cypress Terr., cul-de-
sacs off of Key Haven Rd. (including
sidewalks)
Pieces of Eight Rd. in Buccaneer
Beach Estates (F. B. 5, pg. 78)
Roads in Indian Mound Estates
(F. B. 4, pg. 132) Seminole,
Caloosa & Tequesta Sts.
Water Main crossing at Manatee
Camp, including deceleration lane
Rebuild F Ave. :from 4th St. to Barce-
lona Dr., and Barcelona Dr. ; Resur-
face Fuerta Dr. in Coppitt Sub. (F.
B. 4, pg. 50) & Gulfrest Fark (F. B.
4, pgs. 119, 157)
Resurface Riviera Dr. in Riviera
Shores (P. B. 3, pg. 48), Const.
(including sidewalks) Trinidad Dr.
& Airport Blvd. in Riviera Shores
lstAddn. (P.B. 5, pg. 85)
Roads in Gulfstream Shores (F. B.
3, pg. 61)
Katherine St. from W. Shore Dr.
to 45th St. in Summerland Estates
(P. B. 3, pg. 158, F. B. 4, pg. 2)
Resurface Roosevelt Dr. in Sunshine
Sub. (P. B. 2, pg. 169); Resurface
2nd & 3rd Sts. from Roosevelt to
Seidenberg
Type
Length
Miles
2. 153
1.5
.13
.15
200 ft.
G. P. S.
G. P. S.
G. F. S.
G. P. S.
G. F. S.
1.0
G. F. S.
Lan:dscape
0.81
G. F. S.
2.87
G. P. S.
0.73
G. P. S.
G. P. S.
0.71
Resurf. -
G. P. S.
0.75
Re surf. -
G. F. S.
0.30
G. P. S.
0.57
G. F. S.
0.53
Resurf.
20
21
22
Stock Island
Key West
Road from u.S. 1toJr. College 0.72
Laura Park - pave Morris Ave. in
Monroe Park Sub. (P. B. 3, pg. 140) 0.5
Road north of Parcel 34, lying between
and adjacent to Parcels 34, 35, 36 &
38, and road on southerly 601 of Par-
cel 34, as shown on Plat of Survey
of lands on the Island of Key West,
Monroe County, Florida (P. B. 3,
pg. 35)
G.P.S.
G. P.S.
0.64
G.P.S.
't
BE IT FURTHER RESOLVED That the methods and standards employed by
the State Road Department for determination of major improvement features,
including the specific alignment, the types and widths of pavement, and the
Department's standard specifications for construction are concurred in and
approved by this Board. It is requested: That the Department will consider
the projects in the order listed above insofar as practicable, but not to
the extent of retarding the whole program; that the termini of the projects
as described in the resolution and shown on the accompanying map, rather than
any estimate of funds therefor, shall control the Department's allocation of
funds; that this resolution shall remain in effect throughout the year; and
that after the current year the recommendations of this resolution shall con-
stitute a continuing improvement program for the County, unless changed by a
subsequent annual resolution.
STATE OF FLORIDA
COUNTY OF MONROE,
I, EARL R. ADAMS , Clerk of the Circuit Court in and
for Monroe County, Florida, and ex officio Clerk of the
Board of County Commissioners of Monroe County, Florida, hereby
certified that the above and foregoing is a true and correct copy of a resolu-
tion adopted by the Board of County Commissioners of Monroe
County, Florida, in regular meeting assembled on the 8th day of March,
A.D., 19~, and that the same has been duly incorporated in the minutes of
said meeting.
IN WITNESS WHEREOF, I have hereto affixed my hand and official seal
this day of March , A.D., 19 66
Clerk of Circuit Court