Change Order No. KJ-003-004
CHANGE ORDER
CONSTRucnON MANAGEMENT EDITION
AlA DOCUMENT G701/CM
Distribution to:
OWNER []
ARCHITECT []
CONSTRUCTION MANAGER ~
CONTRACTOR []
FIElD g]
OTHER 0
APPROVED AS TO Fe
AN!J.LEGAL SUFFt IE.
-~
~ AtlQfT/9y'S
0819"'1' '7- 72
PROJECT: New Monroe County Detention Facility
(name, address) 5501 College Road, Stock Island
Key West, Florida 33040
TO (Ce9tract~B:
~ ~~ D.L. Porter/Rosasco Construction
~ CO 1100 Gillespie Avenue
~ ~ Sarasota, Florida 34236
D:...
c_
r:r;
CHANGE ORDER NUMBER: KJ-003-004
INITIATION DATE: April 3, 1992
ARCHITECT'S PROJECT NO: 90007.00
CONSTRUCTION MANAGER'S
PROJECT NO: 331O-KJ
CONTRACT FOR: KJ-003, Concrete & Foundation
C
L-'- ~ CONTRACT DATE: August 7, 1991
D - .
You ara.djrect~ to make the following changes in this Contract:
-l 0"\ '
In accdidance"with the attached Scope of Work, which includes the lump sum amount breakdown, furnish
and install the Loading Dock Equipment.
The Contractor hereby accepts and agrees to the terms and conditions of this Change Order, for the total
absolute lump sum contract adjustment of..........................................................!~~~~~;~~
Not valid until signed by the Owner, the Architect and the Construction Manager.
Signature of the Contractor indicates agreement herewith, including any adjustment in the Contract Sum or the Contract Time.
The original (Contract Sum) ~X1axaD(teedMaxirJIUlOlJClJlS~ was........................... $ 440,714.00
Net change by previously authorized Change Orders. .(C.{)....#.1. .th.r.u. .#3.)....... . ....... " $ 59,018.00
The (Contract Sum) J(GuafaJOter:eol M~iIXllKTlxCx>skl prior to this Change Order was ......... $ 499,732.00
The (Contract Sum) (f;oor>>~e<<dJMaxXmulJO f(:~t) will be (increased) 6docr~axeol) (Nnx:hlln~e:d)
by this Change Order.. ... ... ... ......... ... .......... . .... ....... ...... . ...... $ 7,945.00
The new (Contract Sum) (~~rll:n~ec:llM~xKn~~ <Xo~) including this Change Order will be . .. $ 507,677 .00
The Contract Time will be (N1Q(ells<<d)dQle<<rt')Cls~dX (unchanged) by Zero Days ( -0- ) Days.
The Date of Substantial Completion as of the date of this Change Order therefore is May 30, 1992.
Recommended: Approved:
Morrison-Knudsen/Gerrits Hansen Lind Meyer/Gonzalez
CONSTRUCTION MANAGER ARCHITECT
5090 College Road, Key Wet, Florida 33040 3130 rthside D
A[~~ESS, A ilL +'I.~\. AD RE
~ DATE BY
Agreed To:
D.L. Porter/Rosasco Construction
CONTRACTOR
1100 Gilles ie Avenue, Sarasota, Florida 34236
ADDRESS
./'?; ..../ 7 f ~
BY
Authorized:
Monroe County Board of County Commissioners
OWNER
500 Whitehe d Stree
CIJ
DA E BY ayor a I rman
DATE: April 22, 1992
CAUTION: You should sign an original AlA document which has this caution printed in red,
An original assures that changes will not be obscured as may occur when documents are reproduced.
AlA DOCUMENT G701/CM . CHANGE ORDER. CONSTRUCTION MANAGEMENT EDITION. JUNE 1980 EDITION. AIA@
@ 1980 . THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVENUE, N.W" WASHINGTON, D.C. 20006
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
KJ-048
G701/CM -1980
CHANGE ORDER NO. KJ-003-004
SCOPE OF WORK
Loading Dock Equipment
1.1 General Scope
Provide all labor, supervision, materials, supplies,
equipment, tools, transportation, surveying and layout, and
protection, to install complete operating systems, and proper
execution and completion of all Work specified on the
drawings, and the sections of the Specifications, which
include, but are not limited to the listing that follows. The
contractor shall review all drawings and specification
sections that are not specifically listed, for any additional
requirements in order to complete the scope of work described
herein.
Primary sections and Descriptions
11160
Loading Dock Equipment
Related Sections and Descriptions
03100
03200
03300
16010
16111
16660
Concrete Formwork
Concrete Reinforcement
Cast-In-Place Concrete
Electrical General provisions
Conduit Systems - Bid Group 3
Wiring For Equipment Furnished By Others
Primary Drawings
7.00
7.03
11. 03
Standard Mounting Heights
Equipment Plan Ground Floor Zone C
Power and Lighting Plan Ground Floor Zone C
Reference Drawings
3.03
3.31
Foundation Plan Ground Floor Zone C
Foundations Sections and Details
1.2 Special provisions
The following Special provisions are intended to clarify the
scope of work, or highlight features of the work, or modify,
change, add to, or delete from the General Scope of this Bid
Package.
02/27/92
PAGE 1 OF 3
LOADING DOCK EQUIPMENT
".1 Coordinate installation of embeds, angles, anchors,
plates, blockouts, etc. with the structural concrete.
.2 Coordinate installation of conduit, boxes, and electrical
connections with the Electrical Contractor.
.3 Provide shop drawings/catalog cuts of equipment to
Electrical Contractor prior to rough-ins and concrete
placement.
.4 It is the responsibility of this contractor to verify
rough-ins prior to the installation of loading dock
equipment.
.5 All equipment installed shall be verified for install-
ation to provide adequate clearances for maintenance and
service.
.6 This contractor shall provide all equipment disconnects
as specified throughout this bid package and speci-
fications. This contractor shall assist the Owner I sneed
to standardize product sources wherever possible within
this package and other divisions.
.7 All incoming materials and equipment shall be coordinated
with other trades and the CM is to be notified, in order
that proper laydown, staginq and stockinq areas are
developed, prior to release for shipping. Within the
building, areas shall be restricted and stocking areas
will be authorized in writing.
.8 For all fusible devices, provide (1) spare set of fuses
of (3) each, of each type and size of fuse.
.9 Provide, replace, and maintain any safety rails and
barricades as necessary during the process of work, or
during deliveries of materials or equipment.
.10 All licenses required in order to perform the scope of
work in the specified location, shall be procured and
maintained by the contractor and his subcontractors.
Contractor shall submit copies to the Construction
Manager. This shall include construction permits
required by the City of Key West.
02/27/92
LOADING DOCK EQUIPMENT
PAGE 2 OF 3
BREAKDOWN
Lump Sum
1. Labor & Equipment
TOTAL
$ 825.00
$ 5,710.00
$ 200.00
$ 1,210.00
$ 7,945.00
----------
----------
2. Equipment
(Kelley Model HYD-72)
3. Shipping
4. Bond, Overhead, Mark-up
02/27/92
LOADING DOCK EQUIPMENT
PAGE 3 OF 3