Change Order No. KJ-008-010 C H A N G E 0 R D E R Proj~ct: KJ - NEW DETENTION FACILITY To Contractor: J.F. HOFF ELECTRIC 371 CYPRESS DRIVE TEQUESTA, FL Change Order Number: 01-008-010 Change Order Date: 08/13/93 33460 Architect's Project #: Contract For: PRIME ELECTRICAL Contract Date: 02/19/92 You are directed to make the following changes in this contract; all other provisions of the contract shall, except as specifically changed herein, remain in full force and effect. Issue: 206 - TEMPORARY ELECTRIC SERVICE REVISIONS In accordance with the attached J.F.Hoff Change Order Proposal dated June 8, 1993, revise the temporary electric power supply to maintain this service and also permit the connection of the permanent power supply as shown in the Contract Documents. ..0 -,., -7 \...:) I...V ;11 l/') CJ rr1 -0 ~-.:; N 0:) ....~ ~ -1 \Q , j::,. Contractor agrees to accept this LUMP SUM CHANGE ORDER as FINAL SETTLEMENT for this extra work and all related impacts due to this contract change for the LUMP SUM AMOUNT of $ 4,093.00 and 0 days. The Original Contract Amount was............ ...... ...... ..... .... ........ ..................... ...... $ Net Change by Previously Authorized Change Orders .................................................... $ The Contract Amount prior to this Change was ......................................................... $ The Value of this Change Order is .................................................................... $ The New Contract Amount including this Change Order will be .......................................... $ The Contract Time will change by ....... ......... ........... ........... ............................... The Date of Substantial Completion as of the Date of this Change Order is ............................ 1,855,491.00 -807,316.72 1,048,174.28 4,093.00 1,052,267.28 o days 11/01/93 Recommended by Construction Manager: Approved by Architect: Morrison-Knudsen/Gerrits 5090 College Road Key West, Fl 33040 Agreed to by Contractor: Authorized by Owner: J.F. HOFF ELECTRIC 371 CYPRESS DRIVE TEQUESTA, FL 33460 ~~~~Q~I By ~ b~!\. <?j"- 26cl,S iDate County Commissioners " At Date County Attor t?"- ~a -(9~ By Danny L. Kolhage, Clerk tJo~ C. ~~ Deputy Cle~ Q9- ()1'-9 '3 By Date Not valid unless signed by the Owner, the Architect, and the Construction Manager. Signature of the Contractor indicates agreement herewith, including any and all adjustments in Contract Sum and/or Contract Time. f . ( , //. - ,. J.F. Hoff Electric Co. 5501 Jr. College Road Key West FL 33040 305 296-4333 PROPOSED CHANGE ORDER #00002 RE: Temporary Elec. Supply Project: Monroe Cnty. Detention Job:9201 Morrison-Knudsen/Gerrits P.O. Box 5283 ~ey West FL 33045-5283 Attn: Larry Keys (Proj. Mgr. ) 'T'o.--- t.Jcct5oIJ In Reference To KJ /OC08 /00106 Started: June 8, 1993 To Vendor MK/G Completed: The completion date, contract price, and all terms, covenants, and conditions of the above referenced contract, except as duly modified by this and previous Change Orders, if any, remain in full force and effect. Description of Changes: Set a temporary 480volt, fused, three phase disconnect amperage equal that required at the temporary electric facility serving the trailer area, in the primary electric vault room. Remove the existing service wire from the coonection at the temporary srevice enterance to the last manhole prior to the primary vault. Re-pu1l the existing temporary service wire to the temporary disconnect in the primary vault using the conduit installed for future use as the raceway to temporary facility at the trailers. Tap the buildings 480volt secondary circuit within the primary vault for the circuit to the disconnect and feed the trailers with this circuit. Remove the existing meter at the temporary electric service building and replace with lug bars at the meter base and install a glass meter base seal off untagged on the meter base. Please find attached a copy of the back-up for the material and labor required to accomplish the above mentioned items. Proposed by:J.F. Hoff Electric Co. Signed: By: Date: B' \ r(') C (",u... ~~--<.--' , Thomas Patri Proj.Mgr. L. - I '-) ',,3 Total Cost: $ 4093.0C