Change Order No. KJ-003-004 CHANGE ORDER CONSTRucnON MANAGEMENT EDITION AlA DOCUMENT G701/CM Distribution to: OWNER [] ARCHITECT [] CONSTRUCTION MANAGER ~ CONTRACTOR [] FIElD g] OTHER 0 APPROVED AS TO Fe AN!J.LEGAL SUFFt IE. -~ ~ AtlQfT/9y'S 0819"'1' '7- 72 PROJECT: New Monroe County Detention Facility (name, address) 5501 College Road, Stock Island Key West, Florida 33040 TO (Ce9tract~B: ~ ~~ D.L. Porter/Rosasco Construction ~ CO 1100 Gillespie Avenue ~ ~ Sarasota, Florida 34236 D:... c_ r:r; CHANGE ORDER NUMBER: KJ-003-004 INITIATION DATE: April 3, 1992 ARCHITECT'S PROJECT NO: 90007.00 CONSTRUCTION MANAGER'S PROJECT NO: 331O-KJ CONTRACT FOR: KJ-003, Concrete & Foundation C L-'- ~ CONTRACT DATE: August 7, 1991 D - . You ara.djrect~ to make the following changes in this Contract: -l 0"\ ' In accdidance"with the attached Scope of Work, which includes the lump sum amount breakdown, furnish and install the Loading Dock Equipment. The Contractor hereby accepts and agrees to the terms and conditions of this Change Order, for the total absolute lump sum contract adjustment of..........................................................!~~~~~;~~ Not valid until signed by the Owner, the Architect and the Construction Manager. Signature of the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time. The original (Contract Sum) ~X1axaD(teedMaxirJIUlOlJClJlS~ was........................... $ 440,714.00 Net change by previously authorized Change Orders. .(C.{)....#.1. .th.r.u. .#3.)....... . ....... " $ 59,018.00 The (Contract Sum) J(GuafaJOter:eol M~iIXllKTlxCx>skl prior to this Change Order was ......... $ 499,732.00 The (Contract Sum) (f;oor>>~e<<dJMaxXmulJO f(:~t) will be (increased) 6docr~axeol) (Nnx:hlln~e:d) by this Change Order.. ... ... ... ......... ... .......... . .... ....... ...... . ...... $ 7,945.00 The new (Contract Sum) (~~rll:n~ec:llM~xKn~~ <Xo~) including this Change Order will be . .. $ 507,677 .00 The Contract Time will be (N1Q(ells<<d)dQle<<rt')Cls~dX (unchanged) by Zero Days ( -0- ) Days. The Date of Substantial Completion as of the date of this Change Order therefore is May 30, 1992. Recommended: Approved: Morrison-Knudsen/Gerrits Hansen Lind Meyer/Gonzalez CONSTRUCTION MANAGER ARCHITECT 5090 College Road, Key Wet, Florida 33040 3130 rthside D A[~~ESS, A ilL +'I.~\. AD RE ~ DATE BY Agreed To: D.L. Porter/Rosasco Construction CONTRACTOR 1100 Gilles ie Avenue, Sarasota, Florida 34236 ADDRESS ./'?; ..../ 7 f ~ BY Authorized: Monroe County Board of County Commissioners OWNER 500 Whitehe d Stree CIJ DA E BY ayor a I rman DATE: April 22, 1992 CAUTION: You should sign an original AlA document which has this caution printed in red, An original assures that changes will not be obscured as may occur when documents are reproduced. AlA DOCUMENT G701/CM . CHANGE ORDER. CONSTRUCTION MANAGEMENT EDITION. JUNE 1980 EDITION. AIA@ @ 1980 . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W" WASHINGTON, D.C. 20006 WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution. KJ-048 G701/CM -1980 CHANGE ORDER NO. KJ-003-004 SCOPE OF WORK Loading Dock Equipment 1.1 General Scope Provide all labor, supervision, materials, supplies, equipment, tools, transportation, surveying and layout, and protection, to install complete operating systems, and proper execution and completion of all Work specified on the drawings, and the sections of the Specifications, which include, but are not limited to the listing that follows. The contractor shall review all drawings and specification sections that are not specifically listed, for any additional requirements in order to complete the scope of work described herein. Primary sections and Descriptions 11160 Loading Dock Equipment Related Sections and Descriptions 03100 03200 03300 16010 16111 16660 Concrete Formwork Concrete Reinforcement Cast-In-Place Concrete Electrical General provisions Conduit Systems - Bid Group 3 Wiring For Equipment Furnished By Others Primary Drawings 7.00 7.03 11. 03 Standard Mounting Heights Equipment Plan Ground Floor Zone C Power and Lighting Plan Ground Floor Zone C Reference Drawings 3.03 3.31 Foundation Plan Ground Floor Zone C Foundations Sections and Details 1.2 Special provisions The following Special provisions are intended to clarify the scope of work, or highlight features of the work, or modify, change, add to, or delete from the General Scope of this Bid Package. 02/27/92 PAGE 1 OF 3 LOADING DOCK EQUIPMENT ".1 Coordinate installation of embeds, angles, anchors, plates, blockouts, etc. with the structural concrete. .2 Coordinate installation of conduit, boxes, and electrical connections with the Electrical Contractor. .3 Provide shop drawings/catalog cuts of equipment to Electrical Contractor prior to rough-ins and concrete placement. .4 It is the responsibility of this contractor to verify rough-ins prior to the installation of loading dock equipment. .5 All equipment installed shall be verified for install- ation to provide adequate clearances for maintenance and service. .6 This contractor shall provide all equipment disconnects as specified throughout this bid package and speci- fications. This contractor shall assist the Owner I sneed to standardize product sources wherever possible within this package and other divisions. .7 All incoming materials and equipment shall be coordinated with other trades and the CM is to be notified, in order that proper laydown, staginq and stockinq areas are developed, prior to release for shipping. Within the building, areas shall be restricted and stocking areas will be authorized in writing. .8 For all fusible devices, provide (1) spare set of fuses of (3) each, of each type and size of fuse. .9 Provide, replace, and maintain any safety rails and barricades as necessary during the process of work, or during deliveries of materials or equipment. .10 All licenses required in order to perform the scope of work in the specified location, shall be procured and maintained by the contractor and his subcontractors. Contractor shall submit copies to the Construction Manager. This shall include construction permits required by the City of Key West. 02/27/92 LOADING DOCK EQUIPMENT PAGE 2 OF 3 BREAKDOWN Lump Sum 1. Labor & Equipment TOTAL $ 825.00 $ 5,710.00 $ 200.00 $ 1,210.00 $ 7,945.00 ---------- ---------- 2. Equipment (Kelley Model HYD-72) 3. Shipping 4. Bond, Overhead, Mark-up 02/27/92 LOADING DOCK EQUIPMENT PAGE 3 OF 3