Loading...
Resolution 080-1970 RESOLUTION NO. 80 -1970 WHEREAS. the Board of County Commissioners of Monroe County, Flo rida. by Resolution dated July 5. 1960, adopted the Southern Standard Building Code. 1957-58 Revision as adopted by the Building Code Congress. as the Building Code for Monroe County, Florida. and WHEREAS. said Board desires to amend Section 107.4. Schedule of Permit Fees by deleting Paragraphs (A). (B). (C). and substituting in their place a new schedule of permit fees, now, therefore, BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, that Section 107.4 of the Southern Standard Building Code as adopted as the building code for Monroe County, Florida, be and the same is hereby amended to read as follows: SCHEDULE OF PERMIT FEES NEW BUILDING AND/OR ADDITIONS: (Fees listed herewith do not include electrical or plumbing) For each 100 Sq. Ft. of area or fractional part of each floor $ 4.00 Minimum Permit Fee 10.00 ACCESSOR Y BUILDING: One-car garage or parte cochere, two car garage or porte cochere. sheds. shelters. screened enclosures and other accessory buildings: For each 100 Sq. Ft. of area of fractional part for each floor 4.00 Minimum Permit Fee 5.00 NEW CONSTRUCTIONS OTHER THAN SPECIFIED HEREIN: (Water Towers, Cooling Tower Pylons, Etc.) For each $1.000.00 cost or estimated cost 3.00 Minimum Permit Fee 10. 00 ALTERATIONS, TO BUILDING AND OTHER STRUCTURES: For the first $1, 000.00 of estimated cost or fractional part 5.00 For each additional $1, 000. 00 of estimated cost or fractional part 3.00 REPAIR TO BUILDINGS AND OTHER STRUCTURES: For each $25. 00 to $100.00 of estimated cost or fractional part 3.00 '~, Over $100.00 to $l~ 000. 00 of estimated cost or fractional part $ 5.00 For each additional $l~ 000. 00 of estimated cost or fractional part 3.00 MOVING BUILDINGS ON OR ACROSS PUBLIC THOROUGHFARES: For each 100 Sq. Ft. per fHor or fractional part . 50 Minimum Permit Fee 20. 00 MOVING BUILDINGS FROM ONE LOCATION ON A LOT TO ANOTHER LOCATION ON THE SAME LOT OR MOVING STRUC- TURE OTHER THAN A BUILDING, EXCLUDING THE COST OF THE NEW FOUNDATIONS: For each $1,000.00 of the estimated cost or fractional part 5.00 Minimum Permit Fee 10.00 CONCRETE SLABS: For the first l~ 500 Sq. Ft. or fractional part 5.00 For each additional l~ 000 Sq. Ft. or fractional part 2.00 INCINERA TORS OR HOME BARBECUE PITS: Each 3.00 ROOFING: For each 1,000 Sq. Ft. of area or fractional part 4. 00 NOTE: Permits not required for minor repairs under $25.00 or for in- stallation of 100 Sq. Ft. or less of roof area. Minimum Permit Fee 5.00 FENCES AND/OR WALLS: For each 100 Lieneal Feet or Fractional Part 3.00 MARQUEES: For each Sq. Ft. of horizontally projected area or fractional part .05 Minimum Permit Fee 10.00 SWIMMING POOLS: For the first 20,000 gallon capacity or fractional part 20.00 For each additional 1, 000 gallon capacity or fractional part 1. 00 SIGNS: Single-faced signs, including channelletter signs~ 10~ per Sq. Ft. Double-faced signs, including channelfaced signs, l5f per Sq. Ft. Minimum Permit Fee $ 3.00 Flat-wall signs, for each 20 Sq. Ft. or fractional part 2.00 TENTS: Temporary permit only: For each tent up to and including 20, 000 Sq. Ft. in area 5. 00 For each additional 1,000 Sq. Ft. or fractional part of area, per tent 1. 00 NOTE: All tent permits shall be issued for a 30 day period only, and fees are not pro- ratable. DEMOLITION OF BUILDINGS: For the first 1,500 Sq. Ft~ of floor or fractional part 5.00 For each additional 1, 000 Sq. Ft. per floor or fractional part 2.00 Minimum Permit Fee 5.00 DEMOLITION OF SIGNS, FENCES AND/OR WALLS: For each $100.00 of estimated cost of fractional part up to $1,000. 00 1.00 For each additional $1, 000. 00 of estimated cost or fractional part 2.00 DEMOLITION OF STRUCTURES OTHER THAN ABOVE: For each 1, 000 cubic feet of voluLne or fractional part of the cubic content described by the outside dimensions of the structure 2.00 DOUBLE FEE: When work for which a permit is required by this ordinance is started or proceeded with prior to the pertaining of said permit, the fees as speci- fied herein may be doubled. The payment of such double fees shall not relieve any person, firm or corporation from fully complying with the require- ments of the COUNTY OF MONROE ordinances, nor from any penalties prescribed therein. September 8th , 1970. Dated