06/10/1992 Agreement
New Detention Facility
CONTRACT KJ-018, Stairs & Miscellaneous Metals
Big C Steel, Inc.
I.
II.
B.
C.
D.
E.
F.
G.
A.
B.
C.
D.
E.
F.
G.
Form of Agreement
Public Construction Bond
Certificate of Insurance
Table of Contents
Schedule of Drawings
Scope of Work - Bid Package #31
Milestone Schedule
A.
Proposal Form, pages 00131-1 through 00131-4, signed by bidder and dated April 20,
1992.
Bid bond from Fidelity & Deposit Company of Maryland.
Power of Attorney from Fidelity & Deposit Company of Maryland.
Sworn Statement on Public Entity Crimes.
Lobbying and Conflict of Interest Clause.
Non-Collusion Affidavit.
Proposed Subcontractor Listing
III. Conditions of the Contract
A. General Conditions
B. Supplementary Conditions
C. Project Safety and Health Plan
D. Contractor's Quality Control Plan
E. Substantial Completion & Owner's Acceptance
F. General Requirements
Application for Payment
Change Order Procedures
Security Project Procedures
Project Meetings
Submittals
Progress Schedules
Schedule of Values
Daily Construction Report
Document Clarification Requests
Testing Laboratory Services
Temporary Utilities
Construction Aids
Access Roads and Parking Areas
Temporary Controls
Project Identification and Signs
Field Offices and Sheds
Construction Cleaning
Material and Equipment
Post-Bid Substitutions
Starting of Systems
Systems Demonstrations
Contract Closeout
Final Cleaning
Project Record Documents
Operation and Maintenance Data
THE AMERICAN INSTITUTE OF A~~Hll~(;:"['S('ORf-
.
.92 JUL -2 A8 :13
r)A)~!'.. ',GE
CLr\ ,_'<1\
~lONRO[ C:DUN1 Y. Fl.t..
AlA Document A101/CM
CONSTRUCTION MANAGEMENT EDITION
Standard Form of Agreement Between
Owner and Contractor
where the basis of payment is a
STlPULA TED SUM
1980 EDITION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED.
This document is intended to be used in conjunction with AlA Documents
A201/CM, 1980; B141/CM, 1980; and B801, 1980.
AGREEMENT No. KJ-018, Stairs & Miscellaneous Metals
made as of the /Of" day of
Hundred and N\~e.4j- "'fWd
Jf.lY\....
in the year of Nineteen
BETWEEN the Owner: Monroe County Board of County Commissioners
500 Whitehead Street
Key West, FL 33040
and the Contractor: Big C Steel, Inc.
13095 49th Street, North
Clearwater, FL 34622
(813) 573-2442
the Project: New Monroe County Detention Facil ity
5501 College Road
Stock Island, Key West, FL 33040
the Construction Manager: Morrison-Knudsen/Gerrits
the Architect: Hansen Lind Meyer/Gonzalez
The Owner and the Contractor agree as set forth below.
Copyright 1975, @ 1980 by The American Institute of Architects, 1735 New York Avenue, N.W., Washington, D.C. 20006. Re-
production of the material herein or substantial quotation of its provisions without written permission of the AlA violates the
copyright laws of the United States and will be subject to legal prosecution.
AlA DOCUMENT Al0l/CM . OWNER-CONTRACTOR AGREEMENT. CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA8 . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
A101/CM -1980 1
ARTICLE 1
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, the Conditions of the Contract (General, Supplementary and
other Conditions), the Drawings, the Specifications, all Addenda issued prior to and all Modifications issued after
execution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this
Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 7.
ARTICLE 2
THE WORK
The Contractor shall perform all the Work required by the Contract Documents for
(Here insert the caption descriptive of the Work as used on other Contract Documents.)
Bid Group 3. Bid Package No. 31. Stairs & Miscellaneous Metals
ARTICLE 3
TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
The Work to be performed under this Contract shall be commenced on the date as established in the Notice
to proceed
and, subject to authorized adjustments, Substantial Completion of the Work shall be achieved not later than
(Here inset! any special provisions for liquidated damages relating to fai/ure to complete on time.)
the time indicated in Section 00353 Milestone Schedule.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT' CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA8 . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101/CM -1980 2
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
ARTICLE 4
CONTRACT SUM
The Owner shall pay the Contractor in current funds for the performance of the Work, subject to additions and
deductions by Change Order as provided in the Contract Documents, the Contract Sum of
Two hundred eighty thousand, two hundred sixty-nine dollars ...........................$ 280,269.00
The Contract Sum is determined as follows:
(State here the base bid or other lump sum amount, accepted alternates and unit prices, as applicable.)
Base Bid.............................................................................. $ 280,269.00
ARTICLE 5
PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Construction Manager by the Contractor and Project Certificates
for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the
Contractor as provided in the Contract Documents for the period ending the twenty-fifth' (25) . *~lo.f each
month as follows: approxlm y
Not later than thi rty (30) days following the end of the period covered by the Application for Payment,
Ni nety percent ( 90 %) of the portion of the Contract Sum properly allocable to labor, materials and
equipment incorporated in the Work and Ninety percent (90 %) of the portion of the Contract
Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon
in writing, for the period covered by the Application for Payment, less the aggregate of previous payments made by
the Owner; and upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
One Hundred percent ( 100 %) of the Contract Sum, less such amounts as the Architect shall determine for
all incomplete Work and unsettled claims as provided in the Contract Documents,
(If not covered elsewhere in the Contract Documents, here insert any provision for limiting or reducing the amount retained alter the Work reaches a certain
stage of completion.)
Reference Section 00800 Substantial Completion and Owner Acceptance.
.->".".-
P il'fR16l+t!;-Gwe -and ~Q-W RQef -tHe-~e+rt FaC-t-ge€o\:WAeA~ 5 A a \.l-eea-'" ffl~e~t- tl'Ofl'l-the- -da'l:e1'1ry'merrt-rs-d 0 e-C!t" the -rate
eDl~r~b~Q~~_Q~U1jbe_ab~Qalbet~Q~~~l~gaL~pr~~li~al~be_p~4J-~p~o~~-
(Ik<e- .........+ ""Y' ...+e-af-i"!e_!-ag1'~-<JP"".-1
(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's
and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Specific legal advice should
be obtained with respect to deletion, modification or other requirements such as written disclosures or waivers.)
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT . CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA@ . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006 A101/CM -1980 3
WARNING: Unlicensed photocopying violates U.S. copyright laws and Is subject to legal prosecution.
ARTICLE 6
FINAL PAYMENT
Final payment, cons!ituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the
Contractor when the Work has been completed, the Contract fully performed, and the Architect has issued a Project
Certificate for Payment which approves the final payment due the Contractor.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings
designated in those Conditions.
7.2 The Contract Documents, which constitute the entire agreement between the Owner and the Contractor, are listed
in Article 1 and, except for Modifications issued after execution of this Agreement, are enumerated as follows:
(List below the Agreement, the Conditions 01 the Contract/General, Supplementary and other Conditions], the Drawings, the Specifications, and any Addenda
and accepted alternates, showing page or sheet numbers in all cases and dates where applicable.)
I. Bid Group 3 Bid Package Documents for the New Monroe County Detention Facility, which
include Bidding Documents, Contract Documents, Conditions, Drawings, General Requirement~
and Technical Specifications and which are enumerated in the attached Table of Contents
contained in Bid Group 3, pages 00001-1 thru 00001-4, dated 3/24/92, and in the attached
Schudule of Drawings contained in Bid Group 3, pages 00993-1 thru 00993-19, dated 11/19/91,
all as amended oy the addenda.
II. Addendum No. 1A dated November 26, 1991
Addendum No. 1B dated December 11, 1991
Addendum No. 1 dated December 20, 1991
Addendum No. 2A dated January 3, 1992
Addendum No. 2 dated January 6, 1992
Addendun No.3 dated January 9, 1992
Addendum No.4 dated January 13, 1992
Addendum No.5 dated February 18, 1~9~
Addendum No. 6 dated March 4, 1992
Addendum No.7 dated March 10, 1992
Addendum No. 8 dated March 25, 1992
Addendum No. 9 dated April 3, 1992
Addendum No. 10 dated April 16, 1992
II. Proposal Documents submitted by Big C Steel, Inc., on April 22, 1992:
A. Proposal Form, pages 00131-1 thru 00131-4, signed by bidder, and dated April 20, 1992.
B. 5% Bid Bond, from Fidelity and Deposit Company of Baltimore, MD.
C. Sworn Statement on Public Entity Crimes.
D. LobbYlnggand Conflict of Interest Clause.
E. Non-Collusion Affidavit.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT . CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA@ . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., NW., WASHINGTON, D.C. 20006
'~'''''''''''''''''''. "-"- ___I_I__,.__-~ :.__ '..__ .,.... ___
A101/CM --1980 4
7.3 Temporary facilities and services: .
(Here insert temporary facilities and services which are different from or in addition to those included elsewhere In the Contract Documents.)
Reference Contract Documents
7.4 Working Conditions:
(Here list any speciaf conditions affecting the Contract.)
Reference Contract Documents
Date:
(Deputy Cl k)
, -,,- ,~
"Approved as to Form and
legal Seffle'ee,y" ~
B~r?h -
(Attorne~ s Office
Date: ~-(p - '9 "'Z-
By:
This Agreement entered into as of the day and year first written above.
-:~~:;~: ~~i~~
Its: C It _ . r ",. ft
OWNER
em
CAUTION: You should sign an original AlA document which has this caution printed in red.
An original assures that changes will not be obscured as may occur when documents are reproduced.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT' CONSTRUCTION
MANAGEMENT EDITION' JUNE 1960 EDITION . AIA@ . @1960 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101/CM -1980 5
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
.
J
IPI
PUBLIC CONSTRUCTION BOND
FIDELITY AND DEPOSIT
BY THIS BOND, We BIG C STEEL, INC. , as Principal and COMPANY OF MARYLAND
, a corporation, as Surety, are bound tOMONROE COUNTY BOARD ~F COUNTY
herein called Owner, in the sum of $ 280,269.00 for payment ofCOMMISSIONER~
which we bind ourselves, our heirs, personal representatives,
successors, and assigns, ~ointly and severally.
THE CONDITION OF THIS BOND is that if Principal:
1. Performs the contract dated June 10 , 19.2.L, between
Principal and Owner for construction of NEW MONROE COUNTY DETENTION FAqLITY
the contract being made a part of this bond by reference, at the
times and in the manner prescribed in the contract; and.
2. Promptly makes payments to all claimants, as defined in
section 255.05(1), Florida statutes, supplying Principal with
labor, materials, or supplies, used directly or indirectly by
Principal in the prosecution of the work provided for in the
contract; and
3. Pays Owner all losses, damages, expenses, costs, and
attorney's fees, including appellate proceedings, that Owner
sustains because of a default by Principal under the contract;
and
4. Performs the guarantee of all work and materials furnished
under the contract for the time specified in the contract, then
this bond is void; otherwise it remains in full force.
Any changes in or under the contract documents and compliance
with any formalities connected with the contract or the changes
does not affect Surety's obligation under this bond.
DATE ON Tnnp 17 , - 19-..2.L.
BIG C STEEL, INC.
(NAME OF PRINCIPAL)
BY
flSlGNEO ~:r
~NTAAL"'VE.
453RS13UflG, FLORlOA ~
sr. ~Sl COAST INSURORS
11/20/91
I
j
I
\
I
. I
,
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
.. (~ OF SURI;;TYY) /J _ ~_ j !!
BY~ _(:dZ,LA...-A J '- 2: ~~
Clara F. Altine, Attorney-in-Fact
PUBLIC CONSTRUCTION BOND 00610 - 1
Power of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
HOME OFFICE. BALnMORE. MO
KNOW ALL MEN BY THESE PRESENTS: That the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, a corporation of the
State of Maryland, by C. M. PECOT, JR. ,Vice-President, and C. W. ROBBINS ,
Assistant Secretary, in pursuance of authority granted by Article VI, Section 2, of the By-Laws of said Company, which are set
forth on the reverse side hereof and are hereby certified to be in full~rce and eff~n the date hereof, does hereby nominate,
constitute and appoint Robert P. Clark, Clara F. Al and D ~ Murphy, all of St.
Petersburg, Florida, EACH................. ~..... ~ .....................
e an agent and Attorney-in-Fact, to make, execute, a deliver d on ita behalf as surety, and as ita act and deed:
any and all bonds and undertakings.... ~ ...... . . . . . . . . .. . . . . . . . . . . . . .. .
~
e execution of such bonds or undertakings in p of the nta, shall be as binding upon said Company, as fully
and amply, to all intentll and purposes, as if they h n duly e~lm and acknowledged by the regularly elected officers of
the Company at its office in Baltimore, Md., in j;) pro~~ns. This power of attorney revokes that
issued on behalf of Robert P. eta~~ted, September 21, 1987.
The said Assistant Secretary does hereby at th~e :ect~t forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By-Laws of said comi!an ~ d is now' .
IN WITNESS WHEREOF, the said Vi ent and . t Secretary have hereunto subscribed their names and affixed the
Corporate Seal of the said FIDELITY EPOSIh~ANY OF MARYLAND, this 23rd day of
September , A.D. 19...2l ~-
ATIFsr, ._._~~_:~~b:ui:=~ :~.:=-w~~tJ:~---
STATE OF MARYLAND
CITY OF BALTIMORE
I ss:
\
On this 23rd day of September , A.D. 1991 , before the subscriber, a Notary Public of the State of
Maryland, in and for the City of Baltimore, duly commissioned and qualified, came the above-named Vice-President and Assistant
Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, to me personally known to be the individuals and officers
described in and who executed the preceding instrument, and they each acknowledged the execution of the same, and being by
me duly sworn, severally and each for himself depoeeth and saith, that they are the said officers of the Company aforesaid, and
that the seal affixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corpora~ Seal and their
signatures as such officers were duly affixed and subscribed to the said instrument by the authority and direction of the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set my hand and affixed my Official Seal, at the City of Baltimore, the day and
__u-wrnren. ~ ~
~ "
CAROL J. F ADER ..,.0(-
Notary Public ~mmission p' AU;:~ I. 19~
CERTIFICATE
I, the undersigned, Assistant Secretary of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND, do hereby certify that
the original Power of Attorney of which the foregoing is a full, true and correct copy, is in full force and eHect on the date of this
certificate; and I do further certify that the Vice-President who executed the said Power of Attorney was one of the additional Vice-
Presidenta specially authorized by the Board of Directors to appoint any Attorney-in-Fact 88 provided in Article VI, Section 2, of
the By-Laws of the FIDELITY AND DEPOSIT COMPANY OF MARYLAND.
This Certificate may be signed by facsimile under and by authority of the following resolution of the Board. of Directors of the
FIDELITY AND DEPOSIT COMPANY OF MARYLAND at a meeting duly called and held on the 16th day of July, 1969.
RESOLVED: "That the facsimile or mechanically reproduced signature of any Assistant Secretary of the Company, whether made
heretofore or hereafter, wherever appearing upon a certified copy of any power of attorney issued by the Company, shall be valid
and binding upon the Company with the same force and eHect 88 though manually afr1Xed."
IN TESTIMONY WHEREOF, I have hereunto subecribed my name and affixed the corporate seal of the said Company, this 17th
day of Jlln~, 19..92.
~to'd ~~--
031-4548
EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF MARYLAND
"Article VI, Section 2. The Chairman of the Board, or the President, or any Executive Vice-President. or any of the Senior Vic(
Presidents or Vice-Presidents specially authorized so to do by the Board of Directors or by the Executive Committee, shall have
power, by and with the concurrence of the Secretary or anyone of the Assistant Secretaries, to appoint Resident Vice-Presidents,
Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to authorize any person or persons
to execute on behalf of the Company any bonds, undertakings, recognizances, stipulations, policies, contracts, agreements. deeds,
and releases and assignments of judgements, decrees, mortgages and instruments in the nature of mortgages,. . . and to affix the
seal of the Company thereto."
L 112Kb
I_~~~~~~~-
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND,
EXTEND OR ALTER THE COVERAGE AFFORDED BYTHE POLICIES BELOW
PRODUCER
~LACE,WELCH,WILLINGHAM
t.O. BOX 33020
ST. PETERSBURG FL 33733-3020
COMPANIES AFFORDING COVERAGE
INSURED
BIG C STEEL, INC.
13095 49TH STREET, N.
CLEARWATER, FL 34622
COMPANY A
LETTER
COMPANY B
LETTER
COMPANY C
LETTER
COMPANY D
LETTER
MARYLAND CASUALTY CO.
COMPANY E
LETTER
;~.ft:::::mt:mmI:t:IIm:~ttm;::t:Imt:::t:;::t::ttmm:~:::tmm::t~~::::::t::::t:t:tlIt:mmm::::::::::::t;ltt:I:t::lmI::::::t::t:mI~::I::::::::::::::t:Imll::::::::::::tt:::::II~:I::I:::::m:::::::m::~m:m::II::::t:::~t:IIm:II:':t:I:::::ttm:tlll:II:::::::::t::m:m:::m:t::::::::::::::::t:I:m::::
THIS IS TO CERTIFYTHATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TOTHE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECTTO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BYTHE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
/J I
IT7lJT." 1;}
(')/~/)
V' ~ V(
co
POLICY EFFECTIVE POLICY EXPIRATIO~
DATE (MM/DD/YV DATE (MM/DD/YV
02/05/92 02/05/93 GENERAL AGGREGATE
ALL LIMITS IN THOUSANDS
TYPE OF INSURANCE POLICY NUMBER
TR
~ GENERALLIABILIlY EPA15652861
~::;f:;}f COMMERCIAL GENERAL LIABILlT
;::::;;::,'::::,: CLAIMS MADWOCCUR.
OWNER'S & CONTRACTOR'S PROT
PRODUCTS-COMP/OPS AGGR
PERSONAL &ADVERTISING INJURl
EACH OCCURRENCE
FIRE DAMAGE(Any one fire)
MEDICAL EXPENSE (Anyone person
$ 1. 000
$ 1. 000
$ L 000
$ 1, 000
$ 50
'.
::!:::!!::!::!:!::!:::::!!!:::!:::::!:!:!!::::!::::
ijj~rjr~j~~~mtr~~~f~jj~mtt
~)~ ~~ ~~~ ~ ~~ ~ ~~~~~ ~~~ ~ ~~ ~ ~~ ~[~ ~~~ ~ ~~ ~~~ j~i~j~~i~~ ~~ ~
:t~tt~~~~~~~~~~~t~~f~tt~~;~~~~
1~1~1~1j~~j~11~~1~~~~~I~1~t~1~1~111~~~jjjiij~
~~~f~~~~~~~~;~;~;~;~;;;~;;;;;;;;f;fi;t;
~ ~OMOBILELIABILIlY ECA15650162
ANY AUTO
-
ALL OWNED AUTOS
-
SCHEDULED AUTOS
-
L HIRED AUTOS
L NON OWNED AUTOS
GARAGE LIABILITY
-
P2/05/92 02/05/93 COMBINED
SINGLE $
LIMIT 1.000
BODILY
INJURY $
(Per person)
BODILY
INJURY $
(Per ace)
PROPERTY
DAMAGE $
~ EXCESS LIABILITY UBA 6 814 87 6 7
q UMBRELLA
OTHER THAN UMBRELLA FORM
02/05/92 02/05/93
:;:;:::::::::::::;:::;:::;:::::::::::::::;.
::}'ttft}}'ttt EA C H
;:":,::,:}:;:":":,:::':,,,:':":,,"', l 0, c;..c lJ Il..
:;:::::::::::::::::;::::::::::::::::::::::: uuu
j~~j!I~!I~II~~t~~i~~)i~)i~ii
......................--:::;::::::::::::::;::::.;:;::::;:::;:::::::::::::::::::::::;::::::::::;:::::::::::::::::;;::;:::::;:::::
8T A TUTORY t~tfrir~jf~)rrIfIJj(~~ftt~~ttt~jrJt
AGGREGATE
$
1,000
WORKER'S COMPENSATION
AND
EMPLOYERS' LIABILITY
0;
(EACH ACCIDENT)
(DISEASE-POLICY LIMIT)
(DISEASE-EACH EMPLOYEE
$
$
OTH.
DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/SPECIAL ITEMS
RE: MONROE COUNTY DETENTION FACILITY
MORRISON KNUDESON/GERRITS AND MONROE COUNTY BOARD OF COUNTY COMMISSIONERS ARE
ADDITIONAL INSUREDS UNDER ABOVE POLICIES
~;9Ifm_lI.Iv.tgIB:jIt:t:'t:::t~:':((:t}t::::::::}:(':':~}mm:((:}t::::::::}tt:::::::::(jj,t}~,}:::tt((.~Dm:f:(:t::t:::::::~t:::('}}}}tf:(::::::::::::::::::::::::::j:t:::::j:::::::tm::::::~:::((:t:::::::::((((:t:t:::ft:(::(::::::::~:::::m::::::::::::::'jm}tm
t:::: SHOULD ANY OFTHE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
.... EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
MORRISON KNUDESON /GERRIT MAIL6..0-DAYS WRITTEN NOTICETOTHE CERTIFICATE HOLDER NAMED TOTHE
P .0. BOX 5283 ':':"': LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
KEY WEST, FL 33045-5283 :::::::: LIABILITY OF ANY KIND UPON THE COMPANY,ITS AGEN);SOR REPRESENTATIVES.
~~
C~=-'~~-
PRODUCER
~ ~LACE,WELCH,WILLINGHAM
.1..0. BOX 33020
ST. PETERSBURG FL 33733-3020
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND,
EXTEND OR ALTER THE COVERAGE AFFORDED BYTHE POLICIES BELOW
COMPANIES AFFORDING COVERAGE
COMPANY
A
BIG C STEEL, INC.
13095 49TH STREET, N.
CLEARWATER, FL 34622
LETTER
COMPANY B
LETTER
COMPANY C
LETTER
COMPANY D
LETTER
COMPANY E
FCCI
INSURED
j "
nY;J 6 /u7
Jt'-" /,)/ ('
t ,/" I
I
LETTER
::_"~ffff:::::::'::fff::f:':':rr:fffffff:r:ff:r::r::'tff:::r::::,:,:r:::::::ffff:rr:::f:':'::f::f:rr'ff:::::::r:::::fff:rrrrIr:::::::::f:::'fff:::::r'f:rr::::::::::'fff:r:,r::r:::f:::::rr::rrrttt::tt,:rmf:::':'f:::tm::fffffffffft::ffff:tt:::::::::::f:::
THIS IS TO CERTIFYTHATTHE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
IN DICA TED, NOTWITHSTAN DING ANY R EaUIR EM ENT, TER M OR CONDITION OF ANY CONTRACT OR OTH ER DOCUM ENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BYTHE POLICIES DESCRIBED HEREIN IS SUBJECTTO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
CO
m
TYPE OF INSURANCE
POLlCYNUMBER
POLICY EFFECTIVE POLICY EXPIRATIO~
DATE (MMjDD/Y'I DATE (MMjDD/YY
ALL LIMITS IN THOUSANDS
GENERAL LIAB'LITY
~.,:,:,:,:,:,:,:,. COMMERCIAL GENERAL LIABILlT
t:tt:::: CLAIMS MADDoCCUR.
OWNER'S & CONTRACTOR'S PROT
GENERAL AGGREGATE
$
PRODUCTS-COMPjOPSAGGR $
PERSONAL &ADVERTISING INJURY $
EACH OCCURRENCE $
$
$
~OMOBILE LIABILITY
ANY AUTO
-
ALL OWNED AUTOS
I--
SCHEDULED AUTOS
f--
HIRED AUTOS
f--
NON-OWNED AUTOS
f--
GARAGE LIABILITY
i--
FIRE DAMAGE (Anyone fire)
MEDICAL EXPENSE (Any one person
COMBINED
SINGLE
LIMIT
$
..................................................
~~~~?~~~~~~~~~~~i~~~~t?1~i~~~~jiiiit~~~
.........................
..........................
.........................
..........................
~j~~~j~r!~t~;~i~~i;tt~~i~~f~~~~ijji!
.........................
..........................
.........................
.........................
.
~j ~ ~ r !~~ ~ i~! [~f~~ i~Ii~[~~j!~~ j~i~j!!~! ~ I~~
:::;:::::;;::;;:::;::;:::::::::::::::::::::::::::::
..........................
~rm~rrrmmrmrttri
...................................................
..........................
BODILY
INJURY $
(Per person)
BODILY
INJURY $
(Per ace)
PROPERTY
DAMAGE $
1\ EXCESS LIABILITY
q-OTHER THAN UMBRELLA FORM
I\.
WORKER'S COMPENSATION
AND
EMPLOYERS' LIABILITY
24540001
02/05/92 12/31/92
.....................
......................
!:::!:!:::!:!!!!!:!!!:::!::!!!:!::!::!::i!:
ir???:?:r::??,:? $
:.;.:.:.:.;.;.:.:.:.:.:.:.:.:.:.:.:.:.:.;.;
;;::::;::::;:;:;::::::;::::;:;:;::::;::::::
:.:.:.:.:.:.:.:.:.:~;~.;~:~ORY::::::::t::::::::::::::::::::::::::::::::::::::::::'::::::::::::::::::::::::::::::::::::::::::::::::
$ 500 (EAC~ ACCIDENT)
$ 500 (DISEASE-POLICY LIMIT)
$ 500 (DISEASE- EACH EMPLOYEE
EACH
OCCUR.
AGGREGATE
UBA68148767
~2/05/92 02/05/93
$
OTH.
DESCRIPTION OF OPERATlONS/LOCATlONS/VEHICLES/SPECIAL ITEMS
RE: MONROE COUNTY DETENTION FACILITY
:Bftnfgt'JIIRmf::m:\}\i::::m\::::m'::m:::::\::\:::'::::::::m::'}::::m:::::::::m:::::::::::::::::\:'::::m::,::mm}:::::::':'}}j:j:j:j:\MMI.RMADIH\:::::t:m:mm}}:'\::f:::'::":::'::f:'::::::::f::::m:m::",::m:::m::::'\"::::::\}':::m:}}"::mI'::::::"::m'::::::::::}:::::::::::'::::::::::::::::\::m:::::::::::m::mmm:::::::::::
t:::: SHOULD ANYOFTHEABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING COMPANY WILL ENDEAVOR TO
MORRISON KNUDESON / GERRIT MAIL1D- DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE
P . O. BOX 5283 .... LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR
--=~=~
- <...,..... -~" >;--- ~.~....,.......--~ .>-.-.":_......,.. -.c-.. .~-=- __...._..-'-_
TABLE OF CONTENTS
BID GROUP 3A
1. Bidding Documents (Volume I)
section 00030
section 00050
section 00100
section 00113
section 00114
section 00115
section 00116
section 00117
section 00118
section 00119
section 00120
section 00121
section 00122
section 00123
section 00124
section 00125
section 00126
section 00127
section 00143
section 00144
section 00145
section 00146
section 00147
section 00155
Section 00156
section 00157
section 00163
section 00220
Section 00230
Notice of Calling for Bids
Project Summary
Instructions to Bidders
Proposal Forms:
Security Systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
Fire Protection System
Food Service Equipment
Laundry Equipment
Loading Dock Equipment
Pneumatic Tube System
Metals
Security Glass and Glazing
Aluminum Window Walls, Glass & Glazing
Plumbing Contract Zones D and E
Electrical Contract Zones D and E
Metals-Doors-Glazing
Schedule of Unit Prices:
Security Systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
Fire Protection System
Plumbing Contract Zones D and E
Electrical Contract Zones D and E
Metals-Doors-Glazing
Pre-Bid Substitutions
Geotechnical Data
site Survey
02/18/92
00001 - 1
TABLE OF CONTENTS (ADD. 5)
section 00303
section 00305
section 00307
section 00309
section 00310
section 00311
section 00312
section 00313
section 00314
Section 00315
section 00316
section 00317
section 00318
section 00319
section 00320
section 00321
section 00322
section 00323
section 00324
section 00325
section 00326
section 00327
section 00353
section 00410
section 00420
section 00425
section 00430
section 00440
section 00450
Scopes of Work for Reference (BG-1 and
BG-2): -
site Electrical & Temporary Power
site Grading & Caissons
Concrete Foundations
site Plumbing
Precast Concrete
Hydraulic Elevators
Precast Embeds
Scopes of Work (BG-3A):
Security Systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
Fire Protection System
Food Service Equipment
Laundry Equipment
Loading Dock Equipment
Pneumatic Tube System
Metals
Security Glass and Glazing
Aluminum Window Walls, Glass & Glazing
Plumbing Contract Zones D and E
Electrical Contract Zones D and E
Metals-Doors-Glazing
Milestone Schedule
Bid Bond - AlA Document A310, February
1970 edition
Sworn Statement on Public Entity Crimes
Lobbying and Conflict of Interest Clause
Non-Collusion Affidavit
Proposed Subcontractor Listing
Contractor's Qualification Statement -
AlA Document A305
02/18/92
00001 - 2
TABLE OF CONTENTS (ADD. 5)
.-....."'Jo "';.-. -. ._-
_..~
2. Contract Documents (Volume I)
section 00500 Standard Form of Agreement Between Owner
and Contractor - AlA Document A101/CM,
June 1980 edition
section 00610 Public Construction Bond
3. Conditions (Volume I)
section 00750 General Conditions, AlA Document
A201/CM, June 1980 edition
Section 00800 Substantial Completion and Owner
Acceptance
section 00805 Supplementary General Conditions
section 00900 Application & Certificate for Payment -
AlA Document G702/G703
section 00905 Contractor's Affidavit of Payment of
Debts and Claims
section 00908 Contractor's Affidavit of Release of
Liens
section 00910 Consent of Surety to Final Payment - AlA
Document G707, April 1970 edition
section 00915 Affidavit and Partial Release of Lien
section 00970 Project Safety and Health Plan
section 00980 Contractor Quality Control Plan
4. Drawings
section 00993 Schedule of Drawings, Bid Group 3
02/18/92
TABLE OF CONTENTS (ADD. 5)
00001 - 3
5. General Requirements (Volume I)
section 01027
section 01028
section 01130
Section 01200
Section 01301
section 01310
section 01370
section 01385
section 01395
section 01410
Section 01510
section 01520
section 01550
section 01560
section 01580
section 01590
section 01595
section 01600
section 01630
section 01650
section 01670
section 01700
section 01710
section 01720
section 01730
Application for Payment
Change Order Procedures
security project Procedures
Project Meetings
Submittals
Progress Schedules
Schedule of Values
Daily Construction Reports
Document Clarification Requests
Testing Laboratory Services
Temporary utilities
Construction Aids
Access Roads and Parking Areas
Temporary Controls
Project Identification and signs
Field Offices and Sheds
Construction Cleaning
Material and Equipment
Post-Bid substitutions
starting of systems
systems Demonstrations
Contract Closeout
Final Cleaning
Project Record Documents
operation and Maintenance Data
02/18/92
00001 - 4
TABLE OF CONTENTS (ADD. 5)
6. Technical Specifications, Bid Group Three, (Volume II, dated
November 11, 1991)
DIVISION 2 - SITEWORK
section 02211
section 02215
section 02222
section 02226
section 02510
section 02518
section 02520
section 02580
section 02644
section 02721
section 02730
section 02732
section 02733
section 02800
section 02810
section 02830
section 02835
section 02930
section 02950
Rough Grading
Finish Grading
Excavating, Backfilling And Compacting
For Structures
Excavating, Backfilling and Compacting
For utilities
Asphaltic Concrete Paving
Concrete unit Pavers
Portland Cement Concrete Paving
Pavement Marking
Water Mains
Sewer structures
Sanitary Sewerage
Sewage Force Mains
Sewage Pump station
site Improvements
Irrigation System
Fence And Gates
Barbed Tape
Lawns
Trees, Shrubs And Ground Cover
DIVISION 3 - CONCRETE
section 03100
section 03200
section 03300
section 03520
section 03600
Concrete Formwork
Concrete Reinforcement
cast-in-Place Concrete
Insulating Concrete Decks
Grout
DIVISION 4 - MASONRY
section 04200 Unit Masonry
DIVISION 5 - METALS
/Section 05180
./ section 05500
./ section 05510
section 05810
Miscellaneous Structural Steel
Metal Fabrications
Metal stairs
Expansion Joint Covers Assemblies
DIVISION 6 - WOOD AND PLASTIC
Section 06100 Rough Carpentry
Section 06200 Finish Carpentry
02/18/92
00001 - 5
TABLE OF CONTENTS (ADD. 5)
DIVISION 7 - THERMAL AND MOISTURB PROTECTION
$.
section 07115
section 07210
section 07215
section 07272
section 07530
section 07730
section 07900
Sheet Waterproofing
Building Insulation
sprayed Insulation
Firestop And Penetration Sealing System
Single Ply Roofing
Roof Accessories
Joint Sealers
DIVISION 8 - DOORS AND WINDOWS
section 08100
section 08211
section 08300
section 08305
section 08320
section 08410
section 08660
section 08710
section 08800
section 08842
section 08902
Metal Doors And Frames
Flush Wood Doors
Special Doors
Access Panels And Doors
Security Metal Doors And Frames
Aluminum Entrances
Security windows
Door Hardware
Glazing
Security Glazing
Aluminum Window Walls
DIVISION 9 - FINISHES
section 09110
section 09200
section 09250
section 09300
section 09510
section 09650
section 09680
section 09700
section 09800
section 09830
section 09900
section 09950
Non-Load Bearing Wall Framing Systems
Lath and Plaster
Gypsum Board
Tile
Acoustical Ceilings
Resilient Flooring
carpet
Special Flooring
Special coatings
Elastomeric coating
Painting
Wallcovering
DIVISION 10 - SPECIALTIES
section 10100
section 10160
section 10200
section 10270
section 10350
section 10500
section 10520
section 10550
section 10606
section 10800
Chalkboards And Tackboards
Solid Plastic Toilet Partitions
Louvers and Vents
Access Flooring
Flagpole
steel Lockers
Fire Extinguisher Cabinets
Postal Specialties
Security Fencing Assembly
Toilet Accessories
02/18/92
00001 - 6
TABLE OF CONTENTS (ADD. 5)
-..-;,...-- ,---~.-.'.-~...-._- ~.............., -.........- .....-'....' .'-
DIVISION 10 - SPECIALITIES continued
section 10900 Miscellaneous Specialties
DIVISION 11 - EQUIPMENT
section 11110
section 11160
section 11197
section 11200
Section 11202
section 11203
section 11204
section 11205
section 11206
section 11208
Section 11211
section 11212
section 11217
section 11218
section 11222
section 11224
section 11400
section 11480
section 11704
Laundry Equipment
Loading Dock Equipment
Security/Detention Equipment
Basic Electronic Security Requirements
System Central Processing unit
Fire Alarm Interface
Programmable Logic Controller
Address Panels
Relay Cabinets
Card Access Control
situation Man-Down Equipment
Closed Circuit video Equipment
Vehicle Loop Detection
Operational Intercom System
Inmate/Attorney Telephones
Metal Detection Equipment
Food Service Equipment
Athletic Equipment
Ice Machines
DIVISION 13 - RADIATION PROTECTION
section 13090 Radiation Protection
DIVISION 14 - CONVEYING SYSTEMS
section 14700
Section 14240
Pneumatic Tube System
Hydraulic Elevators
DIVISION 15 - MECHANICAL
section 15000
section 15050
section 15060
section 15085
section 15100
section 15110
section 15130
section 15140
section 15160
section 15175
section 15242
section 15252
General provisions
Water Treatment
Pipe and Pipe Fittings
Piping Identification
Valves
Heat Trace System
Thermometers and Gages
Pipe Hangers And Supports
Pumps
Variable Speed Motor Control for Fans
and Pumps
vibration Isolation
Pipe And Equipment Insulation
02 / 18 / 92.
00001 - 7
TABLE OF CONTENTS (ADD. 5)
DIVISION 15 - MECHANICAL continued
section 15290
section 15330
section 15403
section 15404
section 15408
section 15410
section 15430
section 15440
section 15460
section 15470
section 15490
section 15517
section 15540
section 15684
section 15714
section 15770
section 15785
section 15855
section 15858
section 15880
section 15884
section 15885
section 15890
section 15894
section 15936
section 15950
section 15965
section 15992
section 15995
Ductwork Insulation
Wet-sprinkler system
Water Booster Pumps
Domestic Water Softener
soil, Waste and Vent System
storm Drainage System
Plumbing specialties
Plumbing Fixtures and Accessories
Sump Pumps
Hot Water storage Heater
Fuel storage And Dispensing Systems
Hydronic specialties
Emergency Generator Auxiliaries
Centrifugal Chillers
Blow Thru Cooling Tower
Make-Up Air Units
Fan Coil units
Air Handling units
Fans
Fire Dampers
Combination Smoke And Fire Dampers
Air Filters
Ductwork
Air Terminal units
Grilles, Registers, Diffusers
Automatic Temperature Control Systems
Building Automation System
Tests - piping systems
System Balancing and Testing
DIVISION 16 - ELECTRICAL
section 16010
Section 16111
section 16111
section 16120
section 16155
section 16161
section 16170
section 16199
section 16300
section 16351
section 16400
section 16425
section 16450
section 16461
section 16470
Electrical General provisions
Conduit systems - Bid Group 3
Conduit systems - Bid Group 2
Wire and Cable
Combination Motor starters
Motor Control Centers
Disconnect Switches
wiring Devices and Plates
Standby Power Generation
uninterruptible Power supply
service and Power Distribution Systems
Main Service switchboard
Electrical Systems Grounding
Dry Type Distribution Transformers
Distribution panelboards - circuit
Breaker Type
02/18/92
00001 - 8
TABLE OF CONTENTS (ADD. 5)
section 16471
DIVISION 16 - ELECTRICAL continued
section 16472
section 16500
section 16601
section 16605
section 16660
section 16721
section 16781
section 16930
Feeder and Branch circuits and Emergency
wiring
Branch circuit Panelboards - circuit
Breaker Type
Lighting
Lightning Protection System
Transient Voltage/Surge Protection
Wiring for Equipment Furnished by Others
Fire Alarm System
Telephone Conduit Systems
Lighting Control Equipment
02/18/92
00001 - 9
TABLE OF CONTENTS (ADD. 5)
SECTION 00993
SCHEDULE OF DRAWINGS
./
.. ...- -."_ ~r . ._... ~_. -..
NUMBER
/0.00
0.01
0.02A
0.03
0.04
0.05
1. OOA
1.00B
1. OOC
1. 01A
1.02A
1. 03A
1.04A
1. 05A
1. 06
1.06A
1.07A
1. 08A
,
1.09A
1.10
1.11
DRAWING TITLE
Cover
Index of Drawings
Life Safety Plan Ground Floor
Symbols and Abbreviations (Architectural)
Life Safety Plan First Floor
Life Safety Plan 2nd Floor
Existing Conditions North
Existing Conditions Central
Existing Conditions South
Not Used
Not Used
Final site Layout Central
Final site Layout and Grading south
Final Grading North
Rough Grading and Drainage
Final Grading and Drainage Central
Not Used
Final site utilities Central
Not Used
Entrance Enlargement
1.12 Landscape Plan Central
Landscape Plan North
DRAWING
LATEST
REVISION DATE
f
Rev 11/11/91 ~
1 Rev 11/11/91 ,/
2 Rev 01/09/92 ,/
2 Rev 01/09/92 .r
2 Rev 01/09/92 y
1 Rev 11/11/91 r
1 Rev 11/11/91 ,/
1 Rev 11/11/91 v-
,I"
II
2 Rev 02/07/92 Y'
BG3 10/15/91 Y'
1 Rev 11/11/91 ,/
4 Rev 02/18/92 I
1 Rev 02/07/92 ./
/
2 Rev 02/07/92 \
1 Rev 02/07/92 I
BG3 10/15/91 V
1 Rev 02/07/92 ./
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 1
1.13
1.14
1.15
1.16
1.17
1.18
1.19
1. 20
1. 21
1. 22
3.01
3.02
3.03
3.04
3.05
3.06
3.07
3.08
3.09
3.10
3.11
3.12
3.13
3.14
3.15
3.16
03/17/92
Landscape Plan South
Irrigation Plan North
Irrigation Plan Central
Irrigation Plan South
Pump station Grinder Details
Not Used
Not Used
site Details Fencing and Paving
Landscape Irrigation Details
civil Details
Not Used
Foundation Plan, Ground Floor Zone B
Not Used
Not Used
Not Used
Not Used
Framing Plan First Floor Zone A
Framing Plan First Floor Zone B
Framing Plan First Floor Zone C
Framing Plan First Floor Zone D
Framing Plan First Floor Zone E
Framing Plan First Floor Zone F Alternate
Framing Plan Second Floor Zone A
Framing Plan Second Floor Zone B
Framing Plan Second Floor Zone C
Framing Plan Mezzanine Level Zone D
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
BG3 10/15/91
BG3 10/15/9
1 Rev 02/07/92
BG3 10/15/91
1 Rev 11/11/91
2 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
1 Rev 02/18/92
3 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
6 Rev 02/07/92
6 Rev 02/07/92
BG3 11/11/91
5 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
5 Rev 02/07/92
00993 - 2
~..... .._~~_...__.......... ..:--', .......-_~'""..."'.__ ......-. ..... --""!'r . '.-..,....-.....--..:-.""';-
3.17 Framing Plan Mezzanine Level Zone E 5 Rev 02/07/92
3.18 Framing Plan Mezzanine Floor Zone F BG3 11/11/91
Alternate
3.19 Framing Plan Mechanical Plenum Zone D BG3 11/11/91
3.20 Framing Plan Mechanical Plenum Zone E BG3 11/11/91
3.21 Framing Plan Mechanical Plenum Zone F BG3 11/11/91
Alternate
3.22 Framing Plan Roof Level Zone A 4 Rev 02/07/92 .
3.23 Framing Plan Roof Level Zone B 3 Rev 02/07/92
3.24 Framing Plan Roof Level Zone C 3 Rev 02/07/92
3.25 Framing Plan Roof Level Zone D 5 Rev 02/07/92
3.26 Framing Plan Roof Level Zone E 5 Rev 02/07/92
/
3.27 Framing Plan Roof Level Zone F Alternate BG3 11/11/91
3.28 Not Used
3.29 Not Used
3.30 Not Used
3.31 Foundations, Sections and Details 4 Rev 02/18/92
3.32 Typical Details 4 Rev 02/07/92
3.33 Sections & Details 4 Rev 02/07/92
3.34 Sections & Details 3 Rev 02/07/92
3.35 Precast Wall Schedule & Details 4 Rev 02/07/92
3.36 Precast Column Schedule & Details 4 Rev 02/07/92
3.37 General Notes & Abbreviations & Typical 4 Rev 02/07/92.
Details
3.38 Sections & Details 3 Rev 02/07/92
3.39 Sections & Details 5 Rev 02/07/92
4.01 Exterior Building Plan Ground Floor Zone A 1 Rev 02/07/92
03/17/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 3
4.01A Building Plan Ground Floor Zone A 1 Rev 02/07/92
4.02 Exterior Building Plan Ground Floor Zone B BG3 11/11/9:
4.02A Building Plan Ground Floor Zone B BG3 10/15/91
4.03 Exterior Building Plan Ground Floor Zone C BG3 11/11/91
4.03A Building Plan Ground Floor Zone C BG3 10/15/91
4.04 Exterior Building Plan Ground Floor Zone D BG3 11/11/91
4.04A Building Plan Ground Floor Zone D Housing BG3 10/15/91
4.05 Exterior Building Plan Ground Floor Zone E BG3 11/11/91
Housing
4.05A Building Plan Ground Floor Zone E Housing BG3 10/15/91
4.06 Exterior Building Plan Ground Floor Zone F BG3 11/11/91
Housing Alternate
4.06A Building Plan Ground Floor Zone F Housing BG3 10/15/91
Alternate
4.07 Exterior Building Plan First Floor Zone A 1 Rev 02/07/92
4.08 Exterior Building Plan First Floor Zone B BG3 11/11/9J
4.09 Exterior Building Plan First Floor Zone C 4 Rev 02/07/92
4.10 Exterior Building Plan First Floor Zone D BG3 11/11/91
Housing
4.11 Exterior Building Plan First Floor Zone E BG3 11/11/91
Housing
4.12 Exterior Building Plan First Floor Zone F BG3 11/11/91
Housing Alternate
4.13 Exterior Building Plan Second Floor Zone A 4 Rev 02/07/92
4.14 Exterior Building Plan Second Floor Zone B BG3 11/11/91
4.15 Exterior Building Plan Second Floor Zone C 3 Rev 02/07/92
4.16 Exterior Building Plan Mezzanine Level BG3 11/11/91
Zone 0 Housing
4.17 Exterior Building Plan Mezzanine Level BG3 11/11/91
Zone E Housing
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8) 00993 - 4
4.18 Exterior Building Plan Mezzanine Level
Zone F Housing Alternate
4.19 Mechanical Plenum Plan Zone D
4.20 Mechanical Plenum Plan Zone E
4.21 Mechanical Plenum Plan Zone F Alternate
4.22 Building Plan Roof Level Zone A
4.23 Building Plan Roof Level Zone B
4.24 Building Plan Roof Level Zone C
4.25 Building Plan Roof Level Zone D
4.2p Building Plan Roof Level Zone E
4.27 Building Plan Roof Level Zone F Alternate
4.28 Exterior Elevations
4.29 Exterior Elevations
4.30 Exterior Elevations
4.31 Exterior Elevations
4.32 Exterior Elevations
4.33 Exterior Elevations
4.33A Exterior Elevations
4.34 Wall sections
4.35 Wall sections
4.36 Wall sections
4.37 Wall sections
4.38 Exterior Details
4.39 Exterior Details
4.40 Exterior Details
4.41 Exterior Details
BG3 11/11/91
BG3 11/11/91
BG3 11/11/91
BG3 11/11/91
4 Rev 02/07/92
3 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/')2
BG3 11/11/91
2 Rev 02/07/92
1 Rev 02/07/~2
3 Rev 02/07/92
3 Rev 02/07/C)2
BG3 11/11/91
BG3 11/11/91
2 Rev 02/07/92
4 Rev 02/07/92
3 Rev 02/07/92
2 Rev 02/07/92
5 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
5 Rev 02/07/92
BG3 11/11/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 5
4.41A
Exterior Details
4.41B
Exterior Details
4.42
Metal Door & Window Frame Elevations &
Details, Door Schedule
4.43
Not Used
4.44
Not Used
4.45
Not Used
4.46
stair Plans & sections
4.47
stair Plans & Sections
"--
4.47A
stair Plans & sections
4.48
stair Details
4.49
Elevator Plans & sections
4.50
Elevator Details
4.51
Enlarged Cell - Plans & Elevations
4.52
Not Used
4.53 Interior Building Plan First Floor Zone A
4.54 Interior Building Plan First Floor Zone B
4.55 Interior Building Plan First Floor Zone C
4.56 Interior Building Plan First Floor Zone D
Housing
4.57 Interior Building Plan First Floor Zone E
Housing
4.58 Interior Building Plan First Floor Zone F
Housing Alternate
4.59 Interior Building Plan Second Floor Zone A
4.60 Interior Building Plan Second Floor Zone B
4.61 Interior Building Plan Second Floor Zone C
BG3 11/11/91
3 Rev 02/07,
3 Rev 12/20/91
BG3 11/11/91
3 Rev 02/07/92
BG3 11/11/91
BG3 11/11/91
2 Rev 02/07/92
2 Rev 02/07/92
BG3 11/11/91
3 Rev 02/07/92
2 Rev 01/09/92
1 Rev 11/11/91
2 Rev 01/09/92
2 Rev 01/09/92
1 Rev 01/09/92
2 Rev 02/07/92
1 Rev 11/11/91
1 Rev 11/11/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 6
, -,,------ -
- ----"---._---...~.~....- .. -.--.----. ._-------~~_..... ~.... - -
-~.,. --~'" ~ --':..~~' .-/
4.62
4.63
4.64
4.65
4.66
4.67
4.67A
4.68
4.69
4.70
4.71
4.72
4.73
4.74
4.75
4.76
4.77
4.78
4.79
4.79A
4.80
6.01
Interior Building Plan Mezzanine Level D
Housing
Interior Building Plan Mezzanine Level
Zone E Housing
Interior Building Plan Mezzanine Level
Zone F Housing Alternate
Building sections
Building sections
Not Used
Partition Types
Interior Details
Interior Details
Interior Details
Interior Details
Interior Details
Door Schedule
Door Schedule
Door Schedule
H.M. Elevations
Door and Window Details and Buck Types
Finish Schedule
Finish Schedule
Finish Schedule
Miscellaneous Details
Reflected ceiling Plan Ground Floor Zone A
6.02 Not Used
6.03 Reflected Ceiling Plan Ground Floor Zone C
1 Rev 02/07/92
2 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
2 Rev 01/02/92
2 Rev 02/07/92
2 Rev 02/07/92
1 Rev 02/07/92
2 Rev 02/07/92
1 Rev 02/07/92
2 Rev 02/07/92
3 Rev 01/09/92
4 Rev 01/09/92
2 Rev 01/09/92
1 Rev 01/09/92
BG3 10/15/91
3 Rev 02/07/92
3 Rev 02/07/92
2 Rev 12/20/91
BG3 10/15/91
1 Rev 02/07/92
BG3 10/15/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 7
6.04
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
7.00
7.01
7.02
7.03
Not Used
Not Used
Not Used
Reflected ceiling Plan First Floor Zone A 1 Rev 02/07/92
Reflected Ceiling Plan First Floor Zone B BG3 10/15/91
Reflected Ceiling Plan First Floor Zone C BG3 10/15/91
Reflected Ceiling Plan First Floor D Housing BG3 10/15/91
Reflected Ceiling Plan First Floor Zone E
Housing
Reflected Ceiling Plan First Floor Zone F
Housing Alternate
Reflected Ceiling Plan Second Floor Zone A
Reflected Ceiling Plan Second Floor Zone B
Reflected Ceiling Plan Second Floor Zone C
Reflected Ceiling Plan Mezzanine Level
Zone D Housing
Reflected Ceiling Plan Mezzanine Level
Zone E Housing
Reflected Ceiling Plan Mezzanine Level
Zone F Housing Alternate
Ceiling Details
ceiling Details
standard Mounting Heights
Not used
Not used
7.04 Not Used
Equipment Plan Ground Floor Zone C
7.05 Not Used
BG3 10/15/91
BG3 10/15/91
1 Rev 02/07/92
1 Rev 12/20/91
BG3 10/15/91
1 Rev 02/07/92
1 Rev 02/07/92
BG3 10/15/91
2 Rev 02/07/92
1 Rev 02/07/92
1 Rev 11/11/91
BG3 10/15/91
03/17/92
00993 - 8
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
7.06
Not Used
7.07 Equipment Plan First Floor Zone A
7.08 Equipment Plan First Floor Zone B
7.09 Equipment Plan First Floor Zone C
7.10 Equipment Plan First Floor Zone D Housing
7.11 Equipment Plan First Floor Zone E Housing
7.12 Equipment Plan First Floor Zone F Housing
Alternate
7.13 Equipment Plan Second Floor Zone A
7.14 Equipment Plan Second Floor Zone B
7.15 Equipment Plan second Floor Zone C
7.16 Equipment Plan Mezzanine Level Zone D
Housing
7.17 Equipment Plan Mezzanine Level Zone E
Housing
7.18 Equipment Plan Mezzanine Level Zone F
Housing Alternate
7.19 Enlarged Toilet/Shower Equipment Plan
7.20 Enlarged Plans
7.21 Millwork Elevations
7.22 Millwork Elevations
7.23 Millwork Elevations
7.24 Millwork Elevations
7.25 Millwork Details
7.26 Millwork Details
FS-1 Food Service Equipment Schedule
FS-2 Food Service Equipment Plan
FS-3 Food Service Mechanical Plan
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
1 Rev 11/11/91
BG3 10/15/91
BG3 10/15/91
1 Rev 11/11/91
1 Rev 11/11/91
1 Rev 11/11/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 02/07/92
1 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 01/02/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
00993 - 9
FS-4 Food Service Electrical Plan BG3 10/15/91
FS-5 Food Service plumbing Plan BG3 10/15/~
FS-6 Food Service Equipment Details BG3 10/15/91
FS-7 Food Service Equipment Details BG3 10/15/91
L-1 Laundry Equipment Plan and Schedule BG3 10/15/91
L-2 Laundry Mechanical Plan BG3 10/15/91
L-3 Laundry Electrical Plan BG3 10/15/91
L-4 Laundry Plumbing Plan BG3 10/15/91
Vol.II
0.00 Cover
0.01 Index of Drawings Rev 11/11/91
8.00 Plumbing Legend BG3 10/15/91
8.00A Plumbing Schedules 1 Rev 12/20/91
8.01 Plumbing Ground Floor Zone A 3 Rev 02/07/92
8.02 Plumbing Ground Floor Zone B BG3 10/15/9.J..
8.03 Plumbing Ground Floor Zone C 3 Rev 01/02/92
8.04 Plumbing Ground Floor Zone D Housing 2 Rev 01/09/92
8.05 Plumbing Ground Floor Zone E Housing BG3 10/15/91
8.06 Plumbing Ground Floor Zone F Housing 1 Rev 11/11/91
Alternate
8.07 Plumbing First Floor Zone A 2 Rev 02/07/92
8.08 Plumbing First Floor Zone B BG3 10/15/91
8.09 Plumbing First Floor Zone C 1 Rev 01/02/92
8.10 Plumbing First Floor Zone D Housing 2 Rev 01/09/92
8.11 Plumbing First Floor Zone E Housing 1 Rev 12/20/91
8.12 Plumbing First Floor Zone F Housing 1 Rev 11/11/91
Alternate
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8) 00993 - 10
"<', "" _,~._ ""'.,," _. ...,.",....*~:.~...._ _ .:"..'""_,-. ,.'"'";...... "',....~...,'-;...., '''.-,_-, ,.!--~. -'." '~'-o~<h,' -,,'_".F ..,.."..,.'.,..-,~ '. '...,....:..' J,_ ""'."'.. ....__.___,_..>.., ". _ ',",-'" "'; "'-- ..~~..., ,.......-." '... ". .-...... .- ._.....~~.. ,.-......
-. -- -----_...._._-------~.._-_._-_._--_.- _.._-_._-~-_.,;...
8.13 Plumbing Second Floor Zone A 1 Rev 01/09/92
8.14 Plumbing Second Floor Zone B BG3 10/15/91
8.15 Plumbing Second Floor Zone C 2 Rev 12/20/91
8.16 Plumbing Mezzanine Level Zone D Housing 1 Rev 12/20/91
8.17 Plumbing Mezzanine Level Zone E Housing BG3 10/15/91
8.18 Plumbing Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
8.l9 Plumbing Plenum Plan Zone D Housing 1 Rev 01/09/92
8.20 Plumbing Plenum Plan Zone E Housing BG3 10/15/91
8.21 Plumbing Plenum Plan Zone F Housing BG3 10/15/91
Alternate
8.22 Plumbing Schedules and Details 1 Rev 01/02/92
8.23 Plumbing Riser Diagram 2 Rev 02/07/92
8.24 Plumbing Riser Diagram 1 Rev 01/09/92
8.25 Plumbing Riser Diagram 1 Rev 01/09/92
8.26 Plumbing Riser Diagram BG3 10/15/91
8.27 Plumbing Riser Diagram BG3 10/15/91
8.28 Plumbing Riser Diagram BG3 10/15/91
8.29 Plumbing Riser Diagram BG3 10/15/91
8.30 Plumbing Riser Diagram BG3 10/15/91
8.31 Plumbing Riser Diagram BG3 10/15/91
8.32 Plumbing Riser Diagram 1 Rev 11/11/91
8.33 Plumbing Riser Diagram BG3 10/15/91
8.34 Plumbing Riser Diagram BG3 10/15/91
8.35 Plumbing Kitchen Plan 1 Rev 01/02/92
8.36 Waste Handling System Details 1 Rev 01/02/92
9.01 Not Used
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8) 00993 - 11
9.02
9.03
9.04
9.05
9.06
9.07
9.08
9.09
9.10
9.11
9.12
9.13
9.14
9.15
9.16
9.17
9.18
9.19
9.20
9.21
9.22
10.01
Not Used
Not Used
Not Used
Not used
Not Used
Piping Plan First Floor Zone A
Piping Plan First Floor Zone B
piping Plan First Floor Zone C
Piping Plan First Floor Zone D Housing
Piping Plan First Floor Zone E Housing
Piping Plan First Floor Zone F Housing
Alternate
Piping Plan Second Floor Zone A
Piping Plan Second Floor Zone B
piping Plan Second Floor Zone C
Piping Plan Mezzanine Level Zone D Housing
Piping Plan Mezzanine Level Zone E Housing
Piping Plan Mezzanine Level Zone F Housing
Alternate
Not Used
Not Used
Fuel oil Details
Piping Diagrams
10.02 HVAC Plan Ground Floor Zone B
Not Used
10.03 HVAC Plan Ground Floor Zone C
10.04 HVAC Plan Ground Floor Zone D Housing
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 1Q.L15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
00993 - 12
.- _._-- - .-.-. -- '-' -.. -- ....--- -- ..... '._'''~''''''-.> ...._-..--.-...-~_.~ ..-
10.05 HVAC Plan Ground Floor Zone E Housing BG3 10/15/91
10.06 HVAC Plan Ground Floor Zone F Housing BG3 10/15/91
Alternate
10.07 HVAC Plan First Floor Zone A 1 Rev 02/07/92
10.08 HVAC Plan First Floor Zone B BG3 10/15/91
10.09 HVAC Plan First Floor Zone C BG3 10/15/91
10.10 HVAC Plan First Floor Zone D Housing 1 Rev 01/09/92
10.11 HVAC Plan First Floor Zone E Housing 1 Rev 01/09/92
10.12 HVAC Plan First Floor Zone F Housing 1 Rev 01/09/92
Alternate
10.13 HVAC Plan Second Floor Zone A 1 Rev 02/07/92
10.14 HVAC Plan Second Floor Zone B 1 Rev 12/20/91
10.15 HVAC Plan Second Floor Zone C 1 Rev 01/09/92
10.16 HVAC Plan Mezzanine Level Zone D Housing BG3 10/15/91
10.17 HVAC Plan Mezzanine Level Zone E Housing BG3 10/15/91
10.18 HVAC Plan Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
10.19 HVAC Plenum Plan Zone D Housing BG3 10/15/91
10.20 HVAC Plenum Plan Zone E Housing BG3 10/15/91
10.21 HVAC Plenum Plan Zone F Housing Alternate BG3 10/15/91
10.22 Not Used
10.23 Not Used
10.24 HVAC Plan Roof Level Zone C 1 Rev 01/09/92
10.25 Not Used
10.26 Not Used
10.27 Not Used
10.28 Enlarged Mechanical Room Plan BG3 10/15/91
03/17/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 13
10.29
HVAC Details
10.30
HVAC Details
10.31
HVAC Details
10.32
HVAC Schedules
10.33
HVAC Schedules
10.34
HVAC Schedules
10.35
Central Plant Control Diagrams
10.36
HVAC Temperature Control
10.37
HVAC Smoke Control
11.00
Electrical Symbols and Notes
11.00A
Electrical site Lighting Plan
11. 01
Power and Lighting Plan Ground Floor
Zone A
11. 02
Power and Lighting Plan Ground Floor
Zone B
11.03 Power and Lighting Plan Ground Floor
Zone C
11.04 Power and Lighting Plan Ground Floor
Zone D Housing
11.05 Power and Lighting Plan Ground Floor
Zone E Housing
11.06 Power and Lighting Plan Ground Floor
Zone F Housing Alternate
11.07 Power Plan First Floor Zone A
11.08 Lighting Plan First Floor Zone A
11.09 Power Plan First Floor Zone B
11.10 Lighting plan First Floor Zone B
11.11 Power Plan First Floor Zone C
11.12 Lighting Plan First Floor Zone C
BG3 10/15/91
BG3 10/15/5
BG3 10/15/91
BG3 10/15/91
1 Rev 11/11/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
1 Rev 02/07/92
BG3 10/15/91
1 Rev 01/02/;12
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
BG3 10/15/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 14
11.13
11.14
11.15
11. 16
11. 17
11.l8
11.19
11. 20
11.21
11. 22
11.23
11.24
11. 25
11.26
11. 27
11. 28
11.29
11.30
Power Plan First Floor Zone D Housing
Lighting Plan First Floor Zone D Housing
Power Plan First Floor Zone E Housing
Lighting Plan First Floor Zone E Housing
Power Plan First Floor Zone F Housing
Alternate
Lighting Plan First Floor Zone F Housing
Alternate
Power Plan Second Floor Zone A
Lighting Plan Second Floor Zone A
Power Plan Second Floor Zone B
Lighting Plan Second Floor Zone B
Power Plan Second Floor Zone C
Lighting Plan Second Floor Zone C
Power Plan Mezzanine Level Zone D Housing
3 Rev 03/04/92
BG3 10/15/91
3 Rev 03/04/92
BG3 10/15/91
2 Rev 01/02/92
BG3 10/15/91
1 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
1 Rev 12/20/91
1 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
Power Plan Mezzanine Level Zone E Housing
Lighting Plan Mezzanine Level Zone D Housing BG3 10/15/91
2 Rev 03/04/92
Lighting Plan Mezzanine Level Zone E Housing BG3 10/15/91
Power Plan Mezzanine Level Zone F Housing
Alternate
1 Rev 12/20/91
Lighting Plan Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
11.31 Power and Lighting Plan Plenum Plan Zone D
Housing
11.32 Power and Lighting Plan Plenum Plan Zone E
Housing
11.33 Power and Lighting Plan Plenum Plan Zone F
Housing Alternate
11.34 Power Plan Roof Level Zone A
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 15
11. 35 Power Plan Roof Level Zone B BG3 10/15/91
11. 36 Power Plan Roof Level Zone C 1 Rev 01/09/
11. 37 Power Plan Roof Level Zone D BG3 10/15/91
11. 38 Power Plan Roof Level Zone E BG3 10/15/91
11. 39 Power Plan Roof Level Zone F Alternate BG3 10/15/91
11.40 Electrical Enlarged Kitchen Plan BG3 10/15/91
11.41 Electrical Enlarged Laundry Plan BG3 10/15/91
11.42 Lightning Protection Plan BG3 10/15/91
11. 43 Lightning Protection Plan Details BG3 10/15/91
11.44 Electrical Riser Diagram Part 1 2 Rev 01/02/92
11.45 Electrical Riser Diagram Part 2 1 Rev 11/11/91
11.46 Electrical Schedules and Details BG3 10/15/91
11. 47 Electrical Schedules and Details 5 Rev 03/04/92
11. 48 Electrical Schedules and Details 1 Rev 11/11/91
11.49 Electrical Schedules and Details 2 Rev 01/09/'='..
11. 50 Electrical Schedules and Details BG3 10/15/91
11.51 Electrical Schedules and Details BG3 10/15/91
11. 52 Not Used
12.01 Communications Plan Ground Floor Zone A BG3 10/15/91
12.02 Communications Plan Ground Floor Zone B BG3 10/15/91
12.03 Communications Plan Ground Floor Zone C 1 Rev 03/04/92
12.04 Communications Plan Ground Floor Zone D BG3 10/15/91
Housing
12.05 Communications Plan Ground Floor Zone E BG3 10/15/91
Housing
12.06 communications Plan Ground Floor Zone F BG3 10/15/91
Housing Alternate
03/17/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 16
12.07 Communications Plan First Floor Zone A 1 Rev 03/04/92
12.08 Communications Plan First Floor Zone B 1 Rev 03/04/92
12.09 Communications Plan First Floor Zone C 1 Rev 03/04/92
12.10 Communications Plan First Floor Zone D 1 Rev 03/04/92
Housing
12.11 Communications Plan First Floor Zone E 1 Rev 03/04/92
Housing
12.12 Communications Plan First Floor Zone F BG3 10/15/91
Housing Alternate
12.13 Communications Plan Second Floor Zone A 1 Rev 03/04/92
12.14 Communications Plan Second Floor Zone B 1 Rev 03/04/92
12.15 Communications Plan Second Floor Zone C 1 Rev 03/04/92
12.16 Communications Plan Mezzanine Level Zone D 1 Rev 03/04/92
Housing
12.17 Communications Plan Mezzanine Level Zone E 1 Rev 03/04/92
Housing
12.18 Communications Plan Mezzanine Level Zone F BG3 10/15/91
Housing Alternate
12.19 Fire Alarm Riser Diagram BG3 10/15/91
12.20 Telephone Riser Diagram and Elevator 1 Rev 12/20/91
Fire Alarm System
12.21 Not Used
12.22 Not Used
12.23 Not Used
12.24 Security Plan Ground Floor Zone A 1 Rev 12/20/91
12.25 security Plan Ground Floor Zone B 1 Rev 12/20/91
12.26 Security Plan Ground Floor Zone C 1 Rev 12/20/91
12.27 Security Plan Ground Floor Zone D Housing 1 Rev 12/20/91
12.28 security Plan Ground Floor Zone E Housing 1 Rev 12/20/91
03/17/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 17
12.29 Security Plan Ground Floor Zone F Housing 1 Rev 12/20/91
Alternate
12.30 Security Plan First Floor Zone A 3 Rev 03/04/92
12.31 Security Plan First Floor Zone B 3 Rev 03/04/92
12.32 Security Plan First Floor Zone C 2 Rev 03/04/92
12.33 Security Plan First Floor Zone D Housing 3 Rev 03/04/92
12.34 Security Plan First Floor Zone E Housing 3 Rev 03/04/92
12.35 Security Plan First Floor Zone F Housing BG3 10/15/91
Alternate
12.36 Security Plan Second Floor Zone A 5 Rev 03/04/92
12.37 Security Plan Second Floor Zone B 1 Rev 12/20/91
12.38 Security Plan Second Floor Zone C 3 Rev 03/04/92
12.39 Security Plan Mezzanine Level Zone D 3 Rev 03/04/92
Housing
12.40 Security Plan Mezzanine Level Zone E 3 Rev 03/04/92
Housing
12.41 security Plan Mezzanin Level Zone F 1 Rev 12/20/~~
Housing Alternate
12.42 Security Systems Riser Diagram 2 Rev 02/07/92
12.43 Details 1 Rev 02/07/92
12.44 Details 1 Rev 12/20/91
13.01 Fire Protection Ground Floor Zone A BG3 10/15/91
13.02 Fire Protection Ground Floor Zone B BG3 10/15/91
13.03 Fire Protection Ground Floor Zone C BG3 10/15/91
13.04 Fire Protection Ground Floor Zone D Housing BG3 10/15/91
13.05 Fire Protection Ground Floor Zone E Housing BG3 10/15/91
13.06 Fire Protection Ground Floor Zone F Housing BG3 10/15/91
Alternate
13.07 Fire Protection First Floor Zone A BG3 10/15/91
03/17/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 8) 00993 - 18
13.08 Fire Protection First Floor Zone B BG3 10/15/91
13.09 Fire Protection First Floor Zone C BG3 10/15/91
13.10 Fire Protection First Floor Zone D Housing BG3 10/15/91
13.11 Fire Protection First Floor Zone E Housing BG3 10/15/91
13.12 Fire Protection First Floor Zone F Housing BG3 10/15/91
Alternate
13.13 Fire Protection Second Floor Zone A BG3 10/15/91
13.14 Fire Protection Second Floor Zone B BG3 10/15/91
13.15 Fire Protection Second Floor Zone C BG3 10/15/91
13.16 Fire Protection Mezz. Level Zone D Housing BG3 10/15/91
13.17 Fire Protection Mezz. Level Zone E Housing BG3 10/15/91
13.18 Fire Protection Mezz. Level Zone F Housing BG3 10/15/91
Alternate
13.19 Not Used
13.20 Not Used
13.21 Not Used
13.22 Not Used
13.23 Not Used
13.24 Not Used
13.25 Not Used
13.26 Not Used
13.27 Not Used
13.28 Fire Protection Details BG3 10/15/91
13.29 Fire Protection Details BG3 10/15/91
03/17/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 8)
00993 - 19
SECTION 00331
SCOPE OF WORK
Bid Package No. 31
stairs & Miscellaneous Metals
1.1 General Scope
Provide all labor, supervision, engineering, materials,
supplies, equipment, tools, transportation, surveying and
layout, and protection, to install complete operating
systems, and proper execution and completion of all Work
specified on the drawings, in the bid package, and the
sections of the specifications, which include, but are not
limited to the listing that follows. The bidder shall review
all drawings, and specification sections that are not
specifically listed, for any additional requirements in order
to complete the scope of work described herein.
Primary sections and Descriptions of the Work
05500
05510
10606
Metal Fabrications
Metal stairs
Sccurity Fcncing Asscmbly
Related Sections and Descriptions
03300
Note:
03410
03412
03420
03490
03600
09900
Cast-In-Place Concrete
The following (4) Precast Concrete specifications
can be viewed at the office of the Construction
Manager.
Precast Concrete Hollow Cored Planks (BG-2)
Precast Concrete Panels (BG-2)
Precast Prestressed Concrete sections (BG-2)
Precast Concrete Modular Cell (BG-2)
Grout
Painting
1.2 Special provisions
The following special provisions are intended to clarify the
scope of work, or highlight features of the work, or modify,
change, add to, or delete from the General Scope of this Bid
Package.
04/16/92
STAIRS & MISC. METALS (ADD. 10)
00331 - 1
.1 All licenses required in order to perform the scope of
work in the specified location, shall be procured and
maintained by the contractor and his subcontractors.
contractor shall submit copies to the Construction
Manager. Contractor shall be responsible for applying
for, and procuring the construction permit as required by
the city of Key West; however, the Owner shall literally
pay the fee for the permit.
.2 Contractor shall maintain As-Built drawinqs I (Record
Drawings per section 01720), of his work progression. A
50% progress of field work submittal, will be required.
.3 Provide, replace, and maintain any safety rails and
barricades as necessary during the process of work, or
during deliveries of materials or equipment.
.4 Contractor is to review Division 1 General Requirements
for additional responsibilities required in order to
perform the work under this Bid Package.
contractor shall pay particular attention to section
01710 Final Cleaning, which shall be performed as
scheduled by the CM, which will be at or near the
completion of the project.
.5 Furnish to the appropriate trade contractor, for
installation in precast concrete, non-load bearing walls,
masonry, and cast-in-place concrete, all frames, sleeves,
anchors, weld plates and other similar inserts or devices
required to facilitate and coordinate the Work in this
Bid Package. Submit routing shop drawings showing wall
elevation, floor and ceiling plans with requirements for
location and size suitable for field location and
installation. Coordinate and verify correctness of
installation as the work progresses. Verify prior to
casting in form work, or during line and grade
installation of major feature progress.
Furnish and deliver to precast concrete contractor all
required sleeves, inserts and other embedded items with
coordination drawings necessary for incorporation in the
precast components, for all zones, with timeliness to
facilitate the fabrication schedule of the precast
contractor.
.6 Coordination of the Work
This contractor shall be responsible to coordinate his
work with other multiple prime contractors both in the
03/11/92
STAIRS & MISC. METALS (ADD. 8)
00331 - 2
scheduling of field work activities and in the
integration of individually furnished items into final
composite installations.
.7 All unfinished surfaces of materials or equipment
furnished or installed by this contractor, shall be
inspected for readiness by follow-on contractors and the
CM, prior to installation of follow-on work. This would
include bringing back to original condition, surfaces
disturbed by welding, burning, or other disfigurement,
which will need to be made ready for finish painting, or
other work.
.8 All incoming materials and equipment shall be coordinated
with other trades and the CM is to be notified, in order
that proper laydown, staging and stockinq areas are
developed, prior to release for shipping. within the
building, areas shall be restricted and stocking areas
will be authorized in writing.
.9 If in the event of conflicting, or overlapping
requirements in any area of the bidding documents,
technical specifications, or drawings, the most strinqent
condition shall be bid and constructed. Notify the CM in
any event, in order to not compromise the Owner's right
to make appropriate decisions.
.10 This contractor is reminded of inmate contact areas and
perimeters, and of the requirement for security devices,
fasteners, connectors, and any other work associated with
this bid package scope of work, in order that proper care
and construction is performed in accordance with the
standards and guidelines set forth by the regulatory
agencies governing jails.
.11 Furnish and install, in accordance with, and specified in
section 05500 Metal Fabrications, Metal Framing System,
Iron pipe Handrails, Steel Ladders, Steel Stair Treads
and Grating. Furnish to Concrete Contractor for
installation, Bumper Posts and Bollards.
.12 Provide factory finishes on supplied products where
specified.
.13 Furnish and install all ladders. The elevator pit
ladders and the roof scuttles are furnished and installed
by others.
.14 Furnish and install steel pan type stairs and landings
with handrails, plates, angles, posts, anchors, and welds
for securing to building structure. Furnish to Concrete
03/11/92
STAIRS & MISC. METALS (ADD. 8)
00331 - 3
.15
.16
.17
Contractor for installation, abrasive nosings.
Provide sleeves integral with metal stairs,
protection, and the sizing and location
coordinated with Fire Protection Contractor.
for fire
shall be
Coordinate with the Concrete Contractor, who will be
providing the concrete fill at stair treads and landings,
and who will be installing the stair nosings, as
furnished by the stairs & Miscellaneous Metals
Contractor. Allow for temporary fillers for landings and
treads, in order for stairways to be used, prior to
placement of concrete.
In addition to submittals required in this bid package,
submit procedure for weldinq, and welder certifications.
.18
Furni8h ~nd in~t~ll ~ecurity fencing ~nnembly complcte in
~~~~~~anc~ ~ith section 10606. Thin include~ horizont~l
l~t~on on prec~8t concrete 8tructure, ~nd b~lcony
It'I}liil)~llt4ftl~~~~~!~~
Taxes, the stairs & Miscellaneous Metals contractor shall
pay all sales, consumer, use and other similar taxes for
the Work or portions thereof provided by the Contractor
which are legally enacted at the time bids are received,
whether or not yet effective. The bidder shall state the
amount of taxes on the respective proposal form line
item.
.19
Embeds Schedule Attachment 'A'
Find attached to this scope of work Attachment 'A',
EMBEDS SCHEDULE, (6) pages, outlining the entity
responsible for embedded metal. In the 'Responsibility'
column, all items with a '3', are the direct
responsibility of the stairs & Miscellaneous Metals
contractor to furnish and install. This schedule shall
serve as a guide, and not be limited to the items
delineated, and the stairs & Miscellaneous Metals
contractor shall be responsible for determining the total
extent of embeds required under this bid package.
.20
Zone 'F' stairs & Miscellaneous
Owner Option No. 31-01:
Metals:
At the option of the Owner, furnish and install Zone
stairs & Miscellaneous Metals, similar to Zones 'D'
'E' .
'F'
and
04/16/92
STAIRS & MISC. METALS (ADD. 10)
00331 - 4
This area is defined as the area bound by column lines G
to La, and 17 line to 24 line, as well as column lines 37
to X, and U line to 42 line.
.. 21d Furnishdandinstall 4 tfx4itY"'sEiucturalsteeFftiD'e{s as
.~.. ...>.~;':~.~~;'9~~.c;;';.;.....~J1uu~[~~;.;.,.~.~9.t.~()~ 2 ondshe~y.4~9~..E.. ....... ........
04/16/92
STAIRS & MISC. METALS (ADD. 10)
00331 - 4A
1. 3 By Others
.1 Finish painting of all material and equipment is by
others, except where the specifications call for factory
finish.
.2 Elevator pit ladders and roof scuttles.
.3 Welded Steel Security Grille, as specified in section
05500 Metal Fabrications, paragraph 2.2 E. Welded Steel
Countertops, as specified in Section 05500 Metal
Fabrications, paragraph 2.2 I.
03/11/92
STAIRS & MISC. METALS (ADD. 8)
00331 - 5
Attachment 'A'
EMBEDS SCHEDULE
RESPONSIBILITY LEGEND:
1. PRECAST SUPPLIER - Bid Group 2 (pomco Associates, Inc.)
* 2. MISCELLANEOUS METALS SUPPLIER - Bid Group 2 (National
Detention Group, Inc.)
3. MISCELLANEOUS METALS SUPPLIER - Bid Group 3 (Stairs &
Miscellaneous Metals)
4. SECURITY FENCING n~STALLEn Bid Group 3 (Fcncing)tl9m
Q$~P.
5. ELEVATOR SUPPLIER - Bid Group 2 (Mowrey Elevator Co.)
6. ROOFING - Bid Group 3
7. BID GROUP1 - Under Contract
8. MASONRY - Bid Group 3
9. CAST-IN-PLACE CONCRETE - Bid Group 3
10. MISCELLANEOUS METALS SUPPLIER - B. P. 27 Metals-Doors-
Glazing
11. Bid Group 3, B.P. 17 Fire Protection Contractor
* 2s designates ship to site
2p designates ship to precaster
ITEM NO. ITEM
DETAIL #
-------- -----------------
1.
2.
3 .
4 .
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
Angle, Tube, Anchor
Assembly - 12/4.41a
Angle - 7/4.38
Channel - M
Anchor Slot - 4
Embed - 11
Metal flashing cap, clip,
and railing
Angle, tube, and anchor
assembly - 4/10-4.40
Tube - 5
Anchor slots - 1,2,4 thru
8, and 11
Angle - 12
Ladder/Post/Scuttle - 12
Not Used
Embed - 1
Security Bar - 1
Embed - 4
Security Bar & anchors-4
Angle/Anchors - 2
SHEET #
RESPONSIBILITY
4.34
4.36
4.36
4.38
4.38
-4 $'
-4 j
7
1
2p
3
3
3
1
6
6
2p
10
2p
2
2p
4.38
4.39
4.39
4.41
4.41
4.41
4.42
4.42
4.42
4.42
4.42
03/11/92
00331 - 6
STAIRS & MISC. METALS (ADD. 8)
18. Ladder - 1, both shown 4.46
19. Frame - B 4.46
20. Frame - A 4.46
21. Plate det. A/4.46 as shown 4.47
in detail ES-8, DS-3, ES-3,
FS-3, DS-1, CS-1
3
3
2
2P
Except for Plates to be 4.47
installed in cast-in-place
concrete, Ground Floor
2S
22. Plate det. B/4.46 as shown
in detail CS-l, DS-1, ES-8 4.47
23.
24.
25.
26.
27.
27.a
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
4l.
42.
43.
44.
45.
45.a
46.
47.
48.
Angles and plates shown in
ES-8, DS-3, ES-3, FS-3,
DS-6, ES-6, FS-6
Angle/Bolts - 5
Ladder -6
stairs/Rails
Angl/Frame/Lad
Sill angle per
section 7
Angles - Y,A
Embed - X
Plates - X
Rail - X
Embeds - B,A,~
Embeds - BC,2~
Embeds - A-':;: ,0
Embeds - 2,-B
Embeds --2-, C
Frame - 3
Frame - 3
Embeds - Note 1
Embeds - Note 7
Embeds - Note 8
Embeds - 2B
Embeds - 2B
Angle and fastener -
Breakaway Wall
Angle and anchor assembly
- Exterior Secure
Typical Interior Secure
Wall, steel reinforcing
Angle/Plate Shear Conn.
Plate - stairbase and
reinforcing
Reinforcing assembly,
weldment and tablebase
4.46
- All 4.49
BG-2 Add.1,
3
4.47
3
4.47A
4.47A
thru 4.48
& 4.50
3
3
3
5
4.50
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
5
2s
1
3
3
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
8
4.67A
4.67A
8
4.67A
3.32
8
1
3.32
9
3.32
9
03/11/92
00331 - 7
STAIRS & MISC. METALS (ADD. 8)
Embed/Plate, dbl T bear-
ing on beam
Reinforcing for above
Angles - Typ.Opening
Plate and reinforcing
- cooling Tower
Embeds/Plate
Embed - 9
Channel - 9
Plate - 10
Angle - 10
Reinforcing for above
Angle - 12
Plate - 12
Reinforcing for above
Embed - 7A, 7B
Embed - 8
Angle - 13
Plate - 13
Embed - 15
b d -& DBA' :&:Weld
~?~g;.:I- 1, 2 ~ S;41\;> 6,
!.~,8~~::j;:f:~ 9, 1 ~ 0 -l-2-;- 14,
Embed.....::::;:-......l, 18, 20
Embed/Plate - 5
Bent Plate - 11A, 11B
All metals 1,2,3
Reinforcing 5y6~
Embed/Angle/Bolt - 3
Plates, DBA's-5,6,7
Embed - 10
Embeds - 2
Embed - 5
Embeds - Typ.Col.Base
All but anch. bolts
Embeds - Typ.Beam to col
Connection
Embed/Plate Typ.Lat
support est mas wall past
structure
Embed - Typ Precast Beam 3.37
to Slab Conn @ Discont Slab
PI~tc ~nd DBA on ~bovc 3.37
Embed - Typ Beam Bearing 3.37
on CIP Col
Embed - Elev.Rail Conn. 3.37
Angle/Bolt - Elev.Sill 3.37
Embed - 4 3.38
Embed - 6A' 6B, 7A' 7B, 15 3.38
Plate & Dowel 7A, 7B 3.38
49.
49.a
50.
51.
52.
53.
54.
55.
56.
56.a
57.
58.
58.a
59.
60.
61-
62.
63.
64.
65.
66.
67.
68.
69.
70.
71-
72.
73.
74.
75.
76.
77.
78.
78.~
79.
80.
81.
82.
83.
84.
3.32
3.32
3.32
1
9
9 & 1
3.32
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.34
9
1
1
1
1
1
9
1
1
9
1
1
1
1
1
1
3.34
3.34
3.34
3.35
3.35
3.35
3.35
3.35
3.36
3.36
3.36
1
1
1
1
9
1
1
2p
1
1
1
3.36
1
3.37
1
1
9
1
2P
5
1
1
2S
03/11/92
00331 - 8
STAIRS & MISC. METALS (ADD. 8)
85.
86.
87.
88.
89.
90.
91.
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
Angles - 10
Embeds & Plates & DBA
Emb/Ang/Blt - 12, 13, 17
Embed - 18
Angles & DBA 19A, 19B
Embed - 20
Plates & Angles - 14A,14BC
Embed - 7
Emb/Ang/Blt - lSA, lSB
16, 17
Metal Shapes - 11, 18
Metal Necessary for typ
Beam Bearing @ CIP Col.
All stirrup reinforcing &
struct. shapes for
composite beams
Metal Necessary for shear
wall base det.
Typ Precast Beam to
Precast Element Conn
(except @ 1st FLR)
Typical CIP slab
Typic~l non lo~d bc~ring
ccll w~ll on 1st flr.,
~{f ~nd compressible
filler
Reinforcing section 4,5,
11 , IIA, 14 , 16 , 1 7 , ;t.~i. 20
Topping ReinforcIng.only,
sections 2A,B,C,18
Lover reinforcing only,
sectiono 2~,B,C,18
Composite beam reinforc-
ment, sections 1A,B
Typical elevator sill
Typical lateral support
detail for exterior
masonry wall running past
structure - angle, anchor
weld and sheetmetal
Typical control joint
in topping slab- topping
reinforcing
Typical construction
joint in topping slab-
topping reinforcing,
and dowels
Typical elev. rail
support beam connection
beam, clip and bolts
3.38
3.38
3.38
3.38
3.38
3.38
3.38
3.39
3.39
3.39
3.39
3.32
3.32
3.35
3.37
3.32
3.32
3.33
3.33
3.33
3.33
3.37
3.37
3.37
3.37
3.37
1
1
1
1
2s
1
1
1
1
1
1
1
1
1
1
1
9
9
9
1
1
5
9
9
9
5
03/11/92
00331 - 9
109.
STAIRS & MISC. METALS (ADD. 8)
110. Topping and curb rein-
forcing, section 1
111. Curb reinforcing, sec. 5
112. Conc. reinforcing, sec. 8
113. CIP trough stirrups, L's,
and reinforcing
114. CIP trough, sec. 10
115. Reinforcing steel and
reinforcing metals
116. Reinforcing steel, sec.
14A,B,C
117. vertical dowels, sec. 19B
118. Slab/curb reinforcing stl
119. Topping reinforcing,
section 18
120. Reinforcing steel, sec. 12
121. Reinforcing steel, sec. 8
122. All curb, steps, topping
reinforcing; DBA's; plates
and shapes
123. vertic~l do~el ~GGembly,
section 18
124. Pipe enclosure - det. P
125. Det. 8/4.41A, Det. 9/4.41A
126. Channels for louvers, Det.
7/4.41A
127. 2" sched. 40 pipe sleeve
for sprinkler head
128. Details 2 & 3 - Bench &
Bunk Mounting
Rebar -
Plate embed -
129. Detail 7 - stool Mounting:
Rebar -
Plate embed -
3.38 9
3.38 9
3.38 9
3.38 9
3.38 9
3.38 1
3.38 9
3.38 8
3.38 9
3.38 9
3.39 9
3.39 9
3.34 9
3.34 8
4.40 3
4.41A 3
4 . 4 1A By Mechanical
4.51 11
4.80 8
4.80 10
4.80 9
4.80 10
~~;;;'i~liilll~~g~~~~!~ili;1~willi I:I}~~~::. .:;;I;li;'ii',i;iil~p
.1.3..~..i.........f~~..i~~~~~;i.~~........~~ril~~f0t-()......................3..:..3.2........... ...... . 1
:r-..~..G~.~.DgH~.~#\.Jj~?l1ii.....4gtii.i.$
weldp).~t.g$. .. ................
+2g+$ttig+B~.1.Df()r-g:i.ngt.9py~r3Z
.... . .........a.b()\T~.................................. .............................. .
;l;3.4.g......'I'yp4-g~.~.......Pr.g9a~t........~.tA~.Ct!l.\.... ..y........~.......3.2.......> .. ...........>........\\...................../.......1
.............fi 11~Pf\9Hb.lE!t:.~g$8).... ..
wel.dnp)..~],f;i~.
ij5(.Anc119:t;$I&We1dp).a1:gV> .. .............:f..32
...i:)t~~~~~~~~;;~~ +?/ ~@ii" .
03/11/92
00331 - 10
STAIRS & MISC. METALS (ADD. 8)
13?>$~F~i ()I1H1>E3-.f.ias ()ri~YP2\V~ ISH 3. 3
***************
END OF EMBEDS SCHEDULE
03/11/92
STAIRS & MISC. METALS (ADD. 8)
00331 - 11
SECTION 00353
MILESTONE SCHEDULE
The bar chart and associated activity listing presented in
this section depicts the approximate duration, sequence, and
flow of work of major work groups. Not all activities are
shown and groupings are subjective. Logic diagrams
generating the presented document are available for bidder
review in the office of the Construction Manager.
Contractors will be required to submit construction
schedules to meet the requirements of the presented
milestones and in accordance with the Master project
Schedule.
T~e Contractors are to note the following special milestone
dates required for the Project.
a. Building Temperature and Humidity
Controlled for Finishes & Follow-on
Work .. ............... 11/15/92
b. start Contractor Completion Inspections.01/11/93
c.
start Prefinal Inspections .
.03/02/93
d.
Project Completion . . . .
. .07/01/93
03/16/92
MILESTONE SCHEDULE (ADD. 8)
00353 - 1
1
!
1 ~
~ i ~
1 ~
c
.
A
!
:
~
i
~
..
~
>-
......
J ~ w
n:> u -l
"Cl <0 ::;:)
~ LL- 0
c:... w
0 c :r:
.---. au
l.L. ..... U')
......
c 0
>- Q) ......
...... ...... co
c OJ
::>001
0
u >- Q.
...... ::;:)
QJ C C>
0 ::>0:
L o <-:)
c U
0 C>
~ OJ ......
o co
L
c
a
~
;;
c '"
ti ;;:
, " ~ii:;::
11 ~ ~I ~J ~i
z ~ U~~ u
... \, ~
" 0: I -
it
II I ~ :>
:1 !l
II i
II .J
!
'i ij
1- ~ . ~
0
" ~
'i !;~ u
'It \; .=:
~ ~ 2 = t .,;
~ ~~~i ~
~
~ i Ii '"
~ ! r :f ~ ~
'3 ~ i
~ i I~ 6:
~onroe County. Florida
.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... .. .. .. .. .. .. .. .. .'"' .. .. .. .. ... .. .. .. .. ... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ... .. .. .. ... .. .. .. .. .. .. .. .. .. .. ... ... .. ... .. .. .. .. .. .. .. .. .. .. .. .. .. - .. .. .. .. .. .. .. .. .. .. ... .. ... .. ... .. .. .. ... .. .. .. .. .. .. .. .. ... .. .. .. .. ... .. ... .. .. .. .. .. -
PRlKA\~RA PROJECT PlA~~ER
Mooroe COIrlty Detention f&dlity
RT D"TE 19JEC91 RUW~. 50
16:28
SCHED REPORT - line s~ip by &Ctivity code
.......... .......... .......... ........
ACTIVITY
10
ORIG REM
DUR OUR
Site Utili\ie-s
5 1
1325 5
1330 5
H40 5
2000 30
2005 10
2010 15
2015 5
2020 5
2025 10
2030 10
2035 15
2040 15
2045 15
2050 15
3005 10
3010 10
3015 10
3020 5
3050 15
3055 5
~OOO 15
5005 15
5010 15
Caissons
1025
1030
1035
1040
1045
10S0
'OS5
1060
1100
11S0
'200
i250
1300
Colurns
1105
',,0
'''5
1155
Monroe County Detention facility
START DATE 1AUG91 FIN DATE 1:
D"TA DATE 1~0V91 PAGE NO.
....---......... ................................-.....................................................--....... .................. -...-....-. .................. --............. ..
:r;
o 100
5 0
5 0
5 0
5 83
10 0
15 0
5 0
5 0
10 0
10 0
IS 0
15 0
15 0
15 0
10 0
10 0
10 0
5 0
15 0
5 0
15 0
15 0
15 0
10 0 100
10 0 100
40 0 100
IS 0 100
5 0 100
10 9 10
25 0 100
1 1 0
15 15 0
15'5 0
10'0 0
is 1S 0
10 10 0
1S
5
20
15
1S
5
20
is
o
o
o
o
"CTIVITY DESCRIPTION
SCHEDULED
START fiNISH
........................................-....................................-.................. -..-...-....... ................
.
NTP . Site Utilities 9OCT91A 9OCT91A
SW . Zone C Sub-Slab Sanitary. lo&ding Dock 4.u.AR92 10MAR92
SW . Zone C . Storm Drain (JB 28-0 & Upstream) 4.u.AR92 10HAR92
SW . Zone C . Storm Drain (Inlet 1-12 & Upstream 4KAR92 10MAR92
sw . Utilities' Underground Submittals 13SEP91A 22N0V91
SW - Utilities' AlE Apvl of U/G Submittals 25NOV91 9DEC91
SW - Utilities - Install Outfall Structures 100EC91 310EC91
SW . Utilities' Instl U/G Temporary Pwr & Tele 100EC91 16OEC91
SW . Utilities' Sanitary Trunk line ~ Ldg Dock 100EC91 16OEC91
SW . Utilities - Remainder of Sanitary Trunk Lin 17DEC91 310EC91
SW - Utilities . EI~trical Ductban~ and Tele 17DEC91 31DEC91
SW - Utilities. Instl Greywater Line 2JAI/92 22J"I/92
SW - Utilities - Instl Domestic ~ater Line 2JAN92 22JAN92
SW . Uti l ities . Instl Effluent Line 2JAI/92 22JAI/92
SW - Utilities' Instl Gas Line 2JAH92 22JAH92
SW . Entrar.ce Road - Eft luent Line BJAN92 24JAI/92
S~ . Entrance Road . Domestie/FW Main 13JAN92 24JAN92
SW . Entrance Road . Test/Flush/Disinf~t DV/FW 27JAN92 7FEB92
SW - Entrance Road . Tie-in D~/FW Line to F(AA 10FEB92 14FEB92
SY . Utilities. Overhe&d Power/Tel~one line 13JAI/92 31JAI/92
SW - Utillties - Temporary Pwr/Tele Startup 3FEB92 7fEB92
SW - Utilities Storm Drain Trunk Lines 17JUN92 BJUL92
SW - Utilities' SO lateriels & Trench Drain 17JU~92 BJUL92
SW . Utilities' Sanitary Laterals 17JUH92 BJUL92
SW - Caisson Load Test
SW AlE Review of Caisson Load Test Dati
SW Caisson Rebar Submittals - Start
SW - Caisson Rebar Submittals' Complete
SW . AlE Reyiew of Caisson Rebar Submittals
SW . Fabricate & Deliver Caisson Rebar
SW - ~indlCbd ~odification Pricing
SW - BOCC Apvl of I.'indload Char\ge
SW - Zone A - Caissons
SW - Zone 0 - Caissons
sw . Zone B - Caissons
SW . Zone E - Caissons
SW - Zone C Caissons
7OCT91A 17OCT91A
18OCT91A 6H0V91A
13AUG91A 6OCT91A
7OCT91A ~JCT91A
300cT91A 6H0V91A
131/0V91A 29H0V91
6OCT91A 13~OV9'A
20N0V91* 20NOv91
2DEC91 200EC91
23OEC91 1'JAN92
15JAH92 2BJA~92
29JA~92 18FEB92
19FEB92 3HAR92
SW . Zone A
SW . Zone A
SW - Zone A -
SW . Zone 0 -
Columns & Mise Concrete
Verify Locations of Columns
Column Concrete Cure Period
Columns & Mise Concrete
230EC91
1SJAN92
1SJAN92
1SJAN92
'''JAN92
21JAN92
11FEB92
4HB92
.. -.....oo ._. _................ .......... -.. -- -oo......... - - - - -.... ---.... ..-........... -..... ........-...-..... .........- -.. ............. ...... -..... ..oo............ - -..... ..--...... -.....
Xonroe County. Florida
PRlKAVERA PROJECT PLA~NER
Honroe County DetentIon Facility
RE~T DATE 19CEC91 RU~ NO. 50
16:28
SCHED REPORT - line skip by activity code
AClIVIlY
10
Colums
1160
1165
1205
1210
1215
1255
1260
1265
1305
1310
1315
1320
Ere<tion Drawings
7020
7030
7040
7100
7110
7200
7210
Oll.lG REM
DUR OUR
5
20
10
5
20
15
5
20
10
5
20
20
15
15
10
15
10
15
10
~onroe County DetentIon Fecili
START DATE 1AUG91
F IN DATE
DATA DATE 18~0Y91
PAt O.
..-............. -_.-......._...--....-....-....-......._........-_.........--_...._--~ -------.. ....-..-......
x
ACTIVITY DESCRIPTION
SCHEDULED
START FINlSK
-.... ....-........ -...... -..... -... ..-...... ................. ..-..--- --........... ..-..-..... - --........
5
20
10
5
20
15
5
20
10
5
20
20
o
o
o
o
o
o
o
o
o
o
o
o
15
15
10
15
10
15
10
o
o
o
o
o
o
o
Utilities/Pre<ast Coordination Effort
7005 10 0 100
7050 20 20 0
7120 20 20 0
7220 15 15 0
Detei I Drawings
7060
7070
7130
7140
7230
7240
Fabricat ion
7080
7090
7150
7160
7170
7150
7250
7260
7270
7280
15
10
15
10
15
10
20
5
20
10
40
10
25
5
40
5
15
10
15
10
15
10
o
o
o
o
o
o
20
5
20
10
40
10
25
5
40
5
o
o
o
o
o
o
o
o
o
o
S'J-
S'J-
S'J-
S'J-
SIo/ -
S'J-
S'J -
S'J-
$\.1-
S\/-
S'J
S'J-
Zone 0 . Verify locations of Columns
Zone 0 - Column Concrete Cure Period
Zone B - Columns & Mise Concrete
Zone B - Verify locetions of Columns
Zone B - Column Concrete Cure Period
Zone E - Columns & Mise Concrete
Zone E - Verify locations of Columns
Zone E Colunn Concrete Cure Period
Zone C - Columns & Mise Concrete
Zone C . Verify locations of Columns
Zor~ C . Column Concrete Cure Period
Zone C - F/R/P/C Concrete Loading Dock
Pre<ast - Column Interf&ce Deteils
Pre<ast - Area A . Framing Drawings
Pre<ast - Area A - A/E Apvl of Framing Drewings
Precast . Areas B & 0 . Framing Drawings
Precast - Areas B & 0 - A/E Apvl of Framing Dwgs
Precast . Areas C & E - Froming Drawings
Precast - Areas C & E A/E Apvl of Framing Dwgs
Coordinatioo I<ethod De<ision
Precast Area A . Utl/Pcst Coordination
Precast Areas B & D - Uti/Pest Coordinatioo
Pre<ast Areas C & E . Utl/Pcst Coordinatioo
Pre<ast . Area A - Detail Drawings
Precast Area A - AlE Apvl of Detail Drawings
Pre<ast Areas B & D - Detail Drawings
Pre<ast . Areas B & D - A/E Apvl of Detail Dwgs
Pre<ast Areas C & E Detail Drawings
Frecast Areas C & E - AlE Apvl of Detail Dwgs
Precast - Area A Fab1ieation
Precast - Area A B~in Shipping to Site
Precast. Area B - Fabricatioo
Pre<ast - Area B - B~in Shipping to Site
Precast - Area D Fcbrication
Precast - Area D B~in Shipping to Site
Pr~ast . Area C Fabrication
Precast. Area C B~in Shipping to Site
Pre<ast Area E - Fabrieatioo
Precast Area E B~in Shipping to Site
5FEB92
5FEB92
29JAN92
12fEB92
12FEB92
19FEB92
11 KAR92
11KAR92
4I<AR92
1~AR92
1 e.w.A R 92
4AAR92
21N0Y91
21N0Y91
13DEC91
13DEC91
7JAN92
7JAI/n
28JAN92
1N0V91A
1SN0Y91
170EC91
16JAN92
3ooEC91
21JAN92
21JAN92
1HEB92
1HEB92
31'.AR92
4fEB92
3HAR92
25fEB92
241'.AR92
,5fEB92
2iAPR92
2SKAR92
29.1,PR92
18.'<.AR92
13i':AY92
11FEB92
3H.I,Rn
11FE B92
18FEBn
10t".AR92
10KAR92
17HAR92
7APR92
17HAR92
24i'iAR92
14APRn
3 W.ARn
12DEC91
12OEC91
270EC91
6JAN92
20JAN92
27JAN92
10FEBn
15N0Y91A
16OEC91
15JAI/92
5fEB92
20JAN92
3FEB92
10FEB92
24fEBn
2KAR92
161<.AR92
21'.AR92
9\-'.AR92
23i':ARn
6APR92
2CAPRn
4KA Y92
2BAPR92
5KAY92
12HAyn
',9HA Y92
. .............. .............. ............... -..-..... ...-...-..... -. ..... ................ .......... ............-...... -.......... ...... ...................... ......... .-....... ........... ....-...... -.......-................. .................
I<onre>e CQU1ty, Florida PRl~'V[RA PROJECT Pl~~NER I<onroe County Cetentlon f.clllty
~T DATE '9NC"9' RU~ NO. 50 I<onroe CO'Jlty Detffitlon faci I ity START DATE '....U~1 fiN DATE 'J1
'6:28
SellED REPORT - line skip by activity code D....1A O....TE WWV91 P....GE ~o. :
.... .. - - ....-..- ......... ....... . - - - .....--......... ....... ........ .................................. .....-.............. ....- ---.. -....-- ... .. ... . .. .. ................ ................ .. .. .. .... . .... ..
....eTIVITY ORIG REM ....CTIVITY DESCRIPTION SCHEDULED
10 OUR OUR X START FI~ISH
.......... . .... .- ....... .. - .... - ................... ......................-..-...........-.........................................-..-....--- ..............- ........-.....- .. .. .. .... .. . .. - .. -.... -.... .-
Pr~8st Er~tion
10000 40 40 0 Pr~ast . Area A - Er~tlon 'OOR92 4X.A.Y92
20000 30 30 0 Pr~ast . Area B - Er~tlon S",,*,Y92 16JUH92
30000 30 30 0 Pr~ast - Area C - Erection , 7 JUH92 29JUL92
40000 30 30 0 Precast - Area 0 - Erection 5",,*,y92 '6JUN92
50000 30 30 0 Pr~8st . Area E - Er~tlon '7JUH92 29JUL92
Roof
'0050 '0 10 0 Mea A - Roof - Roof I ng 3JUH92 '6JU1/92
20050 '0 '0 0 Area B . Roof I ng 9JUL92 22JUL92
30050 '0 '0 0 Area C . Roofing 20AUG92 2SEP92
40050 '0 '0 0 Area 0 - Roofing 9JUL92 22JUL92
50050 '0 10 0 Area E - Roofing 20AUG92 2SEP92
Stairs
100'0 5 5 0 Area A - Temporary ....ccess Stairs S",,*,Y92 11KAY92
20120 '0 10 0 Area B . Erect Stairs 16JUl92 29JUl92 ,fV'I'l
30080 10 10 0 Area C - Er~t Stairs 27AUG92 'OSEP92 ~. }
"0120 10 '0 0 Area D - Er~t Stai ra 16JUL92 29JUL 92 -' ~.. ~~
0050 15 '5 0 Area D - 2nd F I ~ Meu Handrails 6AUG92 26AUGn
43060 10 '0 0 .....rea 0 . 'st Fl . Interior Stairs 6AUG92 19AUGn 1/ ,JA//'1
50080 ~O '0 0 ....rea E - Ere<t Stairs 27AUGn 10SEP92
53050 15 15 0 Area E - 2nd Fl - Mezz Handrails 18SEP92 8OC192
53060 '0 '0 0 ....rea E . 1st Fl . Interior Stairs 18SEP92 'OCT92
EleYators
10100 '5 15 0 Area A . Elevators . Rough-in 9JUL92 29JUL92
'0"0 5 5 0 Area A . Eleystors - Car & Platfor1ll 30JUl92 5AUG92
'0120 5 5 0 Area A - Elevators - Doors & Frames 6AUC92 12AUG92
'0130 20 20 0 Area A - Elevators Construct Cabs & T ri m- out ~3""UG92 'OSEP92
Slab EIlOeds
"000 15 15 0 Area A . 1st Fl - M/E/P/S Slab Embeds 12.~Y92 2JUIi92
'2000 20 20 0 Area A - 2nd F I - M/E/P/S Slab Embeds 12.w.A Y 92 9JUI\92
21000 '0 10 0 Area B . 'st Fl - M/E/P/S Slab Embeds ,7JU1i92 30JUI\92
22000 ~5 15 0 .....rea B - 2ndFl M/E/P/S Slab Embeds 17JUI\92 8JUL92
31000 10 10 0 Area C - 1st Fl - M/E/P/S Slab E~ 30JUL92 12AUG92
32000 '5 15 0 Area C - 2nd F I - M/E/P/S Slab Embeds 22JUL92 1 , AUG92
"'000 15 15 0 Area 0 - 1stFl - M/E/P/S Slab Embeds 17JUIi92 8JUL92
42000 20 20 0 Area D - 2nd Fl - M/E/P/S Slab Embeds 17JUI\92 1SJUL92
51000 15 15 0 Area E - 15tFl KIf/PIS Slab Embeds 30JUL92 191\UG92
52000 20 20 0 Area E - 2nd Fl - ~/E/P/S Slab En~s 30JUL92 ZtAUG92
Slabs
'0030 5 5 0 ....rea A - Roof - Topping 1 9!o\A Y 92 Zf:)J,AY92
110~0 10 10 0 Area A . 1st Fl - F/R/P/C Slab 3JUHn '6JUI\'92
120~0 '0 '0 0 ....rea A 2nd F I - F/R/P/C Slab 17 JUlin 30JUI\92
20020 5 5 0 "rea B - Roof Topping 24JUN92 30JUI\92
21010 10 10 0 Area B 1st fl - f/R/P/e Slab 1 JUL 92 15JUL92
...... ......................... .......-...- -.... --.......... -..............- -.. -.. --- -.... - --. -. - -.........--.... ........ --. ----..... .....----................ - --..... -...... - ---..-...... .-........
KO()r~ CO\.I1ty, Florida
PRJK~V[RA P~JECT PLA~~ER
Xonroe CO\.I1ty Detention F&cili~
RE~l DATE 190Ec91 RUN WOo 50
16:28
SCHED RE~T . line skip by act ivity code
Konroe COU'1ty Detention Facility
START DATE 1AUG91 FI~ DATE "
DATA DATE 18~0V91 PAGf
- . ..... ..... - ... -.......---... . - -.. --... -.... -..... - -- - - --.... -............. -. - -... --- - - ---..... .....------ ..-.....-.... ... -.. - .. .. - ... ... ..... .. - ... - - .
AClIVITY ORIG REH ACTIVITY DESCRIPTION SCHEDULED
10 DUR OUR " START FllllSH
- . .. .. . .... -. - ................... - -.................... .......-.... --............. -................. .. .. .. .. - ... ..- - .. - - .. - .. - -...-........ .. .. .. ... .. - .. - ..
Slabs
22010 10 10 0 Area B . 2nd Fl F/R/P/C Slab 16JUl92 29JUl92
22200 10 10 0 Area B 2nd Fl - UR/P /C Piers & Supports 30JUl92 12AUG92
22300 10 10 0 Area B - 2nd Fl' Insulation Soard & Slab ~ C\lT 16OCT92 29OCT92
30020 S S 0 Area C Roof TOWing 6AUG92 12AUG92
31010 10 10 0 Area C . 1st Fl . F/R/P/C Slab 13AUG92 26AUG92
32010 10 10 0 Area C . 2nd Fl - F/R/P/C Slab 3SEP92 17SEP92
40020 S S 0 Area D Roof TOWing 24JUN92 30JUN92
4Wl0 10 10 0 Area D - 1st Fl . Form & Rebar for Slab 17JUN92 30JUN92
41020 10 10 0 Area 0 . 1st fl - Pour/Cure Slab 9JUl92 22JUl92
42010 10 10 0 Area 0 - 2nd Fl - Form & Reber for Slab 17JUU92 30JUU92
42020 10 10 0 Area D - 2nd Fl . Pour/Cure Slab 2.3JUl92 5AUG92
42040 5 5 0 Area 0 2nd fl . Pour Eq.Jip peds 13AUG92 19AUG92
50020 5 S 0 Area E - Roof TOWing 6AUG92 12AUG92
51010 10 10 0 Area E - 1st Fl . Fona & R~r for Slab 30JUl92 12AUG92
51020 10 10 0 Area E - 1st Fl - Pour/Cure Slab 20AUG92 2SEP92
52010 10 10 0 Area E . 2nd Fl . Form & Re~r for Slab 30JUL92 12AUG92
52020 10 10 0 Area E . 2nd Fl - Pour/Cure Sleb 3SEP92 17SEP92
52040 5 5 0 Area E 2nd F l . Pour Equip p&ds 25SEP92 1OCT92
Masonry
11020 5 S 0 Area A - 1st Fl . Layout Part/Set Fr~~s/~ ~al 17JUu92 23JUu92
11040 15 15 0 Aree A - 1st Fl . Mbsonry . Bathrooms 16JUL92 SAUG92
11050 35 35 0 Area A - 1st Fl - Bathroom & Sh~r Tile 6AUG92 24SEP92
11070 20 20 0 Area A . 1st fl Masonry. Offices & Corm Areas 24 JUII92 22JUl92
12020 5 5 0 Area A - 2nd f I - Layout Partitions/Set Fr&mes!W 1JUl92 8JUl92
12050 15 15 0 Area A 2nd FI Masonry 9JUl92 29JUl92
12210 15 15 0 Area A . 2nd fl . Ceramic Ti Ie 90C T 92 2YOCT92
20100 10 10 0 Area B " Masonry. Stairs 17JUU92 30JUII92
20110 10 10 0 Area B - Cure Masonry. Stairs 1JUl92 1SJUl92
21020 5 5 0 Area II . 1st fl Layout Part/Set F r ames/\Jnd IJa I 16JUl92 22JUL92
21040 10 10 0 Area B - 1st Fl Masonry . BR 6AUG92 19AUG92
21050 10 10 0 .A.rea B . 1st FI . Ceramic Tile ~ BR 20AUG92 2SEP92
21070 20 20 0 .A.rea B - 1st Fl Masonry 23JUl92 1 9,~UG92
22020 5 5 0 .A.rea B - 2nd Fl . lay-out Part/Set Door Fracroes/IJ 30JUl92 SAUG92
22040 10 10 0 Area B 2nd Fl . Masonry . BR 20AUG92 2SEP92
22050 15 15 0 Area B " 2nd Fl Masonry S~Qrt Systems R~J9h- 6AUG92 264UG92
22060 15 15 0 .A.rea B - 2nd Fl - Masonry 6AUG92 26AUG92
222BO 10 10 0 Area B 2nd FI . Complete Exterior Masonry 18SEP92 10C192
30060 10 10 0 Area C - Mas~~ry . Stairs 30JUl92 1 2.~UG92
30070 10 10 0 .A.rea C Cure ~asonry . Stairs 13AUG92 26AUG92
31020 5 5 0 Area C . 1st Fl - Lay-out Part/Set Dr Fr~s/W 27AUG92 2SEP92
31040 15 15 0 Area C 1 s t Fl - Masonry 3SEP92 21.SEP92
32020 5 5 0 Area C - 2nd fl . layout Part/Set F r ames/'Jnd IJa I 18SEP92 24SEP92
32040 15 15 0 Area C - 2r-d F I Masonry 2SSEP92 15OCT92
. ....... ........ ....... .............. -..... -.....-... - ................ ...... .......................... ..--.................... .... ............ - -........ ---.......... ............. ..-............ .......... ....... ..........
I'l()()roe Cc:>U"'ty, florida
RT DAlE 19DEC91 RUN HO. 50
16:28
~~~tD REPORT' line skip by activity code
ACTIVITY
10
Masonry
40100
40110
41030
41050
41070
42030
430'0
43020
50060
50070
51030
5'~0
51050
5'070
52030
53010
53020
Drywall
'2030
'2200
Spray-on Insulation
'2070 '0
"080 5
22030 10
22 090 5
32060 5
32070 5
43070 10
53070 '0
Utility Rough-in
'0020
'0040
10060
,,030
"060
12~0
12060
200'0
20030
20040
2'030
2'060
22030
OR I G REM
DUR DUR
PRlKAVERA PROJECT PLA~WER
Monroe County Detention facility
Monroe County Det~tlon facility
START DAlE 1AUG91 fiN DATE 1JUl
DAIA DATE '~0\~1 PAGE HO. 5
.. -.." ...----........ ...................................................................................... ............... .......-......
10
10
5
15
'0
5
,0
25
10
'0
5
15
'5
,0
5
10
25
25
'5
5
5
'0
'5
20
25
15
5
5
'0
'0
20
'0
1
ACTIVITY DESCRIPTION
SCHEDULED
START fiNISH
................... .......................................................................................... ..............- ...........--- ....-..-....... ............... ---
'0
10
5
15
10
5
10
25
,0
'0
5
15
'5
10
5
10
25
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
25
,5
o
o
10
5
'0
5
5
5
10
10
o
o
o
o
o
o
o
o
5
5
10
15
20
25
15
5
5
'0
10
20
'0
o
o
o
o
o
o
o
o
o
o
o
o
o
Area D - Masonry. Stairs
Area D - Cure Masonry - Stairs
Area 0 - 1st fl - layout Part/Set Frames/~nd Val
Area 0 - 1st fl . Masonry' 1st level walls
Area 0 . 1st fl - Masonry. BR
Area D - 2nd fl - layout Part/Set Frar.~s/Vnd Val
Area 0 - 2nd Fl - Masonry - 2nd level
Area D . 1st fl - High Say Masonry ~alls
Area E - Masonry. Stairs
Area E - Cure Masonry - Stairs
Area E - 1st fl - layout Part/Set fr&mes/~nd Val
Area E . 1st fl - Masonry Support Systems R/I
Area E - 'st fl - I'lasonry - 1st level walls
Area E - 1st fl - I'lasonry . BR
Area E - 2nd fl . layout Part/Set Frames/~nd Val
Area E - 2nd fl Mas6nry' 2nd level
Area E . 1st fl . High Bay Masonry ~alls
Area A - 2nd Fl . Drywall Frorroing
Area A - 2nd fl - Drywall/Tape/Plaster ~alls
Area A - 2nd Fl - Spray-on Insulation . Pr~
Area A - 2nd fl . Spray-on Insulation - Spray
Area B - 2nd fl . Spray-on Insulation . Pr~
~r~a B - 2nd fl - Spray-on Insulation
Area C - 2nd fl - Spray-on Insulation Pr~
Area C . 2nd Fl - Spray-on Insulation - Spray
Area D . 2nd fl . Spray-on Insulation
Area E . 2nd Fl - Spray-on Insulation
Area A - Roof - Penetrations & Roof Accessories
Area A - Roof - Curbs
Area A . Roof - Roof Drainage
Area A . 'st Fl - Plumbing R/I _ Bathrooms
Area A - 1st Fl - ~asonry R/I Support (~/E/P/S)
Area A 2nd Fl - ~asonry R/I Support (I'l/E/P/S)
Area A - 2nd Fl Ceiling ~nchors & Hangars
Area B Roof - Penetrations & Roof Accessories
Area B - Roof Curbs
Area B - Roof Drainage
Area B - 'st fl . Plumbing Rough-in. BR
Area B - 'st fl ~asonry Support, Systems R/I
Area B Zrd Fl Plumbing Rough- in - BR
'7JUN92
1 JUL92
23JUL92
30JUL92
20AUG92
6AUG92
3SEP92
6AUG92
30JUl92
13AUG92
3SEP92
"SEP92
, , SEP92
25sEP92
laSEP92
90<: T 92
18SEP92
9JUl92
18SEP92
30JUl92
13AUG92
6AUG92
27AUG92
9O<:T92
16OCT92
2OC192
6N0V92
, 2l'.A Y92
27lolAY92
'~AY92
2l,JUN92
2l,JUN92
9JUL92
9JUl92
17JUN92
'JUl92
2l,JUN92
23JUl92
23 JUl92
6AUG92
30JUN92
15JUL92
29JUl92
'9AUG92
2SEP92
12AUG92
17SEP92
lOSEP92
12AUG92
26AUG92
lOSEP92
'OC192
1 OC 192
e.oc T 92
24SEP92
22OCl92
22OC192
'2AUG92
30<:192
'2AUG92
'9AUG92
'9AUG92
2SEP92
15OC192
2?ocT92
15OC192
19w0V92
1 8.U.A Y 92
2 JUlI92
2JUI/92
15JUL92
22 JUL 92
12AUG92
29JUl92
23JUN92
8JUl92
8JUl92
5AUG92
19AUG92
'9AUG92
............ ............ -..... -..-... ...... - _..- -......... -. -..'" -- --...... ..-- -... -. - -....-.... ....-............ -.......-- ............ -........................-..................... ............. ..........
Kvnroe County, Florida
PRIKAVEP~ PROJECT PLA~WER
Konroe County Detention fecilit
RE~l DATE '9DEC91 RUW WOo 50
'6:28
SCHED REPORT' line skip by activity code
~O(1roe CO<$lty Detef1t 10(1 foci l ity
START DATE
'AUG91 FIN DATE
DATA DAlE
1SN0Y91 ~A O.
..... - ..... .. - .... .. .. .... .. .. .. ... - .. .. - .. - .. .. ... ... .. .. -. .. .. .. .. ... ... .. ... .. .. .. .. ... .. .. .. .. .. .. - ... .. ... ... ... .. .. .. .. .. ... .. ... - ... - - ... .. - .. .. .. ... .. .. ........... ....... .... ... ... ... .. .... -.................
ACT IVIIY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 OUR OUR X START F HIl SH
.. .. .. ..... .......... .. ... .. .. .. .. .. - ... ... .. .. ... .. .. .. .. .. .. ... .. .. .. .. - .. .. ... .. .. .. ... .. .. . .. ... .. ... .. ... .. .. .. .. .. .. - - ... ... .. .. - .. ... .. .. ................. .................... . .. .. .. .. .. ..... .................
Utility Rough-In
30010 5 5 0 Area C - Roof - Penetration & Roof Acces sor I es 30JUL92 5AUG92
30030 5 5 0 Area C Roof Curbs 13 AUG92 WAUG92
30040 '0 '0 0 "rea C - Roof Drainage 6AUG92 19AUG92
3'030 '5 '5 0 Area C . 1st Fl - KasO(1ry Support . Systems R/l 3SEP92 24SEP92
3'070 '5 '5 0 Area C . 'st Fl - Plumbi~ Rough-In; BR 3SEP92 24SEP92
32030 '5 '5 0 Area C - 2nd Fl - KasO(1ry Support. Systems R/l 25SEP92 15OCT92
32050 '0 10 0 Area C - 2nd Fl - Ceiling Anchors & Hangers 25SEP92 8OCT92
32100 '0 '0 0 Area C . 2nd fl - Plumbing Rough-in; SR 25SEP92 80C T 92
40010 5 5 0 Area D - Roof - Penetrations & Roof Accessories 17JUN92 23JU~92
40030 5 5 0 Area 0 . Roof Curbs , JUL92 8JUL92
40040 10 10 0 ~rea D - Roof DralNlge 24JUu92 8JUL92
41040 15 '5 0 ~rea o - 'st fl - Masonry Support Systems R/1 30JUL92 '9AUG92
41060 10 '0 0 ~rea o - 1st fl - Plumbl~ Rough-in; Sr 30JUL92 , 2.AU G92
43000 10 10 0 Mea 0 . 2nd Fl - ~asonry Support Systems R/l 3SEP92 17SEP92
43030 '0 '0 0 Area D . 2nd Fl - Ceiling/Pl~ Hangers & Sprts ,e5EP92 'OCT92
.
50010 5 5 0 Area E - Roof - PenetratIons & Roof Accessories 30JUL92 5AUG92
50030 5 5 0 Area E Roof Curbs 13AUG92 '9.lUG92
50040 10 '0 0 Area E - Roof DraiNlge 6AUG92 19AUG92
51060 10 10 0 ~rea E - 'st fl . Plumbi~ Rough-in ~ Br , , SEP92 24SE?92
53000 '0 10 0 Area E - 2nd fl Masonry S~rt Systems R/l 90C 192 22OCl92
53030 10 10 0 ~rea E - 2nd fl - Ceiling/Pl~ Hangers & Sprts 23OC192 51<0'192
Bulk InstallatlO(1of Uti l ities
, '080 25 25 0 "rea A . 1st Fl . HYAC Ductwork Bulk Instl 23JUL 92 26AUG92
nlOO 25 25 0 "rea A . 'st Fl - HVAC Pipi~ Bulk Instl 23 JUL 92 26J.uG92
,',20 25 25 0 Area A - 'st Fl - Plumbing Sulk Instl 23JUL 92 26,lUG92
11140 25 25 0 Area A - 1st fl - Pwr/Ltg Conduit Bulk Inst 23JUL 92 26AUG92
'1160 25 25 0 Area A - Tst f\ - S~/COO'fl\ Conduit Bulk Install 23JUL 92 26AUG92
'1180 25 25 0 Area A 1st fl Fire Prot~tion Sulk Instl 23JUL92 26AUG92
'2:)9'0 20 20 0 Area A 2nd F I HVAC Ductwork Bulk Instl 20AUG92 17SEP92
12100 15 1S 0 Area A 2nd F I HVAC Piping Sulk lnstl 20AUG92 105E?92
12nO 15 T5 0 Area " - 2nd Fl - Plumbing Bulk Instl 20AUG92 'OSEP92
12'20 15 15 0 Area A - 2nd F l Pwr/Ltg Conduit Sulk Instl 20AUG92 10SE?92
12130 '5 15 0 Area A - 2nd F l S~uritY/C~~ Conduit Bulk Ins 20AUG92 10SE?92
12140 '5 '5 0 Area A - 2nd fl - fire Prot~tion Bulk Instl 20,l.UG92 10SE?92
21080 T5 15 0 Area B 1st Fl . KYAC Ductwork - Bulk Install 20AUG92 '05E?92
21090 5 5 0 Area B - 'st fl - KYAC piping - Butk Install 20AUG92 26AUG92
21100 10 10 0 Area B - 1st Fl - PIlri:>ing - Bulk Install 20AUG92 2SE?92
21110 15 15 0 Area S - lst Fl P~r/Ltg C006Jit - Bulk Install 20AUG92 10SEP92
21120 10 10 0 Area 8 - 1st Fl - s~/Comm Conduit - Bulk Instal 20AUG92 2SEP92
21130 10 10 0 Area 8 - 1st Fl - fire Prot~tion - Bulk Install 20AUG92 2SE?92
22100 10 10 0 Area B 2nd f l - HYAC Ductwork - Bulk Install 3SE?92 HSEP92
2211 0 15 15 0 Area 8 - 2nd F l KYAC piping' Sulk Install 3SEP92 24SE?92
22120 10 10 0 Area S - 2nd Fl - Plumbing - Bulk lnstallation 3SEP92 17SE?92
. - . . . - . - - . . - .. .. - . - . . .. . - - - - .. . - . - __ - .. - . . __ . . - - .. - . .. . . - - - . . - - .. .. . . . .. - . . - - . . __ - . __ . .. - .. . - . . - - __ . . __ . - - . .. . - . . . __ . . . - . eo . .. __
Monr oe C O\.I1ty. Fl or i da
~T O.A.TE 19DEC91 RUIl NO. 50
16:28
_~ED REPORT - line skip by activity code
.. .. .. .... ..........
ACT I Y 1 TY
10
ORIG REM
DUR OUR
........ ........ ......- ......
PRlKA.~R.A. PROJECT Pl.A.~.ER
Monroe County Detention Facility
Jo4onroe COU"Ity Detention Facility
STkRT O.A.TE 1.A.UG91 FIN O.A.TE 1Jl
OAT.A. DATE 1ew0V91 PAGE WOo
...........-........ ................................--.............................................-........ ............. ---........ ..--....-.... ....-----.. ..-
x
.A.CTIVITY DESCRIPTION
SCHEDULED
START FINISH
....-..-.....-... ................................................................--.....-........-...... ............... ..---........ ............... .....-..--.... ..-
Bulk Installation of Utilities
22130
22140
22150
22310
3W50
31060
31080
31090
3 " 00
31 "0
32080
32090
32110
32120
32130
32140
43100
43110
1.3120
43130
1.3200
43210
43220
432.30
43300
43330
53100
53110
53120
53130
53200
53210
53220
53230
53300
53330
15
10
10
15
15
5
15
20
20
15
15
10
10
15
10
10
15
15
15
15
15
15
15
15
30
20
15
15
15
15
15
15
15
15
30
20
Ceiling Framing
"200 5
11210 5
11220 5
" 230 5
12150 15
21140 10
15
10
10
15
15
5
15
20
20
15
15
10
10
15
10
10
15
15
15
15
15
15
15
15
30
20
15
15
15
15
15
15
1S
15
30
20
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
5
5
S
5
15
10
o
o
o
o
o
o
.A.rea 8 - 2nd fl - PwrjLtg Conduit - Bulk Install
~rea B . 2nd fl - SecjC~~ Conduit - Bulk Instal
Area 8 . 2nd fl - fire Protection - Bulk Install
~rea B - 2nd Fl - Ancilllary Pipe
Area C - 1st Fl . HYAC Ductwork Bulk Install
~rea C - 1st fl - HVAC Piping' Bulk Install
Area C - 1st Fl - Plumbing' Bulk Install
.A.rea C - 1st Fl PwrjLtg Conduit - Bulk Install
Area C - 1st Fl - Sec/Coarn Conduit - Bulk Instal
~ree C - 1st Fl - Fire Protection' Bulk Install
Aree C . 2nd fl - KVAC Ductwork - Bulk Install
Area C - 2nd Fl . KVAC Piping' Bulk Install
~rea C . 2nd Fl - Plumbing' Bulk Install
Area C - 2nd Fl Pwr/Ltg Conduit - Bulk Install
~rea C . 2nd fl - Sec/Comm Conduit. Bulk Instal
~rea C . 2nd Fl - Fire Prot~tion . Bulk Install
Area 0 . 1st fl . HU Side A - vert chase utI
. ~rea 0 - 1st Fl - HU Side B vert chase utI
Area 0 . 2nd Fl . HU Side A - horlz chase utl
Area 0 . 2nd Fl - HU 1 Side B - horiz chase utl
~rea 0 - 1st Fl - HU 2 Side C - vert chase utI
Area 0 . 1st Fl HU 2 Side D - vert chase utl
Aree 0 - 2nd Fl - HU 2 Side C - horiz chase utI
Aree 0 . 2nd Fl . HU 2 Side 0 - horiz chase utI
~rea 0 - 2nd Fl - Mechanical Room Utilities
Area 0 . DayroomlOffice Utilities
~rea E - 1st Fl - HU 3 Side E - vert chase utI
.A.rea E . 1st Fl HU 3 Side F . vert chase utl
Area E - 2nd Fl HU 3 Side E - heriz chase utI
Area E - 2nd Fl . HU 3 Side F horiz chase utI
Area E - 1st Fl HU 4 Side G vert chase utl
~rea E . 1st Fl - HU 4 Side H vert chase utl
Area E - 2nd Fl . HU 4 Side G heriz chase utl
Area E . 2nd Fl . HU 4 Side H horiz chase utl
Area E 2nd Fl . ~~hanical Room Utilities
Area E - OayroomlOffice Util
Area A - 1st Fl
Area A - ist Fl
.A.rea A - 1st Fl
-'rea A . 1st Fl
Area A - 2nd Fl
Area B - 1st Fl
- Ceiling Froming in AiOOa
Ceiling Fr~~ing in A1029
- Ceiling Framing in "1039
. Ceiling Framing in .A.1049
. Ceiling Fr~~ing
- Ceiling Framing
3SEP92
3SEP92
3SEP92
16OCT92
2SSEP92
2SSEP92
25SEP92
25SEP92
25SEP92
2SSEP92
23OC192
2.3OCT92
230C192
23OCT92
23OCT92
230CT92
16OCT92
6110>'92
610/0>'92
iOEC92
16OCT92
611 0'19 2
6110'19 2
10EC92
16OCT92
16OC192
2010/0>'92
15DEC92
i5DEC92
7;.A.1o/93
2010/0>'92
1S0EC92
iSOEC92
7JAIo/93
2 o 101 ov92
201010>'92
27AUG92
3SEP92
11 SEP92
1SSEP92
iSSEP92
1iSEP92
24SEP92
17SEP92
17SEP92
SN0V92
1SOC192
1OCT92
15OCl92
22OCT92
22OC192
1SOC192
12N0V92
~MO"92
51010-192
121010'192
51010'192
SI/0V92
51/0'1'92
3010/0'0'92
30NO....92
2iOEC92
5100'1'92
3 o 101 0\'92
3010/0\-92
210EC92
30;.;('\'92
12101::-0'92
1~EC92
6JAA93
6JAl\93
27;Al\93
11.DEC92
6JA'-193
6JAJ/93
27J1l\93
6JAI\93
210EC92
2SE?92
iOSEP92
i7SEP92
24SE?92
8OCT92
24SEP92
a.._....... ..- -. ....... -- - -. ....- .-. .--.... -... -...... -... ..... ...... -- - -... ....-....... - -......... -- -...... .-.. ..-............................. - .............. ............. .......
Mooroe CCU1ty. Florida
REPORT DAle 1%E1:91 RUN 110. SO
16:28
SCHED REPORT . li~ skip by ectivity code
ACTIVITY
10
Cei I ing Freming
22070
22160
31BO
31140
32160
43340
53340
System Drops I
11240
11250
11260
11270
12160
12170
12180
12190
21150
21160
21170
211BO
22170
22400
22410
3" 50
3"60
3 " 70
31180
32170
321BO
32190
32200
1.3310
1.3320
43350
I. 3:>60
43370
~3310
53320
53350
53360
53370
Cei lings
112BO
Pl\lKf,VERA PROJECT PlAIi~ER
Hooroe County Detention Facility
l'lroroe CC>tX'lty Detentloo f~tlit
START DATE
DATA DATE
1 AUG91 fIN DATE
1&10'0'91 PAG '
................... .............-.................-..-............-...................-.......---.. .....--......... ......-........
Of<lG REM
OUR OUR
x
-....-.......-.... .........................................................-.......................--..... .-..........-
10 10 0
5 5 0
5 5 0
5 5 0
10 10 0
10 10 0
10 10 0
Testing I Punch-out
10 10 0
5 5 0
5 5 0
5 5 0
15 15 0
5 5 0
5 5 0
5 5 0
10 10 0
5 5 0
5 5 0
5 5 0
5 5 0
10 10 0
550
5 5 0
5 5 0
5 5 0
550
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
5 5 0
20 20
o
ACTIVITY DESCRIPTION
Area B . 2nd Fl . Ceiling Anchors & Hangers
Area B . 2nd Fl . Ceiling Framing
Area C . 1st fl . Ceiling Framing' Start
Area C . 1st Fl . Ceiling Framing . Con~lete
Area C - 2nd fl . Ceiling Framing
Area D . Ceiling Framing
Area E - Ceiling Framing
Area A - 1st Ft - Systems Drops - Start
Area A . 1st fl - Systems Drops - Complete
Area A . 1st Ft . Test Utility Piping Systems
Area A . 1st fl - Pur~h-out Above Ceiling Vork
Area A - 2nd fl . Utility System Drops - Start
Area A . 2nd fl - Utility System Drops - Cpl
Area A - 2nd fl . Test utility Piping Systems
Area A 2nd fl Punch-out Above Ceiling Vork
Area B - 1st fl . System Drops - Start
Area B - 1st ft - Systems Drops - Complete
Area B - 1st Ft Systems Test
Area B . 1st fl - Punch-out
Area B . 2nd fl - Systems Drops
Area B 2nd Fl - Systems Test
Area B - 2nd Fl . Punch-out
Area C - 1st fl . System Drops - Start
Area C - 1st fl . Systems Drops - Complete
Area C - 1st fl - Systems Test
Area C 1st fl System Punch-out
Area C - 2nd fl - System Drops - Start
Area C - 2nd fl - System Drops Complete
Area C - 2nd fl System test
Area C 2nd Fl Punch-out
Area D 2nd fl Test Systems
Area D - 2nd fl - Punch-out
Area D - System Drops - both floors
Area 0 Syst~ Test - Dayrm/Off - both floors
Area D Punch-out - Dayrm/Off - both floors
Area E - 2nd fl - Test Systems
Area E 2nd fl - PurKh-out
Area E System Drops - both flc-ors
Area E Systems Test - Dayrm/Off - both floors
Area E - Punch-out - DayrmlOff - both floors
Area A 1st fl . Ceiling Board/Tape/Plaster
SCHEDULED
START fiNISH
6AUG92
25SEP92
230C T 92
300c192
13 II 0V92
13 N0V92
22DEC92
3$EP92
25SEP92
20(192
90C T 92
18SEP92
90C T 92
16OC192
230CT92
11 SEP92
25SEP92
20(T92
90C T 92
20(T92
~0V92
201l0V92
300cT92
~ov92
131010\'92
20N0V92
13N0V92
1DEC92
BDEI:92
15CEC92
220EC92
300EC92
1DEC92
8OEC92
150EC92
28JAl\93
4FEB93
7JAl\93
14JAI,'93
21JAII93
19AUG92
10(T92
290C T 92
5 "0V92
301l0V92
30fl0V92
6JAN93
17SEP92
10(T92
80C T 92
15OCT92
8OCT92
150(T92
22OCT92
29OCT92
24SEP92
1OCT92
8OCT92
15OCT92
BOCT92
19fi0V92
30N0V92
51/0V92
12N0V92
19110V92
301oi0V92
19N0V92
lDEC92
14lEC92
21DEC92
290EI:92
6JAI/93
lDEC92
11.0EC92
21DEI:92
3fEB93
10fEB93
13JAN93
20JAN93
27 JAN93
16OCT92 12~0V92
......... .........................-...- --......... ....-.... -..-....... .............. ................. ........... ............................... .................. -.................... ............... --...... .............. -........ ........... ......
~onroe County, Florida
lRT DATE 190EC91
16:28
~I,.,,(D IlEPDRT - I i roe
ACTlVI TY
10
Cei lings
12220
21200
22430
31200
32410
43>SO
53380
IIi re Pulls
1\300
12240
21220
22450
31220
32400
43420
43430
53420
53430
Trim-out Utilities
1 1330
12280
21260
221.30
31260
32470
43470
534 70
Painting
1\310
11320
12250
12260
21230
21240
22t..60
22470
31230
31240
3200
32440
43450
43 t..6O
53450
RUN 110. SO
skip by activity code
ORIG REM
OUR OUR
15
15
10
15
15
15
15
15
15
10
15
15
15
15
10
10
15
20
15
15
10
5
10
5
10
10
15
20
15
15
10
5.
10
5
15
15
15
10
10
10
15
15
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
rRIKAVERA PROJECT PLAWIIER
~onroe County Detention facility
Monroe County Detention facility
START DATE 1AUG91 fiN DATE
1 J'Ji
DATA DATE 1~0V91 PAGE 110.
9
................... ...........................................................................-......-........... .................. ................ ................. .............. ....
%
ACTIVITY DESCRIPTION
SCHEDULED
START fllllSK
.................. ....................................................................--.................. ............... ............... ............. ................
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
15
15
15
10
10
10
15
15
o
o
o
o
o
o
o
o
10
10
10
10
10
10
10
10
10
10
10
10
10
10
10
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Area A . 2nd fl - Drywall/Tape/Plaster Ceilings
Area B - 1st fl Ceiling 8oard/Tape/Plaster
Area B - 2nd fl - Drywall/Tape/Plaster Ceilings
Area C - 1st fl - Ceiling Board Tape & Plaster
Area C . 2nd fl - Ceilings
Area D - Drywall/Tape/Plaster Ceilings - both fl
Area E - Drywall/Tape/Plaster Clgs - both floors
Area A . 1st fl - ~ire Pulls
Area A . 2nd fl - ~ire Pulls
Area B . 1st fl lIire Pull
Area 8 - 2nd fl - ~ire Pull
Area C - 1st fl - lIire Pull
Area C - 2nd fl - ~ire Pull
Area 0 - ~ire Pull - start - both floors
Area D . lIire Pull - complete - both floors
Area E - ~ire Pull - start. both floors
Area E lIire Pull - complete - both floors
Area A - 1st fl ~/E/P/S Trim-out
Area A 2nd fl - ~/E/P/S Trim'out
Area B 1st Fl - ~/E/P/S Trim-out
Area B - 2nd Fl . ~/E/P/S Trim-out
Area C . 1st fl - ~/E/P/S Trim-out
Area C - 2nd fl ~/E/P/S Trim'out
Area 0 ~/E/P/S trim-out both floors
Area E - H/E/P/S trim-out - both floors
Area A . 1st Fl . Pr~ for Bulk Painting
Area A - 1st fl - 8ulk Painting
Area A 2nd fl Pr~ for Bulk Painting
Area A - 2nd fl Bulk Painting
Area B - 1st Fl . Painting Pr~
Area 8 1st fl 8ulk Painting
Area 8 - 2rd Fl - Painting Prep
Area 8 - 2nd fl . Bulk Painting
Area C - 1st fl - Painting Pr~
Area C 1st fl Bulk Pointing
Area C 2nd fl - Paint Prep
Area C 2nd fl . 8ulk Painting
Area 0 Paint prep' both floors
Area 0 . Bulk Paint both floors
Area E - Paint prep - both floors
300cT92
16OCT92
1DEC92
1DEC92
14JA~93
22DEC92
28JAI/93
13110'.'92
20H0V92
61010'.'92
150EC92
22DEC92
22DEC92
3ODEC92
14JAII93
4fE893
18fEB93
150EC92
22DEC92
15DEC92
28JAII93
28JAI/93
l,KAR93
4FEB93
11AAR93
13H0V92
10EC92
201/0V92
80 E cn
6NCV92
10EC92
150EC92
14JAI/93
220EC92
14JAH93
14JAN93
4FEB93
22DEcn
21JAH93
28JAI/93
191/0\'92
51/0\-;2
140EC92
21DEC"92
3FES93
13JA~.;3
17fEE"93
30HO\";2
7tlEC92
30HO'.92
13JAI(;3
13JAh'93
13JAI(;3
13'JAX93
2 o JAlr. 3
i7fB93
24FES93
6JA~';3
13JA~'~3
6JA~;3
1 OrE .;3
1DFE: ;3
17\',1-.;3
24 FE :93
31KA::93
3CII::.-;2
140E(,;2
7tlE en
21DEC-;2
19110''-;2
140fC'2
29OE:>2
27 JA'-Y'3
6JA,';3
27_'A~;3
27 J.I.....;3
17fE:93
6JA';3
3FE:;3
10FE:03
~~.. -. -.......... --.........Oo.-Oo - _.._...___...................... ~ -..... -.... ...........-... ..~_.......... -....-..... -.... -...... ---.. _..~ .............- -.... ..-....... ......-....---. ....-....
M()flr ce C()I.f)ty, rt or Ida
rRlKA\~RA PROJECT PLA~~ER
M()flroe C<X.nty Detentioo f~:il it)
REPORT DATE '9DEC91 RUW WOo SO
'6:28
SCHED REPORT - line skIp by activity code
Monroe County Detention facility
START DATE 1AUG91 fIN DATE 1J
CATA DATE 1&'10'191 PACr
.. .. .. ... ........... .. .. - ........... - .. .. .. .. .......... --...... -............-.... -.. .................. --..... -..-..............-- .. ... .. .. .. .. ..... .. -... .. ... ... - ... - - - . .... ..... ...... - .. .. .. .. ..
ACTIVITY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 DUR OUR X START fiNISH
.... .. .. ... ....... .. .. ... .-................ -.. -....... ---- ..--....... .................-.......... ..-.......--... .........-...... . - - - .. ... .. ... .. .... .. .. .. - .. ... - ... .. .. .. ..... .......... - - - -
Painting
S~ 10 10 0 Area E - Bulk Paint - both f t oors 25fEB93 1OHAR93
77020 30 30 0 Painting . InterIor Touch-up (start) 1/lXAR93 28APR93
77030 10 10 0 Painting - Interior Touch-up (compl) 13M Y93 200'1'93
7704 0 60 60 0 Paint ing - Exterior Building 5fEB93 29"'PR93
Finishes
"290 10 10 0 ....rea A - 1st Fl- Instal I Doors & Grills 13NO\l92 30110\192
11340 15 15 0 ....rea A . 1st FI - CasellOrk 15DEC92 6JAN93
11350 15 15 0 ....rea A - 1st f\ . Glazing 15DEC92 6Jf..1I93
11:>60 15 15 0 Area A - hot f\ - Door Hardware 1SDEC92 6JAN93
11370 10 10 0 "rea A - 1st Fl . Floor & lIall Coverlr.gs 7JAII93 20JAI/93
12230 10 10 0 Area A 2nd fl . Instl Doors & Gri lis 20NOV92 7DEC92
12270 '0 10 0 Area A - 2nd f\ - Case-;.oork 22DEC92 6JAI/93
12290 15 15 0 Area A . 2rd f\ . ....coustlcal Tile 22DEcn 13JAN93
12300 15 15 0 ....rea A 2rd F\ Door Hardware 22DEC92 13JAN93
12310 15 15 0 Area A - 2nd f\ - Glazing 22DEC92 13JAN93
12320 15 15 0 ....rea A - 2rd Fl . Floor & Uall Coverings 14J"'N93 3fEB93
21190 10 10 0 Area B 1st Fl Floor Prep 16O<:T92 290C T 92
21210 15 15 0 ....rea 8 . 1st Fl . Doors & Grilles 6NOV92 301/0\192
21250 15 15 0 Area 8 . 1st f\ - ....coustical Tile 150EC92 6JAN93
21270 10 10 0 "'rea 8 - 1st FI . Door Hardware 1S0EC92 290EC92
21280 10 10 0 Area B 1st f\ . Glazing 150EC92 290EC92
2'290 15 15 0 ....rea B - 1st Fl . floor & lIallcoverings 7JAH93 27JAN93
22420 10 10 0 ....rea 8 2rd fl - Floor Prep 1DEC92 140EC92
22440 10 10 0 ....rea 8 . 2rd F\ - Doors & Grilles - Install 150EC92 i9DEC92
22490 5 5 0 "'rea 8 . 2nd F\ Door Hardware 28JAli93 3fEB93
22500 5 5 0 Area B 2nd fl - Glazir.g 28JAI/93 3fEB93
22510 S 5 0 Area 8 . 2rd F\ Acoustical Ti Ie 28J....lo/93 3fEB93
22520 5 5 0 Area 8 - 2rd F\ - floor & lIallcoverings 11FEB93 17FEB93
:;1120 10 10 0 Area C - 1st fl - Ceri:lll\ic Ti Ie 25SEP92 &lC T 92
31190 10 10 0 Area C . 1st F\ Floor Prep 1DECn 14DE<:92
312'0 10 10 0 Area C - 1st Fl - Doors & Grilles 22DEC92 6JAli93
312S0 5 5 0 ....rea C 1st F\ - ....coustical Ti Ie 28JAlo/93 3fEB93
31270 10 10 0 "rea C 1st fl Door Harchlare 28JA1I93 1 OfE B93
31280 10 10 0 ....rea C 1st Fl Glazing 28J"1I93 10FEB93
31290 10 10 0 Area C 1st Fl floor Covering 1 HE B93 24fEB93
32420 10 10 0 "rea C . 2rd Fl - Install Doors & Cril les 14 JAli93 27 Jf..1i93
32450 10 10 0 "rea C 2rd fl SeOO\less Floors 18fEB93 3f!.AR93
321,90 10 10 0 Area C 2r"j f I Other F! oori ng 4,w.AR93 1 lHAR93
43040 1S 15 0 Area D 1st fl Cell furniture 20AUG92 10SEPn
43045 10 10 0 Area 0 2nd F\ Cell rurni ture 11 SEP92 24SEP92
43400 20 20 0 .l.rea 0 Cel I Doors & .Door frames '60<:192 i2IiOV92
43410 10 10 0 Area o - Grout Cell Door frames both floors 131/0\192 301iOv92
43440 5 5 0 Mea 0 Doors & Grilles - both floors 14JAN93 20JAN93
...... ........ ......................... ...-........... -............ ...-.. ............. .............................. ........... ............... .........................-... .......... --.... .......... ....... ..... ...... -.... .............. .-........-..
/W(1roe COU"ty, Florida
PRIKAVERA PROJECT PLA~~ER
~onroe County Cetentlon facilit
>RT DAlE 19'ClEC91
16:28
~~~ED RE~T - line
RUN NO. 50
~onroe County Cetention facility
START DATE
1A~1 FIN DATE
skip by activity code
DATA DATE
18~0V91 PAGE ~O.
...... ... .. .. ...... ......---..-..... ...... ........................- ..................... ....--........... ..----.. -.. - --.. -... .. .. - - .. .. - ... - .. ... .. . .. . .. -.. .. .. ....... .... - -.. ..... ..
ACTIVI TY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 DUR DUR X ST AR T fll/ISH
.......... ....... ..-..........--- ... ........... ...-....-..-...........- - --.. -..... - -....................... -... .. .. . . . .. . .. ...........-... ............-- .. .. .. .. - ..... .
finishes
H'-SQ 15 15 0 Area 0 . Case~rk - both floors HE893 24fEB93
UL.9O 15 15 0 }..rea 0 . Glazing ~ both floors 4FEB93 24FEB93
43500 15 15 0 Area 0 . Door Hardware - both floors 4FE893 24fE893
43510 15 15 0 Area 0 - Acoustical Ceiling - both floors 4FEB93 24fEB93
43520 10 10 0 Area 0 - floor prep' both floors 4FEB93 17FEB93
43530 10 10 0 Area 0 . floor covering. both floors 25fEB93 10KAR93
53040 15 15 0 }..rea E - 1st fl - Cell furniture 2 OCT 92 22OCT92
53045 10 10 0 Area E - 2nd FI . Cell Furniture 23OCT92 5~OV92
5:),::00 20 20 0 Area E . Cell Doors & Door fr~s . bo th Ft oors 2010/0V92 210Ee92
53410 10 10 0 J,.r ea E . Grout Cell Door frames . both floors 220 E e92 6JAN93
534L.0 5 5 0 Area E . Doors & Grilles. both floors 18fEB93 24fEB93
5 :!4SO 15 15 0 }..rea E Casework' both floors 11KAR93 311'.AR93
5:),::90 15 15 0 }..rea E - Glazing - both floors 11KAR93 311'.AR93
53500 15 15 0 Area E - Door Hardware' both floors 11KAR93 31KAR93
53510 15 15 0 Area E - Acoustical Ceiling - both floors 11KAR93 311'.AR93
53520 10 10 0 Area E Floor prep - both floors l1KAR93 24/o1AR93
53530 10 10 0 Area E - Floor covering - both floors 'APR93 14APR93
EI~tric81 Equipment
20350 15 15 0 Area B . Switchgear Generate P.O. 13JAI/92 3' WI92
20:>60 5 5 0 Area B Switchgear. Sel~t Vendor 3FEB92 7fEB92
20370 1 1 0 Area B . Switchgear. Issue PO 10FEB92 10fEB92
20~ 70 70 0 .&.rea B Switchgear Fab & Delver 1HEB92 1e..w.AY92
20400 15 15 0 Area B . [merg Gen . Generate P.O. 13JAI/92 3'JAI/92
2C,,- 10 5 5 0 Area B - Emerg Gen - Sel~t Vendor 3FEB92 7fEB92
20420 1 1 0 Area B - [rr.erg Gen Issue PO 1 Off 392 10FE892
20430 '20 120 0 Area B . Emerg Gen - Fab & Del iver 1HE892 29JUl92
20450 15 15 0 Area B . UPS Systelll Generate P.O. BJAI/92 31.1,1,1/92
20460 5 5 0 Area B UPS Systel1l - Select Vendor 3fE892 7FEB92
2[...70 1 1 0 Area B UPS System I ssue PO 10fE892 1CFE392
2C~0 145 145 0 Area B UPS System . Fab & Del iver 1HEB92 2SEP92
~echanical Equipment
20200 15 15 0 "rea B M - Generate P.O. 13JA1/92 3'.1,1,1/92
202'0 5 5 0 Area B - CIlT - Select Verdor 3fEB92 7FE892
20220 1 1 0 .&.rea B . M. Issue PO 10FE692 10fEB92
2:230 70 70 0 Area B - CIlT . Fab & Deliver 1 HEB92 W".A Y92
20250 15 '5 0 Area B - Chillers - Generate P.O. 13JAII92 31JAII92
20260 5 5 0 Area B - Chit lers - Select Vendor 3FEB92 7FEB92
20270 , 1 0 Area B - Chi llers . Issue PO 10FEB92 10FE892
2C2&0 110 no 0 Area 8 . Chi llers Fab & Del iver 11FE892 15JUl92
20300 15 15 0 Area B AHU - Generate P.O. 13JAI/92 31JAI/92
20310 5 5 0 Area B AHU - Select Verdor 3FEB92 7fEB92
20320 , 1 0 Area B . AHU . Issue PO 10FEB92 'OfEB92
20330 80 80 0 Area B AHU - Fab & Deliver 1HEB92 2 JUII92
. - '. - - . . - - . . - - . - - . - - . - - - . . - - - - - - - - - - - - - - - - - - . - - - - . - - - - - - - - - . - - - - . . . - - - - - - . - - - - - . - - - . . - . - . - - . - . . . - - . . . - . . . - . . - - - - . - - . . . . . - . . . . - - - .
PR1KA.~RA PROJECT PLA~NER
~ooroe Ccxnty DetE:rltlon F&oCility
~ooroe Co;..nty. fl or! d.a
REPORT DATE 190EC91 RUW NO. SO
16:28
SCHED ~EPORT . line skip by &ctivity code
~onroe County Detention F&cility
STA~T DATE 1AUG91 fiN DATE 1J
DATA DATE 1&<0V91 PAGE
...... ...... .. .. .. .. .. .. ... ... ... .. ...--... ............................. .......................-- -----.. -_....- .......... ........--... --............. .. .. ..... .. .. ..... ................ ....
ACT IVI TY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
ID DUR OUR X STAAT FINISH
......... .. ........ ... .. .. .. .. .. .. .. .. .. ..........-...........-..-......-......--.............--....-......-....-----.... ....---..-- ---......-- .. .. ... ... .. ....... .................. ....
~~hanlcal Equipment
22290 10 \0 0 Area B 2rd f I - Erect C'WT 20C T 92 1SOCT92
32300 10 10 0 Area C . 2rd fl . Cooler Floors - IrtStall 16O<:T92 290C T 92
32310 10 10 0 "rell C . 2rd F l . Cure floors 300cTn 12"0'192
32320 10 10 0 Mea C . WFl - Cooler Framing 13liO'l92 30110'192
32310 \0 10 0 Area C . 2rd F I . Cooler Panels' Install lDEC92 14DEC92
32.340 5 5 0 Area C 2rd Fl . Cooler Trim -out \5DECn 21DEC92
40500 \5 15 0 "rell 0 . AHU'S - Generate P.O. BJAWn 31JAHn
405\0 5 5 0 Area 0 . AKU' S . Select Vendor 3FEB92 7FEBn
4052Q 1 1 0 Arell 0 - "HU'S . Issue PO 10fEBn 10FESn
40530 40 40 0 Mell 0 - AHU'S . Fllb & Deliver 11FEB92 6APRn
50500 15 15 0 Area E . AHU' S - Gen(:rate P.O. 13JAWn 31JAH92
,OSlO 5 5 0 "rell E - AH'J's - Sele<:t vendor 3FEB92 7fE892
,OS20 1 1 0 Area E - AHU'S - I ssue PO 10HB92 10HBn
,0530 40 40 0 "rea E . AHU's - Fllb & Del iver 1 HEB92 6APRn
Lll\.X'!dry Eq.Ji ~t
20500 is 15 0 Area B . lll\.X'!dry Equip - Cer\erate P.O. 13JAW92 31JAHn
20510 5 5 0 Area B . lalJ""dry Equi P . Select VeN30r 3fESn 7FEB92
2OS20 5 5 0 Aree B - lalJ""dry Equip' Issue PO 10HBn 14fEBn
2OS30 55 85 0 "ree B laLrdry Equip' Fllb & Del iver 17FEB92 15JUHn
I::itchffi Equipne1"1t
30100 25 25 0 Area C I::itchffi Equip' Generate P.O. 13JAH92 14FEB92
30110 5 5 0 ....rell C . (;tchen Equip - Staff Review 17FEBn 2HESn
30115 5 ~ 0 Arell C I::itchffi Equip - Award P.O. 2UEBn 2BFES92
30120 50 SO 0 ....rea C . I::itchen Equip' Shop Drawings mRn &w.A'1"n
30130 15 15 0 "rell C - (itchen Equip' AlE Review & Approval l1AA'1"92 1 JUH92
301100 35 35 0 Area C . (itchen Equip - fnl Coord wi others 2JUNn 21JULn
30150 1,0 i50 0 Arell C (itchen Equip' Fab & Deliver 2JUNn SJAH93
32150 5 5 0 Area C - 2nd Fl - Install I::itchen Hoods 23OCT92 2<;0<: Tn
32~ 5 5 0 Aree C - 2rd f\ . Kitchen Equip;.ent Trim-out 2SAAR93 31 t'.AR93
Set E qu ; pT1efI t
22210 10 10 0 Aree B 2rd F l . Set ~ Equipment 13AUG92 26AUG92
22220 10 10 0 Arell B 2rd Fl - Set Chiller Equipment 13.a.UG92 26.A.Ue92
22230 10 10 0 "rea B . 2rd Fl . Set AHU Equiprrent 13AUG92 26,A.LJG92
22240 10 \0 0 Area 8 - 2rd Fl - Set Switchgear 13AUG92 26.AUG92
22250 10 10 0 Area B 200 Fl . Set E~rsency G~~rator 13AUGn 26AUGn
22260 10 10 0 ....rea 8 - 2rd Fl - Set UPS System 3sE1'92 17SEP92
22270 10 10 0 .l.rea B 2rd Fl - Set laundry Equipment 13.a.UGn 26AUGn
324bO 15 15 0 Area C 2rd F I Set I::itchen Equi~nt {,/{AR93 2l.KAR93
42050 5 5 0 .l.rea 0 2rd F I - Set .a.HU'S Dl and 02 20AUG92 26,Auen
52050 5 5 0 Aree E - 2rd Fl . Set AHU's - E1 and E2 2OCT92 50<: T 92
Ke<hanical system Che<k-out & Balancing
71005 20 20 0 Area A K~h System Tie-in & In; t i al HV.a.C T&8 14JAW93 10fEB93
72005 20 20 0 .a.rea B Ke<:h System Tie- in & Ini t i al HV.a.C T&8 \HEB93 10t',AR93
~onroe County. Florida
............... ........ ...... ..---....................-............ --........... .--......-.-....-.........- ---............................... _..- ----- ..................-.......... --................ -....... ...... -..-........
~onroe County Detention F&cility
RT CATE 190EC91 RUN NO.
50
16:28
.._..cO REPORT - line skip by activity c~
PRj~~VERA PROJECT PLA~NER
~onroe County Detention Facility
START DATE 1AUG91 FIN DATE 1JUt
DATA DATE 18f10V91 PAGE liD. 13
.. --- ................. --........-....-........---.......-.............--......-...................--- ..-..--..-- --............. ---........... ............... -...
ACTIVITY
ID
ORIG REM
DUR DUR
x
..........-....-... ---------...--...................--.............-..--..............-............... ........---... ..--......-.. ......-....-- ..---.....- .....
ACTIVITY DESCRIPTION
SCHEDULED
START FINISH
Mechanical Syst~ Check-out & Balancing
73005 20 20 0 Mea D - Hech System Tie-in & Initial HVAC a8
74005 20 20 0 Area C - ~ech System Tie-in & Initial HVAC 1&-8
7S005 20 20 0 Area E - ~ech System Tie-in & Initial HVAC i&B
7S500 10 10 0 HVAC System - final Test & Balance
7S600 10 10 0 Building 0 & M System' Verification! Checl:.out
nOlO 10 10 0 Chlorinate & Flush Drinking \later l ir.es
Electrical! Security Device Verification
71020 15 15 0 Area A Point to Point Device Verification
72010 15 15 0 Area B Point to.point Device Verification
730'0 '5 15 0 Area 0 . Point to Point Device Verification
740'0 15 15 0 Area C - Point to Point Device Verification
7S010 15 15 0 Area E - Point to Point Device Verification
rire Protection System final Test
7S700 20 20 0
~ecurity System Operational Tests
7'010 5 5 0
710'5 5 5 0
7'025 15 15 0
72015 '5'5 0
730'5 15'5 0
74015 15'5 0
7S0'5 lS 1S 0
Security System Int~rated Tests
76000 '0 10 0
76010 20 20 0
F i na I PlXlCh
n050 15 '5 0
Owner! AE Demonstrations\
5CGOO 5 5 0
fire Protection System - final Testi~
Instl Security System CocrpUter Equip ~ Ctl
load Security System Programs
Area A - Security Syst~ Operational Tests
Area B Security System Operational Tests
Area 0 Security System Operational Tests
Area C Security System Operational Tests
Area E - Security System Operational Tests
Security System - Inte9r8t~ Test (start)
Security System . Integrat~ Test (cempl)
AlE Building C~nt Punchout
o..mer/AE Demor.strations & Final I.'allthru
25FEB93 24}'.AR93
'BKAR93 14APR93
1APR93 28APR93
29APR93 12KAY93
13KA Y93 26HAY93
29APR93 12Jo1AY93
14 JAII93 3rEB93
"f EB93 31'.AR93
2SFEB93 '7KAR93
18.'".AR93 7APR93
1APR93 21APR93
29APR93 26HAY93
Roan 111EB93 17FEB93
18FEB93 24FEB93
25FEB93 '7HAR93
4KAR93 24KAR93
181'.AR93 7APR93
BAPR93 28APR93
22APR93 12KAY93
131o'.A Y93 261',A Y93
27HA Y93 24 JUlol93
27XAY93 17JUII93
2SJUh'93 'JUL93
..-....."""l;- .-:" ......_.. --00- - ,
.f.-" ~._;,~>~~';-
...A~
.......... 'i~~ ._. -:i.~i.~;.:.:- t~h~~j~~~
'''''~~ '_M.''''''_'''~'' -~'-...'~' .. ff-'~
~.....~ ;{ ~~~-:i ~~-.J .. -: --:M~ -"""<< .. .' ..~ -~~~ ~ .
.~ :t '".{2I....:~~..~~ \ It ' . ' -:r ~ .. .., ~ ~iI<.fit. ...
~~.- .. :-. - :..' ~.,~ .~ '~;~."
" ::.:i::'~
. ~';r:"." -
SECTION 00131
PROPOS1\L FORM
Bid package No. 31
stairs and Miscellaneous Metals
BID TO : MONROE COUNTY PURCHASING DEPARTMENT
PUBLIC SERVICE BUILDING, CROSS WING,
ROOK 002, 5100 COLLEGE ROAD, STOCK
ISLAND, KEY WEST, FLORIDA 33040
BID FROM:
Big C steel. Tn~.
13095 49th street. North
Clearwater. Fl. 34622
The undersigned, having carefully examined the Work and Drawings,
specifications, Proposal, and Addenda thereto and other Contract
Documents for the construction of:
Bid package No. 31, stairs and Miscellaneous Metals
and having carefully examined the site where the Work is to be
performed, having become familiar with all local conditions
including labor affecting the cost thereof, and having
familiarized himself with material availability, Federal, state,
and Local laws, ordinances, rules and regulations affecting
performance of the Work, does hereby propose to furnish all
labor, mechanics, superintendents, tools, material, equipment,
transportation services, engineering support, and all incidentals
necessary to perform and complete said Work and work incidental
hereto, in a workman-like manner, in conformance with said
Drawings, specifications, and other Contract Documents including
Addenda issued thereto.
The undersigned further certifies that he has personally
inspected the actual location of where the Work is to be
performed, together with the local sources of supply and that he
understands the conditions under which the Work is to be
performed. The successful bidder shall assume the risk of any
and all costs and delays arising from the existence of any
subsurface or other latent physical condition which could be
reasonably anticipated by reference to documentary information
provided and made available, and from inspection and examination
of the site.
04/16/92
STAIRS PROPOSAL FORM (ADD. 10)
00131 - 1
..
- .
.'
.:;.....
"'-~7~" ~':",.... .-"~,-~:'~::~\1~::,;..~>"r<..~_~~4_'
,.3.:...,,,& . . ""~*~ .k, ~_. _d
~'.~~J<~- -"'~:.{~~:,"'..., i~{-4~-.:-J~
~ " ~- - ......
. . -
-..~. '-~..:" ~ .:~ ,/.:""" '~.. -.~::~.,..' ~ " ;'~'-\ '~" ,-::: ~',,:'~" - ;:' -
-~- ," -.',., "'\~'';:~ffi11~~-'-r..
':,~~)\-:~:"i~i'~i~~~~~~~.
PROPOSAL FORM
Lump Sum Base Bid
Note:
Items are 'furnish and install' where applicable,
as specified in the Scope of Work.
1.
Mobilization
$ 2 , 500 . 00
$-.2,775.00
$ 13 I 464 .00
$ 7, 000 . 00
$ 103 , 200 . 00
$151,330.00
2.
Bond
3.
Sales Tax
4 .
submittals
5.
Metal Fabrications
6.
Hetals stairs
7.
Security rcn~~~c~bly
$
$
8.
Miscellaneous Items (use if work items
cannot be categorized in items 1-7 above)
TOTAL BASE BID, Items 1-8, (figures)
!~~~J~~- '1- ~
- I
TOTAL BASE BID, (\-,lOrds) two h\mdred ei Qhty tnO'JC:;:H'n two l'11lnnrpn
sixtv-nine-----------------------------------------OOIxxx DO LlJ(R S
04/16/92
STAIRS PROPOSAL FORM (ADD. 10)
00131 .
. .
,
~-':."" . ;~...~, --
~~i'~:;'>-
-.<I-"{;:;~ .";.~.::'-~ ."
;~ >~-~"~~f~~~~/'>....~..
,.......:0-
~ -.-
-... \4~'.::. ,.,' .... ....,.:-. ,.& . ~ ",'...._ :_~ *~:"J~ :-;;':':,}
.. ~~.-:- ,"~':';:.'~f:'-l;.'~-'.;~-' - ~;.~. ""~.~~',..""'
~L-:"~~', ~ .;.,_::'~""~"~~'!.~'~.'",- ~~'_~: .'IH-~
.-.- ." - .......;z:':'<. '<. '\..~.~, ~'"
-.. "."" ~J:~~;;~~::~-~~'.':},"2!~~: _.'..
9. Owner option 31-01: Zone F stairs and Miscellaneous Metals
~ DEDUCT (circle One)
Owner option 31-01, (figures)
$ 95,912.00
===========
Owner option 31-01, (words) n;nptJ'-f{vP thouSrmd nine hundred
tFE'l"E'
~-----------------------------------OO/xxx
DOLLARS
04/16/92
STAIRS PROPOSAL FORM (ADD. 10)
00131 - 3
.'
,
:":,, - ~,'~'~'.
.<>..:..~~i#,:
,"- -:,= --~; 'tfi-::'. .
-'~~:~~~_~~:i'..J~f -~.
.-:e:;':~.;J::i. :~'
I acknowledge receipt of Addenda No. (s) 1,2.3.5.6.7.8,9.10
I have included pages 1-4 of the Proposal Form x , and attached
the required Bid Security~, Lobbying and Conflict of Interest
Clause x , Sworn statement of Public Entity Crimes x I and Non-
.-- . t -
CollusIon AffIdavIt~
(Check mark items above, as a reminder that they are included.)
Mailing Address:
Biq C Steel, Inc.
13095 49th Street, North
C1earHater, Fl. 34622
Phone Number:
813-573-2442
Date: April 20, 1992
Signed:
!
David S. Cox
(Name)
President
(Title)
witness:
LA_~~ p:.J &M-
(Sea l)
04/16/92
00131 - 4
STAIRS PROPOSAL FORM (ADD. 10)
,~ ;..
..,.
. ~.,--
'7"';' ..~
Bond XO'H_HH'.='~~:
Fidelity and Deposit Company
HOfifE OFFICE OF 1tIARYLAND BALT/MORE, fifD. 2/203
DID BOND
Kl\OW ALL ?\1EN BY THESE PRESENTS:
Th a t we,..................... ........ J?J~...Q ...~.'IF.:.J;;~.J ..JNQ.~ ...... ............ ...... ............... ............. ............ .....m............ ............ ....h.......
.... ~... .......- - .-................. .... ..... .......~.... .............. ......~. ~...~.. ..... ...... ..-. ..... ~.~~....... ........ ..... ....... .... ........ .~... ... ....................-.... ....... ................... .........-..........
.............. ................ .....mm .....................m..:..........m............., as Pri nci pa I, (herei naf ter called the II Pri nci pal "), and
the FIDELITY A>:D DEPOSIT COMPANY OF MARYLAND, of Baltimore, ~Iaryland, acorporation duly organized
under the laws of the State of Maryland, as Surety, (hereinafter called the "Surety"), are held and firmly bound
unto........... ... ~g.~@... Qf.. ~g.1lli.IT...QQ~:J;.~.~ A9.~F.:R~..l1Q~Q ~... Q9J.IN.IT.................. ... ..... .-....-.-... .... ............... ..............
........... ......... ........ ............. ....~. ...... ~.............. ..... .~.. .-....... ....... ... .......... ..... ~.. ................... ...... ....... ... ....... ......... ......... ...... ........... ....... .............. ........... ..... ...... ............ ..............
... ............. ........ ..... ............ ................................ ....... ..................................as Obligee, (hereinafter called the "Obligee "),
in the su m of........ ~ ~...?~...~~.~...~~?~.~~ ...~}~... .... ........................ ........... ................ .......... Dollars ($............................),
for the payment of which sum well and truly to be made, the said Principal and the said Surety, bind ourselves,
our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WH EREAS, the Principal has submitted a bid for.....__~~~.~~.E~})..~~.':l:~...~.~~.~LJ~!'._........................._.......
...... ....... .... ~.~~ ..~~::.~ ~~. ..~!?~~.~.'t....~!:~.~~.~.~ ~~. ..!..~.~P.!EY.... ....... ........ .... ........ ................. ... ........ ............. ... ..... ..._.........
......-...........................-..-.......-......................-.....................................................................................................................................................................
...................................................................................................................................................................................................................................................
........................................................................................................-..................................................-.....................................................................................
KOW, THEREFORE, if the Obligee shall accept the bid of the Principal and the Principal shall enter into
a contract with the Obligee in accordance with the terms of su~h bid and give such.bond or bonds as may be
specified in the bidding or contract documents with good and sufficient surety for the faithful performance of
such contract and for the prompt payment of labor and material furnished in the prosecution thereof, or in the
event of the failure of the Principal to enter into such contract and give such bond or bonds, if the Principal
f-hall pay to the Obligee the difference not to exceed the penalty hereof between the amount 5pecified in said
bid and such larger amount for which the Obligee may in good faith contract with another party to perform
the work covered by 5aid bid, then this obligation shall be null and void,otherwise to remain in full force and effect.
Si g ned a nd sealed this..............__?~~....... .... ................... .....day oL....... ...... ....~.~~.J:.... ..........._......A. D. 19...?~...
tf!~~7~u:~
, ..,,, ..."FIDELITY A:\D DEPOSIT CO:.1PA~Y OF l\L\RYLA:\D
CO'JNTE~,,,k,,ED A1 SlIrcly
,:,:j~ C::Nl;;4.L AV'C. /
5T PClEP.S"~RG !OLO?:!)." :!3}13 ~
' ..' .. .. .~. '~'IDO"''''''/ /
\JEST CO,,:> 11N~.... ~7/ y.... ~ .
.uuu..u.......u......uu...."'.. . J ,.). . .;.a .J <fkl. By...... .... ..~.d,.~~EAL)
FlOR!DAUCENSE ffZ! IT rrr CLARA F. ALTINE Title
O"5d-150M,
E-t~
HZ
(f)<S
OH~
p... ~ Q
~ p:: ~
A < IS
A ~ ~
Z ~ 5
< 0 ~
~ ~
E-t ~ ~
H < 0
H P.c ~
~:s 6
eo~
~(,)
=
~
e
=
=
~
=
Cl
Z
o
=
~
><
0.1.
c::
<
~
~
30 3iVH3H 1\:0
t
~
Cf)
<
~
~
~
'O~
.. .
.~-
Power of Attorney
FIDELITY AND DEPOSIT COMPANY OF MARYLAND
HOME OFFICr, BAlTIMORE. MO
K:'\O~' ALL ~I[:\ BY THESE PRESENTS: That the FIDELITI' A~D DEPOSIT COMPA~Y OF MARYLAND, a corporation of the
State of ~Ian'land by C. M. PECOT, JR. ,Vice-President, and C. W. ROBB INS ,
Assistant Secretar):, in pursuaDce of authority granted by Article VI, Section 2, of the By-Laws of said Company, which are set
forth on the reverse side hereof and are hereby certiJied to be in full~ce and eff~c D the date hereof, does hereby Dominate,
constitute and appoint Robert P. Clark, Clara F. Al and D <> :-lurphy, all of St.
Petersburg, Florida, EACH................. ~......::-",; .....................
I e an '" ageDt and Attorne)'-in-Fact, to make, execute.~ deliver. d on its behalf as surety, and as its act and deed:
any and all bonds and undertakings....~~..... .... ...... .......... .....
e execution of such boDds or undertakings in p~ of the~ nt!, shall be as binding upon said Company, as fully
and amply, to all intentJl and purposes, as iJ they h i. lie'en duly~iC~ and aclrnowledged by the regularly elected officers of
the Company at it! office in Baltimore, Md., in <> 'Il pro .. . ns. This power of attorney revokes that
issued on behalf of Robert P. ~,eta~ ted, September 21, 1987.
The said Assistant Secretary does hereb)' ce at th~e t set forth on the reverse side hereof is a true copy of Article VI,
Section 2, of the By-Laws of said comitp<> d is now' .
11'\ WITNESS WHERE?F, the said Vi entaDd'- _t Secretary have ~ere~to subscribed their Dames and alfixed the
Corporate Seal of the said FIDELITY AN EPOSI~ANY OF MARYLAND, thIS 23rd day of
SeQtember . A.D.19~ ~
ATIET, .....~.:.:A~~J.;::tA ~~ ~;.~~~y :~..'~:~.~.:~~........_......~~~__...
GG .~.. l';ce-Presiclent
STATE Of MARYLA,'l>
em Of BAL'lniORE
I ss:
,
On this 23rd day of September , A.D. 1991 , before the subscriber, a Notary Public of the State of
MAr)'land, in and for the City of Baltimore, duly commissioDed and qualified, came the above-named Vice-President and Auistant
Secretary of the FIDELITY AND DEPOSIT COMPANY OF M.~YLAND, to me peI1lOnall)'1mo~'Il to be the individuals and oHicen
described in and who executed the preceding instrument, and they each acbJowledged the executioD of the same, and being by
me duly sworn, severally and each for himself deposeth and saith, that they are the said officers of the Company aloresaid, and
that the seal alfixed to the preceding instrument is the Corporate Seal of said Company, and that the said Corpora,te Seal and their
signatures as mch officers were duly affixed and suhscribed to the said instrument by the authority and direction of the said Corporation.
IN TESTIMONY WHEREOF, I have hereunto set m)' hand and alIixed my Official Seal, at the City of Baltimore, the day and
you r~t .bo". .Tin.D. ~ ' ~
CAROL J. FADER r{~ ~
Notary Public ctmmission / p' AU~~ I. 1992
CERTIFICATE
I, the undersigned, Assistant Secretar)' of the FIDELIIT ,~"TI DEPOSIT COMPA.."IY OF MARYLA.."-'D, do hereby certily that
the original Power of Attorney of which the foregoing is a full, true and correct copy, is in full force and effect on the date of this
certilicate; and I do further certily that the Vice-Pre~ident who executed the said Power of Attorney was one of the additional Vice-
President! speciall)' authorized by the Board of Directors to appoint any Attorney-in-Fact as pro\;ded in Article VI, Section 2, of
the B)'-Laws of the FIDEUTY A..'\'D DEPOSIT COMPA..'\'Y OF MARYLAJ'm.
This Certificate may be signed b)' facsimile under and by authorit)' of the following resolution of the Board of Directors of the
FIDELITI' A."'D DEPOSIT Cmn>ANY OF MARYLA.."'D at a meeting dul)' called and held on the 16th da)' of July, 1969.
RESOLYED: "That the facsimile or mechanically reproduced signature of any Assistant Secretar)' of the Company, whether made
heretofore or hereaIter, wherever appearing upon a certified copy of any power of attorney issued b)' the Company. shall be valid
and binding upon the Comp8DY ...;th the same force and eHect 86 though m8Dually alfixed."
11'< TESTIMO:'\Y WHEREOF, 1 have hereunto subscribed my name and alfuoo the corporate se.al of the said Compan)', this 20th
day of Apri 1 , 19-9.2
031-4548
~ A< ~~~
. 0 6 AMUtAnl SecretAry
EXTRACT FROM BY-LAWS OF FIDELITY AND DEPOSIT COMPANY OF ?\1ARYLA);D
.. Article VI. Section 2. The Chairman of the Board. or the President, or any EXl'clltive Vice-President. or any of the Senior ,"ice-
Prl'sidents or Vice-Presidents specially authorized so to do by the Board of Directors or by thl' Executive CommiUl'i', sh~JJ have
power. by and with the concurrence of the Secretary or anyone of the Assistant Secretaries, to appoint Resirlent Vice-Pn nt~.
Assistant Vice-Presidents and Attorneys-in-Fact as the business of the Company may require, or to authorize any person or pl'r;.(.ns
to eHcute on behalf of the Company any bonos. undertakings. recogni7.8ncl':s. stipulations, policies. c(mtracts, agreements. d('prls.
and releases and assignments of judgemrnts. decrees. mortgages and instruments in the nature of mortgages.. . . ;mo to affix lh...
seal of the Cnmpany thereto."
l.Ji~~h
. .
.
.
.,~~':.
'\'~.......
. .. ~ -
. ......~3,:;;-$7~.~.... '3~j~i_.
......",'r.~,,~_....'. - ,.>r.... I
..~;.-..~. -'7~~""" - ~ . ...~,~~
~~'- .";:,.':. u
. ... j.;I'~-',(;"<~" -,-
,{.j-~y~ -,
_..~~~;~."":'~''":'''.iS-.....~-t'.,L .
:~~~~~~~. ': - ..~ .
- -- "~:;:Ai:"~':;' .~~is~:-
......~ ~""""J>.~t-~,
, '.""i~',"'<'U;"':"C
.~{;: .-'<:r!.~~7:'
SWORN STATEMENT PURSUANT TO SECTION 287.133(3) (a),
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to:
-=
the public entity]
by
David S. Cox, President
[print individual's name and title]
,
for
Big C Steel, Inc.
[print name of entity submitting sworn statement)
,
whose business address is 13095 19th street, North, C1c:;n."2~cr, Fl.
34622
and (if applicable) its Federal Employer Identification Number
(FEIN) is 59-1863367 (If the entity has no
FEIN, include the Social Security Number of the individual
signing this sworn statement: 436-76-7465 ) .
2. I understand that a "public entity crimelf as defined in
Paragraph 287.133(1) (g), Florida Statutes, means a violation
of any state or federal law by a person with respect to and
directly related to the transaction of business with any
public entity or with an agency or political subdivision of
any other state or of the united states, including, but not
limited to, any bid or contract for goods or services to be
provided to any public entity or an agency or political
subdivision of any other state or of the United states and
involving antitrust, fraud, theft, br ibery, collusion,
racketeering, conspiracy, or material misrepresentation.
3. I understand that "convictedlf or "conviction" as defined in
Paragraph 287.133(1} (b), Florida statutes, means a finding of
guilt or a conviction of a public entity crime, with or
without an adjudication of guilt, in any federal or state
trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of
a jury verdict, nonjury trial, or entry of a plea of guilty or
nolo contendere.
4. I understand that an "affiliate" as def ined in Paragraph
287.133(1) (a), Florida Statutes, means:
03/02/92
PUBLIC ENTITY CRIMES (ADD. 6)
00420 - 1
. '.;;:.. -,,~._~::~.::'--J~.-
.
'''':j;i~'~*' :;:~~9",~
"' .
.. ...~
,'~~~*.;<~,~ :;-"":'
.. .
,.',,"" ,~--<*"';:'~*". .'.".':~,?" ..' ::~~"~'~ ~'. > ~
~~.'" . .~'~t. _.~,.. -
., '.~~..':,: '-.:jl~z~~{:~~. -~ ~
more of its officers, directors, executives, partners.
shareholders, employees, members, or agents who are active in
the management of the entity, or an affiliate of the entity
has been charged with and convicted of a public entity crime
subsequent to July 1, 1989. However there has been a
subsequent proceeding before a Hearing Officer of the state of
Florida, Division of Administrative Hearings and the Final
Order entered by the Hearing Officer determined that it was
not in the public interest to place the entity submitting this
sworn statement on the convicted vendor list. [attach a copy
of the final order]
I UNDERSTAND THAT THE SUBMISSION OF THIS FO~1 TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN P~~GRAPH 1 (ONE) ABOVE
IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO
UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO
ENTERING INTO A CONTRACT IN EXCESS OF THE THRESHOLD AHOUNT PROVIDED
IN SECTION 287.017, FLORIDA STATUTES FOR ATEGORY TWO OF ANY CHANGE
IN THE INFOR11ATION CONTAINED IN THIS '1.... / / /
& / t<,.,
[Si a ure] I
Date:
April 20, 1992
STATE OF Florida
COUNTY OF Pinellas
PERSONALLY APPEARED BEFORE ME, the undersigned authority,
David S. Cox
[name of individual signing)
who, after fi~st being s\o.'orn by me,
affixed his/her signature in the space provided above on this
?Ot'h day of
I q? C/ (j(~fft/IJW
NOTARY !UBLIe
l1o~'Y Publ1c, Stct~ of FlorIda at targ~
!.Iy Commission ExpIres DEC. 27 '/ q ~ 3
My commission expires:
Form PUR 7068 (Rev. 04/10/91)
03/02/92
PUBLIC ENTITY CRIMES (ADD. 6)
00420 - 3
'.. -....... .
.......
. .
~; ',~
LOBBYING AND CONFLICT OF INTEREST CLAUSE
~:~;~~~:;~,;::,~.':"~ '.' .~',"~~+~:-~'~~~~.eF~.
-~- . ....
. ...... ~
. -
SWORN STATEMENT UNDER ORDINANCE NO. 010-1990
MONROE COUNTY, FLORIDA
II
BIG C S~~E~, INC.
II
(Company)
II warrants that it has not employed, retained or otherwise had
act on its behalf any former county officer or employee subject
to the prohibition of section 2 of Ordinance No. 010-1990 or any
County officer or employee in violation of section 3 of Ordinance
No. 010-1990. For breach or violation of this provision the
County may, in its discretion, terminate this contract without
liability and may also, in its discretion, deduct from the
contract or purchase price, or otherwise recover, the full amount
of any fee, commission, percentage, gift, or consideration paid
to the former County officer or employe
Date:
A~:;r i1 20, :.99;
STATE OF Flcri0<:
COUNTY OF Fin211as
PERSONALLY APPEARED BEFORE ME, the undersigned authority,
i)z.vi:, S. re': ....rho, after fi~st being sworn by me, affixed
hisJ~r~ signature (name of individ ~l signing in the space
provided above on this 20t."-: daY, of 'r; , 1~d-. ~
.1 ,tyV"'1 f' ~ (jft11[f',,:
NOTARY PUBLIC/ -=-
l'lY commission expires: Nota:-y Publ1c. S:cle of F10rlda at lug.
My Commlsslon Expires DEC. 27. FiA 3
07/25/91 LOBBYING AND CONFLICT OF INTEREST CLAUSE
00425 - 1
JII '.: ~:........ '" ... - . ~: ---;...
~ . '~-, ".": ' "':: ,: '.',,-~~." -
I ~'::"David S: Cox
according to law on
and say that;
: c:<_: ~:;-;'~~;:. -tff.l~~r~ti~~.!-~'i t~...:gi ~i~an.a~e~ ".,'~;j~;"{It:~>'-
my oath, and under penalty of perjury, depose
~:,<-. - .
.:' -
-!.'-:'
> ,:.:.~
1. ) I am President. of the f irm ~f
Big C steQl Ine ' the bidder making the Proposal for V
proj ect descr ibed in the not ice for call ing for bids for - ~tair~ ~nd
mic:;rpl1;mpn1JC:: TTlPtrllE and that I executed the said proposal with
full authority to do so;
2.) the prices in this bid have been arrived at
independently without collusion, consultation, communication or
agreement for the purpose of restricting competition, as to any
matter relating to such proces with any other bidder or with any
competitor; .
3.) unless otherwise required by law, the prices which have
been quoted in this bid have not been knowingly disclosed by the
bidder and will not knowingly be disclosed by the bidder and will
not be knowingly disclosed by the bidder prior to bid opening,
directly or indirectly, to any other bidder or to any competitor;
and
4.) no attempt has been made or will be made by the bidder
to induce any other person, partnership or corporation to submit,
or not to submit, a bid for the purpose of restricting
competition;
5. )
correct,
upon the
awarding
the statements contained in this
and made with full knowledge that
truth of the statements contained
contracts for said project.
STATE OF
COUNTY OF
Florida
Pinellas
ADd 1 20, 1992
DATE
PERSONALLY APPEARED BEFORE ME, the undersigned authority, _
David S. Cox who, after first being s\o,'Orn by r.,e,
(name of individual signing)
affixed his~ signature in the space
:10th day of 1'.;':-:-11
providedyabove on ,D..'I1is
, 19~.; v'A- ~
J' ~/ / -(ll /;.:/)
:;l\ C----/v<---1 // ~' [//',- "-
NOTARY JiUBLIC
1>1y commission expires: tJO~2ry Publlc. S:ate of Florida al Large
My C~~-nls.sb') Ex;iri's DEC. 27 i ?C;~~
11/20/91
NON-COLLUSION AFFIDAVIT
00430 - _
~,"~'-'-'-.- -.-- -..... ;,...,.,'-'~'-'-" '""
.. ~:
. "t.,'
'1 '" ,. l' . .:. ~,.
. '.;~' ,~.:>~e;,. .
>:-:-.~.~~~~:.I!i. .
'":.,,11.:..... ~.~of'~~:?~t_'
SECTION 00440
PROPOSED SUBCONTRACTOR LISTING
1.
Subcontractor:
Address:
Buccaneer steel
P.O. Box 389, Oldsmar, Fl. 33557
Phone: 855-6940
Contact:
Coy Lee
Portion of Work:
erection of steel
Percentage this proposed Subcontract is of total Bid Price as
delineated on Proposal Form: 22 %.
2. Subcontractor:
Address:
Phone:
Contact:
Portion of Work:
Percentage this proposed Subcontract is of total Bid Price as
delineated on Proposal Form: %.
3. Subcontractor:
Address:
Phone:
Contact:
Portion of Work:
Percentage this proposed Subcontract is of total Bid Price as
delineated on Proposal Form: %.
4. Subcontractor:
Address:
Phone:
Contact:
Portion of Hork:
Percentage this proposed Subcontract is of total Bid Price as
delineated on proposal Ferm: %.
11/20/91
SUBCONTRACTOR LISTING
00440 - 1
THE Atv\ERICAN INSTITUTE OF ARCHITECTS
',,1'.-\",
\ \ :,
~
AlA Document A201/CM
CONSTRUCTION MANAGEMENT EDITION
General Conditions of the Contract
for Construction
THIS DOCUMENT /1AS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION
,VITH AN ATTORNEY /5 ENCOURAGED.
1980 EDITION
TABLE OF ARTICLES
1. CONTRACT DOCUMENTS 8. TIME
2. ADMINISTRATION OF THE 9. PAYMENTS AND COMPLETION
CONTRACT
10. PROTECTION OF PERSONS AND
3. O\YNER PROPERTY
4. CONTRACTOR 11. INSURANCE
5. SUBCONTRACTORS 12. CHANGES IN THE \\I0RK
6. "\lORK BY O\VNER OR BY 13. UNCOVERING AND CORRECTION
SEPARATE CONTRACTORS OF \YORK
7. MISCELLANEOUS PROVISIONS 14. TERMINATION OF THE CONTRACT
~m CAUTION: You should use an original AlA document which has this caution printed in red.
b~ An original assures that changes will not be obscured as may occur when documents are reproduced.
Copyright 1975, <S 1980, by The Ame,iun InstilLte of Architects, 1735 l"ew York ,"-venue, :--i,W" Was"in~;'2" D,C 10006.
Reprodutlion of the material herein or svbstanlial quotation of its pro\isions without" rillen permission of :c.e AI:\ \ iolales
the copyright laws of the U"ited 5t2!es and "ill be subject to legal prosecution.
AlA DOCU,~\[NT AlOl:CM . GES[R:',l CO"DITIO"S Of lH[ CO'- TR.~C1 fOR CO"STRL:CTIO"i
CO"SlRUC110"i ~'.ASAG(MEST [01110" . JU"i[ ;,,.) [OITlOS . AlAS. @1980 . THE
A.~IERJC~'" ',-,SlJ1UlE Of ARCHITEC15, 173; '-'[I\' \O~,K AVE., "IV" WASHI"iG10N, O,c. ~((06
A201/C\i - 1980 1
Acceptance of Delective of 1\:0nConformins Work. .6.22,13.3
Acceptance of Work................. .9.5.5,98.1,9.9.1,9.9.3
Access to Work................................ .2.3.6, 6.2.1
Accident Pre\ention .............................. .2.3.5, 10
Acts and Omissions............. .4.18.3,7.4,7.6.2,8.3.1,10.5
Addenda, Ddinition of .............................. .1.1.1
Additional Costs, Claims for. . . . . . . . . . . . . . . . . . . . . . . . . . .12.3
ADMINISTRATION OF THE CO,"iTRAO ............. .2,4.3.3
Agreement, Extent of .............................. .1.1,1.2
All Ri~k Imurance .................... .. . . . . . . . . . . . . .11.3.1
Allowances .......................................... .4.8
Applications for Payment, Contractor's...... .2.3.8, 9.2.1, 9.3.1,
933.,9.5.3,9.7.1,9.8.2,9.9.1,9.9.3,9.9.5,11.3.1,14.2.2
.Applications for Payment,
Project................ .2.3,8,2.3.9,93.1,9.4,9.6.1,9.7.1
Approvals.. . . . . . . . . . . . . . . . . . . . .2.3.18, 3.4, 4.3.3, 45, 4.12.4,
4.12.5,4.126,4.12.8,4.13.2,7.7,9.3.2
Arbitration....... .2.3.15,23.23,6.2.5,7.9,8.3.1,11.3.7,11.3.3
Archilect, Delinition of .......................... ...... .2.1
Architect, htent of Authority. . . . .. . .2.3, 3.4,4.12.8, 5.2, 7.7.2,
8.1.3,8.1.4,8.3.1,9.2,9.3.1,9.4,9.5.3,9.6,9.8, 9.9.1, 9.9.3,
12.1.1,12.1.4,12.3.1,12.4.1,13.1,13.2.1,13.2.5,14.2
Architect, limitations of Authority and Responsibility.... .2.3.2
thfOugh 235, 2.313 through 23.18, 2.3.22, 4.12.6,
52.1,9.4.2,95.4,9.5.5,12.4
Architect's Additional Services... 3.4,7.7.2,13.2.1,13.2.5,14.2.2
Architect's Approvals..... .2.3.18,3.4,4.5,4.12.6,4.12.8,4.18.3
Architect's Authority to Reject Work... .2.3.16, 4.5, 13.1.2, 13.2
Architect's Copyright.................................. .1.3
Architect's Decisions............. .2.3.10 through 2.3.16, 7.7.2,
7.9.1,9.2,9.4,96.2,98.1,12.1.4,12.3.1
Architect's Inspections........ .2.3.16,2.3.21,9.42,9.8.1,9.9.1
Architect's Instructions......... .2.3.16,2.3.19,7.7.2, 12.4, 13.~
Architect's Interpretations........ .2.3.10 through 2.3.13, 12.32
Architect's On. Site Observations. . . . . . .2.3.4, 2.3.6, 2.3.9, 7.7.1,
7.7.4,9.4.2,961,99.1
Architect's Relationship With Contractor..... .1.1.2,2.3.5,23.6,
2.3.13,2.3.16.43.3,4.5,4.7.3,4.126,4.18,11.3.6
Architect's Relationship with
Subcontractors..... ............ .1.1.2,2.3.16,9.5.3,9.5.4
Architect's Representations............ .....9.42, 96.1, 99.1
Artiq,c [ffect .... ......... ....123.] 314, 2.315, 7.9.1
Attorneys' fees.. ..... .......... . ........ .4.18.1,62.5,9.9.2
A"ard of Separate Contracts.......................... .6.1.1
Award of Subcontracts and Other Contracts for
PorJiom o( the \';'ark ..... ....... .52
. . . . . . . . . .11 32
.9.3.3, 992
. .75, 9.9.3
. . . . . . . .4.7
Borler and -'Iachiner\, Insurance. . . . . . . . . . . . .
Bonds, lien .. . . . . . . . . . . . . . . . . . . . . . . . . . . .
Bonds, Performance, labor and ,\.\atenal Paymfnt ...
Building Permit. . . .
Certificate o( Substantial Corr.pl~tion ... .9.8.1, 9.8.2,98.3,98.4
Ctrt,ficates of Inspection, T"<:lng or Approval........... .7.7.3
C~rtlf'C2tes of Insurance.... .......... .. .... .' .93.2, 11.1.4
Certificates for Payment, Project. ...... .2.39.2.321,9.4,9.5.1,
9.5.5,96.1,9.7.1,9.8.2,9.9.1,9.9.3,12.1.4,14.1.1,142.2
Change Orders ........ .1.1.1,2.3.19,3.4,4.823,4.11.1,
5.2.3,7.7.2,83.1,9.7,9.9.3,113.1,113.5,11.3.7,
12.1.12.2.1,12.31,13.12,13.25,13.3.1
C h an g I' 0 r d e r s, De fi nit ion 0 f .......... . . . . . . . . . . . . . . . 1 2.1.1
CHANGES I~ THE WORK................. .2.3.19,4.11.1,12
INDEX
Cia ms for .A.dd,t,(.c,al Co;t or Time . .83 2,833,122.1,123
Cia ms for Dama~es .... ...... .61,1, 6 2.5,7.4,8.3,9612
Cia ms and Di~pL.:es Br!\H'en Contractor
and O\\ner ............. 23,12.2.3.15,23.23,4.18.2,7.9
Cleaning Up . . . . . . . . . . . . . . . . . . . . , . . . ' . . . . . . . . . . 415 63
Commencement oi the Work, Conditions Relating to' '. 3.i.l,' 4.2,
4.7.1,410,5.2,1,62.2,7.5,92,11.1,11.34
Communic21ions .......... . ........' ..232 326 491 416
Completion, ., . ., . ., .
Conditions r~!atjng to .. .2.3.21, 4.11,4.15,9.4,2,9.9,13.2.2
COMPlE110N, PAYMENTS AND..........................9
Completion of the Project, Substantial .......8.1.4, 9,8.3, 9.8.<4,
9.9.4,9.9.5,9.9.6,132.1,13.2.2
Completion of the Work, Substantial....... .2.321,8.1.1,8.1.3,
8.22,9.8,9,42,99.3,11.3.9
Compliance wit~ Law~ ........... .1.3,2.1.1,4.6,4.7,4.13,7.1,
7.6.1,7.7.1,10.22,142.1
Concealed Cond:::ons ....................... ......... .12.2
Consent, \\'ritten ................... .2.3.22, 4.14.2, 7.2, 7.6.2,
9.8.1,9.92,993,11.3,9
Construction ."Iauber, Definition of . .................. .2.2
Construction Mac.ager's Appro\'al .............. .4.10.1,4.13.2
Construction \Iac.ager's
Additional $-2c"ces ........ .3.4,772,13.2.1,132.5,14.2.2
Construction ."I,,' ,,!;er's Authority and Responsibility.... ,2.33,
23.5,2.3.16,23.10,2.3.22,4.8.1,4.17.1,4.18.3,
7.7.4,9.2,1025,113.6,12.1.4,14.1.1
Construction Ma~."ger's Confirmation.................. .9.9.3
Construction Mac."ger's Consultation with the Architect .2.3.12,
2.3.16,23.;9,2.3.21,3.4.1,9.6.1,981,12.1.4,123.1,14),1
Construction M<~."!;er's Coordination ond Scheduling.... "
2317,4.3.1,410.1,4. ,L..
Construction .\\a'.,,;;er's Decisions... ........... '" .6.3, 83.1
Construction \Ia'.,,!;!?r's Determirations 23,3,63.1,7.7.2,83.1
Construction ,~I"c"ger's Interests............... .11.3.1,11.3.2
Construction Ma~'<ber's Recomm~ndations ... .2.3.8,2.39,9.3.1,
94.1,9.7.1,9.9.1,12.1.1
Construction Mac ager's Relation~hip
with ,ArchitK1 .................. .1.1.2,2.3.1,2.3.3,2321
Con~truction ,\la'''5er's RE'latioCl~hip wll'o Contractor.... .1.1.2.
2.3.15,23.16,3:: 6, 4.21, 43.3. 4.5,4./.3,4.11.1,4.12.4,4126.
4.16.1, ~-".l, 4.18,52.62.1,62.2,7.62,7.7,7,91,7.9.2,
8.3.1, C 3 2, 9.4 1.95.4.98.1,99.1,102.6,11.1.4,113.6
Construction Ma-.at:er's Rel.:;tionship
With Subcoc:'actors ............
Con<lructicn \Ia-, ~",r's I:;>\'iew
Co,",'truc!,cn 5cc~:~le, Contractor's...
Contract, Def'ClII ~'"' of . . . . . . . . .. . . . . .
Contract Adnlinl~::2~jon .. . . . . . .. . . . . .
Contract .""ward <-oj Execution,
Conc',llons r~'2ting to..... .4.7.1.410,5.2,75,11.1,11,3,4
COSTRACT DOCU.',.\[l\lS ..........:....................1
Coc,tract Docum~-.:s,
Copies furr. ,Li:d and Use oi ...."......... .1,3,325,5.3
Contract DoculT.e-:s, D~;'.:1ltion oi .................... .1.1.1
Contract V,odific::ons ....... ......... ...... .1.1.1,12
Contract 5'cm, De:.Clltion oi . , . . . . . . . . . . . . .. . . .9.9.1
Contract T e-rmir.c:':,n ................ . . . . . . . . . . . . , , . .14
Contracl Ti",e, D~:.~ition of ........................., ,8.1.1
CO~TRACTOR . .......................................<4
COnlriJctor. Dek 'OCl oi .............. .4.1,6.1.2
ContriJctor's COf":'cction 5chec_:e ... ................ .4.1C
... .1.1.2, 2.3.16, 53.1
.... .238,23,17,521
, . . . . . . . . . .. . .4.10
. . . . . . . . . . . . . . .112
............ .23,43 3
2 A201/C.I,1-1980
AlA DOCUMlNT ~)Ol;CM . Cl',RAt (.~"JllI0'S Of ,,..., CO""O lOR CO'lSHl'.
CO:--:"lRUCTIO" \\,~"^C""['T lDIIIC' . lV.., 19&:: EJiilOS . AIA~ . ~1930 . ""
^\HRICA.-..: 1~"lllUH or ^,CH:ifC15. '-" ",\\ '0" .<\1.. ." IV, \\~SHI"C,ON. DC )CD:>:
\"~r:hi'L-:: '..;r-I!:'-,-'n~"~!t:"l.-,-'y~::-,,';r" ..::/~~:,~U~ c':'.... r!":.~~;:o-,..-::~-:',.. <;:,'-It;....~ .~ I~-
Contractor's frnplo)'ees ..... .43.2,4.4.2,4.8.1,4.9,4.18,102.1
through 10.2.4, 10.26, 10.3, 11.1.1
Contractor's lia~rlit)' Insurance. . . .. . . . . . . . . . . . . . . . .. . . .11.1
Contractor's Re:ationship with Architect..... .1.1.2,2.3.5,2.3.6,
2.3.13,2.3.16,4.33,4.5,4.73,4.12.6,4.18,11.36
Contractor's Re:2tionship with Construction Manager.... .1.1.2,
2.3.15,2.3.16,3.2.6,42.1,4.3.3,4.5,4.7.2, 4.11.1, 4.12.4,
4.12.6,4.16.1,4.17.1,4.18,5.2,6.2.1,6.2.2,7.6.2, 7.7, 7.9.1,
7.9.2,8.3.1,8.3.2,9.4.1,9.5.4,9.8.1,9.9.1,10.2.6, 11.1.4, 11.3.6
Contractor's Relationship with Separate Contractors
and Owner's Forces........................... .3.2.7,6
Contractor's Relationship with
Subcontr,"lctors .... ..... .1.2.4,5.2,5.3,9.5.2,11.3.3,11.3.6
Contractor's Representations.......... .1.2.2,4.5,4.12.5,9.3.3
Contractor's Re~ponsibility for Those
Periorming the Work.................... .4.3.2,4.18, 10
Contractor's Re'.iew of Contract Documents... .1.2.2,42,4.7.3
Contractor's Riff1t to Stop the Work. . . . . . . . . . . . . . . ... . . .9.7
Contractor's Right to Terminate the Contract............ .14.1
Contractor's Subn1ittJls .............. .2.3.18,4.10,4.12,5.2.1,
52.3,9.2,93.1,9.8.1,992,9.93
Contractor's Superintendent...................... .4.9, 102.6
Contractor's Supervision and
Construction Procedures......... .1.2.4, 2.3.5, 4.3, 4.4, 10
Contri!ctuallii!bility Insurance....................... .11.1.3
Coordini!tion and Correlation........ .1.2.2,1.2.4,4.3.1,4.10.1,
4.12.5,6.1.3,6.2.1
Copies Furnished of Drawings and Specifications. .1.3, 3.2.5, 5.3
Correc1ion of \\'ork .................... .3.3,3.4,10.2.5,13 2
Cost, Definition of .................... . . . . . . . . . . ., . .12.1.4
Costs...... .3A, 4.8.2, 4152. 5.2.3, 6.1.1, 6.2.3, 6.2.5, 6.3, 7.7.1,
772,9.7,11.3.1,113.5,1213,12.1.4,12.3,13.1.2,13.2,14.2.2
Culling and Patching of Work. . . . . . . . . . . . . . . . . . . . . ... ..4.14
Damage to the Work........... .414.2,10.2.1.2,102.7,11.3.1
Damoge to Work............ .4.142, 4.18.1, 6.2.4, 6.2.5,9.6.15,
10.2.13,102.2, 10.25, 103,13.2.6
Dami!ges, Clai"" for................. .6.1.1,6.2.5, 7.4,9.6.1.2
Damates for De'a)' ......................... .6.1.1, 8.3.4, 9.7
Day, De:'inition of . .................. ................ .8.1.5
Decislu:1s of the Arch;lC'ct ........ .2.3.10 through 2.3.16, 7.7.2,
7.9.1,9.2,9.4,9.6.1,9.8.1,12.14.12.3.1
Decisic;ls of tre Construction .\Ianager .. . . . . . . . . . . . .63,83.1
D~ieC11\e or <"C:1,CoC:iorming \\'ork, Acceptonce,
Rr.E'ctior 2~d CO:CE'ctlon oi ..... .2.3.4,2.3.16,3.3,3.4,4.'>,
6.2.2,623,96.1.1,9.9.4.2,13
Definitions.............. .1.1,2.1,2.2,3.1,4.1,4.12.1 t"IIough
4.12.3,5.1,6.1.2,8.1,9.1.1,12.1.1,12.1.4
Dela) ~ and h:<-:;io;l~ of Time.................. ...... ..8.3
Di<.pules . . . . . . . . . . . . . . . . .:> 312, 2.3.15, 2.3.23, 6.2.5,6.3,7.9.1
Docur.e;lts a;lC 5am.,!r:s at the Site.................... .4.11
Ora\' j;,;~ and S~e(l{i(ations,
L"e and 0-.\ Clr:rship of .............. . .1.3, 32.5, 4.11, 5.3
Easem~'1ts . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .3.2.3
Emergencies ........................................ .10.3
Emplc) cr:s, CC':1t:octor's .......... .4.3.2, 4.4.4, 4.8.1, 4.9, 4.18,
10.2.1 through 1024, 10.2.6, 103,11.1.1
fquipfTent, tabor, .'latC'rials and..... .1.1.1, 4.4, 4.5, 412, 4.13,
4.15.1,6.2.1,9.3.2,9.3.3,9.6.1.3,9.9.2,
10.2.12,11.31,12.1.4,13.2.2,13.2.5,14
fxecution and Progress of the Work........ .1.13,1.2.3,2.3.4,
23.5,2.3.11,4.2,4.4.1,45,4.7.1,6.2.2,7.9.3,
8.22,8.31,83.2,9.6.1, 102.3, 10.2.4, 14.2
Execution, Correlation and Intent of
the Contract Documents ......................1.2, 4.7.1
Extensions of Time....................... .8.3,12.1.1,12.1.2
Failure of Payment by Owner...................... .9.7, 14.1
Failure of Payment of Subcontractors..... .9.6.1.3,9.9.2,14.2.1
Failure to CHry out the Work......................... .2.3.5
Final Completion and Final Pa}'ment .. .2.3.15, 2.3.21, 9.9, 13.3.1
Financial Arrangements, Owner's. . . . . . . . . . . . . . . . . . . . . ..3.2.1
Fire and Extended Coverage Insurance................ .11.3.1
Governing law. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .7.1
Indemnification....................... .4.17, 4.18,62.5,9.9.2
Identification of Contract Documents. . . . . . . . . . . . . . . . . . .1.2.1
Identification of Subcontractors and Suppliers........... .5.2.1
Information and Services RC'quired of
the Owner. . . . . . . . . . . . . . . . . . . . .. . 3) 61 9 11 2 11 3
In<.pections ............. .23.16,2.3.21,' 4.'33: 7.'7: 12.1.i:9.9:1
Instructions to Bidders............................... .1.1.1
Instructions to the Contractor......... .2.3.2,3.2.6,4.8.1,7.7.2,
12.12,12.1.4
INSURANCE..................................... .9.8.1,11
Insurance, Contractor's liability..... . . . . . . . . . .. . . . . .. . .11.1
Insurance, toss of Use. . . . . .. . . . . . . . .. . . . . . . . . . . . . . . . . .11.4
Insurance, Owner's liability..... ...................... .11.2
Insurance, Property..................... ............. .11.3
Insurance, Boiler and .\Iachinery ..................... .11.3.2
Insurance, Special Hazards..................... .. . .. .11.3.5
Insurance, Stored Materials...................... 93.2,11.3.1
Insurance Companies, Consent to Partial Occupancy.... .11.3.9
Insurance Companies, Settlement \\'ith ................ .11.3.8
Intent of the Contract
Documfnts ............. .1.2.3,2.3.10,23.13,2.3.14,12.4
Interest ............................. 78
Interpretalions, Written....... .1.1.1, 2.3.'1'1: '2'3'1'2, 'i.3:i3,' ;2:4
labor, '''aterlal~ and fqulp:nent ...... .1.1.3,4.4,4.5,4.12,4.13,
4.15.1,62.1,9.3.2,9.3.3,9.6.1.3,92.2,102.1.2,
113.1,1214,1322,1325,14
labor end .\'.aterlal Pe)mec;t Sand...................... .7.5
labor DI,putes ...................................... .8,).1
laws and Rt'gulalions ............ .13,2.1.1,4.6,4.7,4.13,7.1,
. 7.61,7.7.1,1022,14
liens ........... . . . . . . . . . . . . . . . . . . . . . . . .93.3, 9.9.2, 99.4.1
limitations 01 Aulhoflty ................. .2.3.2, 113.8,12.4.1
L;ml!alions 01 liability..... .... .23.13,2.316,2.3.18,3.3,4.2,
4/.3,4.12.6,4.17,4.18,62.2,7.6.2,9.4.2,
954,9.9.4,995,1025,11.1.2,11.3.6
Limitations oi Time. General....... .2.3.11,2.3.18,3.2.1,32.4,
42,4.7.1,4.7,),412.4,415.1,5.2.1,5.2.3,62.2,7.4,
7.7,7.9.2,8.2,9.52,9.6.1,9.8,9.9,113.1,11.3.4,
. .. '. 113.9,12.1.4,12.4,132.1,132.2,132.5
limitations ot Time, 5pecii,c .........3.4,4.10,7.9.2,82,8.3.2,
8.3.3,9.2,93.1,9.4.1,9.5.1,97,11.1.4,113.8,
. . . 122,123.1,132.2,132.7,14.1,142.1
lrmltal.'o~s, 5tatutes oi .................. .7.9.2,13.2.2,13.2.7
toss 01 Lse In~urance ................. . . . . . . . . . . " . . . .11.4
AlA DOCL:."\['o.T ~:Q11(.'.1. GE'-ER~L CO'-OITIO'S Of THE CO'-1R.~CT FOR CO'-'lRUCTiOS
CO'-SE~CTIC'- ","~G[\\[ST [DITIOS . JLSE ~%O EDITIO' . AlA'!: . ,g: 1980 . THE
A~\lRIC~' IS"iTL ~E OF ARCHlllCTS, 1:35 'EI\' YORK AVE. '\\'. \\'5HISG10S. DC ~['()()6
A201/CM-1980 3
.\\aterrals. labor and Equ:pment . .1.1 3,4.4,4 5, 41~, 4.13.
4.15.1, 6~1, 932.933,9.613.9.92.
102.1.2,113.1, 12.1.4, 13~2, 13 25,14
-'Iaterral Suppliers ................. .4.12.1, 521, 9.33
,\leans, ,\lethods, Techniques, SeqUl'nces and
and Procedures of Construction........ .2.35,4.3.1.9.42
."Iinor Changes in the Work............... .1.1.1,2.3.19,12.4
MISCELLANEOUS PRO\'ISIONS ...........................7
Modifications, Definition of .......................... .1.1.1
Modifications to the Contract....... .1.1.1,1.1.2, 2.3.2, 2.3.22,
4.11.1,4.7.3, -12
Mutual Respo;osibility ..................................6:!
Non-Conforrning Work, ,Acccptance of Defective or ...... .13.3
Notice, \\'ri1ten ........... 2.3.11,2.3.15,4.2,4.7.3,4; 4,49,
4.12.6,4.12.7,52.1,7.3,7.4,79.2,8.12,8.3.2,8.3.3,
9.41,961,9.7, ([9.1, 99.5, 1026, 11.14, 11.31.
11.3.5,11.3.7,11.3.8,12.2,12.3,13.2.2,1325,14
Notices, Permits, Fees and............. 2.3.2,4.1,4.13.1,10.22
r--:otice oj Testing and Inspections....................... .7.;
Notice to Proceed............................. .8.1.2
Ob;Cr\ations, Contractor's.................. . .., .12 2. 4.;.3
Oc c u pa ncy ........................ .8.1.3, B.l.4, 9 5.5. 11.3.9
On' Site Inspections
b\' the Architect.......... .23.16,2.3.21,94.2,98.1,9.9.1
On-Site Obscn ations by the Architect. . . . . . . .23.4, 2.3.6, 2.3.9,
7.7.1,7.7.4,942,961,9.9.1
Orders, Written................. .3.3,4.9,12.1.4,1241,131
O\\'NER ...............................................3
Owner, De:!i['1ltion .................................... .3.1
0" ner, Information and Sef\ ices
Required of the..........3~, n1, 6.13, 6.2, 9, 112, 113
0\\ ner's Authority........ ..........2.321, 7.72,9.3.1, 9.3.2,
98.1,1138,1212.12.1.4
Owner's Financial Ca[J3brlit)' ..........................3.2.1
0\\ nu's liabrll!Y Insura:1ce ....... .' ..... .112
O\\ners Relationship \\.th <;ubCO:1:ra(lors ......... .1.12,9.5.4
O\\nc'r's Right to Carr) Out the Work..............3~. 132.4
Owner; Right :0 Clear. l'p .. .................. .4152,63
0\\ ncr , R,S"': \0 P('rfor~" \\or\.. c'-'s to
A,,\;,rd Separale Ccc.:,acls ............
O\\~,er' Right \0 Term:n,,!e the Cor:tract ..
O\', nu , Right t() Stup :~c \\ 01 ~ ......... . . .
O\\nt?~~~;p a~-:d L'~c 01 C:.C.J;""TH:':;t~
. ' .1'1
. 1~ 2
. . .33
.13,325,53
Palch::1g of \\ urk, Cut. ~g and. . . .
Patent'. Ro\;;:tc; ard
, , .
.. ......-1
.4.1- .1
P.a\n"1(-rit be,r'.d, LJ!'-;I..)f c'-;:; '.\.~~:('~'d! .. . . . .' ::>
P2~'me~,t Cc~,1~a(lor'~ ,.'.:,~1:i(-3:io~" '-Of ::! 38, 9 2. <:3, 9.~,
. I ~)_3,96.i S'.~.1/~8,~,~,,~'_l,9o.).1..1.;:::
PJ\mc"t P,,;I('C\ Cc'rli:':'atc' lor. 23.9, 2321. c..~ 9).1.
, ' 95'). 96.1. 9~.1, ~8~, 991, 9 93. 121~. l~i, 14 ~ 2
Pa\ "'Celt. F",'c;re of ." ..9.52, Oh 13. 9~, c. 9~, ,~
Pa)rT\cnt, Fic;al ...... ... 2.315. ~3 21, ':' ~ 1331
P~~)nier,~~, r,c'gr('~5 ...... .;.8,7.9.3,9.5.5,9 3 ~ 9~_5_ 1:?1.~
PAY,'I("1S A"D CO.,\PIETION .................9
Pa\ rnt":"t~ 10 5ubcontractors ..... 9-5~, 9.5.3, 9,5_~. 9.6.13,
. 1133.1421
P",meelts \\',thlwld ........ .......... ...96
Pc-rformance Sond and labor and ,'Iatcllal Payment Bond... 7.5
Permits, Fee; and :--:o\ices ........ .3.2.3,4.7, 4.13, 102.2
P[RSO~S AND PROPERTY, PROTECTIO~ OF ... . . . . . . . . . . .10
Product Data, Definition of ........ . . . . . . . . . . . . .14.2.2
Product Data, Shop Drawings, Samples ard ...2.3.18,4.2.1,4.12
Progre>s and Complelron ............. ... .2.3.4, 7.9.3, 8.2
Probress Payments......... .7.8,7.9.3,955,9.8.2,9.9.3,121.4
Project, Definition of ............................... .1.1.4
Project Construction Schedule. . . . . .. ... . . . . . . . . . . . . . . . .4.10
PropHty Insurance................................... .11.3
PROTECTION OF PERSONS AND PROPERTY, . . . , . . . . , . . . .10
Record Documc-nts .................................. .4.11
Regulations and laws.............. .1.3,2.1.1,4.6,4.7,4.13.1,
7.1,10.2.2,14
RCJection oj \\'ork ....................... .2.3.16,4.5.1,13.2
Relca,es oi \\'ai\crs 2nd Liens................... .9.9.2,9.9.4
Representations. . . . . . . . . . . .122, ~5, 4.12.5, 9.4.2, 9.6.1, 9.9.1
Representati\es ... .2.1,2.2,2.3.2,2.3.22,3.1,4.1,4.9,5.1,9.3.3
Re'ponsibility for Tlco;e Performing the Work.... .2.3.5,4.3.2,
61.3,6.2,981
Rdainage ..................... .931.95.2,9.82,9.9.2,9.9.3
Rc\iew oi Cvntr"ct Documenls by the Contractor...... .122,
42,4.7.3
Rc\'iews of Contractor's Submittals by O\\r.er and
Architect.............. .2.3.18, 4.10, 4.12, 5.2.1, 5.2.3, 92
Rights and Remc-dies ............ .1.1.2,2.3.15,2.3.16,3.3,3.4,
5.3,6.1,6.3,7.6,1.9,8.3.1,9.6.1,9.7,
103,12.12,12.2,1327
Royalties and Patents
................................ .
~2:cty of Per'on, and Proper!\, ........................ .10.2
~aiety Precautions and ProgramS................. .2.35,10.1
~"mples, Dei,nltlon oj .............................. .4.12.3
Samples, Shop Dra\\ings, Product Data aCld ..... .2.3.17, 2.3.18,
4.2,4.12
. . . . . . . . . . . .4.11
. . . . . . . . . . . . . .4.10
. . . . . . . . ... . .. .4.10
. . . . . . . . . . . . . . . . .92
.4.14.2,6,11.36,13.12
. . . . . . . . . . . . . .412.1
23.1; ,
~_3.iS, ~ 2, ..1.1:
. . . . . . . . . . . . ~ 13, 62.1
~3 21, 1.;,001,991
2.3.4,236,2.39,7;1,
7.7.4,9.42,961,99.1
. . . . . . . .. 2316, 77
.. .1135
.111,12.4,13
...792.1322,1327
.33, 9./1, 103, 1~1
.. .621, ') 3 2, ",0 ~12, 11 31. 1325
.5
. . . . .51.1
12.4,:: 3), 431, 432
. S 3
. .13, :3 - o. no, 4.12. 5.:.1, ) 23.
92 9.3.1,981,9.9.1,993
camples at the Site, Documents and
Schedule, Co~,tractors Construction
Schedule, Project COel;tructlon .....
Sc!wdule oj \ a!ues .............
cc-parate Cor-tracts and Contractors
cnop Drawins;, DC'i,[')itlon .........
S'-oop Dra\\ rr.s', Prod~ct Data and Samp:es
, tc, L"e of
5ic !nspecllc:"',S, .1.2.1, :.3...9
5:1€ Vi)it5-, ,-\:c~.ltect's . . . . . . . .
C;:;cCi,,1 In'j)((:ic[') a~.d Te"tlng
5;}cclal Haz2'c~ ~n~',..;:,jn(e .........
5;)ecJiicallor:~ .
5:2.tvles 01 L~~- '.2tIOi'~
c!cpplng the \\ ork
5:ored ,\~3t(-r.2!~
Sl'BCONTRACTORS
5Jb(()ntrJ(1(':~, Dc"i:-- tlon of
5Jb(onll~(tc~~, \\'o~k by
5__:bccntrJctccl ,cle:tl(Jns
c.Jbmlttals
4 A~Ol!C."1~1980
"~DOCL\H'T ~~[.1 eM. Cl....l"c (0'-:' '10'-" Of Ti,[ (,~"': '.(1 fOR CO,",L'.
CC",~-RLC.10' \'.;'.,'l.l-.{\lt'\,T [J.-.O....' . JL'E ~'.~3;..l EDi":C'\ . .:"':.:"'~ . 'i .-.~.). l~
;,',':,;:'(;' .'\,S.l~:L~:: OF "t\CHjnC-~ 1-;: ,u\' lC)~:!< .t...\'E. '- \\ \\ .1,5hl'-C~O'-.:J (>_~Xljj
5_!Jrog,~tion, Wai\er of ............................. .11.3.6
5c!JQantlal Completion 01 the Project....... .8.1.4, 9.8.3, 9.8.4,
9.9.4,9.9.5,9.9.6,13.2.1,132.2
5_!Jstantial Completion oj the Project, Definition of ..... .8.1.4
5cbQantial Completion 01 the Work...... . .2.3.21, 8.1.1,8.1.3,
8.2.2,9.42,98,99.3,11.3.9
5c;bstanlial ComplC'lion of the V/ork, Definition of ....... .8.1.3
5~bstitution of Subcontractors. . .. . .. . . . . . . . . . . . . .5.2.3, 5.2.4
5.;b~titution of the Architect......................... .2.3.23
5ubstitution of the Construction Manager. . . . . . . .. . . . . .2.3.23
5c;bstitutions of ,\\alerials ....................... .4.5, 12.1.4
5c;b,subcontractors, Definition of ........... ............5.1.2
5c;bsurface Conditions.............................. .12.1.1
5~ccessors and Assisns ................................ .7.2
Supervision and Construction Procedures.. . ...... .1.2.4,2.3.3,
4.3, 4.4, 10
5,jperintendent, Contractor's..................... .4.9,10.2.6
~"rety, Consent of .................... . . . . . . . . . .9.9.2, 9.9.3
5.;[\e)'s ...................................... .3.2.2,4.18.3
T c \ es ................................................ 4 6
--:-ecmination b\' the Contractor........................ .14.1
;erminallon by (he Ol\ner ............................ .14.2
;t-rminalion of tnI' .A,rchitect ........................ .2.3.23
Termination oi the Construction \I;,nager ....... ...... .2.3.23
HRMINA110N Of THE CONTRAO ................ ... " .14
Tests...... ......................... .2.3.16,433,7.7,9.4.2
T I\1E ..................................................8
;.me, Definition of ................................... .8.1
T,me, Delays and blen<ions of ......... .8.3,12.1,12.3,13.2.7
Time limits, Specific... ........... .3.4,4.10,7.9.2,82, B.3.2,
833,92,9.3.1, Q.4.1, 9.5.1, 9.7,11.1.4,
11.38,12.2,123.1,1322,132.7,14.1,14.2.1
Tille to Work ..................................9.3.2, 93.3
UNCOVERING AND CORRECTIO~ Of WORK............ .13
Unco\'erlng of V'/ork ................................. .13.1
Unforseen Conditions........................... .8.3.1,12.2
Unit Prices. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . .12.1.3.2, 12.1.5
Use of Documpnts .... . . . . . . . . . . . . . . . . ... . . . . .1.3, 3.2.5, 5.3
Use of Site .................................... .4.13, 62.1
Values, Schedule of ..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2
Wai\'er oi Claims by the Contractor... .7.62,8.3.2,9.9.5,11.3.6
Wailcr 01 Claims by the Ol\ner ..... .7.6.2,9.9.4,113.6,11.4.1
\\'ai\er 01 liens..................................... .9.9.2
Warranty and Warranties............. .23.21,4.5,9.3.3,9.8.4,
9.9.4, 132.2, 132.7
Wrather Delays...... . . ........ ..................... .8.3.1
Words, Rpcognil('d \Ieaning of . ...... ................ .1.2.3
Work, Ddinltion of ................................ ..1.1.3
WORK BY OWNER OR BY SEPARATE COSTRACTORS .......6
\\'rillcn Consent......... .2.322,4.14.2,7.2,7.6.2,981,9.9.3
Writtcn Interpretations.................. .1.1.1,2.3.11,12.3.2
\\'rillc'n :-":olice ...... .2.3.11, 2.3.15, 4.2, 4.7.3, 4.7.4, 4.9, 4.12.6,
4.12.7,5.2.1,7.3.7.4,7.7.2,7.9.2,8.1.2,83.2,8.3.3,9.4.1,
96.1,9.7,9.9.1,102.6,11.1.4,11.3.1,11.35,11.3.7,
1138,12.2,12.3,1322,1325,14
\\'"tlen Orders.................. .33,49,12.1.4,12.4.1,13.1
-\c-\ DOCL:\\EST AiOl/CM . GE'ER-\l (C'DllI0"S OF THE (O'lRACT FOR CO'-SIRUClIO"
(0'SlRUCiI0"'~"AGE\\E'T [DI110' . Jl,'-[ 1980 [01110-'; . AlA! . ([ ;oSO . lHE
"\ERIC..., ISS111LH Of ARCHIHC1S, 1:J5 '-E\\' YORK AVE., 'W. \\ASHI~GTOS. O.c. :,(".:('6
A201/CM-1980 5
[ . ..~E'~[RA~ ~ONDlrlONS ~; ~HE C~~;~AC~~OR ~~"~~~~C-1IO: .-=-:J
ARTICLE 1
CONTRACT DOCUMENTS
1.1 DEFI~ITIO~S
1.1.1 THE CO~TRACT DOCUMENTS
The Contract Documents consist of the Owner-Contractor
Agreement, the Conditions of the Contract (General, Sup-
plementary and other Conditions), the Drawings, the
Specifications, and all Addenda issued prior to and all
Modifications issued after execution of the Contract. A
Modification is (1) a wrillen amendment to the Contract
signed by both parties, (2) a Change Order, (3) a written
interpretation issued by the Architect pursuant to Sub-
paragraph 2.3.11, or (4) a \\'rillen order for a minor
chJnge in the Work issued by the Architect pUr>uant to
Prtragraph 12.4. The ContrJct Documents do not include
Bidding Documents such as the Advertisement or Invita-
tion to Bid. the Instructions to Bidders, sample forms, the
Contractor's Bid or portions oi Addenda relating to any
of these, or any other documents unless speciiically enu-
merated in the Owner-Contractor Agreement.
1.1.2 THE CO~T RACT
The Contract Documents form the Contract for Construc-
tion. This Contr;JCt represents lhe entire and integrated
agreement be1\\een the parties hereto and supersedes all
prior negotiations, representations or agreements. either
written or oral. The Contract may be amended or modi-
fied only by a ."-lodifiC2tion as defined in Subparagraph
1.1.1. The Contract Documents shall not be construed to
create any contractual relationship of any kind between
the Architect and the Contractor. between the Construc-
tion Manager and the Contractor or between the Archi-
tecl and the Construction ,\Ianager, but the Architect and
the Construction Manager shall be entitled to perform-
ance of the obligations of the Contractor intended for
their beneill and to enforcement thereof. I\'othing con-
tained in the Contract Documents shJII create anv con-
tractual relationship bel\\een the Owner, the Co~struc-
tion Manager or the Architect and any Subcontractor or
Sub-subcont rac tor.
1.1.3 THE \\ORK
The \\'ork comprises the completed construction required
of the Conlraclor by the Cont~act Documents, and in-
cludes all labor necessarv fo prcduce such const'uction,
and all mJterials and equipment incorporated or to be
incorpor;;ted in such con'-truction.
1.1.4 THE PROJECT
The Project, as deiined in the Owner-Contractor Agree-
ment. is the total construction of which the \\-'o,k per-
formed under the Contract Documents is a part.
1.2 E\ECUTIO~, COR RflATIO,,", A,"iD INH~T
1.2.1 The Ccntract Documents shall be signed in not
les< than quadruplicate b\ the O\\ner and the Contractor.
If either the 01\ ner or the Contractor or both do not sign
the Cond:tions of the Contract. Drawings. Speciiications
or any of the other Contract Documents, the .-\rchitect
shall identify such Documents.
1.2.2 Execution of the Contract by Ihe Contractor is a
representation that the Contractor has \ I<iled the site be-
come familiar with Ihe local conditions under which the
'Nork is to be performed, and has correlated personal
observatiOns \\ Ith the requirements of the ContraCI Docu-
ments.
1.2.3 The intent of the Contract Documents is to include
all items necessary for the proper execution and comple-
tion of the \-\'ork. The Contract Documents are comple-
mentary, and what is required by anyone shall be as
binding as if required by all. Work not co\ered in the
Contrilct Documents \\ ill not be requ;red unless it is con-
sis~ent therewith and is reasonably inferable therefrom as
bemg necessary to produce the intended results. \\'ords
and abbreviations \\hich have \\ell-KnOlln technical or
trade meanings are used in the Contract Documents in
accordance with such recognized meJnings.
1.2.4 The organization of the SpeciiiCJtions into divi-
sions. seclions and articles, and the arranf;ement oi Ora\\'-
Ings shall not control the Contractor in dll iding the \Vork
among Subcontractors or in establishing the e,tent of
Work to be performed by any trilde.
1.3 OWNERSHIP A~D USE OF DOCU.\1f\'TS
1.3.1 All Drawings, Specifications and copies thereof
furnis~ed by the. Architect are and sh~1I remain the prop-
erty 01 the Archilect. They are to be used only with re-
spect to this Project and are not to be used on any other
project. \\'ilh the exception of one contract set ior eJch
party to the Contract, such documents Me to be returned
or suitably accounted for to the Architect on request at
the completion of the Work. Submis<,ion Or distribution
to meet official regulatory requirements or for other pur-
poses rn connection with the Project is not to be con-
slrued as publication in derog.,tion of the Architect's
common law copyright or other re'-er'. ed ri?,hts.
ARTICLE 2
ADMINISTRATION OF THE CO~TRACT
2.1 THE ARCHITECT
2.1.1 The Architect is the person 1.1'.\ kifv licensed to
pr~ctice architecture, or an entitv 1031\ iul!\ practicing ar-
chItecture, Identdled as such in the 01\ ner.Contractor
Agreement. The telm .-\rchitecl meJns the Architect or
the Architect's Jutnoriled representative.
2.2 THE CO~STRUCTIO~ MASAGER
2.2.1.The Construction \Ianager is the person or entity
Identified as such In the Ol\'ner-Contraclor /\greement.
The term Construction .\Ianager means the Construction
\Ianager or the Conqruction\\ana;er's authorized
representati\e.
2.3 AD,\\INISTRATIO~ OF THE CO"TRACT
2.3.1 The Architect and the Ccn<,truction \~Jnager will
"IA OOCL\\E'q A~r,l CM ' CE',RAl (0'::J1110'5 Of iHE CC'-RACT fOR CO'5TRL:O:O'
CO",iRL:CTIO, ~"\',~CE.'I['T EDITIO, . JU~[ 1960 [OITIO, . AIA~ . (S 1980 . THE
^",RIC\' :,qlTl T[ Of ARCHITEOS. 1-3; ,[\\' YORK AV[ . 'IV. \\ASHI'CTO-':, OC :C'O()f,
A201/CM - 1980 6
PlO\ Ide .1dmlni~lr~t;(ln oi the Co:-,lr.1ct ", here "1~fler
Ge'c ',bed.
2.3.2 The r\rchllc(( and the Co~.,:ructlon \<.:on"St:r \\ dl
be tr,e 0\\ n('r'~ rt'p'('~('ntJti\ e~ c,,"ng con'l'uclion and
un!;! 'in.,1 p.1) ment to ,11\ contractors is due. The ""rchi-
tect "nd the Con<trl-ction \~Jn.1bcr \\ ill ad.. :'e ~nd con-
<ull "Ith the O\\ne' All In,lruc\lons to the Cont'actor
,hall be furw<1[ckd through the Con<truclion '\;,nager.
The Ar~hilect .,nd t~e CO~~lructlon Manager \\:1i. ha\e
authority to act on behalf ot the 0\\ ner only to the ",tent
plo\lded in the Contract Documents, unless otherwise
modified by written instrument in accordance \\ ilh Sub-
par~graph 2.3.22,
2.3.3 The Comtruclion \\anager will determine In gen-
eral that the \\'ork oi the Contractor is being performed
in accordance with the Contract Documents, and will en-
deavor to guald the Owner against defects and deiicien-
cies in the \Vork of the Contractor.
2.3.4 The Architect will visit the site at inter\'als Jppro-
priate to the ~tage oi comtruction to become generalh'
familiar with the propes, and quality of the Work and to
determine in general If the Work i~ proceeding in auord-
ance \\ ith the ConlrHt Documents. Ho\\e\er, the r\rchi-
teet Will not be required to nlJke exhau~ti\e or con-
tinuous on-~ite in,pectiom to check the quality or quan-
tit\' oi the Work. On the ba,i~ of on-sile ob'ef\~tic,n~ as
.In' a'chilC'Ct. thl' Architect Will keep the O\\nl'r informed
of the pro~re,~ oi :~e \\'ork, <,nd \\ill end('~\or to guard
the Owner asains! dcfect~ and deficiencil', ,n the \Vork
of the ContractOr.
2.3.5 t'either the :\rchitect nor the Comtruction Man-
ager will be re,pon~lble ior or have control or cnarSe of
con~truction meam. method~, techniques, ~equences or
procedures, or for ~afet\ precautions and progr~ms in
connection with the Work, and neither will be [c<pon-
slb!e for the Contractor's failure to carry out the \\crk in
accorddnce "ith the Contract Document,. ~ei\hcr Ihe
Architect nor the Construction \\anager \\ III be re,pon-
sible for or ha\'e conlrol or charse o\er the acb or olTli~-
,ions of the Con1r~ctor. Subcontractor" or any of their
dbents or employee', or any other persom performins an\'
of the Work.
2.3.& The ,""rchrlec: and the Co~'truction ,\I~n2ser ~hall
at all limes ha\e 2cce's 10 the \\'vl> \\here\er 1\ i~ in
preparation and progress. The Contractor ~ha!1 pr~\ide
faci!lties for ~uch acce<s ~o tr,at the Arcr,ltect ano the
Cc ~,;:ructi0" \\,]n2;;;T r;',c\ re':', 'on l~eir iL::loion< ,:nder
the Contract Documents
2.3.7 The Con~truction !--\anaSt:r will ~chedule ;;nd coor-
dir,2te the Work of all conlractor~ on the Project includ-
Ing their u-e of t!~e lite. The Cc~'trl;ction \\,,~.,ser \,,:11
ke~p the Conlr.1ctc iniOimcd of the P'ojec: Con,tructlon
SChcoule to enable the Contrac:or to plan z,nd p..:-rforlTl
tne \\'ork properl\.
2.3.8 The Comtruction '\In,,~t:r "iii re\iew all :;~'plica-
tiGns for Pa\ ment b\ the Cont~cctor, including !:r,al pa\'-
!"ent. and ;\ill a<<emble them with simil2r .Tp!ications
fro:-n Olher contractors on the Project into a cornbined
Prc'iect Application for Payment. The Construction \\~n.
,,'eer will then m,,~e recommc!',dJti0m to the A'chitect
f~, certiiication for payment.
2.3.9 Ba~ed on the Archilect'~ 0bser\ation~, the recorn-
mendatlons cf :~e Con,truction ,\\:on.,g('r .1nd an e\ ,-,Iua-
lion of tne Project Applicat,on for P.J) ment. the ..\rchitect
\\rll del('rmine t~,e amount 0\\ ing to the Contr.1Ctor MId
\\ rll i~'l)e a P'oject Certllicite for ['.1\ I'\'\('nt Incolporati,..'"
<uch "mOunt. a' pro\ Ided In Paraf,l,iph g-1,
2.3.10 The;rchitcct wrll be the Inlclprl'\er of the re-
qUJlcmt:nb of :",e Contract Docu:nent, .lnd the judse oi
the perlorlTIanCe ih([eunder by both the 0\\ ner and the
Contractor.
2.3.11 The Archilect will render interprC'tations neces-
'-iry ior the proper execution or progf('~S of the Work,
with rea~onz,ble promptness and in accordance with
agreeri upon l:rne limits. Either party to lhe Contract may
make" ritten reque,t to the i\rchilcct for such interpreta-
tions.
2.3.12 Claims, di,putes and other matters in que,tion
between the Contractor and the Owner relating to the
execution or progress of the \Vork or the interpretation
of the Contract Documents shall be referred initially to
the Archilect for decision. After consultation with the
Comtruction ""nager, the Architect will render a deci-
,ion in \\riting within J reasonable time.
2.3.13 All interpretations and decisiom of the Architect
,hall be con~i~lent with the intent of Jnd reasonably in-
felable from the Contract Documents ;;nd will be in writ-
ing or in graphic form. In this capacity as interpreter and
judge. the A:chilect will endea\'or to ~e(ure iaithful per-
formance by both the 0\\ ner and the Contractor, \\ill not
show partiality to either, and \\rll not be liable for the
result of any interpretation or decision rendered in good
faith in ~uch capacity.
2.3.14 The Architect's decisions in m"tters relating to
artistic effect \\ ill be final if comistent with the intent
the Contract Documents.
2.3.15 Any claim, di~pule or other malter in que~tion
bet\\een the Contractor and the Owner referred to the
Architect through the Comtruction ."anager, except Iho~e
relating to 2!li~tic effect a~ prO\ ided in Subparasraph
2,3.14 and those \\'hich have been wai\C'd by the making
or acceptance of final pa) ment as provided in Subpara-
graphs 9.9.4 through 9.9.&, inclu~i\e, ,h.,11 be subject to
arbitration I-~on the written demand of either party.
Ho\\e\er. no demand for arbitration of .in\' 'uch claim.
di'pl):e or OI~er nlatter may be m.1de unit! Ihe earlier of
\1) the date en "hlch the .-\rchitect ha~ rendered a writ-
ten decision. or ':?\ the tenth da\' aiter the partie~ ha\e
ple,('~,led :hEe:' e\ Idence to the .-\reh,teet or ha\ e been
gi\en a reJ'c~_;b:e Oppo!tLnity 10 ria '0. Ii t',e ,-\:chi1ect
ha~ not rendered a written deci~lon bv that riate. When
<uch a \\ritlc'l deci,ion of the Archilect <{.,les (1) that the
deci'.on i~ i;~JI but ~ubiect to appeal, and 12) Ihat am
dem,-,~d for 2'bilrJlion of a claim. di'pute or other malter
CO\ ercd b\' "cch ceci'ion ",u~t be nl2de ",:hin thirt\' d2\ s
"fler :r,e date 0n \\ hieh tr,e part\' m"Ling Ihe dC-fl1"nd re-
cei\e, the \\ ':llen deci,ion. failure to dem;,nd Jrbitration
"ith,n 'aid thrly riay pe:iod will re'ult in the l\rchitect'5
deci~:on be((,,',;ng final 2nd binding upon the O\'.ner
and the Cortr~cIOr. If the ;\rchilect rcnders a decision
after a'bitr~:'on procecdings hz,\e been inili;iled, 'uch
dC'cl'ion m~\ ,=,e ('ntered a' evidence but \'. ,II not 'Leper-
~ede any arc:lration proceeding, unles, the dcci'ion is
"cceplable 10211 parties concerned,
7 A201/CM -1980
".1' DOCl 'It' T -'.201'CM ' (['l;:~' CO'DI1rO'S Of 1HE co' ;1'.>,C1 lOR C,J';SHl (
(C~~~-:~lC-:-!O' .\j,A'A,GE\',::-":l [O~- .J' . JL':--''E 19-:-J [DI110'-: . :\IA'!: I (s~ 19bO . ir.E
!..'.'.~;;:C-\" !"STlTlq[ or~,CtillEC'~ -:-!) o.,,;E\\' )C;::~ AVE.." \\' \\\~I~I'C!O."'. 0 C :.'(.)'-'6
2.3.16 The :\rch,:ect \\ill h.J\e au:r.oritv to reject Work
I\hlch d,'c, not cc,-,iolm to :he Cortract Documents. ,lnd
to require 'peCla! :n,pectlon or le,t;ng. but will tlke such
action on!\ aiter con~ultatlon 1\ Ith :!oe Con~truction \Ian-
ager. SUbi~CI to re\ lew b\ the .-\rch,tect. the Construction
-'tlnager 1\ ill h21 e the au:horilv to reject Work \, hich
doe~ not conform to the Contract Document~. \\'hene\ er,
in the Construction ,\1.1nager~ opinion. it I~ considered
necessary or ad\ i'-,lble for the Imp:ementation of the in-
tent of the Contract Documents. lr.e Conqruction -'lan-
ager wdl ha\e authority to require 'pecial inspection or
leqing oi the Work in accordance with Subparagraph
1./.2 whether or not ~uch Work be then iabricated. in-
qalled or completed. The foregoing authority of the Con-
~truction \\anager will be subject to the provisiom of
Subparagr.::phs 23.10 through 2.3.16. inclusive, with re-
spect to interpretations and decisions of the Archit:cl.
However, neither the Architect's nor the Construction
.'t1nJger's authorit\' to act under thiS Subparagraph 23.16.
nor any decision made bv them in good faith either to
exercis~ or nol to exercis~ such authority shall gi\'e rise
to an\' out\' or re'-ponsibilit\' oi the .-\rchitect or the Con-
struct<ion <Ianager to the Contractor. any Subcontractor,
anI' of their agents or emplo\ees. or anI' other person
pe;forming any of the Work.
2.3.17 The ConSlruction -'lanager \\ ill recei\e from the
Contractor and re\iew all Shop Dra\I ings. Proouct Dala
and Samples. coordinate them IIlth :niormation contained
in relaled documents, and transmit to the Architect those
recommended for apprO\'al.
2.3.18 The Architect \vill re\iew dnd approve or take
other appropriate action upon the Contractor's submittals
such as Shop Drawings, Product Dcta and Samples. but
only for coniormence with rhe design concept of the
\Vork and the information gi\en in the Contract Docu-
ments. Such action shall be t.iken \\ith reasonable prompt-
ness so as to cause no delay. The Architect's approval of
a specific item shall not indicate apprO\'al of an assembly
of 1\ hich the item is a component.
2.3.19 Following consultation with the Conqruction
,\1anager, the Architect will tal;e dppropriate action on
Change O'd<:>rs in accordance 1\ ith -\rticle 12, and will
ha\e authority to order minor chGn~es in the Work as
provided in Subparagraph 12.4.1.
2.3.20 The Cons!~uclion \\dnager II ill maintain at the
Project site one record cOP\ oi all Contracts. Oral.. ings.
Specii1calions, Addenda, Change Orders and other "'odi-
fica lions pertaining to the ProjE'ct. in good Older and
marked cu:rently :0 record dll chdnges made during
construction. and apprmed ShOp Dr.::wings, Prc,cuct
Data and Samples These shall be '::\c:lable to the ;\rchi-
tect and the Con:~actor, dnd shall be delilered 10 the
Architect fc,r the 0.... ner upon comp'cion of the Project.
2.3.21 The Con~lruction .\Ianager I', "I assist Ihe Archi-
tE'ct in concucting inspeclions to detumine the dales of
Subsl.ontlal Completion and iinal con,pietion, and will
receile and iorward to the Ol\ner ior the O\Iner's re\'iew
\I ritten warr"nties end related documents required b)' the
Contract and assembled b\' the Contractor. The Architect
will is'ue a final Project Certificate for Pa"ment upon
complidnce with the requirements oi Pdragraph 9.9.
2.3.22 The duties, re,pon'-lbdities ,lnd lil11i1.'I,oo,- c:
authority oi the :\rcr.ilect and the C":1,"u,tion \',,-.,se'
a, the 01\ ner's repre~entati\ es dur'ns lOnqrucl:on a' ,€<
iorth in the Contract Documenls. \I ill not be I11c\cLE'd o'
e\tended \\ ithout 1\ ritten conSE'nt oi the 0\1 ner< the Con-
trMtor, the ,-\rchitecl and the Con,lruction .\\anage~
1\ h,ch con,('nt ,hall not be unre,1Sonabh II ilhheld. Failure
of the Contractor 10 re'pond \ldhln ten d.l)'S to a 1\ r::te,
request shall conqitute consent b" the Contractor.
2.3.23 In case of the termination of the emplOl ment O'
the Architect or Ihe Construction .\Ian.lger, the 0" ne:
shall appoint an architect or a construction manage:
against whom the Contractor mJkes no reasonable objec-
tion and whose slatus under the Contract Documents
shall be that of the former architect or construction man-
ager, respectivel)'. Any dispute in connection with such
appointments shall be subject to arbitration.
ARTICLE 3
OWNER
3.1 DfFI~ITlON
3.1.1 The Owner IS the person or entity identiiied as
,uch in the Owner-Conlractor Agreement. The term
Owner means Ihe 0\\ ner or the 01\ ner's authorized
representative.
3.2 I~FORMATlO~ AND SERVICES RFQUIRED OF
THE OWNER
3.2.1 The Owner shall, at the request of the Contractor,
at the time of execution of the 0\\ ner-Contractor Agree-
ment furnish to the Contractor reasonable evidence that
the Owner has made financial arrangements to fuliill the
Ol\ner's obligations under Ihe Contract. L:nle~s such
~eJsondble evidence is furnished. the Contractor is not
required 10 execute the Owner-Contractor Agreer1knt or
to commence the \\'ork.
3.2.2 The Owner shall furnish ,111 SUT\e\< describing the
physical characteristics, legal limitations "nd utilitv loca-
tions for the Sill' of the Project. and a leg.;) descr:ption of
lhe site.
3.2.3 bcept as prO\ ided in Subparagrdph 4./.1. the
Owner shall secure and pay for nece",ar\ apprO\ 2~S. ease-
r:1Cnls. assessments and charges reqUired ior the const~uc-
lion, u<e or occupancy of permanent structures or for
':;E'rmar,<cnl changes ,n e\i<ting iarl:ities
3.2,4 Iniormation or services under the Owner's control
,hall be furnished b\ the Ol\ner \lith lea'onable prompt-
ness to dl oid dela) In the orderh prosre's of the Work.
3.2.5 l'nless othem ise pro\ ided in Ihe Contract Docu-
ments, the Contractor \I ill be iu~nished. iree oi charge.
all copie' oi Drzmings and Specl:'ll.,tior.,- rC"2S0n,1::,h r.~c-
e"d1v ior the execu::on of the \\'ork. .
3.2.6 The OwnE'r ,h211 fOIll d'd "II instructions 10 the
Contr2ctor through the Construct;o.'1 \\an,oger. \11th <ilO',ul.
1aneous notification to the .-\rchitect.
3.2.7 The foregoing are in adddion to o:her duties dnd
respon<lbriilies of the O\\ner enumera:ed herein "rld es-
peciall\' those in re,pect to \\'o~l- 51 01\ ner or BI Sepa-
r"te Contractors, Pal ments and Comp!etion, dnd Insur-
ance in Articles 6. 9 and 11, re<pecti\elv.
AlA DOCl<'H'T A~Ol C\\. GE'-[""l CO'DIT!O'S Of THE CO'E~CT fOR CO:,S;"lCTIO,
C0'-5ELC110' I\A'~C I\E"'T ED1710'- . JL 'E 1980 lDITIO'" . AlA!' . @,I;OO . THE
..\"l"C~' ",,-lTlCH 0, '.RCHITlC1S. '-33 'EI" )OR~ A\T. '- IV \\'\~H"GTO'-. DC CC0J6
A201:CM - 1980 8
3.3 O\\~lR'S RtGHl TO SlOP THE \\ORK
3.3.1 If tne Conl'"clor fJ'!~ to COlreLl Ocfccli\e \\'or1... as
required b)' PMdt'Gph 132, or p(f~i~:entlj fails to c:,rry
out the \Vork in acord"nce \\ Ith the Cor,lract Docu-
menb, the O\\nel, by a \\fltlc-n olocr ~igneo pC'I~onal\)' or
by an agent 'pccl:"cally ~o C'lllpol\ered by the 0\\ ner in
writing, lllay order the Contr,:clor to ..top the \\'ork, or
any portion thereoi. until the cau~e for ..uch order has
becn elllllinated; rOI\c\er. this right of the O\\ner to ~top
the Work shall not gl\e ri~e to any duty on the part oi the
Owner to exerci~€ this right for the benefit of the Con-
tractor or any other person or entit)'. except to the e,tent
required b)' Subp.::r,:graph 6.13.
3.4 O\\'NER'S RIGHT 10 CARRY OUT THE WORK
3.4.1. If the Contractor defaults or neglects to carry out
the \Vork in accordance with the Contract Documents,
and fails within sel en day~ after receipt of written notice
from the Owner to commence and continue correction of
~uch default or neglect with diligence and promptness,
the 01\ ner may, ai:er se\'<:n days following receipt by the
Contraclor of an edditional written notice and without
prejudice to any other Ic-nled)' the O\\ner may ha\'e,
make good ~uch deiicicncie~. In ~uch case <in appropriate
Change Order ..he!1 be i<~ued deducting from the pay-
ment~ lhc.n or the'eafter due the Contractor the cost of
correcting <uch de:jciencies, including compemation for
the Architect's ane the Construc\ion .'\~an~b€r'S addit;onal
~er\ices made neeesary bv ~uch default, r.eglect or fail-
ure. Such action bv the Owner and the amount charged
to the Contractor ~re both subject to the prior approval
of the Architect, 2::er con~ultation with the Construction
Manager. If the pe\ ments then or thereafter due the Con-
tractor are not sur::cient to Co\er such amount, the Con-
tractor ~hall pay tre difference to the Owner.
ARTICLE 4
---
CONTRACTOR
4.1 DHI:--'ITfO~
4.1.1 The Contractor i.. t~e per~on or entity identified as
'uch in the 01\ ner-Contractor ,-\creement. The term Con-
;ractor means the Contr2ctor or";he Contractor's aut:.or-
ized r<:presentati\ e.
4.2 REVIEW OF CO~TR.'!"CT DOCUMEt'\TS
4.2.1 The Contractor sheli carefully stud: and compare
the Ce,ntract D"c-:"ent~ and "f>?11 at once ~eport to the
,-\rch;~('ct ,~nd lhe C~Jn~trL'ction \'..::i2ger ar.\ error, i:-.con-
,istency or omis','~'" that ma\' be dr~co\'e'ed. The Con-
Iractor shall not be liable to the 0\\ ner, the ,Architect or
the Conqruction '.'"n"ger for ar\ cLm"ge re~ultinE :'om
an\' s.uch error~. I;"cons.iqcr,cit.?~ or oni:~~i(.:~s in the Con-
tra'cl Docur"ents. -;--.e Cort'acto, ,: 2:1 pc-de'm no pC'tion
of the \\'ork at aI", ',me \'.Ithout Contr,;c\ Docu~,el'.ts or,
I\hc-re required, c:~ro\ec Shop Dral\ings. Product Data
or ':<,mples for Sl'c"; port'or. oi the \\'ark.
4.3 SUP[R\'ISIO<' A"D CO:--'STRL:CTION
PROCfDLiF,ES
4.3.1 The Con,'J!or ~\.-all ',:;Ju\ise ;,,,d direct the
\\'ork. ucing the (:"tra(tc,'s be.t ~~III 2nd attention. The
Contraltor "~h<illl::e ,olel\ 'e<po~';b:e for a:1 construction
mcan~, methods. :echniq~e~. <eq~cnces a:-.d procec:.;res;
and sh,,1I coore,nate all porI ions oi the \\'ork under the
Contract. ~ub;ed to the O\uall looroin;dlon of the Con-
struction ,\\an,,;er.
4.3.2 The Contractor sh.:11 be le'ponc,ble 10 the Q' ~er
for the acts and omi~sion~ of the Cllntr.lctor'~ emplL ~,
Subcontr.lctor~ <ind their agents and emplo\e('~, and any
other persons performing any oi the \Vork under a con-
tract with the Contractor.
4.3.3 The Contractor ~hall not be reliel'l'd from the
Contractor's obligations to perform the Work in accord-
ance with the Contract Documents either by the aclililies
or duties of t:-.e Comtruction ,\lan,lger or the Architect
in their administration of the Contract, or by in<pections,
tests or appro\als required or performcd under P;nagraph
7.7 by per~om other than the Contractor.
4.4 lABOR AND MATERIALS
4.4.1 Unless otherwise provided in the Contract Docu-
ments, the Contractor shall provide and pay for all labor,
materials, equipment, tools, con~truction equipment and
machinery, water, heat, utilities, tramportation, and other
facilitie~ Jnd sef\ ices ncce'~ary tor the proper execution
and completion of the \\'o~k, whether 1cmpor,lry or per-
manent ,lnd I\hether or not incorporated or to be incor-
porated in the Work.
4.4.2 The Co"tractor shall at all time~ enforce strict dis-
cipline and scod order among the Contractor's em-
ployecs and ~r,JII not employ on the Work any unfit per-
son or "nyone not skilled in the ta~k a~signcd them.
4.5 WARRASTY
4.5.1 The Contractor warrants to the Owner, the Archi-
tect and the Construction Manager that all materials and
equipn;enl furnished under this Contract will be new un-
less otherwise >pecified, and that all Work will be of d
quality, frce from faults Jnd defects and in confOlma"ce
with the Contract Documents. All \Vork not conforming
to these requirements, including ~ubstilutions not prop-
erly apprO\'ed and <iuthorized, m2\' be considered defec-
tive. If required by the Architect or the Construction !\\an-
ager, the Contractor ~hall furnish ,atisfactor\' evidence as
to the kind and quality of materials and cq~ipment. This
warranty is net limited b\ the pro\i',ons of Paragr,'ph
132.
4.6 TAXES
4.6.1 The COI'.tractor shall pay all ",les. con,umer, u..e
and other ~in:,!ar taxes tor the \\'ork or portions thereot
pro\ ,ded by ;~e Contrac:cr which arC' ;C'salh- enacted at
the tin~e bid~ 2:e r€ceiv<:d, \\hetr-,er 0; not jet ci{ccti\c.
4.7 PER\111S, fEES A~D \OllerS
4.7.1 L'nlC'~s c\hcfl'.i~e ~'o'.ided in tr-,e Contr,:ct Docu-
ment~, thc O\"ner <hall 'HUre <ind pJ\ for t!~e budding
permit ,lno the Contractor ~hall ~C'cure and p\' lor all
other pc:-r[;)it~ ,'~,d govern'-'~ental ices, 1,(er>E'5 ,-,'d i'~<pec-
tlons nc'ce<~ar. for the prc'per E\ecution ;,nd lGrnp!etion
oi the \\'ork,,, hich ,:re c_'tom<ir;lv '('Cured after oecu-
lion ot the Cc.'-'~r<ict ;,,,d \'.;-,,;ch Jre In:"II\ re(!~::recl at the
time b,d' ,Ole .t-Ceiled. "
4.7.2 The Cc~t'actor ~h.:!1 gi\e "II n(':,ces ;,,,d C(dllph
\\ith all 121\' ordinance'. 'ule~ reSlC1,'tlon< ;,:-,0 !awful
orders oi "n\ ;:>ublic autho'ily bE,iflr,~ 0/1 the pc-:form.
;,nce oi the \\ ark.
'-.(11:' )~
-,0,,: [HE
'. D C ~C(Y~
9
A201/C!\1-1980
AlA DOCL'\\E'T A:Ol:C.\\' G["'["~' ::::"JllIO"~ 0' ,,,[ c(.,~,~.c 'OR (
CO\~-:-.~CIIO\: '\A"'.-\GE.'~E."T to:; =, . J:....'E ~~~<~ ~ul1:c" . ~,~! .
\",(r. :~,..... :'~111L:1E OF \RCHlhC-:~ -~35 'E\\ 'Ie;::., ;\'E." \\ ", ~~:'-;~'J-,:
4.7.3 It is not the re<pom,bility of the Contractor to
male certain that the Contract Documents are In accord-
ance with ;!pplicJble laws, 51atutes, building codes and
rh:,~'"tions. If the Contractor ob<erves that any of the
Cc',,,tract Documents are at variance there\\ dh in any re-
spect. the Contractor shall promptly notify the Architect
and the Construction ,",~,1flager in \\ riting, and any neces-
saf'\ chJnges shall be accomplished by appropriate
,", It,di fic a tion.
4.7.4 If the Contractor performs any Work knowing it
to be contrary to such laws, ordinances, rule< and regula-
tions, and wi'U,out such notice to the Architect and the
Comtruction ,\~"nager, the Contractor shall assume full
responsibility therefor and shall bear all costs attributable
thereto.
4.8 AllOWANCES
4.8.1 The Contrilctor shall include in the Contract Sum
all allowances stated in the Contract Documents. Items
cO\ered by these allowances shall be supplied for such
amounts and by such persons as the Construction Man-
ager may direct, but the Contractor will not be required
to c'rnploy' persons against whom the Contractor makes a
rC2sonable obj~ction.
4.8.2 Unless othem'ise provided in the Contr,lct Docu-
ments:
.1 these allowances shall cover the cost to the
Contrilclor, less any applicable trade discount,
of the materials and equipment required by the
allowance, delivered at the site, and ali appli-
cable taxes;
.2 the Contractor's costs for unloading and han-
dling on the site. labor, installation costs. over-
head, profit and other expenses contemplated
ior the original allowance shall be included in
the Contract Sum and not in the allo\\ance;
.3 \\ henever the cost is more or less than the
allowance. the Contract Sum shall be 3djusted
accordingly by Change Order. the amount of
\\ hich will recognize changes. if any, in han-
dling costs on the site. IJbor, installation costs.
0\ erhead. profit and other expcnc.es.
4.9 SUr[RI~H1"DENT
4.9.1 The Contractor shall employ a competent superin-
tendent and neceSSJfY assistants \\ ho shall be in attend-
ance at the Project <ile dL'ring the piOgress oi tf-:e \\'ork.
The super,ntt-ndent shall rfpre~ent the Contr2ctor Jnd all
communiutions gi\t:n to the superintendent shall be as
binding as Ii gi\en to the Contractor. Important commu-
nicclions shall be confirmed in \\ rlting. Other c(,mmuni-
cat:ons shall be <0 conflTmed on written requc'st in each
c>e.
.U 0 CO.... 1 RAn OR'S CO~STRUClION SCHfDL'lE
4.10.1 The Contractor, immediately after being awarded
the Contract. shall prepare and <l1bmit for the Construc-
tion \1ancger's approval a Contractor's Construction
Sch:dule cor the Work \', hicn shall prO\ ide ior expedi-
tious and practicable execution of the Work. This sched-
ule shall be coordinated by the Construction 'Ianager
\\ Ith the Project Construc:'on Schedule. The Co~,tractor's
CO~,<lruction Schedule shall be rc\j~ed as required by the
conditions of the Work ,1nd the PrOJect. subject to the
Con<lruction .\\.1n,:ger's appro\.,,1.
4.11 OOCU.\lfNTS AND SAMPtlS AT THE SIH
4.11.1 The Contractor shall maintain Jt the Project site,
un a current basis, one recold COP\ of all Drawings,
5pecdiCltions, Addenda, Change Orders and other \lodi-
iications, in good ordC'r and m,Hked currently 10 :ecord
all changes made during construction. ;;nd apprO\ed Shop
Drawings, Product Data and Samples. These shall be
avarlable to the .Architect and the Con,truction \lanager.
The Contractor shall ad\.ise the Construction ,\~anager on
a current basis oi all changes in the Work made during
construction.
4.12 SHOP ORA WINGS, PRODUCT OAT A AND
SAMPLES
4,12.1 Shop Drawings are drawings, diagrams, schedules
Jnd other data specially prepared for the Work by the
Contractor or any Subcontractor, manufacturer, supplier
or distributor to illustrate some portion oi the Work.
4.12.2 Product Data are illustrations, standard schedules,
performance charts, instructionc., biOchures, diagrams and
other information furnished by the Contractor to illustrate
a material, product or system ior some portion of the
Work.
4.12.3 Samples are physical examples \\hich r1Justrate
materials, equipment or workmanship. and establish
s1andards by \\' hich the Work Will be judged.
4.12.4 The Contractor shall prepare, re\ iew, apprm e and
submit through the Construction .\\anager, \\ ith reason-
able promptness 2nd in such sequence as to (,1 use no de-
lay in the Work or in the work oi the O\\ner or any ~epa-
rate contractor, all Shop Drawings, Product Data and
Samples required by the Contract Documents. The Con-
tractor shall cooperate with the Construction Man"ger in
the Comtruction -'\anager's coordin,jtion of the Contrac-
tor's Shop Drawings, Product D,1ta 2'ld Samples with
those of other separate contractors.
4.12.5 By prepar;ng, appro\.ing and 'ubmilting Shop
Drawings, Product Data and Samples. l:~e Contractor rep-
resents that the Contractor has determined and \erified
all m"terials, iield measurements and ::eld const"Jction
criteria related t~ereto, or will do <0 "ith rea<( "able
promptness. and :-:as checked and coorSinalcd the :n10r-
mation contained ',\ ithin 'uch submllt,ll< \\ ,th the rC'Guire-
ments oi the \\'0'>;. the Project ,]I,d :~e Co:'tract Docu-
ment<.
4.12.6 The Contractor shall/lot be '(<Iic\eo of re<pci<lbil-
ity ior any de\ iat.on from the rC'(;LJir(:~e"ts or ,~c Con.
tract Documents bv the .Architect'< :,~';:'ro\ .11 oi Shop
Dra\\ ings. Product Data or S"mples urder 5ubpJ'22raph
2318. unless the Contractor 11,15 <pe(;:'(~':v inforr.~td the
Architect and the Con<truction \t''1;;:er in \\f;:if1C: oi
<uch dc\iation at :he time oi <ubmls<,on ;,nd the ,,;chi-
tect has gi\ en \\' :1en appro\'al 10 :I,e 'pecitic de\ '2tion.
The Contractor ,:-Call not be relie\cd :';);]1 re,po~':bilil\
for ('[rors or olT,."ions in the 5I',()p ;)'.1\\ inc:s. p--.duct
0.1 ta or Sa mp!es 8\ the ,Arc h itec!'" .' :)r-'O\ a I of the::'\.
4.12.7 The Contrcctor shall direct ,;::,oc,iic atlenton, in
writing or on re<~bmitted Shop D',1\\ ,,~s, Produc: Data
or Samples, to ie.. ,ions other than t~0'e ~eC]lie':ec :C\ the
:\rchitect on pre\ DUS submittals.
..1.. DOCli.\Il'T ~;Ol,C.'\' G[':,~l CO'JI110'S Of '''E (O'T,~CT IC, Cu'Sl,L'ClI0'
CC'~~;RL'CI1C""" \t....'ACt'\E'T t:DllIO\: . JL"E 1980 ~o:::c'" . AIAf . ~.196G . THE
,,,,.'o:C~' !'.'-:lL 1[ Of-'.RCHIHCTS. 1~3; ,[\\. ,OR, ~\E,' \\ \\'ASHi'G10'. 0 C. :"....l().,
A201.C.\.1-1980 10
4.12.8 ',:, portlc~ of the \\'ork requiring sub~,:ss;c\n of a
Slwp ::- ':.\ Ine.. r'c,duct D"ta or S.lmple sha:\ be com-
mc:-u: ~,n\d l~(' ",bllll!1,11 hJ' becn apprc'.ed b\ :he
,\Il h,:(,: as pr,'.ded In Subp,l[,ogr,'ph 23,8. .-\11 "Jch
pc,rt:(', of the \\'ork .h,ll1 bc in ,1ccord,lnce \\ ilh JP'
P'o\C-~ <:')milt"I,.
4.13 tSEOFSllE
4.13.1 >e Contractor shall coniine operation< at the site
to ,1TC> permit~(-d by law, ordinances, permits and the
Contr2C~ Docun-enl". ,md shall not unrca"onably encum-
ber I~,C 'Ill' \\ ith "ny materials or equipment.
4.13.2 ~",e Cont-.octor ,h,lll coordinate all of tf~e Contrac-
tor's C;:(<,ltlon< ....,th. ,lnd <ecure appro\'al from. the Con-
structic;n \\ana;er beiore using any portion of the site.
4.14 CUTlING -\\:D PATCHING Of WORK
4.1.U The Contractor shall be responsible for all cutting,
fitting or patching that may be required to complete the
\\'ork or to fTlake its <everal parts fit together properly.
4.14.2 T!-1e Con1r"clor shall not d"mage or endanger any
portio:,; oi the \\'ork or the Ilork of the OIl ner or any
"epar,;:e contr,lC:Ors by cutting, patching or oiher\\ ise
alteri:'; any work. or by excavation. The Contractor shall
not cui or other" ise "iter the \lork of the 0\1 ner or any
separaie contractor except \1 ith the written cor.,ent oi the
0\\ ner dnd of -xh <cp"r"te contractor. The Con~r2ctor
<hall cot unrcasc'l,1bh- withhold irom the 0\1 ner or 2.ny
~ep3'c:e contractor c~nsent to culting or otherwise "Iter-
ing tbe'Work.
4.15 CL[A~ING UP
4.15.1 The Contractor shall at all times keep the premises
free from accumulation oi waste materials or rubbish
causec b\' the Contractor's opera1ions. At the completion
of the \\'ork, the Contractor shallremOle al1111e Contrac-
tor's .... >te materials Jnd rllbbi,h from and "bout the
Pro;ec: as \\ell a;. all the Contl,lctOr'S tools. cor.,trt;C110n
equ'p--;-,ent. machinery and surplus materials.
4.15.2 Ii the COr1trJCtor fail,- to clean up at the comple-
tion c' the \\'0:',;. the O\\ner may do so as pro\ided in
Par2;'2~~ 3-1 arc 1!ie cost thuC'oi ,hall be charged to the
COI~:'2c!or.
4.16 CO"\IU'ICATlO~S
4.16.1 The Cont'actor sh,,11 fOI.... ard all cO;l,"Jnic.o'.ons
to :1-,: 0\1 ner arc the Architect through fhe Ccn,-trc;ction
"\""a ;er.
4.1i ~Q)ALTI[S A'D P.\H~ TS
4.1i.l r;'.t' Cont'actor -10,,11 pa\ all royalties 2nd licen<.e
lee' ,"2'1 de;'e;'.::' .::1 '1).:';, or clcims for ini-lr,;eme'lt oi
a PI ,>:".t r:fhl. ., :',d ;.h3)1 <al e t!le 0\1 ner ,o--:c the Con.
,lru~: -.. \\ar;,,[-:-' ~armle<< 110m loss on acco:"'ll :I-,ceoi,
~\cc-=.' .h,at the' 0,.'. ner, or the Comlructlon \~,on2::er as
the c-e mav be ,hall be rC"porlsible for 211 ;.uc,", 'o;.s
\11,,,, 2 pJrtl~ulc' oe<ign. proces~ or the proc.1Ct oi 2 par-
l'Cl:~2' ""':1n1l1acl..'er or m"nuiacturer;. is ,-elected bl 'uch
per,e" "r cuch ::e:<on's .,;,"nt. Ii the Coni:ac'or, cr the
c()~<. _:c~ion I"c""'\z;:;er J5 ihe c..~c.c n1<1) be, 1~25 rCJ~\=':l to
bcl:~..: :!-1dt the ce'ign, proce,- or product 'elected :' an
Ini:," :'c'l1enl oi a patent. lhat p,ifiy shall be :e<po,':ble
for -~.-~'-; 10'-" un:~:'-< '-uch iniormation is proll'.;:.:!I- gi\cn to
the c:c",s Jnd J"O 10 the .-\rchiiect.
4.18 I.'-'D['\\'-'lflC-\110N
4.18.1 To the fc':C'<1 exlt'nt peril' ::ed bl :.111', the Con.
traclor ,h,ll1 incc-mn,i\ and hold r.;';,llec, the Ollner, the
,-\rchitcct. the Con<tructlon '~Jll,lSc' .1nd :hclr .1genb - 1
C'mployees from ?nd ag,lir.<t ,111 c'.; illS rl.lm.lges, 10
,iI1d expenses, Including. bJt not I,mikd to, .1tiolne\s'
fees arising out of or re"ultlng irc,m the perform,mce oi
the \\lork, prO\ Ided that any <ucr claim. 0.1111.1ge, loss or
expense 11) is a!1rlbutable to boc\ InJur.. sickne"" dis.
e,lse or death, or to injury to or ce,truct,on oi 1.ll1gible
property (other thdn Ihe \\'ork itse:: Inciudlng the loss of
use resulting thereirom, and (21 i;. cau<ed in II'hole or in
part by any negligent act or oml'o'on 01 the Contractor,
Jny Subcontractor. anyone directl\ or mdllectly employed
by Jny of them or anyone for II "o,e acls "ny of them
may be liable, regardless of II'he:r.er or not it is caused
in part by a part\ indemnified hereunder. Such obligation
shall not be construed to negate. ?bridge or otherwise
reduce Jny other right or obligation of indemnity \\ hich
would otherwise exist as to any party or per,-on described
in Ihis ParagrJph .1.18.
4.18.2 In any and all claims agaln<l the 01\ ner, the i'rchi.
teet, the Construction Manager or Jny 01 their "sents or
employees by any employee of the Contractor, z,ny Sub-
contr.Klor, anyone directly or indirectly employed by Jny
of them or anyone for who,-e act- Jny oi them 111,1Y be
I ia ble, the indernnifiution obllsa t ;on l. :lder t his Para.
grJph 4.18 shall not be limited in 21"1\ \\a\ by .1n\' limita-
tion on the Jmount or type of damcges, cC,lllpcn<ation or
benefits payable by or for the Contracior or any Sub.
conlraclor under workers' or Ilorkmen', cOl11pensalion
acts, disability benefit acts or other emplO\ee benefit acts.
4.18.3 The oblig2tions of the Conlr2ctor under this Para.
graph 4.18 shall not extend to the licbtlity of the Archi'
or the ConstflJction Manager, thell ~genls or emplOye
<>rising out of (1) the preparatron or ,'pplol'al oi maps,
drawings, opinions, reports. ,-Ur\'ClS. Change Order,-, de.
sign,- or specificalions. or (2, the g;1 ins oi or the failure to
gi\'e directions or in<lruc!ions b\ the .-\:chitC'ct or the
Conslruclion Manager, their agent;. or emplOl ee,-, pro-
\ided ,-uch gi\ing or failure to gil e i,- the primMv cau<e
of the injury or dam.1ge.
ARTICLE 5
SUBCO~TRACTORS
5.1
D[FJ\:ITIO-';
5.1.1 .-\ Subconlr;,ctor is 2 per<c:' Or C-'llitv \1 ho ha" a
direct contract II Ith the Conlrdclor to periorm any oi the
\\'ork at the '-Ite. The term SubcC""acto; means a Sub-
contractor or a 5ubcontractor', a:..'c ;:If'C :epre<en',-,ti\'e.
The term Subcont:JclOr dee< nC': "cruce an\' <(',1.11.1Ie
COrltractor or;'nI -e,,2~Jte contrac'~", q;:'con\'actor<.
5.1.2 A Sub-subcolilr.1ctor is a perqJn 0; enlit\' I', !,o h,,,,
a direct or ind:rect contract II ith ,'. 5ubCC';,lr.1ctor :0 per-
form anI' of the \\'ork at t:-.e <ite i"e lc"'l <:ub'<'lJhcon.
I:.:ctor means a 5[;b-'ubcc~:;aclC': ;:.: "'1 .'ulhnrilH1 rep.
re,entatil e thereof.
5.2 AWARDS or SlBCO~,TRAC1 S -\" D 01 HER
CO~lRAC1S rOR PORTIO\'S Of THE \\ OR"
5.2.1 Unless ot!-1emise rfi;uired b.. the Contr.let Docu-
~I ~ DOCL ",[" T ~J01 'CM . G["[R~l CC,::)1, :o's 0' -',[ CC' -;'c ' : =: CO" 1 'L C
CO"5~:-'_CT:O.'\ "',,!.,\.'AGE\'tE'T lDJiIO' . ;.........[ lSE.~ :Dl1IC'- -\:A.:. C ~~JSJ. ,t.
~\',~;- C"-.' I'STITl iE Of ,-\F.:CHI-:!.CT5, ~-:,3 ,~\\ 'lor:". ~\E,"""" ".-\.,'''- 'q':,I()'\,' D C. ~(~::\.in
11 ~.:01/C."'1-1980
ments or the Bidding Document<, the Contractor. as soon
as pr.lCtlcable after the a\\ard 01 the Contract.. ,hall ~ur-
nish to the Construction ."\anager In wrltmg tor reView
by the Owner, the Architect and the Constructi9n .'~an-
ager, the names of the persons 01 ent!ties (including those
who are to furnish materials or equipment labrlcated to
a special design) proposed for each of the principal por-
tions of the Work. The Construction !--\;;nager w"l
promptly reply to the Contractor in \\ riting stating
whether or not the Owner, the Architect or the Con-
struction Manager, after due imestigation, has reasonable
objection to any such proposed person or entity. Failure
of the Construction Manager to reply promptly shall con-
stitute notice of no reasonable objection.
5.2.2 The Contractor shall not contract with any such
proposed person or entity to whom the Owner, the Ar-
chitect or the Construction Manager has made reasonable
objection under the provisions of Subparagraph 5.2.1. The
Contractor shall not be required to contract with anyone
to whom the Contractor has a reasonable objection.
5.2.3 If the Owner, the Architect or the Construction
Manager has reasonable objection to any s~ch prop?sed
person or entity, the Contractor shall submit a substilute
to whom the Owner, the Architect and the Construction
Manager have no reasonable objection, and the Contract
Sum shall be increased or decreased by the diiference in
cost occasioned by such substitution and an appropriate
Change Order shall be issued; however, no increase in
the Contract Sum shall be allowed for any such substitu-
tion unless the Contractor has acted promptly and re-
sponsively in submilting names as required by Subpara-
graph 5.2.1.
5.2.4 The Contractor shall make no substitution ior any
Subcontractor, person or entity previously selected if the
0\\ ner, the Architect or the Construction ,\\anager makes
reasonable objection to such substitution.
5.3 SL'BCOSTRACTUAl RElATIONS
5.3,1 By an appropriate agreement, wrilten \\here legally
required for validity, the Contractor shall require each
5ubcontractor, to the extent oi the V,,Iork to be performed
by the Subcontractor, to be bound to the Contractor by
the terms oi the Contract Documents, and to as~ume to-
ward the Contractor all the obligations and re<ponsibili-
ties which the Contractor, by these Documents. assumes
Iowa rd the 0\\ ner, the ..\rchlect and the Con<lIuclion
-"anaser. Said agreerr,ent sh~l: prescrye a:ld protect the
rights oi the 0\\ ner, the :\rchllect and the Construction
.\~anager under the Contract Documents \\itn re<pect to
the Work to be perlo:med b\ the Subcontrcctor ~o that
the subcontr~cting tr.t'eoi \\ ill not prejudice sucn righls,
and shall a110\\ to the 5ubcontractor, unless specilically
provided other\\ise in the Contractor.Subcontractor
Agreement, the benelit of all rights, remedies and redress
ag.,if1't the Contractor that the Conlractor, bv the'e Docu-
ments. has against the O\\ner. \\'here "ppropriate, the
Contractor shall requi:e each Subcontractor to enter into
similar agreements \\ ith their Sub-subcontractors. The
Contractor shall make available to each proposed Sub-
contractor, prior 10 the oecution of the Subcontract.
copies oi the Contract Documents to which the Subcon-
tractor ..\ ill be bound by this Paragraph 53. and identify
to the 5ubcontraclor ~ny terms and conditions oi the pro-
posed Subcontract \d~lch noay be at \ariance \\ith the
Contr.,ct Documents. Each Subcontractor shall similarly
make copies of such Docur:~ents a\.,d"ble to their Sub-
subcont r actors.
ARTiClE 6
WORK BY OWNER OR BY
SEPARATE CONTRACTORS
6,1 OWNER'S RIGHT TO PERFOR.\1 WORK ASD TO
AWARD SEPARATE COSTRACTS
6.1.1 The Owner reseryes the right to periotm work re-
lated to the Project with the Owner's own forces, and to
award separate contracts in connection with other por-
tions of the Project or other work on the site under these
or similar Conditions of the Contract. If the Contractor
claims that delay, damage or additional cost is involved
because of such action by the Owner, the Contractor shall
make such claim as provided elsewhere in the Contract
Documents.
6.1.2 \Vhen separate contracts are awarded for different
portions of the Project or other work on the site, the term
Contractor in the Contract Documents in each case shall
mean the Contractor who e),ecutes each separate Owner-
Contractor Agreement.
6.1.3 The Owner will pro\:de for the coordination of the
work of the Owner's o\\n forces and of each separate
contractor with the Work of the Contractor, who shall
cooperate therewith as pro\ ided in Paragraph 6.2.
6.2 ,",IUTUAl RESPONSIBILITY
6.2.1 The Contractor shall afford the Owner, the Con-
struction !--1anager and separate contractors reasonable
opportunity for the introduction and storage of their ma-
terials and equipment and the execution of their work,
and shall connect and coordinate the Work with theirs
as required by the Contract Documents.
6.2.2 If any part of the Conlr,lctor's Work depends for
proper execution or results upon the work of the Owner
or any separate contractor, the Contractor shall, prior to
proceeding with the Work. promptly report to the Con-
struction Manager any app2rent dl<crepancies or defects
in slJch other work that render it unsuitable for such
proper o.ecution and resul:s. Failure of the Contractor so
to report shall con<titute 211 acceptance oi the Cwner's
or -epr.lte CO:1:ractor's \\c-k 2S fit and pro;:oer to receive
the \\'ork. e'cept as to de'ects \\ hlch ma\ sCJbsequentlv
become apparent in such \',ork by others.
6.2.3 Any costs ca:.;sed by defective or ill-timed work
shall be bOfne by the party re<ponslble thereior.
6.2.4 Should the Contractor \\ rongiully C2cse damage to
the \\ork or property oi t".e 0\\ ner, or to clther work or
p'uperty on the site, the Contractor ,hall V0mptly rem-
edy such damage as pro\ iced in Subparagrcph 10.2.5.
6.2.5 Should the Contractor \\ronSfully delay or cause
damage to the \\ork or prcperty of any separate contrac-
tor, the Contractor shall, cpon due notice. promptly at-
tempt to settle with such other contractor b agreement,
or otherwise to resoke the d:<pute. If such separate con-
tractor ~ues or initiates an arbitration proceeding against
the Owner on account oi 2,\ dela\ or damese alleged 10
have been (Ju5ed by the COrltractor. the O\\ner shall
At" DOCL\\EST "cOl/C~I' G['[R~L CO'01110'S Of irE CO'TR~C1 FOR CO.'-SlRlClI0'-
CO'-STRlCTlO:--' \\ASAGE\',E'T EDlliOS . JUSE 1980 EDITIOS . AIAt; . @ 1980 . THE
.~'\ERIC"''- I,-SiITlTE OF .\I;C'1lTEOS. ;:35 '-EW YO,>.: ~n. 'W.. \\.ASHI'-GTOS. DC:0006
A:'Ol/CM - 1980 12
nOI::" the Contr;,ctor \\ ho <h~11 ddend <uch procC'uJings
~t the 0\\ nt.'r's C\pense, ~nd if ,111\, judg~'enl or ,w,ard
"g2ln,t the OIl ner ,HISC'S ttwrclrorn, the ('J'1tr2C tor ,hall
p,,\, or qtl~l~ It ,Jnd ,h,111 reimburse the 0" ner for all
"Itorne\'s' ices and court or "rbitratron CO'lS \\hich the
O\\ner has incurred.
6.3 OWNlR'S ~:IGHT 10 CLEAN UP
6.3.1 If a dispute arises bet\\een the CcnlrJctor and
<C'p.otate contractors as \0 their responSlbilrl1 for cleaning
up as required by Par~graph 4.15, the 0\\ "cr may clean
lip and chMge the co,t thereof to the contraclors respon-
Sible therefor 3S the Construction Man"SEr shall deler-
mine to be ju<1.
ARTICLE 7
MISCElLANEOUS PROVISIO~S
7.1 GO\'ER:--.'ING LAW
7.1.1 The Contract shall be gO\'erned by the law of the
place \\here the Project is located.
7.2 SUCCESSORS A~O ASSIGNS
7.2.1 The Owner and the Contractor, re<j:ecti\'ely, bind
th<:mselves, their partners, successors, assigns and legal
repre<entati'es to the other party hereto ar,d to the pM!-
ners, <uccessors, assigns and legal represer.:atil es of such
other party II ith respect to all co\enants, a~~eements and
oblig.,tions cont;,:ned in the Contract Docu":lents. ~either
part\' to the Contract shall assign the Contract or sublet it
as a \\hole Without the written consent of :'-,e other.
7.3 WRITHN N011CE
7.3.1 Written notice shall be deemed to h\e been duly
served if delil ered in person 10 the indi\'idual or mem-
ber of the firm or entity or to an officer oi the corpora-
tion :'or \\ hom It was intended, or if delil e -ed at or s<:nt
by regIstered or celt\{ied mail to the last bi-o:ness "ddress
kno\\n to lhc party gil'ing the nolice.
7.4 ClAIMS FOR OMIAGES
7.4.1 Should eilher parly to the Contract <Jt1'er injury or
damase to pe[oon or p'opertv because of a,~ act or omis-
<ion of the (;~hcr p,JI\' or of any of the ot~~er party's
ernp!O\ce,. aCl'r~(, (If (lhCi~ iOI \\ho'e act, ,ucn part\' is
legalh 11"ble. cl...,im ,hail be made in \',' ling to <uch
other party \\ithin a reason,-,ble lime after tre flrq obsen'.
;:n(e oi ~uch ;nitJr) or ol1nlllge.
7.5 f'LRfOR-'IA.....n BO.....O ASD LABOR A.....O
\IATfRIAl PAYMESl BO.....O
7.5.1 The 0... r.er ,hall h"..e the rrght ;: rcqc;i~e the
Contractor te 'J'n"h bond' (0\ eTinE' the i;, '-,iu! perform-
;,nce e'l the Cc'ntract and Ihe pa\ ment 0: "'I ob!'gations
;,r:<;rc' 'hereunder if Jnd as requlled in the SiCCing Doc-
unlC'nt' or the Contract Document,.
7.6 RIGH1S A.....O Rl\\t DlfS
7.6.1 The dL:~ie, and obligation, Ill1po'ec b\ :he Con.
Iract Documents and the right, and rer.~E::es alailable
therc'~'1dcr shall he in addilion to, and not 2 'im'tation of,
;,n)' duties obf,s,-,t,ons. right< and ~emedl(,< ~Iher\\'i,e im-
pc<eo or a\ai!ab!e b, law.
7.6.2 ~o 2(;100 or iarlure 10 Jel b\' t~'c' 0\\ nero tic Ar-
chrtecl, the Construction .~\Jnager or t!'.. (ontrac tor ~ha"
(on,ltlute ,1 \\al\er oi any right or dut, ~;1'orded ;,n)' 01
thc'r:1 under the Contr,',ct, nor ,h.:!1 .;r. ,uch ,1(1:0'-' or
f,lIlure 10 .1et constitute an approl "I of o~ ~cqu,c<cer n
,:111 breach thereunder, exrept ,1S ma'. be ~reclfrcally
.1peed in II riting.
7.7 HSTS
7.7.1 Ii the Contract Documents, la\\'s. c 'o:n.:nce', rules.
regulations or orders of any public ,..,uthC':iy ha\ing Juris-
diction require any portion of the Work :0 be in~pected,
tested or apprO\ed, the Contractor ,hall [Ie the Architect
and the Construction ,\\anager tlmel)' n~::,ce of its readi-
ne~, <0 the Architect and the Con,truct:on M"nager may
observe such in~pection, testmg or ap;:;:oval. The Con-
tractor shall bear all costs of such im;:ections, tests or
approl'als conducted by public authorities. Unless other-
\\ise provided, the Owner shall bear all costs of other in-
<pection" tests or approvals.
7.7.2 Ii the ..\rchiteCI or the Constructic:: \\anager deter-
mines that an)' \\'ork requires speCial 1~';Jection, testing
or approval \\ hich Subparagraph ;-.7.1 c:.es not include,
the Construction Manager will, upon I'. .:tten ,luthorila-
tion from the Owner, instrucl the Co~ :r,ictor to order
,uch <pecial inspection, le5ting or appro',,;!, and the Con-
tractor ,hall gil e nollce as pro\ Ided '1 Subp,H,igraph
;-.;-.1. If ,uch <pl'Cial inspeC1:on or :Cstin~ 'ele,lls a farlure
of the \\'ork to comply with the rec;uirer:',:'nt, of the Con-
tract Document" Ihe Contractor ,ha: bear all costs
thereof, including compensation for the .-\rchitect's ;,nd
the Conslruction \1anager's additional se". ices made nec-
essary by such failure; otherwise the 0." ner shall bear
such costs, and an appropriate Change Older shall I",
issued,
7.7.3 Required certificates of incpC'ctiG~. testing or ap-
pro,al shall be ,ecured by the Cortrac::~ "nd the Con-
tractor shall prompt I)' deliver them to :-,e Conqruction
,\1anager for transmittal 10 the Architect.
7.7.4 If the Architect or the ConstrL;ctior. \1;,nager wishes
to observe the inspectiom, tests or .,pp~c. als required b)'
the Contract Documents, the)' wil! do -: prompt I\' and,
where practlc,;ble, ,1t the source 01 'upp .. .
7.8 1r-\1EREST
7.8.1 Pa\ment, due ;,nd unpaid under 1-,,; Contract Doc.
uments shall bear Interest from the date ::,1\ ment i~ due
at ~l..J(~ rate ~:s i:-,e p2r:ie~ r:lJ\' agree u~ ~ ~ ;n \\ rJtin~ Of,
in t~e ab'ence :~ceof atth,e lesa' ',:Ie :'C'\"",nS at-the
pl,oce of the Project.
;.9 ARBlTR-\110~
7.9.1 All claim;, dr'putes ,:nd olher m,,"e:, In cL:e,:ion
bell'.fen the Conlr"clor ""d the O\lne: " ,In" c;~t 01 or
re!ai,ns to the Contr;,c: Documents or tr~ iJ:e,,'ch Ir,ceof.
C\l<:pt as pro". Iced in 5ubpJragrap>-: :' : '~ \\ Iln re',)ect
to ;:-;e -\rchltect', dc'clsions on m,;::C'r~ :,c cting 10 ;,.::<tic
el~'C'C: ;,no except lor claim< ,,, hirh ;',1\ e - ,een \\ ,'I ed bv
the ",eking or Gccepla:oce of fln:d :',1\ r-o'1t .1< pro. 'ded
b\' 5c;bparasr"ph 9.9~ th~ough 9GG. I,: usil!:'. ,h,-,:I be
dec'ced by a:o'::.-,:Ion In accord,',nce " .- the C,'r:,::uc-
tlOr: ,",cc;stf\ ,\r~:lr"tion Rurc~ of ;~e~,--eriC2n -\rbi:ra-
tiOr:-\-,0clatiorJ :11en obtaining un!l?<< tl-c ::-3rties mutual'"
-\!A DOCU,I."HST ~:01:C\~. C['-f..:'.';L (C'<)I"1:0'-5 OF lHE CO'-:-,;(~ ;-: (()',' ;,;. ~
CC,~Tr:L'CIIO.'\ ',',~.",!".C:"':"I ED~-:O', . !L',\~ ;92.2 [DlilO', . :\:~~ , ~'-~:: . iriE
;\',: ~:c.\, l'5:1,-:~ T[ or ~;'CH:'r:Ci~ ~-.:-, "\,t:\\- ~Oi\~~ ....\T \; \\ ",.. '.~- '.c:ln, ~ C ~'~~-"-\f)
13 A:?Ol/C....i - 1980
,1grc( othcf\\ise. '0 arbitration arising out Q; :' '''''2ting
to tl--: Contr,lct ~xulllents Sh,l11 rncludc. b\ ~0,":,,~lida-
liono:ndcr or ::-: any other manner, the .",. :-;:ecl. the
Cor.-:"uction .\~;;-.eser, their emplo)ces or. :J~,.;..;\"nts
exce;:-: by \\ rilte'": (on~('nt containing a 'pec:' : :,,',"cnce
to th: Owncr-Cc -t,actor Agreement and "t 'c"d !::oy the
Alcr tect, the C:'":struction .\\an"ger, the (-,\ner, the
Con:',;ctor ,lnd ,,-.. other person sought to bE 'J:r,ed. t'o
,1rbi:'2:lon shall .-.clude by consolid"lion. jo: -der or in
,1m other mannE'. p.Hties other than the C.\ner, the
Co'nt'2clor and e-., other persons substantlc . ir.'.olved
in a common ql,;e;tion of fact or law, \\hose ;:e'E:1Ce is
rcqu>ed if comp:ete relief is to be accordec.:1 the arbi-
tration. No perso:-, other than the Owner or t'e Contra~-
tor ;">all be inclt.ced as an original third P2~Y or addr-
tion,,: third part) to an arbitration whose ir;'~:est. or .re-
spon'!bility is ir.;ubstantial. Any consent tc arbItration
in\'o'.. ing an add:tonal person or persons sr 2:: not con-
'-titute consent to 2rbitralion of any di,pute n:: de;cribed
iher"n or with eny person not named c- de;cribed
theren. The fo:e:;oing ag;eement to arbit:o'e g,d any
othe: .1sreemen: '0 .lfbitrate with an additio~.,! pe:,on or
perS0:lS duly co;,;ented to by lhe parties to :'-:e 0\\ ner-
Cor,:'actor Agrctrnent shall be speciiically "nforc('able
und.:-: the pre\'a:'.ng arbitration law. The a\\c.j re:1dered
bv If-e arbitrator- ,hall be fin,ll, and judgmen' ~~2\ be en-
t~rec upon it in 2ccordance \\ith appliCable 'a\\ in any
cou~: having jur:-:iclion thereof.
7.9.2 Notice oi :he demand for arbitration -~all be filed
in \\ 'iling with t'-:e other party to the Ownt--Contract.or
Agrct-nlent and \\ ilh the American Arbitr,,:~n ;\$socla-
lion 2nd a cOP\ ;nall be filed with the Arcr '-:ct end the
Con;truction .l.,~c~.ager. The demand for arc :'ation shall
be r;~,'de within ::'e time limit~ 'peciiied in 5_Sp;;'2graph
2.3.15 \\ here ar:.;::'icable, and in all other U'eS \\ ':hin a
rea,c'":.1ble time 2,'ter the claim. dispute or ::her matter
in c;~e;tion has 2'lsen; and in no e\cnt ~he :t 2e made
after the date \\~en institution of legal or e:_it;;::-~e pro-
ceec:,'":gs ba'ed C:l such claim, dispute or o:-~r ~."'::er in
que-::l~n would be barred by the applica:.;: statute of
limiI2:ions.
7.9.3 LJnless o:Cerwise agreed in w:rting. :-~ Co,-traclor
,hal' carrv on tl-,: \\'ork ,md m,lin1aln It; p': ~'e-, during
am -,'blt~ation :-'oceedings, and the 0\\;",,' 'r-e'l con-
tinl,;e 10 make 1=2\ ments to the Contractor - 2ccC'dance
\\ ill- 'he Conlr2C Document'-.
ARTICLE 8
TL\1E
8.1 DLFl~ITIC'S
8.1.1 L'nles~ C '-er\\'i~e prO\ id\'d, the Cr --.'C: :l1e 1~
the :-cc'lod CJt : -," allotted in the Contr2C! ::- ::u--t-:ll~ for
SUi>' 2 "1tl,ll Cc-- = '(:'t ion oi the Work as c'c' ,,cc ; Cl Sub-
par2:-,',ph 8.1 3 .cluding ,luthorized ,:d;u,:-~nt' '~ereto.
8.1,::! The dc:e c,i commencement oi If-,E '.\'c-, IS the
date .:--t,lb!i,hcc :l a notice to proceed Ii '-~-e , "10 no-
ticE' ') procce-::t shall be '-uch other d_"~ G; ~3Y be
c,I;,: "hed In :'cc Owner-Contractor .I,;re,c-ent Of el-e-
\\ h",'e in the C -t:ac1 Document'
8.1.3 The De:cc oi Sub,t,1Il1ial Completlo. :i t-e \\o:k
or C'>I"n,11ed ;:: ':ion thereoi I~ the Date (,,-'lle: bv the
r\rc~ :e~t \\her. ,:on~truction IS 'ui1Iclen::" :,);,:-:'ete, in
accordance \\ ,th the Cont~,lct Do(ument~. ~o that the
01\ ner or <epar,,!e contraclO:S cln on UP\ or l;lllize the
\\lork or a design,;ted portion thereo\ !"or ihe u<e for
\\ hich II is intended.
8.1.4 The D.:;te 0\ SubS1.1nll,11 Completion oi the Project
or dc<ignated portion the'coi is the Date u'otli'ed by Ihe
,-\rchitect \\ hen con,tructron IS 'u\iicicnti\ cOf:1plete ~o
the 0\\ ner can occupy or I,;trll/e the ProJL'C tor de'-lsn;i1ed
portion thereof ior the u'e lor \\hleh It \\as Intended.
8.1.5 The term da\' a~ used in the Contract Documents
,hall mean calendar dav unles'- 'pc-ciilc.3:h- ce,ign,ltc-d
otherwise.
8.2 PROGRlSS A~D COMPl[TIO~
8.2.1 All lime limits stated in the Contract Documents
are of the essence oj the Contract.
8.2.2 The Contractor shall begin the Work on the date
of commencement as deiined in Subparagraph 8.1.2. The
Contr,lctor shall carry the Work fom"lrd e~peditiously
with ;Idc-quate forces and ;hall achie\e Substantial Com-
pletion of the \\lork within the Contr,lcl Time.
8.3 DELAYS AI\:D lXTf~'SIOSS Of TIME
8.3.1 Ii the Contractor is dela\ed at an\' time in the
progress oi the \\'ork by any ,1Ct or neglect of the O\\ner,
the Architect, Ihe Construction \\anagc-r, In\ oi their em-
ployees, any ~epar21e contractor clllplo\ed bv the Ol\ner.
or by change~ ordered in the \\ark, labor disputes, iire,
unusual delay in tran~por:,ltion. .1d\erse weather condi-
tions not reasonably anticipatable. unavoidable casualties.
any cause~ beyond the Contractor's control. delay author-
ized by the Owner pending ,lrbitration. or b)' any other
cause which the Construction \\anager determines may
justii)' the delay, then the Conlract Time ,hall be ex-
tended by Change Order ior such re,l'onab!e time as the
Comlruction \\anager ma\ determine.
8.3.2 .-\ny claim for e~ten;ion oi lime shall be milde in
\\ riling to the Construction \\an,lgcr :-ot more lhan
!\\enl~ da\'s alter the comr:lenccment oi ,he cela\'; other-
wise Ii ~hall be wai\ed. In the C.1,e oj a cCI;-'tinui~g dela\
only one claim is necessary. The Conlr,lctor ~hall prol ide
an e,tilllate oj the probable c,'~('ct u\ 'ucr. dela\' on the
progress oi l~.e Work.
8.3.3 Ii no agree~lent I' Jl1,)de 't.ltlng If--,e cdte'- upon
1\ hich Inlerpret2tion< as P'O\ idee! in c.ub;),Ir.lg~aph ~.3.11
,h,lll be iUln:srec then no c:,'!Inl lor Celd\' shall be
,111O\\ed on acco....ll! ot i2 .~:c :" :';J'I"~ ",,'::-. -,le'prCl".
lions until 111':een da\s J':er \\II::en rc-ql;e<t i, m"de ior
them Jnd not then unle" 'uch cl,lim i- 'e,l'0I~.lble.
8.3..1 This P,Hagrepn 8.3 dOl:" ,,'01 e\c:l.c:e :"e :('(C''.c-r\
of cL~:'"'::(1::.es for delay b,. (- :h('~ ;~'-I;t\ L!:--::t< (,':~cr pro\'i-
,ion' oi the Con:r2ct Doc __'~~l'n1'
ARTiClE 9
--~
PAYME:-':TS A:-':D CQ,\1PLETION
9.1 (O"TR -\0 ~L'\~
9.1.1 The Contr2ct Sum :- ,1.-JieC In :he- O'.\~er-Contrac.
tor ,.I,;recment 21ld. inc:;;dln~ ,'lJ;h()r.~('d ,'djU'-lment<
thereto. is the totdl alllou~.t P,ll,,:,'e bl :re 0'... ner to lhe
Contractor ior the p('rlo:..,~"ncl' of ::,e \\c'~ Jilder the
Contract Documents.
;\201 C\~ -1980 14
~r^ DOCL;M[~l A~:' C\\. Cl',[RAl CO'DI110'~ C' --: (: ,,-,~C1 f~, CO'S,RLCiO'
'cO"-:LClIO' \"'.'GE'\E~l ECil!O' . JL'E -c:: :=-~ =... . ,~iA' . C19BO . lHE
/\'H~ =;, 1'~lliL -~ OF -.\RCH1T[Cl~ 1:-3) '[\\'~C';. -.~ ',.\ \\;~H\'GTO'. D.C. :(10,)1)'1
9.2 SCHIDUE Of \'AIl'[S
9.2.1 Gcic'c Ill(' Iir't\;'/ir.';: un IC'r Pa, ment :hc Cun-
IloHtor "h.,11 <ubmlt 10 the C0n':'~J(\ion ,",,'laSer a
>chccli!c 0" \ aiue' allocated to :!-,c \ .,r;ou> port:c~,s of the
\\'o~l..:, pfC'p2fcd in <uch form .,'1d >l;pported bv ':.-Ich data
to <0b,1.1Ilti;lle it" .1CCUr.1C\' a< :!le .-\rchitect anc :'-,e Con.
"truCIOn '''mager 11',1) lequ 'e, Thi, <(hcdule. un!c>s
objccted to b\ Ihe Cll!l'tructIO'l \\,,',<~cr or the;rchitect,
~hal: be u>ed only a< ,1 b.1<1< lor the Contractor'< ,\pplica-
tion' lor P.l\ menl.
9.3 APPlICA TIO!>.'S fOR P A Y,\\(!>.'T
9.3.1 At least fiiteen days before the date :'or each
propess pal ment e<tJbli,hed In the 0\\ ner.Contractor
,\sreement. the Contractor ,h211 submit to the Construc-
tion .\~anaser an itemized .\pplrcation for Payment, notar-
ized if required, supported b\ such data ,ub>IJntiating
the Contractor's right to p.3) ment as the Owner. the Ar-
chitect or the Construction ,\\Jnager may require, and re-
flecting retainage, if an\'. as provided elsewhe:e in the
Contract Documents. The Con<lruction I--\anager will as-
~e/llble the Application \\ ith <Imdar appliC2tions from
other contractors on the Project into a combined Project
Application for P?\ment and iOl\\ard it \\ith recommen-
dations to the :\rchitect \\ ithin '-e\'en days.
9.3.2 L.;nless otherwise pro\ ided in the Contract Docu-
ments. paynlents wdl be m.,de on .,ccount of meterials or
equipment not incorpor?\ed in the Work but Geli\ered
and <uit"b!y <tared at the site 2nd. if appro\'ed in 2o\'JnCe
by the Owner, payments may ',milarly be made for mate-
rials or equipment suitablv 'tared at some other loca-
tion .,greed upon in wriling. Payments for materials or
equipment stored on or 011' the site shall be conditioned
upon submission by the Contractor of bills of sale or
such other procedure< satisfactory to the Owner to estab-
lish the 0\\ ner's title to <.l1ch materials or equipment or
otherwise p,atect the 0\\ ner'< inlere>l. includinS .:;pplica.
ble insurance ,;nd tran,port2t:on to the site lor Ihose
fll"terials .,nd e({uipmenl stored oil the <ile,
9.3.3 The Contractor warrants that title to all Work,
materials and equipment cO\e'ed b\ an ,\pplicction for
Pa\ ment will pass to the 0\\ /'Oer either by inco';Joration
in the con'l,uction or LJi)on 'ueipt of payment b\' the
Contractor.,l,:che\'u OUcH' ::"t "'e(' and cl('er of all
liens, claim<, ",'(uri!} intere<.t- or ('Ilculr,br"r,((', he'\',n.
after :derred \0 In thiS Ar',ck 9 a.< Lens", ,we de?\ no
\\'ork. materra!. or eqc:ipmc-nt ,:o\ered by an -\~:>lication
lor P.'\ment \\111 ha\e :)<Cen ,-;,:qu:rea b\' the C':~tr.1ctor,
or b\ ,>llY ether per-on pelic,'c;~:ng \\'ork .,t the <ite or
furnl<hing n~..\terials and equi;:~:ent for the PrO;ecl. <ub-
ject <,0 an ,':c,(ement under \\ ~,:ch an interest t~ ~'ein or
an enCljll1!-'" ,-:~( CJ :1;C:CCir, IS rl'~:: r-:ec b\' the se~:(~ or Clt~~
er\'. i<C' impc-vc: hI Ihe Con".oc:v cr 'uch otnc' ;:<e"on.
9A ClR1IFIC-\HS fOR PA),\W,T
9A.l The .\rchitect \\111, \\ itr:r1 <e\ en days aitc-' the re-
ceipt of the Projecl .Appliutior ior P2\ .'l~ent \\ itr, :\'e rec-
O;lir,-,(-ncL-1tlons 01 the Con~truction \\<:J)2ser, rf:'\ :e\\' the
Proje'c I .-\pp!fcalion for Pa\ IllU,: ane either i>sue 2 Project
Cert,::c.lle tor P2\ men! to the 0'.\ oer with a co~\' to the
Con,::uctian \\a!lager for di,"bu1ion to the Ccntr.ictor
for ,~;ch amount, a<. the ,'~rcr, :ect dr:termine5 2'e prop-
er" ,-'0e. or rlOtify the COllotrl:c:ion \lanager in \'. :iting of
the rE-a<OIlS for \\ Ilhholdin~ J (erll:',o:e .'s prO\ Iced in
Suhl',';ra!:,r,lph 9.61. Such nOi:ii<'lllon \\ I: be fOT\'o;,'ccd
to the Contr.,rtor b) the Cp!l,irLJC tl(ir1 \\.''C.;ser.
9.4.2 The I<<LJ.,nce oj a Pro;C'c t Cl'rt::"u:e lor Pa\ ~'.
\\t11 con,tilutc a repre<ent.ltlon by ihe-\rchitect :0 , .
Ollner thilt, b.,sed 011 the :\rchrlect', ob<eT\.,tions at the
site as PIO\ ided in Subparagraph 23~ ,;nd the data com-
pmlng the Project Application {or P.i" menl, the \\'0', has
progressed to the point indicaled; Ih.il. to the be,t c the
-\rchitect's knowledge, informatloll ,'r1d bcl,ei. the cC:Jlit\,
of the \\'ork is in accordance with the COlltract Docu'-
ments I<ubject to 2n e\.lluatron oi the \\'ork ior cor::'orm-
Jnce II ith the Contract Document< upon Sub<Lntial
Completion of the \\'ork, to the re~ult, 01 am ,ub<ecJent
le<.ts required by or performed under the Co'nlract Docu-
ments. to minor de\iations from the Contract Docun~ents
correctable prior to completion, and to any specific euali-
fications stated in the Certificate}; and that the Con:rac-
tor is entitled to payment in the amount cerlified. How-
ever. by i<.suing a Project Certificate for Pa) ment, tl,e Ar-
chitect shall not thereby be deemed to repre<.ellt th,,: the
r\rchitect has made exhausti\c or continuous on-<.::e in-
<.pections to check the qualit\' or qliJntlt\ of the \\'ork,
has re\'iewed the comtruction me"n~. methods, tech-
nique>, sequences or procedures, or has made .1m e\am-
ination to a,certJill how or for \\'hat purpo-e the Co~:rac-
tor hJ> u<ed the monies pre\ ieusly paid on .,CCOUllt c: the
Conlract Sum.
9.5 PROGRESS PAYMENTS
9.5.1 .\ller the ..'.,rchitect has i>sued a Project Cert::':cate
for Pa) ment, the Owner shall make pJ) mcnt in the rnan-
ner and within the time prOVided in the Contrilct Docu-
ments.
9.5.2 The Contractor shall promptly pal each Subc(.
tractor upon receipt of payment from the OWller, Oc.Jt of
the amount paid to the Coni',lclor Cr1 account oi ouch
Subcontractor's \\'ork, the amCU!lt to II hich silid Subcon.
tractor is elltitled. reflecting the percelltage actualh re-
tained, if any, from pa, ment< to the Contraclor on ac-
count of >uch Subcontractor'<. Work. The ContrJctor ':.all,
b\' an appropriate .1srcenwnt \\ith C'.'ch Subcontr2ctor,
require each Subcontractor to make fl,;\ ments to :l-.,eir
Sub'SlJbconlractc,:<. in <.imilar n1anner.
9.5.3 The r\rchi:ect may, on rcque<: .1nd at tne~,'chi-
lect's di<crelion, iu,nish to aJl\ Subcon:r,';ctor, if : 'ac.
tlcab:e. informat;or1 regarding :he pe~cen:..,se> of C2m-
p~e:,ur1 or Ihe .1I.- 0:~t, appll(~c ,',)( b\ ';'c Contr.1clC' .c,'ld
the .;ct:on taken ''-;ere'Jn b) the .-\:cr. 'ut n'l .1CCO~-t of
\\'Of,- done b\ <uch Subcontr;;ctor.
9.5.4 '.:either the O\\ner, the -\:(hi:('ct ,,'-' the Cor:,"uc-
tiun \'I;,naser ,ha:: h,>le ony ole' g.,ticn:o ::2\ Or 10 ":.: 10
,he i='a\ ment of c~,\ monie< tc' ,',nv 5~::'(C"':',1( tor e' :",pt
,1'- n'",.. othel\\ i,-e be rec;~lr:('d b\ 1,,'\\,
9.5.5 '.:0 cert;(icction of a p,eSles- ;:,,'\ n:c'nt. ;,11\ : 'og-
ress pa\ment. or 2m' fJ"rtial or ent"if(' use or occU:-:'lC\'
of Ihe Project b\ the 0.\ nero ,h.111 cc~q::~te ;,n ;.~_.,,)t'-
2nce 01 ,in\' \\'0:C; rot in .1Cc,d.1nce II ::r-, :he Cv""cl
Documents.
9.6 PAY,\W,lS \\ ITHHHD
9.6.1 The ..'.,rchi:ect, follc,,\ir1g cor.-C11L;::on With :he
Construction Man.iger. ma\' r,ecline io c(-rtiiy pa\ ~-::nt
15 .\201/01 -- 1980
~!.s.. DOCL'.\H'T ~~Ol:C\~ . G~'U\~L CO'-=:-:-:iO'.S Of lH~ CO',:lR~C~ rei, CO'''lr:'... =-
C'~-'~:f:L CTlO'\'.~~,'<ACE",~' 1 ED:iJO~ . JL",E ~~'c"J [[J'~ IO~ . .....L-\! . C) 1~6J . -Ht
"'.'~~'C'", 1'~~!1L1E Of ~';:'Cf-J,llf-Cl~. "1~7.: ',~\\ YORK ,\\'t: '\ \\., \\~<.f~:,( "10'--- D ( ='.-'.~{.
and may 1\ Ithhold the Certificate in whole or ," part to
the e\tent nc(e~~.1fY 10 rca,onabh pr0kct the 0.', nero 11.
In ;he Architect's opinion, the .-\rch1\('ct IS un,1b:e to n~.:.ke
rC~'7e,('ntatlons to the 0\\ ner a~ pro\lded in ~ubpa'a-
SI.,ph 9.4.2. If the .-\rchitect IS unable to make re:'esenta-
tions to the 0\\ ner a~ pro\'ided in Subparaf,rcph 9.4.2.
;,nd to certify pay ment in the amount oi the PrOject .-\p-
pllation, the Archilect \\r11 notify the Con,truCion \'an-
aser as prO\lded in Subparagraph 9.4.1. If the Contractor
and the Architect cannot agree on a reI ised amount. the
Architect II ill promptly i~sue a Project Certificate ior Pa\,-
ment for the amount for which the Architect :- able to
m.,ke ~tJch repre~entations to the 0\\ nero The-\rchitect
mJV al~o decline to certify payment or, becau~e of subse-
QIJently di,co\eled evidence or sub~equent ob<ervations.
the Architect may nullify the whole or any part of any
Project Certificate for Payment previoLl~ly is~ued to ,uch
e,-tent as may be neces~ary, in the Architect's o;J;nion, to
protect the Owner from loss because of:
.1 defective \\lork not remedied;
.2 third pMty claims filed or reasonable e\ icence in-
dicating prob,lble filing of such claims;
.3 f.1ilure of the Contractor to make payments prop-
erly to Subcontractor~, or for labor, materials or
C'quipment:
.4 rC,l~onable evidence that the Work cannot be com-
plc,ted for the unpaid balance of the Contract Sum:
.5 damage to the Owner or another contractor;
.6 rea~onable evidence that the \\lork will not be
completed within the Contract Time; or
.7 per,istent failure to carry out the \Vork in accord-
ance with the Contract Documents.
9.6.2 \'1'hen the ground, in Subparagraph 96.1 abo\e
~lfe removed, payment shall be made for anlC,unts with-
held bec.lu,e of them.
9.7 fAILURE Of PAY,\UNT
9.7.1 If the Comtruction ,""anager should fail to issue
recommendations within seven days of receipt of the
Contractor's ,~pplication for Pay ment. or if, ;hrough no
fault of the Contractor, the Architect does ~ot issue a
P,oJect Certificate for Pay ment \\ithin ,e\en davs after
tr,e Architect's receipt 01 the Project Applicat:on for Pay-
ment. or If the Owner docs not pay the Contractor within
<c\en d.l)'s after the date established in the C00tract Doc-
L~,ents Jny amount certified b\ the Architect 0' 2.' ardeo
b\ arbitration, then the Contractor may, upon 'e.,en Jddi.
tlonal days written notice to the Owner, tr,e Architect
2'1d the Construction ....1anager. <top the Wor~ until pay-
n-ent of the amount o\\ing has been received. The Con-
tract Sum shall be increased bv the amount of tr.e Con-
t:2ctor', reasonable co,ts of shut.do\\ n, dclc\ and start-
\.;p, which shall be effected bv appropriate Cr2,,;e Order
in accordance \\i\h Paragraph 12.3.
9.8 Sl!BSTA'-.:TIAL CO....lrLfTIO~
9.8.1 When the Contractor consider, th.,t thE Work, or a
dEsignated portion thereof \\hich is accept2ble to the
Owner, is substantially complete as defined in 5ubpara-
graph 8.13, the Contractor shall prepare for tre Construc-
tion Manager a list of items to be completed or cor-
rected. The failure to include any items on such list doe~
not allE'r the re,ponslbrllty Cf ::-e Contractor to complete
all \\'or,- In accord~ncc ,,:!, ::-e CC'i:'~Ct Docu'1wnts.
\\ hen Ire Arc:-,Itect. on tn\: :0.'0', 01 in,:::.",Cllon ard con-
<ultatlon \\ Ith the ConstfuC'c,r, \1.ln.1~cr dctermlnes that
the \\'or>.: or designated P: r!ll'n thcreot IS ~ub,lcntiallv
complete. the .-\rchllect II I:' :he!l prep.1fe a Certificate o'f
5ubstantlal Cor..pletion of j'ce \\ ork \\ h,c[, shall e,tablrsh
the Date 01 5ubstantlal CC'1~t:<el:on Ot the \\'or>.:. ~hall
:,!,11e the responslblLtles oi trc O\\ncr Jid the Cor.traclor
for ,ecuflty, maintenance, heat. utdilies dam.lge to the
\\'ork ar.d insurance. and shall 11\ the I.,""e within \\ hich
the Contractor shall comp:ete the Ite~; listed therein.
The Certificate oi 5ubstan:,al CompleL)n of the Work
~hall be ~ubmitted to the 0\\ ner and Ire Contractor ior
their written acceptance of :~e re,pomib:l:ties assigned to
them in ~uch Certificate.
9.8.2 L'pon Substantial Completion oi tr.e Work or de~ig-
nated portion thereof, and upon ,1ppliut;on by the Con-
tractor and certiiication by :he Architect. the O\\ner shall
l1l<lke paymenl. reflecting adjustment in fetainage. if anv,
for such Work or portion t~creoi .1< pro\ .ded in the Con-
tr,lct Documents.
9.8.3 When the Architect. on the ba-i, of impections,
determines that the Project or design,lted portion thereof
is substantially complete. t:-:e Architect \\111 then p:epare
a Certifcate of Substantia! Completion of the Project
\\hich _C,.111 e,tabllsn the Cate ot Sul)':.,:-t,al Cor.~p:et;on
oi the Project and lix the t;rne \\llh,n \\r,ch the Cc'ntrac-
tor shal: complete an~ unompkted ite:o~; on the Certif-
icate of Substantial CompiE-:lon oi the \\'ork.
9.8.4 Warranties required bv the Contract Documents
,hall commence on the Date of Substantial Comp:etion of
the Project or designated portion thereof unle<~ other-
\\I,e provided in the Cert':icate of 5ute':anlial Comple-
tion of the \\'ork or designated portion thereof.
9.9 fl~AL CO,"'~PlHIO~ "'D W,Al PA\.\\ENT
9.9.1 r 0110\\ i ng the ArchitECt" ~ i;suance of the CE rtitica te
of Sub,:anlial Completion oi the Work or de,igna:ed por-
tion tr.ereof, and the Cc;:lractor's cV:ipletion oi the
\\'ork, :l;e Contractor sha:: fon'ard to :';e Cor.,truction
.\\anager a "fillen !lotice :~"l ir.e Wc'>': :s ready ior final
InspecLon and acceptance .;fld -hall .:;!,o 10r\\ard to the
Clln~trt..ctlon ,"a[1ager a '[1.11 .-\ppliC2t:cn for Pel men!.
L'pon receipt. the Comtr~c!:on \\,ln2(~r \\ill ma~e the
necessa;\' e\aluations and 'om .1Td re~ommenda::ons to
t;~e-\rc'-:iteci \\ ho .., ill p. _~. ;.-,,:\ rT,J~e 'uch ir,-:::ect:on.
\\'l1en 'l;e Arch:tect Ilno' :" e \\'ork :~ceptJb:~ ICr.der
the COfltract Documents ~fld the Cortract fI.:r:\ per-
formed the Arch:tect \\i!: :'sue a PrOject Certll:cate for
P.iy rner-t \\hich \\ :11 apprc. e the t':na! ;:,aymenl cue the
Conlr.~(:or. This .~::pro\al .'.::: conQillJte a repre-e!ltation
that, te the best of the~,-cl',;lect's lnc'., ledge, ir;forma-
lion arc beLei, and on tre b,,<:s of o!>-:nation~ and in-
~pectiof)~, the \\'crk ha~ !:ccn completed in accordance
\\ ith the Terms ar;d Corc::t:on~ of Ire Contract Docu-
mcnt< "!ld that the entire b~b')(e fOLc~j to be c~e the
Contr"Clor, 2nd nc!ed in <~ 0 Certificate. i, due a'1d pay-
able. T!-.e Architect's apprc,,'al of <aid Project Cf'tiiicate
for Pa\ f';lent will constitu~e a further repre,enI2t:on that
the co,-,ditions prEcCedent '0 the Contractor's beng en-
tilled to final P2\ r.-,enl 2S ,et (orth In (~l:>paragr2f'h '99.2
ha\e been f u 11dled.
~I ~ OOCLJ.'.\ENT A2011CM . Cl" RAL CO'DI110'S Of ,.: co,,-' R~C1 'J- CO'SlRLC .0-':
CO~S1RUC110N MA!<oACEMEN1 l0l110N . jU'E 1"80 [2:110S . A:;~ . (!: 19&0 . ,HE
~'\lRICAS IS,TI1UH or ARCHIHC1S. 1;35 !<ol\\' YORK .~\,.' II . I\'~'-'''GTO''. D.C. ::.);)6
A201:CM -1980 16
9.9.2 ~crthcr the Im,,1 p;n ;11ent nor the rema;ning retain-
,1~e ,b,lll become o:;e unt;1 :he Contractor <.ubmit< to the
.\'Ich:tef t thrG~gh the Co;-tru<!"n .\\.1f1agrr, (1) 2n ai11'
0,:\ It that all p,:) roll,. b:l:, ior n,:tefl,ll<. ,111d eq~lpment,
and other Indebledne<.<. cr;nnecled with the \\'ork for
\\ h'ch the 0\\ :wr or the 0,,, ner - prOperl\ might in any
way be re'pun<.lble, ha\ c been paid or other,,\ i<e <.atis-
fied. (2) con,ent of sure1\. If am. to final payment, and
13, if requlrC'd b\' the 0,\ rt.'r. other data e<.t2bli<.h:rlg pa\'.
ment or <.,lti,f2ction oi ,1:: <uch obligations, such as re-
ceipts, release, and \\al\ffS of I:ens ari<.ing oul of the
Contr,lcl, to the e\lent and in such form .1<' may be de<.ig-
natcd by the 0\\ nero If 21":\ Subcontractor rdu<es to fur-
nl<.h a relra<.e or wai\u re::uired by the O\\ner, the Con-
tractor may furnish a bard <.,lti'iaclory to the 0\\ ner to
indemnify the Owner against any such lien. If any <.uch
lien remains unsati<.fied after all payments are made, the
Contractor shall refund 10 the 0\\ ner all monies that the
latter may be compel!ed to pay in discharging such lien,
including all costs and re2<.onable attorneys' fees.
9.9.3 If, after Sub<.tantlal Completion of the Work, final
completion thereof is malHialh delayed through no fault
oi the Contractor or b\' the i'<.u,:nce of Change Olders
af1'ecting final completi~n, and the Construction Manager
so confilms, the 0\\ fler <.hall, upon application by the
Contractor and certification by the Architect and I', ithout
terminating the Contract. m,:ke pa) menl of the balance
due for that porlion of the \\'o'k fully completed and
accepted. If the remz,inir.g bal,ince for \\'ork not full)'
completed or corrected IS less than the relainage stipu-
lated in the Contract Documents. and if bonds ha\e been
furnished as prm'ided in Paragraph 7.5, the \\ ritten con-
sent of the surety to the payment of the balance due for
that portion of the \\'ork fully completed and accepted
shall be submitted b)' the Contractor to the Comtcuction
.",lanZIi.;er prior to certl1icat;on of <uch payment Such pav-
ment ~hall be made under the Terms and Conditions go\'-
erninfi i,n"l pa\ ments. evept th,;t it shall not constitute a
\\aiver of claims.
9.9.4 The m~d:ing of final pa) ment <.hall. after the Date
of Substantial Cornp\etiufl of the Project. con<.titute a
\\'ai\E'r of all c'aims c\ t~,e 0\\ '1er e\cept lho<.e cri..ing
from'
.1 un-eitled liens:
.2 faulty Or defect,., e \\ ark appearing aiter Substan-
tial COI1'.p!elion of the Work;
.3 failure of the \\'ark to cCllply \\iln tl-.e .(,quire.
"nents c: thE Cont'oct Docurnents: or
.4 terms of any <peeal \\acranties required by the
Contrac Docu:~~(>r'<
9.9.5 Thr ,'C(f:i:':c:~ce C' 'r,al ~.:) menl 'hall. ai:er the
Dale 01 <,:bqcnt:al Cc,n~~_ '"tion 0, the Proiecl. cor.otitute
a \'.:,i\u of all claim<. b Ihe Contralto; Dcept those
prellou,h mace III \\ rltln,; ,:l1d identified bv t~-,e Contrac-
tor as un<ett!eo at the t r-,e oi t~,e iin,,1 App:,ca:ion for
p,,, ment
9.9.6 ,\I! pro'. -ions oi i-,S Agreement. !i1cluding with-
out limitation :'-:ose estac ';,hing obligation< and proce-
dures. ,h211 re,,-,ain In :ul! 'crce ;,r,d ef~'ect nC:'.lii'~qand-
Illg the rnakinf: or accep:c")ce 07 linal P2) ment prior to
the O,;le of Sct)5ti:nLal Cc"),p!etlon of the PrGjecl.
ARTiClE 10
------..--
PROHCTION OF P[RSONS A'\D PROPFRTY
10.1 SAfETY PR[CAUTIO'S A'D Pr-OGR....'IS
10.1.1 The Contractor shall be re'pon"b!e fnr Initialil
maintaining ;,nd ~uperyi<.ing all <.1:'('11 p'euutions and
programs in connection \\ilh the \\'ork.
10.2 SAfETY or PERSO:'\S A"D PROP[RH
10.2.1 The Contractor shall t"ke all rc,con,1ble prec.lu-
lions for the safety of, and shall prO\ ,oe all rp.1sonable
protection to pre\ent damage, injury or lo<.s to:
.1 all employees On the \\Iork ;,nd .JII other persons
who may be afieCled thereby;
.2 all the \\'ork and all materials and equipment to
be incorporated therein, whether in <.torage on or
off the site, under the CMe, custody or control of
the Conlractor or any of the Contraclor's Subcon-
tractors or Sub-subcontractors;
.3 other property at the site or ;;dj?cent thereto, in-
cluding trees, shrubs, lawns, \\ 2lks, pa\'ements,
roadways, structures and utililies not designated
for removal. relocalion or replacement in the
COurse of construction; and
.4 Ihe work of the Owner or other <(-p.Hate contrac-
tors.
10.2.2 The Contr,lctor shall gi\'e all notices and com pi)
\\ dh all applicable laws, ordinances, rules, rq;ulations
and lawful orders of any public authorrty bearing on the
safety of per<.ons or property or their protection from
d2mage, injury or loss.
10.2.3 The Contractor shall erect and main1.1in, as re-
quired by e\isting conditions and the progress of t/'-
\'1'ork, all reasonable ..afeguards for ..afet)' and prolectio
Including posting danger signs "nd other warnings against
hazards, promulgating safet)' regulations ,lnd notifying
0\\ ners and users oi adjacent utilities.
10.2.4 \\!hen the use or storage of e\plosives or other
hazardous materials or equipment is necessary for the
c\ecution of the Work, the Contractor <.h211 oercise the
utmost care and shall carry on ~uch 2C'\lties under the
-uper\'ision of properly qualdled pers(;:)nel.
10.2.S The Contractor shall promptly ren,ed)' all damage
or loss (other than damage or loss in-ured under Para.
graph 11.3) to any propertv reterrC'd :0 In Clau<.es 10.2.1.2
2nd 10.2.1 3 caused in \\hole or In part b\ the Contrac.
:C' ,in\ Subcontractor In) 5ub-,ubcc":'c.cor. anlone dl'
recti\' or indirectly cI11ployed b\ all\ c' :~"m. Or by any-
one ior whose acts any of them may be liable, and for
,,, n,ch the Contractor is respollC,ble under Clauses 10.2.1.2
~,'c 1021.3, e\Cepl damage or lo~s 2t:ribut.-,ble to the
;,elS or omls<.ions 01 the O\\ner. the .....Cr-.;IE'CI, the Con-
<l'uction .\~anager Or an) one o,recII\ or ,ndi:ectly cm.
(c'\ (cd by an)' of them, Or by an) one :0: \', !lose ,:cts an)
0: them m2)' be li"b!e. and not ;dtflb,Jl2ble to the fZiUlt
or negligence of the Contractor. The io'egoing obliga.
',('10' of the Contractor are in ,iodttion 'C' t'-:e Ce'ntr"ctor's
(Jc;ligations under Par2glaph -1 18.
10.2.6 The Contractor ,hall de,ign2le a re,ponslble
:"c-rnber of the Contractor's organi:a;;cn at the <.ite
'.Ihose duty <hall be the pre\ention oi accidents. This
person shall be the Contractor's superln:endent unless
17 A201/CM--1Q80
~I~ DOCUV,[..,T ~201 C\1 . C["[f;~L CO"DI'<J"S Of ~H[ CO<,;]^"C ,-:., CO"~~". Cl'e.
CO'~-;-Rl'C~iO' .'.'.-\\.1,CE\H~T tDI:IO," . jL''-E -1~BCl {OllIOS .'!'.:~.~ . II -19':,0 . THE
\\',:;,CA''''' i'~-:TllE Of :\j;;CHil!CTS -1:-~;5 "'-['>\,YORK A,V[ '\\ ".-\(,"- '\,(,TO""" DC :':)',~1h
other", i,e de~isna\cd by the Conlr,lctor in Vlllt,r~ \0 the
0\\ Iwr and the Con,tructlon '\anaser.
10.2.7 The Cuntratlor ,h.lll not load or permit ~n\" p.lIt
of the Worh; to be loaded so as to end.lnger its <2'et)'.
10.3 LWRCENCllS
10.3.1 In any emergency "Hecting the ~afety 01 ;:>er,om
or property the Contractor ~hall ,1ct, at the COf'~'actor's
discretion, to pre\"ent threatened damage, injuf\ or loss.
Any additional compemation or extension oi time
claimed by the Contractor on account of elTergenC)
worh; shall be determined as provided in Artlc:e 12 for
Changes in the Work.
ARTIClE 11
INSURANCE
11.1 CONTRACTOR'S LIABILITY INSURANCE
11.1.1 The Contractor shall purchase and maint"in insur-
ance for protection irom the claims set forth below which
may alise out of or result from the Contractor', opera-
tions under the Contract, whether such operatlo~; be"by
the Contractor or by any Subcontractor, or by an\one di-
rectly or indirectly employed by any of them, 01 by any-
one for whose acts any of them may be liable:
.1 claims under workers' or worh;men's co,~,pensa-
tion, disability beneiit ,md other similar f"'plo~ ee
benefit acts;
.2 cl,lil11s for damages because of bodily inJl;f\. occu-
pational sickness or disease, or death 01 tl-,e Con-
tractor's employees;
.3 cl.lims for damages because of bodily inju~', sick-
ness or disease, or death of any person ot!':er than
the Contractor's employees;
.4 claims for damages insured by u~ual per,onal in-
Jury liability coverage which are sustained ',1) by
any person as a result of an oiieme c'fctl\ or
1I1directly related to the employment 01 'uch per-
<.on by the Contractor, or (2) by any olhe' person;
.5 cl2ims for damages, other than to the Wek itself,
becau<.e of mjury to or de<.truction oi '3ngible
property, including lo<.s of u<.e re<.ulting tf-:-'efrom;
and
.6 claims for damage<. because 01 bodil\ .",ury or
death 01 2ny per~on or property dama;" 2'i~ing
out oi the 0\\ ner~hip, malnlena"ce or [.,:- ,)i an\
motor \chicle.
11.1.2 The inswanee required by Subparagra~" 11.1.1
,hall be \\ ,illen for not les<. than any limits c .:3bdity
'pecified in the Cc,nlract Docunwnls or requir(-c ~\ 12\\.
\\hid-;e\er is gre2ter.
11.1.3 The imurance required by Subparagr2::~ 11.1.1
,hall include contractual liability insur2nce api=" '2bJe to
the Contractor's obligation<. under Paragraph 4~S.
11.1A CcrtiiiCJte< of In<urance acceptable to ;'-:- 0,\ ner
,hall be <ubmrllt.'d to the COJ1(,truction \12nager :,:., tr2ns-
mittalto the 0\\ ner prior to commencement of :L.e \,\'ork.
These Certificates ,hall contain a provision that (C\ erases
afforded under the policies will not be c,mcele::' ',m:d at
leaq thirty days' prior written notice has been ;:\ en to
the Owner.
11.2 OWNER'S LIABilITY I~SL!RA'CE
11.2.1 The O\\ner ,hall be re'l:u>b;" . _" I't..:rchas:ng
and m.ll1lt.1ining 0\\ ner's !i.1brl,!\ ,~,ur.,~~e and, at the
0\\ ner's option, ma~ purchase ,1nc m.l -' 21n Ir.'urance
lor protection .1gainQ clalm'- \\~-"ch r,2\ ,1I"e Irom
operations under the Conlr,lct
11.3 PROPERTY I~SURANCE
11.3.1 Unless othem ise prO\ Ided ;he 0... ner shall pur-
chase and maintain properly In<ura'lCe u;::on tr.e entire
Work at the site to the lull imul,lb:e \al.:e thereof. This
insurance shall include the intere'(; oi ::-e O\\ner, the
Construction .\\Jnager, the Contractor. Subcontractors
,1nd Sub-subcontr.1ctors in the \\'orh;, and shall insure
against the perils of fire and extended co\erage and shall
include "all risk" insurance ior ph\<.ical ~oss or damage
including, without duplication oi co\erage, theft, van-
dalism and malicious mi<.chiei. Ii the O,'.ner does not
intend to purchase <.uch insurance ior the full insurable
value of the entire \-\lork, the 0\\ ner c:-.JII inform the
Contractor in writing prior to cornmencement of the
\Vork. The Contractor may then l'i"iect i:-:'urance "hich
wrll protect the interests of the Contractor. the Contrac-
lor's Subcontractors and the Sub.<ubcor:ractors in the
Work, and by appropriate Change Older t~,e cost thereof
shall be charged to the O\\ner. II tl'e Contractor is dam-
,1ged by failure of the Owner to purck'e or maintain
cuch in~urance and to <'0 notriy the Cont'.ector, then the
Owner shall bear all reasonable co-ts prC;:lE'r1y attributa-
ble thereto. 11 not covered under the all risk insurance
or otherwise provided in the Contract Document<., the
Contractor <.hall eHect and maint,1ln simi:u property in-
<urance on portions of the \\'ork stored 0;'; the site or in
transit when such portions of the \\'ork are to be in-
cluded in an ,A,pplicalion (or P.l\ n,ent ,-:lder 5ubp,lfa-
graph 9.3.2.
11.3.2 The 0\\ ner <.hall purch,lce and ;n"intain ~uch
boiler and machiner\' insurance .1' rn,l\ ~e required bv
the Contr.1ct Documents or by 1,1\\ This :'l<.urance <.hall
include the intereqs of the Owner. t"',e CC:''1ruction \\an-
ager. the Contractor. Subcontracto" .""d 5:..o-subcontrac-
.tors in the \\'ork.
11.3.3 ,-\nv 10<.:' in<.ured under Sub~':l,.lg'c;:;h 113.1 i< 10
be adjusted with the 0\\ ner and r-;,:,de ;::,;\able to the
O\\ner as trustee (or the insureds. .1; the' ;ntere,ts may
.lrpear. <ubject to t~e ,equirenl('~ts 01 2"\ a;:,r':r2bI~
morlgagee clau,e and oi SU!);1.1f,1~'''J'' ',' )8. TL.,e Con-
tractor shall Pol) each Subconlracto: a F..< ,hare of any
In<.urance monies recei\ed b\ the (.Jnir.1CJr. and by ap-
propriate agreement, \\rillen \\ here lega', reqt..:ired for
val:dl!v. ,hall require each 5ubco~t'acto' :0 1ll3~e pay-
ments to their Sub-'ubcon!rMIOrs '" 'Iml'c' manner.
11.3.4 The 0" [",cr sh,,11 :'de " cop'. oi c policies \'. it),
the Contractor beiore an expo"ure to los, -3V occur.
11.3.5 Ii the Contractor request, :I \\, ::;g that in<ur-
ance ior rlsh other than tho<.e cie,cTlL<~ 'in Subp~ra-
graph<. 11,3.1 and 11,32, or othe' spec 2! hanrds, be
Included rn the propert\ in'urance poi::--., the 0\\ ner
,hall, Ii pOSSible, include <uch In';,;',;nce and the cost
thereof shall be d'3~ged 10 the Cont'acto' '::\ appropriate
Change Older.
AlA DOCU.>'\E~T A)01 C>'\ . Cl"-'l R.~l CO"-'0:110"-" OF 1 HE ~:,' ~ ,(1 fOR CO"-'~HL C; 10'..;
CO',S~~L'C110' .\tA"-'ACE\\E'..;T E01110' . JUSE ~9S0 EDi- =0; . AlA! . (D 1980 . THE
,."\ERiC~'..; '''-'<.T11L1E OF ~RCHIT[CTS, 173, 'E\\' iORK AVE "-' \\ "',,',<.hl"-'C10'.0.C:'0006
A201/CQ -1980 18
11.3.6 l~(' O\',~,c'r "nd the CO:llr2ctor \\,.i\c 2:1 right,
,,~.iln't \1 e,:eh c:I'cr Jnd the Subcontr.,(\or<, C:l:b.<ub.
e~)n;'Jctc" "Sl'i'.:' .:nd <:mplo\('c, oi c"ch c"her ,:nd ,~.
thc ..\rch,;cCl. Ihc Cun'lruction ,\\.',"1"go ..nd ,,,~::.,.te con.
tr,:ctor~. II "m, .,~,d thrir 'llbcontr.ictor<. <ub,'~::-contrac'
tor~, ,'genl' .,r;d c'!";lplo)'ce,, (or cL:magc< cau~cd b\ iire or
othcr per;!' 10 l'-c cxtent CO\ crrd by In<urancc "I,t,;ined
f'lur'l:;Hll t(. :hl' rar,lgr"ph 11 3 or am other p'c ;:ert)' rn-
'ur.'nce .1rpIIC"b:e 10 the \\'ork. exccpt <uc\-, "sht, J~
:he\ may r.2\ E' to the procccd< oi ~uch in"U'2"1CC' held
b) the O\\f':er .1, tru,tee. The fo:egoins \...,i\er ,'I'i'orded
the .-\rchilfCl. Ihe Conotruction .\\.;nager, their ';E(:nt~ and
emplO\ce, ,hall r,ot extend 10 the Ilab:lil)' 1f':,jJo<cd b\
Subpn.,gr..;:,h -1 ~8.3. The 0\\ ner or the Con:'.;ctor, ",
approprrate <h"l1 require of the ,-\rchitect, the Comtruc-
tion ,\\Jnaser, ,eparate conlractor" Subcontractor, and
Sub.<ubcontrJctors by .,ppropriale agreement<, \\fillen
\\ here Iegallv required (or v,lliditv, ,imilar wai\ er, each
in fJ\or oi all other pJrties enumerated in this Sub-
par.,sraph 11.3.6.
11.3.7 If rc-quired in writing by any partv in in:E're~t, the
Owner as ,'u>lee shall, upon the occurrence of an in-
,ured los,. gl\E' band far Ihe proper pedorm2"ce o( the
0\\ ner's dulie,. The O\\ner ,hall depo~lt in J ,eparate
Jccount am Illoney so recei\ed. and ,hall di>lrloute it in
.,ccardancE \\ith <uch agrcement a~ the partie, .n interest
III 2 \ reac.h or in ,1ccoldance with .,n Jward bv o,bitr,ltion
In \\ hich u,e thc plocedure shall be a, provided in P?I,'-
gr.lph /.9. Ii aiter ~uch lo<~ no other 'pecial a.<;reement
i~ made, replacer.,ent o( damaged Work shall be co\ered
by an appropriatE Change Order.
11.3.8 Thc O\\ner, as tru>lee, ~hall ha\e pawer to Jdju~t
and ~etlle any loss with the imurer~ unless one of the
pJrties in ::1tere" ~hall object, in wriling within fi\ e da\s
.,1ler the occurrence of lo~s. to the 0\\ ner's exerci~e of
thiS pOl\er. and rf <uch objection be made. arbitrators
,h.ll1 be crc."en .1< prOllded in Paragraph ~.9. T!-,e Owner
a, lru<!c'C' <nail. in that casc, make settlement With the
'n,urcrs in "cco:d"nce wilh thc dircctlons of ,uc.h arbi-
trator,. Ii c"lribu:ion of the insc;l"nce pro(C'cds by Jrbi-
tration is :cquire:d. the arbitrator~ \\ ill direct <uch dis-
tribution
11.3.9 If l"e O\\ncr i;nd< II nece"ar\ to OCCC;;J\ or use
a portion c" po:;;om oi the \\'ork prior to ~~b,t,ln:ial
C0:11plE'tlor, the:eof. <uch occup"nC\ ,hall :-,01 c': mm('nce
pilar ta a 1:-,le rll;tually ,;grc-cd 10 b) the 0\\ f"E'r and the
Canlraclc1: z.nd Ie which the In<ur"nce compam or cam-
p..":'" p'C, d:r,t ::1(' pr0perl\ If'.cr,;ncc h,1\ l' c,]n-.ente.s
b\ ('ndor,e~,C"nt 10 the pel:C\ (11 ;'dlcle- Th:~ :1' ',':nce
d~2!1 not be canceled ar LlO<ed on account of <'~ch partial
~ccupanC\ Con'ent of th~ Contractor ~:1d of :'-,e in,ur-
ance com[".'.-,\ CI cr)!l~p,',n;e< 10 <C;dl cC(up""C\' or u,e
,h2:: not f-f u;-,:c,;<on,-,bh- \, ithh.::d
11.-t lOSS Of lSE I ~SURA'iCE
11A.1 The O\'."er, at the O\\n('[s op:ion. ma\ purcha,e
C\r,d rn"int2:n i:l5IL;;2JlCC for proiection aSJ.inst iess of u~e
01 the O\'. ner', r:operty due to fire or other hazard,.
hc\..c\er ccu<eo. The O\\ner wai\es all right< of action
.,c.;;n<t the Cc,ntr,.clor for 105> of use of the Owner's
p~'()p~rtv. rrc!ucing con<cqllentl21 lo"e~ due 10 fire or
Olhcr halc:d, I-.o....e\er cau~('d, to t:.e Ex:ent co\erEd b\
imurance c;nder thi~ Paragrdph 11-\.
ARTICLE 12
~-- ----_.~
CIiA"GlS IN 1 HE WORK
12.1 CH.\'-;CE O[;DI RS
12.1.1 .-\ Ch.-,nge O:der r< a I\[,':,-n order 10 the 1.
Ir,;ctor 'ipled to <~"l'\\ the recun:~..,:nd.,lror1 ot the ~,on.
<!ructlon \\.in,':Ser. the "ppro\'al 0: thC' :\rchtcct and the
.,ulhorr/"tlon (If the O\..ner. I"UU:: aller C'XE'Cullon of the
Contracl, aulhorizing a ch,'<I,[;e 111 "',e \\ork or ,in .'ldJu>t-
ment In the Cont:,;ct Sum or :i~e ContldC! Tllllc. The
ConlrJct Sum and the Contract T:~le m.;\ be changed
only by Chwge Order. A Chante Order <Igncd by the
Contrac tor Indlcate< the Conlr"C:Or'< agreement thele-
l'lth, Including the .,dJu,:ment in the ('inlrClCI Sum or
the Contract Time.
12.1.2 The 0\\ nero \\ithoul Ima!ldJting the Contract,
may order changes in 1he Work \\!:hin the general scope
of the Contract con,isting of addi:;ons, deletions or other
revision" the Contract Sum Jnd the Conlract Time being
adju"ed accoldingh'. All ,uch chanbe~ in the \\'ork ~hall
be .,uthorizC'd by Change Order, and ,h,,1I be performed
under the applicable conditions of the Contr"cl Docu-
ments.
12.1.3 The co,t or credit 10 the O\..ncr re'ulting (rom a
change in the Work ~h,,11 be determined in one or more
of the (ollo\\ing \\ .'\ S;
.1 by mutual .1ccept.iI1ce oi 2 lump ,um properly
itemr/ed ane supported by 'u:'l"cient 'ub<lantialing
data 10 permit e\alll.ltion;
.2 by unit price, ~lated in the COnlr.lC1 Documents or
,ub,equenth agreed upon;
.3 by co,t to be dC'termined in a manner .1grced upon
by the pdftie~ .,nd J mutua!ly accept.lble (ixer1 or
percentage fee; or
A by the methud providE'd in SubpJragraph 12.1.4.
12.1.4 Ii none oi the method, ,et iorth in Clau~es
12.1.3.1,12.1.3.2 or 12.1.3.3 i, af,'c.ed upon, Ihe Contrac-
lor. provided a \\fitlen order <igr,ed bv the 0\.. ner i, reo
cel\ ed, shall promplly proceed I', :th the Work in\oh-ed.
The co" of ,uch \\'ork ~hal! then be determincd by the
.-\rchitect. aiter cOr"".'ultJtion \\ ith :he Con<:luction Man.
agEr, on the ba,is oi the re."of'cble c'\j)e:nditure, and
,a\ ing< 01 lho,e pe:'iolmlnc; the Work ,lttrlbut2ble to the
ch.inge, Inc!L:dlng. .n the C.l<e of ..on Incre.;<e in the Con-
Iract Sum. a reas"nable allo,...,-ce (or 01 erhead and
pro/It. In <uch C.1<e and ,1!<0 unce' Clolu<e- 12.1.3.3 "nd
1~ 1 3~ ;,br,\c tll(' COi1tr,;clor <I'J' 'i:CP ".0 p:e'cnt, in
<uci~ ioun a, the O\..ner. ihc-\rc" :ec I or :l~e Con<lruc-
lion .\tln,lser mol\ pre,cribe, In i:('f""i2E'd ..ccounting to-
ge(ne:r "Ith 2ppro;;"ale <c;pportlrg datJ (or rnclu<ion in
" Ce,ange O.der L':11e,< othcmi'c ~rO\ldc'd in the Con-
traCI Docun',enl<, co,t ,hall be !;-- :cd 10 lhe {ollm\ ing'
eO<l of m.lteriJI" ,,,cludin:; <z,le, '2\ Jnd co't of deli\ cr~';
co" oi labor, inc'~;d,ns <oclal 'E'curity, old ;,ge and
unemplOlnwnt in<v.,:1cC' and (rir;e benc!',:< rt-quired bv
,'greement or cu>to:n; Ilorkers' 01 1\ orkmc:1'S compen,a-
tion in<ur;,nce, bc-,o premlum~. 'cnlal I.-,:ue of (-quip-
ment and m3ch,nc~; 2nd the h~= :,,)n31 c('q~ (Ii oupcr-
I'i<ion and i'eld o,"ce per<cmnel:'ifectl\' 2:!rrhut.',ble to
the chziCIge. Pend,-,; i!n~1 de\err' -,alion oi co'! 10 the
O\'.ner, pJ\me:nt~ ("1 ,1CfO~Jilt 'ha'~ be m.-,ce on the Ar-
chitect's appro\al oi a Project Cet:iicate for p"ymcnt.
19 A201C"'~ - 1980
~l-\ DOCl"'L"l .!,]01.C....\. G['[~>~,l CO"'l~' '10'-5 Of "THE CC',->:';Ci 10", CO'.sIRl .....
CC~,~iRLCTiO\: \'.-\,\',;C(',H ......1 fD!iiO'\: . JL','E ~9o] fDlTIC", . ,~.)A'~ t ':.: .;900 . IHE
~',',~t!CA" 1'~11-~ 1E OF-\RCHilfCl~ j J) ,~\\' YORJ..: .\VE, \. ",'. \\..'.,SH"(,70'- DC ::c.:v"h',
\1': C':l"r:; !'r.'"'
'::: ~ -,'!'~
'.""r' .
The amount of c[c-d,t to be allo\\ed by the C(<'.tractor to
the 0\\ ner for ;,0) deletion or change \\ hich 'r<ults in a
net decrease in the Contract Sum will be the amount of
the actual net cost as confirnwd by the Arcr,:ect after
consultation \\ rlh the Comtructlon Manager. \\ hrn both
addilions and cr(dlts cO\ering related \\'ork or substitu-
tions are imohed in anyone change, the allo\\ance for
O\erhead and profit shall be figured on the basb of the
net increase, if any, with respect to that change.
12.1.5 If unit prices are stated in the ConUact Docu-
ments or subsequently agreed upon, and if the quantities
originally contemplated are so changed in a proposed
Change Order that application of the agreed unit prices
to the quantities of Work proposed will cause substantial
inequity to the Owner or the Contractor, the applicable
unit prices shall be equitably adjusted.
12.2 CONCEAUD CONDITIONS
12.2.1 Should concealed conditions encountered in the
performance of the Work below the surface of :!-ie ground
or should concealed or unkno\\ n conditions in en existing
structure be at variance \\ith the conditions indicated by
the Contract Documents, or should unknO\\ n physical
conditions below the surface of the ground or should
conceakd or unknown conditions in an exis::ng struc-
ture of an unusual nature, differing materially :'~om those
ordinarilv encountered and generally rrcogn:zed as in-
herent in work of the character provided for In this Con-
tract, be encountered, the Contract Sum shall be equita-
bly adjusted by Change Order upon claim by e.ther party
made within twenty days after the first obsef\ence of the
conditions.
12.3 ClAIMS fOR ADDITIONAL COST
12.3.1 If the Contractor wishes to make a claim for an
increase in the Contract Sum, the Contractor shall give
the Architect and the Construction Manager \'. ~it:en no-
tice thereof Within twenty days after the occurrence of
the event giving rise to such claim. This notice shall be
gi\en b) the Contractor before proceeding to o.ecute the
\\'ork, except in an emergency endangering II:e or prop-
erty in \\ hich ca,e the Contractor ,hall plOceed in ac-
cordance with Paragraph 10.3. No such clair.1 shall be
\alid unless so made. Ii the O\\ner and the Contractor
cannot agree on the amount of the adjustment in the
Contract Sum, it shall be determined by the .-\rchitect
after con<ullation \\ ith the Construction .'\\a- ager. Anv
c!-.,;nse in the Cc,n~ract Sum re>ultins i',om '_c~ c!aim
,hall be authorized by Change Order.
12.3.2 If the Contractor claims that ,lddiliona' cost IS in-
\'olved because of but not limited 10, 11' am.'. ~Ii:en in-
terpretaiion pUr<u.int to Subpar"s'aph 23.11, :: an)' or-
der by the O\\;,er to stop the iVork pursue::: to Para-
graph 3.3 \\hele the Contractor \\as not at fa_:: or any
such order by the Cons:~uction \\'mager as t~e 0\\ ner's
abent, 13) an)' \\ ri:ten order for a minor cha:'~e in the
\\'ork i"ued pUI<u,ont to Paragr"ph 12.--1, or (~ iailure oi
p2\ment b\ the O\\ner pur<uant to Paragrap'1 9.7. the
Contractor shall m"ke <uch claim as provlded in Sub-
paragraph 12.3.1.
12.4~II~OR CHA'GES I~ THE \\ORK
12.4.1 The Architect will ha\ e authoril\ to (:':er minor
changes in the \\olk not im 01\ Ing an adJuqr;-,:nt in the
Contract Sum or extension of t~e Contract Time M1d no:
1I1lonsistent \\ ilh the ,nt(nl of :he Contract Documents
Such changes shall be eHected by written order issued
through the Construction i\\anager, and shan be binding
on the O\\ner and the Contraltor. The Contractor shall
carry out ,uch \\ ritten orders promptly.
ARTICLE 13
UNCOVERING AND CORRECTION OF WORK
13.1 UNCO\'ERI~G Of WORK
13.1.1 If any portion of the \\'ork should be covered
contrary to the reque~t of the Architect or the Construc-
tion Manager, or to requirements ,pecjfically expressed in
the Contract Document" it must, it required in writing by
either, be uncovered for their observation and shall be
replaced at the Contractor's expense.
13.1.2 If any other portion of the Work loa, been cov-
ered which the ,-\rchitect or the Construction Manager
has not specifica">' reque,ted to ob,erve prior to its being
covered, either may request to see such \\'ork and it shall
be uncovered by the Contractor. If such \\'ork be found
in accordance wilh the Contract Documents. the cost of
uncovering and replacement shall, by appropriate Change
Older, be charged to the Owner. If such \\'ork be found
not in accordance \\jth the Contract Documents, the
Contractor shall pa)' <uch cost, unless it be found that
this condition was caused by the Owner or a separate
contractor as pro\ided in Article 6, in which event the
0\\ ner ,hall be responsible for the payment of such co,ts.
13.2 CORRECTION OF WORK
13.2.1 The Contractor shall p'omptly COrrect all Work
rejected by the .-\rchitecl or thE' Construction .\\anager as
defecti\'e or as failing to conform to Ihe Contract Docu-
[11E'nts whdher obser\ed before or after Substantial Com-
pletion 01 the Project and whether or not fabricated, in-
<tailed or completed. The Contractor shall bear all costs
of corlecting such rejected Work, including compensa-
tion for the Architect's and the Construction Manager's
additional <ef\ices made necessary thereD\'.
13.2.2 Ii, \\ ithin one \ear after the Dale oi Sub<tantial
Comp!etlon oi the Project or de<ignaled portion thereof.
or \\!th,n one year alter ,1(((-ptance D\' the O\\ner of
de<ignJted equipment. or \\Ithln such (onser period of
time a~ mav be pre,cribed b\' 12\\ or b\' the tums of an\'
"pplicable <1)('ci:;1 \\a'l2"1\ requi'ed b\ the (("tract Don;.
n~(-nts, am oi the \\cd. IS lOU1,d to De dCleCI\e or not In
accordance \\ith the Contract Docunwnt,. the Contractor
,hall cor rut it pror1~ptl\' after '(<elp! of a \\ <tten notice
Ire'r11 the 0\\ r1er to do so un:e~< Ihe 0\\ n':' has previ.
OL;'!\ gl\ en the Contractor a \\ flllen ,;((ep'c,-ce of <uch
cor.alt:un Thi< cb!iSc:,on sh311 'L1r\ i\E- both i ":al pz"ment
for the \\'ork or de<iS";"ed portion t~,ereoi a.,d teimin3-
tlcin of the Con~lac1. The 0\\ ner <hall gi\e '-uch notice
p'CJmptl\ eiter d,oco\ ef\ of the corailio';,.
13.2.3 The Con:lac:c~ '-hall 'E-rno\ e {rom the cite 311
portion< 0;' the \\'olk \'..~,'ch are detect;\e or f"c'nconform-
ing "nd \: f';ch h,;\ e nC)t been corrected under Subpara-
graphs --1:>1. 13.2.1 ar-d 1322 unle'-; remo'. al is waived
by the O\\ner.
13.2.4 Ii the Contractor fail, to correct defec:i\e or non-
coniorming \\'ork a; prO\ ided in <:~bpar2~'aphs 45.1,
~I~ DOCl'IE..,'T A~O' C\I' Cl'[..;l CO'DI110'S Of T1-, :_' ,;<..T fO': CO'S;'lCTIO'
CO..,S1"cCTIOS ,'\"''';C[\\[~T EDITIO~ . JUSE 1930 [[ - 0-..: . ....fA'! . (01980 . THE
.~"[,IC~' 1"STlTl'l[ OF 'RCHITECTS. '-3; ,[\\' 'OR, .\\[ '\\ \\'SH!'-CTO-":. DC 200(\(,
A201/CM-1980 20
13:' 1 ;,nd 13.2.2, the Owner -"3) ccorrect It In MCC ,-.<lCe
\\ I.~ P3f.lgr.lph 3.4.
13.2.5 Ii the Contractor dc: not Plocc.ed \\Ith !~c' cor-
r('(t O:-J of such defectl\c or -j:-JCC'iliorn1lng \\'ark. :hln
a ru,onable time tl\ed by \'. ',:l('n notice from Ih.: -'-,'chi-
tect "ued through the Con,',',Jction .l,,1an2ger. the C.\ ner
ma\ remO\'e it and may stC'" the materials or eqc ::"T.cnt
al :";: expense of the Contr.;c:or. If t~e Contract':. coes
not ;'3)' the cost of such r(':--O\'al ;,nd Qorage 1\ ,: . ten
da\s thercafter, the O\\n(' , ma)', upon ten ,1CC: anal
da\s' \\fitten notice, ~,ell suc~ \\'ork at auction 0' .:: pri-
vate sale and shall accounl :~'r the nel proceeds t-.: :eoi,
afle deducting all the cost, ::~at should have beer. ::orne
by \':c Contractor, includinf compC'/1'.3tlon for thE ~,-chi-
teet, and the Con,truction '.'.anager'< additional Sc'~. ices
made necessary thereby. If s:Jch proceeds of sale CJ not
co\e~ all costs which the Contractor should have ::orne,
the diiference shall be charbed to the Contractor a-,d an
app~opriate Change Order s~all be issued. 11 the pa\ "ents
then or thereafter due the Contractor Me not sufficent to
Co\er such amount. the Contr.lctor shall pay the c::iier-
ence to the Owner.
13.2.6 The Contractor sha:! bear the cost of ;-"king
goc,d all work of the Own(-' or <eparate contractC'" de-
stro\ed or damaged by such correction or remova'
13.2.7 Nothing contained ::1 this Par,lgraph 13l S. "II be
cor,;'ued to e~tab!i~h a perJd of limitation with 'c-pC'ct
to 2~,\ other oblig,ltion \\h'L" the Contr,1ctor mis~' ha\e
unetr the Contract DOCUI"i:.ts, il1clud:ng Parasra~" ~.5
hereof. The establi,hment of the time periods nCCed in
Subp.1fagraph 1322, or ~u(h 10l1ger period of t--:',e a~
ma\ be prescribed by bw or by the terms of any \\2'r,lnt)'
req~ired by the Contract Documents, rel,ltes onl\ :0 the
5peclfic obligation of the COr'trJctor to correct the Work.
and has no relation<hip te the time \\ ith;n \\h,:" the
CO:llractor's obligation to c(""ply wilh the Contrile !Joc.
umi:"lts mai' be sought 10 ':,:, enforced nor to t~c- time
\\'i!~"n I",hich procceding5 ,- ay be commenced te c'l.lb-
li~h t!le Contractor's li.lbili:\ \\ Ith re~pect to the C~ -:rac-
to,'; obligations other then 'peclficall\' to COrre:: the
\\'o'~.
13.3 ACCEPTA~([ OF DlfECTI\[ OR
~ONCO~fOR\II~G \', OR"
13.3.1 11 the O>\ner prefe" to accept l~ei('c tl\ e -'In.
cor,:orming \Vork, the 0\'.,,,' milV do so In<iei:d 0: ',:-::ulr-
in~ Its remO\ al and COrrel' In. in \\ hich ca~e a C - cnge
OrCc" will be i"uec to reik -, ,- :eduction in '>--p C - - "act
S\j;-:' \'. here .ipprC'i:':,le .;:'.~ eq'-' ::,b!e '-"c:, :ee: _ ,~i:rl
sha" be ehected I' I~et!ler C' "~ot :,nal P2\ me:-,! re' ~'.fen
mace.
ARTICLE 14
---------------
TERMI!'\A TION OF THE CONTRACT
14.1
14.1.1
TlRMI'.:ATIO' BY TH: CO'TRACTOR
If the \,\'ork IS 5toPi'"d ior a pe:'od oi tr, - sa\'
.In order of in\' co.'[ cr oll~(-' public ,-.' -Jri!\'
unc'.; .
ha\ Ins ;"IO<dlct on, or as a r('~ult of an ,1C[ of gO\(,lrr,~cnt
'uch as a declaration of ,I national el11e:rGl'ncy n-:~,;ng
I11.11el:,,:, Una\,l':.lb'e. though no act or i.wlt of .he Con.
Ir.lctor c[ a Subc unt~.1( tor 01 their .lbents or CfJ1pIOjl:C'< or
.my ethel pei>CJn' performing any of the \Vork u[',cu
contrJct ..,:th the COl1tr,lctor, or If the \'\'ork ,houid L~
stopped ior a periCH:! 01 Ilmty days by the Contr.1ctor be.
cau,e or the ConSI'uctlon 1\1"nager's failure to recom.
mC'nd or the :\:lh,lect~ !.Jilure to is~ue a Project Cutili-
c.lte lor PJ) mc.nl a~ P'O\ Ided In P,Haglaph 9.7 or IWC2use
the 0" ner ha, not m,lde payment thereon as p,o\'ided in
Paragraph 9./. then the COfltr,lctor may, upon selen 2ddi-
Ilonill d,,,,' \\lIlten notice to the Owner, the r\rchilect
,md the Comtluctlon \\anager, termin,lte the Contrci( t and
recO\C'r from t!le O\lner payment for all \\'ork executed
and for any prO\en Ims sustained upon any rnatuials,
equipment, tools, comtruction equipment and machinC'ry,
includrng rea50n.lble profit and damages.
14.2 1ERMI~ATlO" BY THE O\\'~[R
14.2.1 Ii the Contractor is adjudged a bankrupt, or
makC's d general ,,<<Ignment for the benefit of creditors
or ii a recei\er IS appaifltc"d on account of the Contrac~
tor's in<ol.. enc\', or Ii the Contractor persistently or re-
pc,ltedl) refuse, or iads. e\cept in cases for which oten-
sion oi time rs prO\ ided. to supply enough properly
<killed \\ orkers or proper materials, or fails to nlJke
prumpt p;,)ment to Subcontractors or for matcria:, or
IJbor, or perSlc:enth disregards la\\'s, ordinances, rules,
regulations or order; oi any public Juthority ha\ ing juris-
tlon, or othef'\\ i5e i; guilt\' of a substilntial \'iolation of a
pro\ i~ion of the Cc,ntract Documents, and fails \\ ithin
,e\'en dc\ s after receipt oi written notice to commence
.lnd continue correction oi such default, neglect or \iola-
Ilol1\\llh diligence ,lnd promptness. the Owner, upc
c('rtllll.ltion bl thc'\rchrlect after comultation \\ith tl
Con'\ruClon \\::n.lser that <uificient c.luse e),i~ts to justify
'uch Jction, ma\', ",'!er 'e\ en days follc\\ ing rece'pt by
the Contractor oi In adddlanJI \\ritten noticeo 2nd 1\:110'.
out ple;udlce to am other remedl' the 0\\ ner m,;\ h.l\e,
terminate the ernpiO\ meflt of the Contractor and take
pos<e<<ion oi the <ite and oi all materials, equipI"C'nt,
tool<. con<truction C'quipnlC'nt i,nd machiner\' :h,c(on
(,1\ ncd b\ the Con'".1ctor and 111.1) Ilni<h the \\'or~. hi
\\ h;,te'.er method" :~e 0,.. ner may deC'm e\prOltnt In
'lIl h c,lse the Cont':,ctor <hall nol be entitiC'd to r('Ct':1 C'
:,1)\ i,,:t'-,er pa. "en! L:::lil the Work is fini;hed.
14.:!.2 Ii the ,,:-Jr:,'d b"I:,nce 01 ihe Contr.let (,l;n ex-
(eec> .~( c>:- l~;: - ,I,:::::: 'I,e \\o:k, Irc!~)dl"S C.'::';',:n-
~.J!i0n ~'c'~ :f-,c -\'l~::(-ct ~ ~:-id the Const;lJction ~,L:;-,,,_~:::c-~'~
:,Od,t.O::,,1 <en, :cc" :--"de nccc'<ary lheleb\.. q;cn (:..-ce<s
,h.ll! be paid \( ::,e Contr::ctor. Ii <uch cost< e\c('(-o :!~e
,.np:,r. b::",ncc- the CU:l1',Htor <h,,1I P,l\ the I~j:~'c', ",ce
10 :!'.c 0... ;ler The en-jOl;nt to be p,1id to the Conl;:.ctor
"r ic' ':',,~ O",""i:f ,-" :~e C3"C m,l\ be, <!1::11 be cC'\':lfd b\'
the \,(" :ecl. '..pon application. in the manner pia ;c!C'd
in p;,':,s'aph o~, ,-nd th', o\)IIS,1lion for p,lImen: ,hall
"u r\ 1\ (, .h,e tern' "12t ,"l~, oi ! he C ont r "C I.
.\.1-\ :~I(l;."'H'T A]01C."'~ . c~,::t::._~ C~',~;- =:',~ c; il~[ CO'\lR~Cl fOt: CO'5-F'.~ ,=-
C:- -:,,-C110'\ '~A',AGE\'.::'~ ~D:-IC', ;'"-,~ .is:' [D1110:'\ . AlA!. . Cf' ',':<1' "7.
'. ,--\'- i':-ll~l ,I or ,-\~.c'--~(~~ -~ '-=-,'. \Oi=:< \\[. '- \\. \',;SHi'C10'- ::::' C ::<\,6
21 A201/(''',1-1980
,-- . .~',--- ,--"'-'.,' ',.. ',' ........- .-~' ,~-.,.',,,
_ .. ..~,'.~ _. <0("_ ~_~_"'-~__ ........_._...._~__ ~._w....., _.~:...-_:..;::..,...'..:.::~:-: ._.-.....:.:..;..-;..~:..:..~.~~:_ ,,-:...~_~o~__~-_-=.___.._..
'.
... ~
:~~~:~\y,
SECTION 00805
SUPPLEMENTARY GENERAL CONDITIONS
Information contained in this supplementary Conditions amends,
supplements or clarifies the "General Conditions of the Contract
for Construction, Construction Management Edition, AlA Document
A201/CM dated June 1980 Edition.
A
In cases of conflict between the General Conditions and these
supplementary Conditions, wording of this section shall govern.
ARTICLE 1
1. subparagraph 1.1.3 - third line-after the word
"construction," delete the remaining words and insert the
following:
"and all supplies, tools, construction equipment and
machinery, water, heat, utilities, transportation, and other
facilities, services, and incidentals necessary for the
proper execution and completion of such construction; except
as expressly noted in the Scope of Work or the General
Requirements of the Contract."
2. subparagraph 1.2.1 - delete in its entirety.
3. subparagraph 1.2.3 - after the last word "meanings" in the
paragraph add the following sentence:
"In case of discrepancy or disagreement in the contract
documents, specifications, and/or drawings, the ORDER OF
PRECEDENCE shall be:
Contract Agreement
The addenda as issued
The supplementary General Conditions
General Conditions
The General Requirements
The Technical Specifications
The Drawings (Large scale detail drawings take
precedence over smaller scale general drawings).
Note: Do not rely on scaled dimensions on drawings,
and any discrepancies found shall be brought to the
attention of the A/E through the CM.
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 1
4. Add new subparagraph 1.2.5 as follows:
"Where on any of the drawings a portion of the Work is drawn
out and the remainder is indicated in outline, the parts
drawn out shall also apply to all other like portions of the
Work. II
5. Add new subparagraph 1.3.2 as follows:
"Unless otherwise provided in the Contract Documents, the
Trade Contractor will be furnished, free of charge, all
copies of Drawings and Specifications reasonably necessary
for the execution of the Work." ;
ARTICLE 2
1. Subparagraph 2,2.1 - after the word "representative", add:
"The Construction Manager is not the General Contractor and,
unless otherwise expressly provided in the Contract
Documents, does not assume any of the traditional duties of
a General Contractor. The term Construction Manager means
the Construction Manager acting through his authorized
representative."
2. Subparagraph 2.3.4 - first sentence after the word
"Architect,1I add "along with the Construction Manager."
3. subparagraph 2.3.7 - after the word "properly," add:
lilt is the intent of the Contract Documents to allow the
Construction Manager to schedule the performance of all Work
and the contractors are expected to follow all such schedule
direction. Should a contractor, either in person or through
his subcontractor, supplier, or vendor, fail to maintain
progress according to the Project Schedule and approved
Contractor's Schedule, or cause delay to another Contractor:
he shall furnish additional labor and/or services such as
overtime as may be necessary to bring his operations up to
schedule, all at no additional cost to the Owner."
4. subparagraph 2.3.15 - delete in its entirety.
5. Subparagraph 2.3.18 - delete the word "reasonable" in the
sixth (6th) line. After the word "promptness", add
"consistent with the constraints of the project schedule so
as to cause no delay."
01/06/92 SUPPLENENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 2
....~.,...._.,>.."'-"_.,.: ~ _, ...."'...'.~,,_,.,:. ,_.,:;,'";~>..,.,:). ........=-.-~..:y~.tY,:'....r.v ,.:,...., ~,'-_~-',,_,''''''':;".~1Z'' -"~.~".~.... ._~..,.........,....."...........'._.._"'..._.'-,',. ."-. '.- - _'--,,~~.J .~""~",,,,~-"'--"""'" -.--.-....--...... ..-...-- ~-...---- -.,
. --"..... ,-..."...... .........,.................~ ~--"'I!::<......-..~--;,...- ............. ...~ ,-- ....... ~-_. -- .--..,,~....--.....~..-,,"'..., --'-..-.-...-..' -. .....-.~.-....~....... - ....., - .-......-..- - . . .~...... - --'.' '_.--- '.
~ 2 ~
...-'.
~ .' '.;.'ib
""~"'~~
_. :.;;,,~'. ;~, ~f" J
" ~
;.....
....
.~
6. subparagraph 2.3.23 - delete the phrase "against whom the
Contractor makes no reasonable objection and." Also, delete
the last sentence in the subparagraph in its entirety.
ARTICLE 3
1. subparagraph 3.3.1 - delete from the last sentence the
phrase, "..., except to the extent required by Subparagraph
6.1.311
2. subparagraph 3.4.1 - substitute three (3) days notice in
each case for the seven (7) day notices stipulated. Add at
end of subparagraph the following: "In the event of clean-
up issues, Owner has right to provide a minimum of 24 hours
notice. In the event of safety issues determined to be of a
serious nature, as determined by the CM, notice will given,
and contractor is required to rectify deficiency
immediately."
3. subparagraph 3.2.1 - delete in its entirety.
ARTICLE 4
1. subparagraph 4.1.1 - delete in its entirety and insert the
following:
"The Contractor is the same person or entity identified as
the Trade Contractor. A Trade Contractor is the person or
entity identified as such in the Agreement between the Owner
or Construction Manager and a Trade Contractor. The term
Trade Contractor includes one who furnishes material worked
to a special design but does not include one who furnishes
material not so worked and is referred to throughout the
contract Documents as if singular in number and masculine in
gender. The term Trade Contractor means the Trade
contractor or his authorized representative. II
2. Add new subparagraph 4.4.3 as follows:
liThe Contractor is responsible for the conduct of his
employees at all times. Misconduct, destruction of
property, unsafe practices, or violation of any Federal or
State regulations including abuse of alcohol or drugs, will
be cause for permanent dismissal from the project. If any
Contractor employee is determined to be detrimental to the
Project, as deemed by the Construction Manager, the
Contractor will remove and/or replace the employee at the
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 3
request of the Construction Manager. Employees dismissed
from the project will be transported from the jobsite at the
Contractor's expense."
3. Add new subparagraph 4.4.4 as follows:
"The Trade Contractor shall be totally responsible for the
security of his work, materials, equipment, supplies, tools,
machinery, and construction equipment."
4. Add new subparagraph 4.4.5 as follows:
"The Trade Contractor shall be responsible for complete,
timely and accurate field measurements as necessary for
proper coordination, fabrication and installation of his
materials and equipment. The Trade Contractor agrees to
cooperate with the Construction Manager, if required, to
accommodate any discovered variations or deviations from the
Drawings and Specifications so that the progress of the Work
is not adversely affected."
5. Subparagraph 4.9.1 - add the following sentence:
"The superintendent shall be satisfactory to the
Construction Manager and shall not be changed except with
the consent of the Construction Manager, unless the
superintendent proves to be unsatisfactory to the Trade
Contractor or ceases to be in his employ."
6. Subparagraph 4.10.1 - add the following sentence:
"This schedule, to be submitted within three (3) days after
Contract Award, shall indicate the dates for the starting
and completion of the various stages of construction, shall
be revised as required by the conditions of the Work, and
shall be subject to the Construction Manager's approval."
7. Add new subparagraph 4.10.2:
liThe Construction Manager will conduct a weekly scheduling
meeting which the Contractor shall attend. At this meeting,
the parties can discuss jointly such matters as progress,
scheduling, and problems. II
8. Add new subparagraph 4.12.9:
"If materials specified in the Contract Documents are not
available on the present market, the Trade Contractor may
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 4
submit data on substitute materials through the Construction
Manager to the Architect/Engineer for approval by the
Owner."
9. subparagraph 4.14.1 - add at line 3 after "properly":
"He shall also provide protection of existing work as
required. II
10. subparagraph 4.14.2 - at end of paragraph, add:
"When structural members are involved, the written consent
of the Architect/Engineer shall also be required. The Trade
Contractor shall not unreasonably withhold from the
Construction Manager or any separate contractor his consent
to cutting or otherwise altering the Work."
11. Add new subparagraph 4.14.3:
liThe Trade Contractor shall arrange for any blockouts,
cutouts, or opening required for the installation of his
materials and equipment and the execution of his work,
whether or not shown or indicated on the Drawings. The
Trade Contractor shall be further responsible for sealing
and/or finishing, in an acceptable fashion and meeting any
applicable code requirements, any such blockout, cutout
opening, or other hole in any fire-rated floor, ceiling,
wall, security wall, or any other finished surface".
12. subparagraph 4.15.1 - at end of paragraph, add:
"Clean up shall be performed to the satisfaction of the
Owner or Construction Manager."
13. Add new subparagraph 4.16.2:
liThe Trade Contractor shall promptly return telephone calls
or respond to any other form of communication initiated by
the Construction Manager. Failure to promptly do so shall
be considered a lack of performance on the part of the Trade
Contractor, and may be considered grounds for replacement of
site personnel."
14. Add new Subparagraph 4.16.3:
"AII written correspondence to the Construction l1anager
shall be serialized, dated, and signed by an authorized
representative of the Trade Contractor. The correspondence
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 5
"
-~~~
. ."~'
", : .!' .. ~
_,,,,_t:~;,- -
.:. ~' ":'':';: ',.J.~
15. Subparagraph 4.2.1 - at the end of the paragraph, add the
following:
liThe Owner and the Architect have acknowledged that
nothing in the Architect's engagement implies any
undertaking by the Architect for the benefit of or
which may be enforced by the Contractor, its
subcontractors, or the surety of any of them; it being
understood that the Architect's obligations are to the
Owner and that, in performing such obligations, the
Architect may increase the burdens and expenses of the
Contractor, its subcontractors, or the surety of any of
them. Neither the Contractor, any Subcontractor, nor
the surety of any of them shall bring any civil suit or
other legal action against the Architect arising out of
or in connection with the project."
03/02/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 6)
00805 -Sa
16. Subparagraph 4.18.1 - delete from the 10th line, the phrase,
"... (other than the Work itself). ..11
At the end of the paragraph add the following paragraph:
"The first ten dollars ($10) of remuneration paid to the
CONTRACTOR is for the indemnification provided for above."
04/16/92
SUPPLEMENTARY GENERAL CONDITIONS(ADD. 10) 00805 -58
-.. .,,, .-."'.'~ .........~. '.i'- "'_~'-'.~~', ..._';IW!'"',...__....~..._'_...,.\::oI'._~..'-,l_....,....:-~..,.~.. ):..1'''''' M......~t:~.~,--~...;:_..' ..... ',"", .',.'"":!"!,-,.,!,,,~_,,,,,,,,,,,,,,,,,<"";,,,,,,,~,,,,_,<,,,,,__~,'~~'q>~~""''':''-'''''',,'''_', ,..... ....~.._,_~." .,~,,_..' ...~
_ :.~"-"""~', _.' ....._.........,....,.___..~..._~_....~_....._...'..____......_,.......__,~~~.,r. "-.,,. ""',--..._.__.........._... .~-.,{.~__.... ",-_,,'........-'" ".-"_'~ __._-_...~......___.,_'\ -.~'--"""~_-"'~~~','..1""'.~_,'_'
~.
':-;,.:;-.::;.,~
shall be directed to:
Morrison-Knudsen/Gerrits
P.O. Box 5283
Key West, Florida 33040
Attn: Doug Fuller
or hand delivered to Morrison-Knudsen/Gerrits' office
located at 5090 Junior College Road, Sto~k Island, Florida
33040.
Serialization procedures will be provided to the Trade
Contractor in the pre-construction meeting."
Each trade contractor shall be required to check his
designated mailbox regularly. This mailbox will be made
available, and located by the Construction Manager.
ARTICLE 5
1. Subparagraph 5.2.3 - delete in its entirety and insert the
following:
nIf the Owner or Construction Manager refuses to accept any
person or entity on a list submitted by the Trade Contractor
in response to the requirements of the Contract Documents,
the Trade Contractor shall submit an acceptable substitute;
however, no increase in the Contract Sum shall be allowed
for any such substitution."
ARTICLE 6
1. subparagraph 6.1.1 - delete the last sentence.
2. Subparagraph 6.1.3 - delete in its entirety, and insert the
following:
lilt shall be the responsibility of each contractor to
coordinate his work with the work of other contractors
on the site. The Owner, A/E and Construction Manager
shall be held harmless of any and all costs associated
with improper coordination."
3. Subparagraph 6.2.5 - sixth line, after the word II initiates, "
delete the words "an arbitration proceeding" and substitute
"a claim;" tenth line, delete the words "at the Owner's
expense, and"; thirteenth line, after the words "and court
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 6
or," delete the word "arbitration" and substitute "claim."
4. Add new subparagraph 6.2.6:
"Should the Contractor contend that he is entitled to
an extension of time for completion of any portion or
portions of the work, he shall, within (72) hours of
the occurrence of the cause of the delay, notify the
Construction Manager in writing, of his contention:
setting forth (A) The cause for thedelay/:(B) A
description of the portion or portions of work affected
thereby,' and (C) all details pertinent thereto. A
subsequent written application for thj:sp~cific number
of days of extension of time requested shall be made by
the Contractor to the Construction Manager within (72)
hours after the delay has ceased to exist.
It is a condition precedent to the consideration or
prosecution of any claim for an extension of time that
the foregoing provisions be strictly adhered to in each
instance and, if the Contractor fails to comply, he
shall be deemed to have waived the claim.
The Contractor agrees that whether or not any delay,
regardless of cause, shall be the basis for an
extension of time he shall have no claim against the
Owner, AlE or Construction Manager for an increase in
the contract price, nor a claim against the Owner, AlE
or Construction Manager for a payment or allowance of
any kind for damage, loss or expense resulting from
delays: Nor shall the Contractor have any claim for
damage, loss or expense resulting from interruptions
to, or suspension of, his work to enable other
contractors to perform their work. The only remedy
available to the Contractor shall be an extension of
time."
ARTICLE 7
1. Subparagraph 7.1.1 - delete in its entirety and insert the
following:
liThe contract shall be governed by the laws of the state of
Florida. Venue for any claims or disputes arising under
this contract shall be in the Circuit Court of the 16th
Judicial Circuit of the State of Florida."
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 7
.... ".... -.-...... .:.""-.....,... ...... --_. -.Y .....
: <~<1~;~;~~~.
2. subparagraph 7.2.1 - delete in its entirety and insert the
following:
"The Owner or Construction Manager (as the case may be) and
the Trade Contractor each binds himself, his partners,
successors, assigns, and legal representatives of such other
party in respect to all covenants, agreements, and
obligations contained in the Contract Documents. Neither
party to the Contract shall assign the Contract or sublet it
as a whole without the written consent of the other."
'"
~. ~. .
3. Add new Subparagraph 7.2.2:
"The Trade Contractor shall not assign any monies due or to
become due under this Contract without prior written consent
of the Owner or Construction Manager."
4. Subparagraph 7.8.1 - delete in its entirety.
5. Paragraph 7.9 'Arbitration' and all associated subparagraphs
7.9.1, 7.9.2, & 7.9.3 - delete in their entirety.
ARTICLE 8
1. Subparagraph 8.3.1 - delete in its entirety and insert the
following:
"If the Trade Contractor is delayed, at any time, in the
progress of the Work, by any act or neglect of the Owner,
Construction Manager, or the Architect/Engineer, or by any
employee of either, or by any separate contractor employed
by the Owner, or by changes ordered in the Work, or by fire,
unusual delay in transportation, adverse weather conditions
not reasonably anticipatable, unavoidable casualties or any
causes beyond the Trade Contractor's control, or by delay
authorized by the Owner, Construction Manager, or by any
other cause which the Construction Manager determines may
justify the delay, then the Contract Time shall be extended
by no cost Change Order for such reasonable time as the
Construction Manager may determine, in accordance with
subparagraph 6.2.6."
2. Subparagraph 8.3.2 - replace the remainder of the Paragraph
after the word "waived" in line 4 with the following:
1Ip..ny claim for extension of time shall state the cause of
the delay and the number of days of extension requested. If
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 8
.,-.~
the cause of the delay is continuing, only one claim is
necessary, but the Trade Contractor shall report the
termination of the cause for the delay within twenty (20)
days after such termination; otherwise, any claim for
extension of time based upon that cause shall be waived."
3. subparagraph 8.3.4 - delete in its entirety and insert the
following:
lilt shall be recognized by the Trade Contractor that he may
reasonably anticipate that as the job progresses, the
Construction Manager will be making changes in, and updating
Construction Schedules. No claim for an increase in the
Contract Sum for either acceleration or delay will be
allowed for extensions of time pursuant to this Paragraph
8.3 or for other changes in the Construction Schedules which
are of the type ordinarily experienced in projects of
similar size and complexity."
4. Add new subparagraph 8.3.5:
"If the Project is delayed as a result of the Trade
Contractor's refusal or failure to begin the Work on the
date of commencement as defined in paragraph 8.1.2, or his
refusal or failure to carry the Work forward expeditiously
with adequate forces, the Trade Contractor causing the delay
shall be liable, but not limited to, delay claims from other
Trade Contractors which are affected."
ARTICLE 9
1. Subparagraph 9.3.3 - add at line 14 after the word "person":
"All Trade Subcontractors and Trade Subsubcontractors shall
execute an agreement stating that title will so pass, upon
their receipt of payment from the Trade Contractor."
2. Subparagraph 9.5.1 - add:
"From the total of the amount determined to be payable on a
progress payment, 10 percent of such total amount will be
deducted and retained by the Owner until final payment is
made. The balance (90 percent) of the amount payable, less
all previous payments, shall be certified for payment. When
not less than 95 percent of the work has been completed, the
Owner maYr at his/her discretion (and with the consent of
the surety), prepare an estimate from which will be retained
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 9
. _.. _......- ,.,,~_..:___~: ~__'....~.~..~w _..........l..1t..,....~~-:...~~~...~...~..lI....... _..#~U'~..~~,........:..-"~ I _.':,.._ ~_-:.:-......:.~~.;!'..,;':_"....-..::: _-..::....:~;~::_~.::::-::~~"':~.-:'::.:=-.::~-~:~-,:-
--;:,. 2
an amount not less than twice the contract value or
estimated cost, (whichever is greater), of the work
remaining to be done. The remainder, less all previous
payments and deductions, will then be certified for payment
to the Contractor.
It is understood and agreed that the Contractor shall not be
entitled to demand or receive progress payment based on
quantities of work in excess of those provided in the
proposal or covered by approved change orders, except when
such excess quantities have been determined by the
Construction Manager to be a part of the final quantity for
the item of work in question.
No progress payment shall bind the Owner to the acceptance
of any materials or work in place, as to quality or
quantity. All progress payments are subject to correction
at the time of final payments.
3. Add new subparagraph 9.5.6:
"All material and work covered by partial payments made
shall thereupon become the sole property of the Owner, and
by this provision shall not be construed as relieving the
Trade Contractor from the sole responsibility for the
materials and work upon which payments have been made or the
restoration for any damaged material, or as a waiver to the
right of the Owner or Construction Manager to require the
fulfillment of all the terms of the Contract."
4. Add new subparagraph 9.5.7:
"Except in case of bona fide disputes, or where the Trade
Contractor has some other justifiable reason for delay, the
Trade Contractor shall pay for all transportation and
utility services not later than the end of the calendar
month following that in which services are rendered and for
all materials, tools, and other expendable equipment which
are delivered at the site of the Project. The Trade
Contractor shall pay, to each of his Trade Subcontractors,
not later than the end of the calendar month in which each
payment is made to the Trade Contractor, the representative
amount allowed the Trade Contractor on account of the work
performed by his Trade Subcontractor interest therein. The
Trade Contractor shall, by an appropriate agreement with
each Trade Subcontractor, also require each Trade
Subcontractor to make payments to his suppliers and Trade
Subsubcontractors in a similar manner.1I
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 10
I
4 ..,.~ -. ~.:~:.. .'~ .... _~ ...:. ,'-:J .~,., .-~ .; ._",
-\
5. Subparagraph 9.6.1 - delete in its entirety and insert the
following:
liThe Construction Manager/Architect may decline to approve
an Application for Payment if, in his opinion, the
application is not adequately supported. If the Trade
Contractor and Construction Manager cannot agree on a
revised amount, the Construction Manager shall process the
Application for the amount he deems appropriate. The
Construction Manager may also decline to approve any
Applications for Payment or, because of subsequently
discovered evidence or subsequent inspections, he may
nullify, in whole or part, any approval previously made to
such extent as may be necessary in his opinion because of:
(1) defective work not remedied; (2) third party claims
filed or reasonable evidence indicating probable filing of
such claims; (3) failure of the Trade contractor to make
payments properly to Trade Subcontractors or for labor,
materials, or equipment; (4) reasonable evidence that the
work cannot be completed for the unpaid balance of the
Contract Sum; (5) damage to the Construction Manager, the
Owner, or another contractor working at the project; (6)
reasonable evidence that the Work will not be completed
within the contract time; (7) persistent failure to carry
out the Work in accordance with the Contract Documents.
9.6.1.1 No payment shall be made to the Trade
Contractor until certificates of insurance or other
evidence of compliance by the Trade Contractor, within
all the requirements of Article 12, have been filed
with the Owner and Construction Manager. Further, no
payments on the basis of work performed by a Trade
Subcontractor shall be paid until copies of all bonds
required by Paragraph 7.5 and any certificates of
insurance required of the Trade Subcontractors under
Article 12 have been filed with the Owner."
6. Subparagraph 9.7 - delete in its entirety.
ARTICLE 11
1. Add new subparagraph 11.1.2.1:
The following coverages are required to be maintained by all
Trade Contractors and subcontractors in any tier throughout
the entire length of the contract and any extensions
thereof.
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 11
_ . f'. _... '. T . . ...... ....... .~... ........._ ..",,-.._~.........;.',_.'r""'''#. ... .',,", ....._~._._.....-..___J.J... T -.-'.-......--_____...___....__'__ ......-....----------.---,
:;...
1. Premises and Operation Liability Insurance:
Commercial General Liability Insurance shall be
obtained in amounts of not less than $1,000,000 each
occurrence.
Coverage shall specifically include:
a. Bodily injury and property damage liability
coverage for premises and operations.
b. Products and completed operations.
c. Independent contractor's exposures.
d. Property damage resulting from explosion,
collapse, or underground (x,c,u) exposures.
e. Blanket contractual liability covering this
contract.
f. Personal injury liability.
g. Broad form property damage liability.
2. Automobile Liability Insurance:
Comprehensive automobile liability insurance shall
include coverage for bodily injury and property damage
liability for a minimum limit of $1,000,000 each
occurrence and shall cover use of owned, non-owned, and
hired vehicles, and include employers' non-ownership
liability coverage.
3. Workers Compensation and Employers Liability Insurance:
statutory Workers' compensation coverage including
Employers Liability coverage with limits of not less
than $100,000 per person per accident and $500,000 per
person per occurrence for disease. Coverage shall be
provided to cover operations in the state of Florida
and the Voluntary Compensation endorsement shall be
provided. Coverage for deferally enacted benefits
shall be provided where applicable.
All insurance policies except the Workers Compensation and
Employers Liability Insurance policy, are required in the
name of Monroe County Board of County Commissioners and
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 12
I
-,-'''' ..-..... . ,,~, ~ "-','
. .
....,.,-- .;.,-, >::._".,....'7,....-':-~'"',...,..~~. .--....,.""'._-...-..' !'.~-,..,. ,,'""', ...~_....__..-_.-.'....... ......-....~',., ~ ....,..... ".,.-.... ----~~
, .~ .....T. .........-.-.... ...-~:~-.."--
~'~~""'..",-" ....-.,-....-. .,,,---' -
....... -~ ,__ ._., _t.. _ _. .~_.. .'- ~.- -_.._~. - '--"-~' '~^
Morrison-Knudsen/Gerrits as Additional Insured, and provide
a minimum of sixty (60) days notice in the event of
termination, non-renewal or reduction in coverage. Policy
language shall be modified to provide liability coverage for
Cross Liability suits between insureds without increasing
the total policy limits. Monroe County reserves the right
to require additional insurance as may be deemed necessary
for any specific project or work.
Insurers providing coverage(s) must be financially stable
and authorized to do business in the state of Florida. The
Monroe County Board of County commissioners reserves the
right to reject any insurer that it believes to be
unacceptable.
Failure to maintain required insurance coverage in effect
will provide Monroe County, Florida with the option of
terminating the contract upon written notice to the
Construction Manager.
certificates expiring during the term of the contract shall
be replaced with new certificates prior to the expiration of
the original certificates.
Complete and certified copies of all insurance contracts
shall be furnished to The Monroe County Board of County
Commissioners if requested.
The Certificate Holder on all insurance policies is required
to be as follows:
Monroe County Board of County Commissioners, or Monroe
County,
c/o Morrison-Knudsen/Gerrits
P.O. Box 5283
Key West, FL 33040
2. Subparagraph 11.3.7 - second sentence, delete the phrase,
", .., or in accordance with an award by arbitration in which
case the procedure shall be as provided in Paragraph 7.9"
3. Subparagraph 11.3.8 - first sentence, delete the phrase,
".. . arbitrators shall be chosen as provided in Paragraph
7.9"
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 13
4. Subparagraph 11.3.1 - delete in its entirety, and insert the
following:
" Throughout the term of the CONTRACT, the Ol-lNER shall
purchase and maintain property insurance on the
completed value of the permanent facility only. The
completed value is defined as all material, labor,
supplies, and equipment intended to be incorporated in
and to become a permanent part of the completed
facility. Such insurance shall include perils of fire,
lightning, and extended perils. The facility as
defined for 11.3.1 includes structures as defined in
the contract drawings and specifications.
Notwithstanding any provisions contained in this
paragraph, the CONTRACTOR shall be responsible for the
first $10,000 on any loss governed by this section.
The CONTRACTOR understands that the OWNER'S property
insurance policy contains certain exclusions which are
available upon request from the CONSTRUCTION MANAGER."
04/16/92
SUPPLEMENTARY GENERAL CONDITIONS(ADD. 10) 00805 -13A
. .
... -" -..........- . . ~
..,--~--- --*-'-
. ... .. ... ~.. .~.. ........d, .. ..'
~"
ARTICLE 12
1. subparagraph 12.1.3 - under item .1, add the following at
the end of the sentence, ", as set forth in subparagraph
12.1.6"
2. subparagraph 12.1.4 - replace the remainder of the
paragraph, after the word "changell in line 25, with the
following:
"Pending final determination of cost, payments on account
shall be made as determined by the Construction Manager.
The amount of credit to be allowed by the Trade Contractor
for any deletion or change, which results in a net decrease
in the Contract Sum, will be the amount of the actual net
cost as confirmed by the Construction Manager. When both
additions and credits covering related Work or substitutions
are involved in anyone change, the allowance for overhead
and profit shall be figured on the basis of the net
increase, if any, with respect to that change."
3. Add new subparagraph 12.1.6:
"The actual cost of Changes in the Work may include all
items of labor or material, power tools, and equipment
actually used, utilities, pro rata charges for foreman, and
all payroll charges such as Public Liability and Workman's
Compensation Insurance. No percentage for overhead and
profit shall be allowed on items of social Security and
Sales Tax. If deductions are ordered, the credit shall be
the net cost. Items considered as overhead shall include
insurance other than that mentioned above, bond or bonds,
superintendent, timekeeper, clerks, watchmen, use of small
tools, incidental job costs, and general office expenses.
The actual cost of Changes in the Work (other than those
covered by unit prices set forth in the Contract Documents)
shall be computed as follows:
12.1.6.1 If the Trade Contractor performs the actual
Work, the percentage mark-up for overhead and profit
shall be a maximum addition of fifteen percent (15%).
12.1.6.2 If the Trade Subcontractor performs the
actual Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen percent
(15%). If the Trade Contractor does not enter into the
\vork, the maximum mark up for managing this work will
be ten percent (10%).
01/06/92 SUPPLEMENTpYY GENERAL CONDITIONS (ADD. 2)
00805 - 14
'.'- '--'~-.,,-' .
"_ h_ ~'_'__"~"__._" ',_,~,.,_""_...'.__... .,~,_~_~__.__"......___ . _._. ._..~_.....~... ________6~.__~_...__.....,._.... -"'-~_,_. ...~__.. .-"._.0__.-'_ .~__ ___ '__._.~._
.-- .- ~......,....---,,',--'~' "'--'-'-~-:"""----~-"-
12.1.6.3 If the Trade Subcontractor performs part of
the actual work, his percentage mark-up for overhead
and profit shall be a maximum addition of fifteen
percent (15%) on his direct work only. If the Trade
Contractor performs part of the actual work, his
percentage mark-up for overhead and profit shall be a
maximum addition of fifteen percent (15%) on his direct
work only.
4. Add new subparagraph 12.1.7:
liThe Trade Contractor shall furnish to the Owner through the
Construction Manager, an itemized breakdown of the
quantities and prices used in computing the value of any
change that might be ordered."
5. Subparagraph 12.3.1 - delete in its entirety and insert the
following:
"If the Trade Contractor claims that any instructions given
to him by the Construction Manager, by drawings or
otherwise, involve extra work not covered by the Contract,
he shall give the Construction Manager written notice
thereof within three (3) days after the receipt of such
instructions and before proceeding to execute the work,
except in emergencies endangering life or property, in which
case the Trade Contractor shall proceed in accordance with
Paragraph 10.3."
Should it not be clear to the Trade Contractor that a change
will involve extra work, written notice given within three
(3) days that the change may involve extra work will be
sufficient notice. If it is later determined that the work
involved in such instruction shall be recognized as an
extra, the amounts of additional compensation to be paid
therefore should be determined in accordance with Paragraph
13.1.
Except as otherwise specifically provided, no claim for
additional cost shall be allowed unless the notice specified
by this Subparagraph is given by the Trade Contractor. If
the Contractor considers that the changed work involves
extra costs, the costs shall be accounted for, and presented
in accordance with subparagraph 12.1.3. All claims shall be
submitted to the Owner through the Construction Manager. II
6. Subparagraph 12.3.2 - change the word 'agent' in the 7th
line, to 'representative'. Also, delete item (4).
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 15
7. Add new subparagraph 12.3.3:
"Unless otherwise agreed in writing, the Contractor
shall carryon the Work and maintain its progress
during any dispute or claim proceeding, and Owner shall
continue to make payments to the Contractor in
accordance with the Contract Documents. Disputes
unresolved shall be settled in accordance with
subparagraph 7.1.1."
ARTICLE 14
1. subparagraph 14.1.1 - starting at the 8th line, delete the
phrase, 11. .., or if the Work should be stopped for a period
of thirty days by the CONTRACTOR because of the CONSTRUCTION
MANAGER's failure to recommend or the ARCHITECT's failure to
issue a Project Certificate for Payment as provided in
Paragraph 9.7 or because the OWNER has not made payment
thereon as provided in Paragraph 9.7"
2. Subparagraph 14.2.1 - change the words 'seven days' in the
13th and 18th line, to '72 hours'.
01/06/92 SUPPLEHENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 11
SECTION 00970
PROJECT SAFETY AND HEALTH PLAN
1.1
REGULATIONS AND POLICIES
1.1.1
1.2
1.2.1
Every Trade Contractor and Trade Subcontractor employed
on the Project shall comply with all applicable local,
state, and Federal safety and health regulations and
with Morrison-Knudsen Company, Inc. safety and health
policies as described herein.
PROJECT SAFETY AND HEALTH REQUIREMENTS
It is recognized that it is good business and evidence
of competent leadership to prevent the occurrence of
incidents that lead to occupational injuries or
illnesses. Safety and health requirements on this
project include, but are not limited to, the following:
.1 In general, this accident prevention policy is
based on a sincere desire to eliminate personal
injuries, occupational illnesses, and equipment
and property damage; and to protect the general
public exposed to or associated with the work.
.2 The importance of the safety of all workers on the
project shall be recognized and accident
prevention shall be an integral part of all
operations.
.3 Each Trade Contractor and Trade Subcontractor
shall conduct work in a safe and practical manner
in conformance with the OSHA Safety and Health
Regulations and the latest edition of the Manual
of Accident Prevention, Associated General
Contractors of America.
.4 Each Trade Contractor and Trade Subcontractor
shall observe all applicable Federal, State, local
and project laws and regulations pertaining to
safety and health, pollution control, water
supply, fire protection, sanitation facilities,
waste disposal and other related items.
.5 The Mandatory Safety and Health Rules shall be
posted in a conspicuous location along with the
OSHA and Emergency Phone Number posters.
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 1
.6 A record of all occupational injuries and
illnesses shall be maintained. Medical and lost
time cases shall be properly recorded on the OSHA
log, and reported to MORRISON-KNUDSEN/GERRITS. A
copy of the insurance report for workmen
compensation cases shall be provided to MORRISON-
KNUDSEN/GERRITS.
.7 Each Trade Contractor and Trade Subcontractor
shall provide or arrange for adequate first aid
facilities, emergency transportation and persons
qualified in first aid.
.8 Each Trade Contractor and Trade Subcontractor
shall cooperate fully with all other contractors
in their respective safety and health programs.
.9 Good housekeeping shall be observed at all times.
Waste, debris, and garbage shall be removed daily
or placed in appropriate waste containers. All
materials, tools, and equipment shall be stored in
a safe and orderly fashion. Each contractor shall
donate 10% of their staff to a crew that will
convene every Friday at 1:00pm for a joint site
clean-up effort not to exceed a duration of three
hours.
In summary, there will be a 3-part clean-up plan.
The first part consists of the contractor cleaning
up on a daily basis, his workstations, and his
trade work. The second part consists of the
general clean-up, the concerted effort by all
trade contractors working on the project. A
minimum of (1) crew is to be utilized by each
contractor, or 10%, whichever is more. The third
part consists of the Owner cleaning up for a
particular trade contractor should adequate notice
not compel him to clean up his work. In this
case, the appropriate contractors will be
backcharged.
.10 This project shall be a Hard Hat job and all
supervisors, employees and visitors shall be
required to wear a suitable hard hat while on the
project site.
.11 Other appropriate personal protective equipment
shall be provided and worn as required including
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 2
I
-~'.-.-,'- -,'- "'- -, ., -'#.~...... .-....-_...,~.. ,,---,....-""'........<--......,..--...~..~._._~.......' ". ,..,..~.-..,.,,,._'......'-.
but not limited to long pants, shirts with sleeves
and appropriate leather work boots.
.12 Temporary construction aids such as ladders,
scaffolds, stairs, railings, etc. shall be
provided to facilitate access or working
conditions in a manner that shall conform to the
safety standards specified by Federal, state,
Local or manufacturer's recommendations or
stipulations.
.13 Each Trade Contractor and Trade Subcontractor
shall be expected to indoctrinate his employees as
to the safety and health requirements of this
project and to enforce adherence to safe work
procedures.
.14 If MORRISON-KNUDSEN/GERRITS notifies any Trade
Contractor of any noncompliance with the
provisions of this program, the Trade Contractor
shall make all reasonable efforts to immediately
correct the unsafe conditions or acts.
Satisfactory corrective action shall be taken
within the specified time. If a Trade Contractor
or Trade Subcontractor refuse to correct unsafe or
unhealthy conditions or acts, MORRISON-
KNUDSEN/GERRITS shall take one or more of the
following steps:
a. Cease the operation or a portion thereof.
b. stop payment for the work being performed.
c. Correct the situation using other forces and
back charge the Trade Contractor expenses
incurred.
d. Increase withholding in proportional
increments for that given pay period.
.15 All Trade Contractor's Superintendents shall be
required to attend and participate in all general
project safety meetings. These meetings will be
included in the weekly coordination meetings as
previously specified or on an as needed basis.
.16 All Trade Contractors shall conduct Weekly Tool
Box Safety Training Meetings, and shall document
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 3
1.3
1.3.1
1.4
1.4.1
the minutes on the forms provided. These forms
are to be transmitted to Morrison-Knudsen/Gerrits
on a weekly basis. All employees working at the
project site shall be required to attend and
participate in the meetings.
.17 Shortly after the award of the contract and prior
to the beginning of work, an Activity Hazard
Analysis (phase plan) shall be prepared by the
contractor and submitted to Morrison-
Knudsen/Gerrits for approval. The analysis will
address the hazards for each activity to be
performed in that phase and will present the
procedures and safeguards necessary to eliminate
the hazards or reduce the risk to an acceptable
level. A phase is defined as an operation
involving a type of work presenting hazards not
experienced in previous operations or where a new
subcontractor or work crew is to perform work.
The analysis will be discussed by the contractor
and Morrison-Knudsen/Gerrits on-site
representatives at the Preparatory Inspection
Meeting. Work will not proceed on that phase
until the Activity Hazard Analysis (phase plan)
has been accepted by Morrison-Knudsen/Gerrits.
.18 No personal radios or stereos will be allowed on
the job-site.
FIRE PROTECTION
Every Trade Contractor and Trade Subcontractor employed
on the Project shall exercise good construction
practices to prevent fire. It shall be the
responsibility of the Trade Contractor to insure that
general fire protection facilities are adequate for his
work and to provide additional fire protection
facilities and devices, including fire extinguishers as
required by their scope of work.
WORK NEAR ENERGIZED ELECTRICAL LINES OR OTHER UTILITIES
It shall be the Trade Contractor's sole and exclusive
responsibility (a) to provide personnel capable of
working adjacent to energized electrical lines or other
utilities; (b) to provide adequate, safe and properly
maintained equipment; (c) to conduct all of his work in
accordance with the safety rules and regulations
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 4
1.5
1.5.1
1.5.2
1.5.3
prescribed by the National Electric Code, National
Electric Safety Code, H30, and Safety Rules for
Installation and Maintenance of Electrical Supply and
Communication Lines Hand Book 81, Occupational Safety
and Health Act of 1970, as well as other safety codes
in effect at the site of construction and as specified
elsewhere herein, or as are generally applicable to the
type of work being performed; and (d) to continuously
supervise and inspect the work being performed to
assure that the requirements of (a), (b), and (c) above
are complied with and nothing in these Contract
Documents shall be held to mean that any such
responsibility is the obligation of the Owner or the
Architect or the Construction Manager.
BARRICADES, WARNING DEVICES AND LIGHTING
The Trade Contractor shall be solely responsible for
providing temporary ladders, guard rails, warning
signs, barricades, night guard lights, and deck or
floor closures required in connection with his work to
comply with Federal, State and local safety
requirements. The Trade Contractor shall be solely and
exclusively responsible for the design, construction,
inspection and maintenance of such facilities at all
times.
It shall be the responsibility of the Trade Contractor
to provide additional temporary lighting, if needed to
maintain safe conditions.
It shall be the sole and exclusive responsibility of
the Trade Contractor to provide a safe place to work
for all laborers and mechanics and other persons
employed on or in connection with the project, and
nothing in these Contract Documents shall be construed
to give any of such responsibility to the Owner, the
Architect, or the Construction Manager.
11/21/91
00970 - 5
PROJECT SAFETY AND HEALTH PLAN
, ,-... ~......-<tc'-__.' ."",. ,~~' "'.......-. ~....-.....--._.-~,:~_-..~___. _,"" "",._-",--_.-::-
SECTION 00980
CONTRACTOR QUALITY CONTROL PLAN
1.1
1.1.1
1.2
1.2.1
1.2.2
1.2.3
1.2.4
MORRISON-KNUDSEN/GERRITS' DUTIES AND RESPONSIBILITIES
The Morrison-Knudsen/Gerrits' superintendent will
monitor all work performed by the Trade Contractor and
assist the Trade Contractor with his conformance of the
work to the Contract Drawings and Specifications.
TRADE CONTRACTOR'S DUTIES AND RESPONSIBILITIES
The Trade Contractor is responsible for the quality of
the work performed by his work force on this project as
well as the quality of the material, equipment and
supplies furnished by him to be incorporated into the
work.
The Trade Contractor will designate a Quality Control
Representative who will be on site at all times while
the respective Trade Contractor's work is in progress
and will have the authority and responsibility to
accept or reject items of work. The Trade Contractor's
Quality Control Representative may delegate his duties
but the primary responsibility and authority will rest
on him.
The Trade Contractor's Quality Control Representative
will coordinate the submittal of all shop drawings,
product data and samples to Morrison-Knudsen/Gerrits.
Any submittal that is a variance to the contract
requirements must be identified as such and transmitted
to the Construction Manager for submittal and approval
by the Architect/Engineer or Owner. No work requiring
submittal of a shop drawing, product data or sample
shall commence until the submittal has been reviewed
and approved by the Architect/Engineer.
The Trade Contractor will bear the responsibility of
notifying the designated material-testing laboratory,
whether Monroe County or Contractor is required to
perform testing of materials as required by the
contract drawings and specifications in a timely
fashion to prevent needless cancellations and delays of
work activities. Any costs caused by untimely
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (ADD. 3)
00980 - 1
1.2.5
1.2.6
1.3
1.3.1
notification shall be borne by the Contractor.
The Trade Contractor's Quality Control Representative
will review his drawings, procurement documents and
contracts to insure that the technical information
provided and all work performed is in accordance with
the latest revisions of the Contract Drawings and
specifications.
The Trade Contractor's Quality Control Representative
will perform an inspection upon receipt at the site of
the work of all materials, equipment and supplies
including those furnished to him by the Owner. Notes
from this inspection will be filled out on the
appropriate form and included with the Contractor Daily
Quality Control Report. Items which are damaged or not
in conformance with the respective submittals, quality
standards, contract drawings and specifications shall
be brought to the attention of Morrison-
Knudsen/Gerrits' representative on site and then will
be identified and segregated from accepted items.
Items thus identified will not be incorporated into the
work until corrective action acceptable to Morrison-
Knudsen/Gerrits is completed. Items determined
unsalvageable will be removed from the job site. These
items shall be noted as deficient in the applicable
section of the Contractor Daily Quality Control Report.
INSPECTION AND TESTING
INSPECTION PLAN
Morrison-Knudsen/Gerrits utilizes a multi-point
inspection plan for each separate feature of work to be
performed under this Trade Contract, i.e., work
described by each division of the technical provision
section of the contract specifications. This plan
consists of the following:
.1 Preparatory Inspection - Prior to commencing the
work, the Trade Contractor's Quality Control
Representative will meet with Morrison-
Knudsen/Gerrits' superintendent and the
Architect's representative if he so desires to
attend and check the following items at a minimum
for conformance:
(a) Approval of shop drawings and submittals.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (^DD. 3)
00980 - 2
(b) Approval of inspection and test reports of
materials and equipment to be utilized.
(c) Completion of previous operations of
preliminary work.
(d) Availability of materials and equipment
required.
(e) Potential utility outages.
(f) Any other preparatory steps dependent upon
the particular operation.
(g) Quality standards.
(h) Safety or environmental precautions to be
observed. (Phase Hazard)
Note:
Morrison-Knudsen/Gerrits will record the minutes
to this inspection meeting and distribute
accordingly.
.2
Initial inspection - Upon completion of a
representative sample of a given feature of the
work, the Trade Contractor's Quality Control
Representative will meet with the Morrison-
Knudsen/Gerrits Superintendent and the Architect's
representative if he so desires to attend and
check the following items at a minimum for
conformance:
(a) Workmanship to established quality standards.
(b) Configuration to contract drawings and
specifications.
(c) Construction methods, equipment and tools
utilized.
(d) Materials and articles utilized.
(e) Adequacy of testing methods.
(f) Adequacy of shop drawings.
(g) Adequacy of safety or environmental
precautions.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (nOD. 3)
00980 - 3
Note:
Note:
Note:
Morrison-Knudsen/Gerrits will record the minutes
to this inspection meeting and distribute
accordingly.
. 3
Follow-up Inspections - The Trade contractor's
Quality control Representative will inspect the
work daily to assure the continuing conformance of
the work to the workmanship standards established
during the preparatory and initial inspections.
Additionally, as a part of the follow-up
inspection, sign-off sheets will be utilized as
often as possible. The intent of these sheets is
to achieve concurrence from other trade
contractors and responsible parties that ensuing
work can indeed commence over underlying work.
This will prevent oversights and omissions which
could elevate costs. sign-off sheets shall be
used for, but not be limited to, concrete,
drywall, ceilings, painting, roofing substrates
and flooring. These reports are to be generated
by the applicable Trade Contractor and submitted
to Morrison-Knudsen/Gerrits' superintendent for
approval prior to the start-up of work.
Failure to generate a sign-off sheet or to attain
proper signatures prior to covering up underlying
work may affect payment for that piece of work if
ensuing problems are detected or not. This
disciplinary action shall be carried out via the
Nonconformance Report. (See section 1.4.2 of this
plan.)
The Trade Contractor shall be responsible to
record these inspections and all other project
related activities encountered throughout the day
on the Contractor Daily Quality Control Report.
. 4
Completion Inspections - Upon completion of a
given feature of the work, the Trade Contractor's
Quality Control Representative will meet with
Morrison-Knudsen/Gerrits' Superintendent, if he so
desires to attend, to perform an inspection of the
completed work. Non-conforming items will be
identified and corrected prior to commencement of
the next operation.
The Trade Contractor shall conduct and report
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (~DD. 3)
00980 - 4
1.3.1.5
1.3.1.6
1.3.2
1.3.3
corrections of this inspection which shall be a
required submittal.
Follow-On Inspections - Upon execution of the
contractor's completion inspection in elements of the
work which result in concealment; such as, ceiling and
drywall installations, MK/G shall schedule and conduct
multi-trade or singular inspections prior to covering
installation.
Note:
MK/G will record the minutes to this
inspection meeting.
Pre-Final Inspection - Upon substantial completion of
the project work MK/G shall coordinate and conduct a
universal inspection of all areas and elements of the
work. The Architect/Engineer may be represented if he
so desires. This inspection shall be completed at
least (15) days prior to the final substantial
completion inspection which shall be conducted by the
AlE. All deficiencies and incomplete work should be
completed prior to the final substantial completion
inspection.
OPERATION AND CHECK OUT TESTING
The Trade Contractor will provide personnel and
equipment to perform the operational tests and checkout
of the equipment, facilities or equipment constructed,
fabricated or installed under this Trade Contract.
Morrison-Knudsen/Gerrits' Superintendent will
coordinate and witness all such tests. Notification
should be given at least ten (10) days in advance of
the scheduled tests.
FINAL INSPECTION and issuance of the A/E CERTIFICATE OF
SUBSTANTIAL COMPLETION
Morrison-Knudsen/Gerrits' Superintendent will
coordinate and attend all final inspections of the work
by the Architect/Engineer. Prior to requesting a final
inspection, all tests for the equipment and systems
must be completed.
Upon completion of the AlE's inspection, the A/E will
publish outstanding items and issue a Project
Certificate of Substantial Completion, which will
define the date of 'Turn-Over' to the Owner the care,
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (ADD. 3)
00980 - 5
control and custody. Reference section 00800,
Substantial Completion.
1.4
REPORTING
Maintaining accurate and retrievable records is
extremely important in the Quality Assurance Program.
These records will act as a main source of information
in the present and in the future for the entire project
management team. The main report that will be utilized
to provide this information is the Daily Quality
Control Report. Nonconformance Reports may also be
issued.
1.4.1
DAILY QUALITY CONTROL REPORT
The Daily Quality Control Report shall be used to
document the summary of daily inspection activities
performed by the Trade Contractor's designated Quality
Control Representative. It shall include any of the
steps of inspection that are performed that day, all
test monitoring and any rework of nonconforming items.
The daily Quality Control Report section of the Daily
superintendent's Report will be routinely used for
daily reporting requirements. When the magnitude or
complexity necessitates such, a more separate and
comprehensive form will be used. Reference
Contractor's Daily Report, and as needed Contractor
Daily Quality Control Report, section 01385.
1.4.2
NONCONFORMANCE REPORT
Nonconformance Reports will be issued for work that is
found to be in nonconformance with the contract
documents or the referenced quality standards. The
report will be issued by Morrison-Knudsen/Gerrits.
It is not the intent to routinely and repeatedly issue
nonconformance reports, but to issue them only after
normal enforcement standards have been exhausted, or if
the work performed is a detriment to the project.
A copy of the Nonconformance Report will be forwarded
to the Project Manager for his information and/or
action. It should also be included in the Trade
Contractor's Daily Quality Report package for general
review.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (ADD. 3)
00980 - 6
Nonconformance Reports will be signed off once the
deficient item or items have adequately been corrected.
This will be done by the issuing Superintendent and
Project Manager. These sign-offs will be included with
a corresponding corrective action taken. Significant
nonconformances need to be addressed to prevent
recurrence. The signed-off report will also be
submitted for review.
Work activities affected by a Nonconformance Report
will proportionally counteraffect payments. Whether
that be partial or full retainage will be left up to
the discretion of Morrison-Knudsen/Gerrits' management
team.
1.5
NOT USED
1.6
AUDITS
1.6.1
Morrison-Knudsen/Gerrits may choose at its option to
perform Trade Contractor audits of their Contractor
Quality Control Plan at any time. Reports of these
audit results will be forwarded to the Project Manager
for his action. Any action items noted during an audit
for the Trade Contractor will be followed up and
documented to insure compliance and avoid recurrence.
1.7
SUMMARY
The intention of this plan is to create a system of
checks and balances that will minimize delays caused by
rework and a lack of planning and maximize production
and insure that the finished product is one that the
entire construction team can pride themselves in.
These goals can be achieved by giving the Owner exactly
what he has bought. The owner will expect no more and
through Quality Assurance, the construction team will
provide no less.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (~DD. 3)
00980 - 7
SECTION 00800
SUBSTANTIAL COMPLETION AND OWNER ACCEPTANCE
Bid Group 2, and Bid Group 3 Contractors shall turn over care,
custody and control of their work to the Owner as defined in the
issuance of the A/E's certificate of Substantial Completion of the
Project. All contracts in these bid groups shall exchange as a
group and in unison, possession, maintenance and security
responsibilities with the Monroe County Officials. Any portion of
the work which is in non-conformance with the contract documents or
elements which prevent the Owner's use of the facilities for its
intended use shall be excluded from acceptance. The contractor
shall be responsible for all work performed, equipment, and
materials furnished to, or by the contractor under this contract
until the contractors work is completed and has been accepted by
the Owner as stated in the Certificate of Substantial Completion.
In the event of loss, damage or destruction of such work,
equipment, or materials, the contractor at his sole expense shall
promptly repa ir, restore, or replace such, to the conditions
required by the contract documents.
All warranties and guarantees shall commence as stated on the A/E's
certificate of Substantial Completion.
Substantial Completion Certificates for portions of the project or
portions of the work may be used to reduce retention. This partial
certification shall only be used for the purpose of reducing
retention. The implementation and amounts of reduction shall be at
the Owner's sole discretion.
In the event of discrepancy or disagreement in the contract
documents, specifications, and/or drawings, this section will take
precedence over the Supplementary General Conditions, General
Conditions, General Requirements, technical specifications and
drawings.
11/20/91
OWNER ACCEPTANCE
00800 - 1
~
r
SECTION 01027
APPLICATION FOR PAYMENT
PART 1 - GENERAL
1..1 SUMMARY
A. Section includes:
1. Procedures for preparation and submittal of
Applications for Payment.
B. Related sections
1. Section 00750 - General Conditions
2. Section 00900 - AlA G702/G703
2. Section 01370 - Schedule of Values
1..2 FORMAT
A. AlA G702 Application and Certificate for Payment
including continuation sheets when required.
1..3 PREPARATION OF APPLICATIONS
A. Present required information in typewritten form.
B.
Execute certification by
authorized officer.
notarized
signature
of
C.
List each authorized Change Order on the form, including
change order number, date and dollar amount.
D.
Prepare Application for Final Payment as specified in
Section 01700.
1..4 SUBMITTAL PROCEDURES
A. The initial Application for Payment will not be processed
until the construction schedule, the schedule of values,
and the initial submittal schedule have been received by
the Construction Manager, reviewed and approved by the
Architect.
B. Submit an updated construction and submittal schedule
with each Application for Payment.
C. Payment Period: Submit once per month, during the last
OS/20/91
APPLICATION FOR PAYMENT
01027 - 1
week of the month. Payment will be made by the Owner
within (30) days thereafter.
D. Work Item Update Listing - this work sheet, prepared by
the Construction Manager, shows the work items which are
being considered for progress payments. It is to be
billed from the Contractor's approved schedule of values
and approved changes only. The Contractor must fill in
percentages of work completed on each line item or total
dollar amount of Original Suppliers Invoices. Suppliers
Invoices are then attached for payments on materials
stored.
E. Status Meeting - The Contractor's representative and the
Construction Manager review the Contractor's Work Item
Update Listing. Upon agreement between the two parties,
both the Contractor and Construction Manager will sign
off on the form.
F. Estimate Voucher - The Construction Manager will input
the progress into the computer from the Work Item Update
Listing, and will issue the Estimate Voucher to the
Contractor.
G. Submit waivers as required.
H. Submit three (3) copies of each Application for Payment.
1..5 SUBSTANTIATING DATA
A. When the Construction Manager and/or Architect requires
substantiating information, submit data justifying dollar
amounts in question.
B. Provide one copy of data with cover letter for each copy
of submittal. Indicate Application number and date, and
line item by number and description.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01027
OS/20/91
APPLICATION FOR PAYMENT
01027 - 2
'-........- ...,..,.. ... ....~.....,..-......-"' t....;:,.~_c..".t'.....~^".. ,... _.__...__*'-'.._......_....n.._-....,_._-.,"~,_"..."_,.....,,__"',,..."'.-"...._.,~.~.....".~~,. c. ~'~-_.~.....,..-~......_,,~...._.~..,...'_._ .......""~._.._._.-..___..4"-'"..'_...'--. ....,........_"" ,_.."___ _.___....;;._. .~._""'-"'" ..__..... ....-...~__ ._~.._ ~,
-.- ...--_. .--..-.. ...'"'--~.".. -...---..~' -
"'..
SECTION 01028
CHANGE ORDER PROCEDURES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Promptly implement change order procedures.
a. Provide full written data required to evaluate
changes.
b. Maintain detailed records of the work done on
a time and material/force account basis.
c. Provide full documentation to the Construction
Manager with each request.
2. Designate in writing the member of the Contractor's
organization authorized to accept changes in the
Work.
3. The Owner will designate in writing the person who
is authorized to execute Change Orders.
B. Related requirements:
1. Agreement: The amounts of established unit prices.
2. Agreement: The amounts of established allowances.
3. Conditions of the Contract, Article 12 of the
General Conditions:
a. Methods of determining cost or credit to the
Owner resulting from changes in the Work made
on a time and material basis.
b. The Contractor's claims for additional costs.
1..2 DEFINITIONS
A. Change Order, AlA Document G701/CM: Refer to the General
Conditions.
B. Construction Change Directive: A written order to the
Contractor, signed by the Owner, MK/Gerrits and the
Architect, which amends the Contract Documents as
described, and authorizes the Contractor to proceed with
a change which affects the Contract Sum or the Contract
time, for inclusion in a subsequent Change Order.
1..3 PRELIMINARY PROCEDURES
A. A change may be initiated by submitting a Proposal
Request to the Contractor. Request will include:
1. Detailed description of the change, products and
04/30/91
CHANGE ORDER PROCEDURES
01028 - 1
.-
_~ .'~_;:':i "~""_
location of the change in the Project.
2. supplementary or revised Drawings and
specifications.
3. The projected time span for making the change, and
a specific statement as to whether overtime work
is, or is not, authorized.
4. A specific period of time during which the
requested price will be considered valid.
5. Such request is for information only, and is not an
instruction to execute the changes, nor to stop the
Work in progress.
B. The Contractor may. initiate changes by submitting a
written notice to the Construction Manager containing:
1. Description of the proposed changes.
2. statement of the reason for making the changes.
3. statement of the effect on the Contract Sum and the
Contract Time.
4. Statement of the effect on the Work of separate
contractors.
5. Documentation supporting change in the Contract Sum
or the Contract Time, as appropriate.
1..4 CONSTRUCTION CHANGE DIRECTIVE
A. In lieu of Proposal Request, a Construction Change
Directive may be issued for Contractor to proceed with a
change for subsequent inclusion in a Change Order.
B. The Construction Change Directive will describe changes
in the Work, both additions and deletions, with
attachments of revised Contract Documents to def ine
details of the change, and will designate the method of
determining a change in the Contract Sum and change in
the Contract Time.
C. The Owner, Construction Manager, and the Architect will
sign and date the Construction Change Directive as
authorization for the Contractor to proceed with changes.
D. At completion of the change, submit itemized accounting
and supporting data as provided in the Article
"Documentation of Proposals and Claims" of this Section.
E. The allowable costs of such work will be determined as
provided in the General Conditions and supplementary
Conditions.
F. The Owner, Construction Manager and Architect will sign
and date the Change Order to establish the change in the
Contract Sum and in the Contract Time.
04/30/91
CHANGE ORDER PROCEDURES
01028 - 2
~. ,.. . ....~ ,-.,__ ~_"'>o.'''<'.._'.'-_'..~-.'.'''_'__,+~.~""",,"'' ... _ e-.... ......_ _'~.-. ~..'''__''_ ..........
....--.....-.., ~,-'-~.....-__._-'_..__._--_._~_...,_.-......_.. ~..._"...._-...._...__.~_. ,- --......-...-,.--......-..-.- -~ .-..~. '-~-'
G. The Owner and the Contractor will sign and date the
Change Order to indicate their agreement.
~ -:
1..5 DOCUMENTATION OF PROPOSALS AND CLAIMS
A. Support each quotation for a lump-sum proposal, and for
each unit price which has not previously been
established, with sufficient substantiating data to allow
evaluation of the quotation.
B. On request provide additional data to support time and
cost computations:
1. Labor required.
2. Equipment required.
3. Products required.
a. Recommended source of purchase and unit cost.
b. Quantities required.
4. Taxes, insurance and bonds.
5. Credit for the work deleted from the Contract,
similarly documented.
6. Overhead and profit.
If the Trade Contractor performs the actual
Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen
percent (15%).
If the Trade Subcontractor performs the actual
Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen
percent (15%). If the Trade Contractor does
not enter into the Work, the maximum mark-up
for managing this work will be ten percent
(10%) .
If the Trade Subcontractor performs part of
the actual Work, his percentage mark-up for
overhead and profit shall be a maximum
addition of fifteen percent (15%) on his
direct work only. If the Trade Contractor
performs part of the actual work, his
percentage mark-up for overhead and profit
shall be a maximum addition of fifteen percent
(15%) on his direct work only.
7. Justification for change in the Contract Time.
C. Support each claim for additional costs, and for the work
done on a time-and-material/force account basis, with
documentation as required for a lump-sum proposal, plus
additional information:
04/30/91
CHANGE ORDER PROCEDURES
01028 - 3
!"
1.
2.
3 .
4 .
5.
Name of the Owner's authorized agent who ordered
the work, and date of the order.
Dates and times the work was performed, and by
whom.
Time record, summary of hours worked, and hourly
rates paid.
Receipts and invoices for:
a. Equipment used, listing dates and times of
use.
b. Products used, listing of quantities.
c. Subcontracts.
signature of Construction Manager's Superintendent,
concurring with quantities.
1..6 PREPARATION OF CHANGE ORDERS
A. The Construction Manager will prepare each Change Order.
B. Change Order form: AlA Document G701/CM.
C. Change Order will describe changes in the Work, both
additions and deletions, with attachments of revised
Contract Documents to define details of the change.
D. Change Order will provide an accounting of the adjustment
in the Contract Sum and in the Contract Time.
1..7 LUMP-SUM/FIXED PRICE CHANGE ORDERS
A. Content of Change Orders will be based on either:
1. The Proposal Request and the Contractor's
responsive Proposal as mutually agreed between the
Owner and the Contractor.
2. The Contractor's Proposal for a change, as
recommended by the Architect or Construction
Manager.
B. The Owner, Construction Manager and the Architect will
sign and date the Change Order as authorization for the
Contractor to proceed with the changes.
C. The Contractor may sign and date the Change Order to
indicate agreement with the terms therein.
1..8 UNIT PRICE CHANGE ORDER
A.
The
1.
content of the change Orders will be based on either:
The definition of the scope of the required
changes.
The Contractor's Proposal for a change, as
recommended by the Architect, or Construction
2.
04/30/91
CHANGE ORDER PROCEDURES
01028 - 4
I
_ .~ ~ ..'_ ~__........~_--....~. .. . ~~__..., ...._.,.,.'-_ _______ __ ...._..,._.....___..~~......___......__-.,' ....4.-0 ...-_.
~:\~.
Manager.
3. Survey of completed work.
B.
The
1.
2.
amounts of the unit prices to be:
Those stated in the Agreement.
Those mutually agreed upon between
Architect and the Contractor.
the
Owner,
C. When quanti ties of each of the items affected by the
Change Order be determined prior to start of the Work:
1. The Owner, Construction Manager and the Architect
will sign and date the Change Order as
authorization for the Contractor to proceed with
the changes.
2. The Contractor may sign and date the Change Order
to indicate agreement with the terms therein.
D. When quantities of the items cannot be determined prior
to start of the Work:
1. A Construction change Directive will be issued
directing the Contractor to proceed with the change
on the basis of unit prices, and will cite the
applicable unit prices.
2. At completion of the change, the cost of such work
will be determined based on the unit prices and
quantities used.
3. The Owner, Construction Manager and the Architect
will sign and date the Change Order to establish
the change in the Contract Sum and in the Contract
Time.
4. The Contractor will sign and date the Change Order
to indicate their agreement with the terms therein.
1..9 CORRELATION WITH THE CONTRACTOR'S SUBMITTALS
A. Revise Schedule of Values and Request for Payment forms
monthly to record each change as a separate item of the
Work, and to record the adjusted Contract Sum prior to
submission of Application for Payment.
B. Revise the Construction Schedule to reflect each change
in the Contract Time prior to monthly submissions.
Revise subschedules to show changes for other items of
work affected by the changes.
C. Upon completion of the Work under a Change Order, enter
pertinent changes in Record Documents.
04/30/91
CHANGE ORDER PROCEDURES
01028 - 5
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED
****************
END OF SECTION 01028
04/30/91
CHANGE ORDER PROCEDURES
01028 - 6
SECTION 01100
COORDINATION DRAWINGS
PART 1 - GENERAL
1..1 SUMMARY
A. Summary:
1. Coordination drawings are a special type of shop
drawing that show the relationship and integration
of different construction elements that require
careful coordination during fabrication or
installation to fit in the space provided or
function as intended.
B. section includes:
1.
Procedures for preparation
Coordination Drawings.
and
submittal
of
C. Related sections:
1. section 01301 - Submittals
1..2 FORMAT
A. 30" x 42" blueline prints
1..3 PREPARATION OF COORDINATION DRAWINGS
A. Present required information on blueline prints.
B. Submit coordination drawings for integration of different
construction elements. Show sequences and relationships
of separate components to avoid conflicts in use of
space.
C. Prepare and submit coordination drawings where close and
careful coordination is required by installation of
products and materials fabricated off-site by separate
entities, and where limited space availability
necessitates maximum utilization of space for effeient
installation of different componenets.
07/22/91
COORDINATION DRAWINGS
01100 - 1
'.-r
1. Show the interrelationship of componenets shown on
separate shop drawings.
2. Indicate required installation sequences.
3. Comply with applicable common submittal
requirements contained in this section.
1..4 SUBMITTAL PROCEDURES
A.
B.
E. Status Meeting - The Contractor's representative and the
Construction Manager review the
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01100
07/22/91
COORDINATION DRAWINGS
01100 - 2
---.- --.-,.~ -- --~.
SECURITY PROJECT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes
1. Electronic automated computerized security
management system.
2. Provide a complete enclosed raceway system for all
wiring for security devices and controls in
compliance with NEe, NFPA-70 1990 and in accordance
with 16050 and 16111.
3. Drawings for this work are diagrammatic, intended
to convey the extent, general arrangement and
locations of the work. Because of the scale of the
drawings, certain basic items such as conduit
fittings, access panels, cabinet sizes, sleeves,
pull and junction boxes may not be shown. Include
such items where required by code, other sections,
and for proper installation of the work.
4. Equipment specifications may not deal individually
with every part, control, or device which may be
required to produce the equipment warranties.
5. Coordinate with other trades in submittal of shop
drawings. Shop drawings shall detail space
conditions to the satisfaction of concerned trades
and is subject to final review by the Architect.
If installation of equipment, raceways, cable trays
or conduit is performed prior to coordination with
other trades and interferes with work of other
trades, make necessary changes to correct the
condition at no additional cost to the Owner.
6. Provide required integration of components to
create an operational computerized security
management system providing control and monitoring
from a touchscreen CRT.
1.2 TESTS
A. Notify Architect and Owner's representative in writing,
14 days in advance of testing to prevent delays in
construction schedules.
B. Test systems and place in proper and specified working
order prior to demonstration of the systems.
C. Test system grounds to demonstrate that the ground
resistance does not exceed the requirements of the
transient voltage surge suppression (TVSS) or the
National Electric Codes (NEC).
D. Perform tests required by authorities having jurisdiction
11/18/91
SECURITY PROJECT PROCEDURES
01130-1
over the site.
E. Testing shall be in the presence of the Owner's
designated representatives, Contractor and Architect.
1.3 DEMONSTRATION
A. Prior to acceptance of the work, the Security System
Installer shall demonstrate to the Owner, designated
representatives, Contractor and Architect, the features
and functions of the system, and all subsystems and shall
instruct the Owner in the proper operation and event
sequences of the system.
B. Demonstrate each system and subsystem. The demonstration
is to consist of not less than the following:
1. Designate actual location of each component of a
system or subsystem and demonstrate its function
and its relationship to other components within the
system.
2. Demonstrate the systems and subsystems operations
by actual "START-STOP/ON-OFFIl cycling showing how
to work controls, reset devices, replace fuses and
conduct emergency operating/operations procedures.
3. Demonstrate communication, signaling and security
equipment/devices by actual operation of such
devices.
C. Demonstration of systems are to include, but not be
limited to the following:
1. UPS Power and Distribution System
2. Touchscreen CRT Operations
3. Alarm Detection and signalling Equipment
4. Door control/Monitoring System
5. Access Control System
6. situation Alarms (Hardwire)
7. Man-Down Alarms (Wireless)
8. CCTV system
9. Intercom Systems
10. Telephone Systems (Inmate/Attorney/Visitor)
11. Lighting Control
12. Fire Alarm Interface
13. Cable supervision System (Random Points to be
Selected by Architect)
D. Security System Installer/Integrator shall furnish the
necessary trained personnel to perform the demonstration
and instructions and shall arrange to have the
manufacturer' s representatives present to assist with the
demonstrations. The Security System Installer shall
allow a minimum of one week for performing the prescribed
demonstrations.
E. Security systems Installer/Integrator shall arrange with
the Owner the date and times for performing the
demonstration. The Owner will select date and time for
11/18/91
SECURITY PROJECT PROCEDURES
01130-2
demonstration.
F. Comply with requirements of section 01670 SYSTEMS
DEMONSTRATIONS.
1. Securi ty system Installer/Integrator shall video
tape in high speed, high quality, VHS format the
demonstration of systems listed.
1.4 QUALIFICATIONS
A. Manufacturer Qualifications: Company specializing in
electronic automated computerized security management
systems of the same type, scope, operation and magnitude
f or a minimum of five years. Documented exper ience sha 11
include the following:
1. List at least 10 facilities of equal size and
technical requirements utilizing the equipment
submitted.
2. For each facility, list:
a. Name and location of facility
b. Date of occupancy by Owner
c. Owner's representative to contact and
telephone number
d. Construction Manager and/or General Contractor
e. Architect
B. Use the products of a single manufacturer for similar
type equipment, i.e., motion detectors, magnetic
contacts.
C. Use products made by companies regularly engaged in the
manufacture of the type equipment specified.
1.5 IDENTIFICATION
A. Identify control and sub-control, motor and equipment
controls, remote relay cabinets, address panels, system
interface cabinets, and similar equipment with 1/211 red
lettering or as specified for individual piece of
equipment.
B. Identify pull and junction boxes in service areas,
tunnels, above accessible ceilings, and in accessible
chases with 1/211 red lettering indicating the circuit and
system. Example: Security Alarms "SY", Fire Alarms
IIFAII, circuit Number "SY-126".
C. Engraved laminated plastic tags may be used for
identification in lieu of painted lettering.
D. Provide typewritten circuit directories installed in 3
ring binders with transparent page protectors in each
control and sub-control cabinet.
1.6 RECORD DOCUMENTS
A. Provide complete schematic drawings depicting location of
interface, number of conductors, types of connectors,
circuit requirements, and type of enclosure.
11/18/91
SECURITY PROJECT PROCEDURES
01130-3
1.7 PROTECTION OF EQUIPMENT
A. Protect materials stored on the job site. Protect
materials during construction and after installation.
B. Provide and apply protective material immediately upon
receiving the products and maintain throughout the
construction process.
C. Keep products clean and dry or by elevating equipment
above ground and floor.
D. Take precautions to protect apparatus and materials from
damage. Failure to protect materials constitutes
sufficient cause for rejection of the apparatus or
material.
E. Protect equipment and factory finish from damage during
construction operations and until final acceptance.
Restore finishes that become stained, scratched, or
damaged.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED
********************
END OF SECTION 01130
11/18/91
SECURITY PROJECT PROCEDURES
01130-4
.~".'?-.',.
~....~ ....,,~.. . . ~., .
'.,. "';--'.'r.~: ".~ .-.,........----.-...."+.-. ......",-.;.....,...1.......... . _
;"-'".
:-.---.~.:.....:
--... .~ - ..~. -- -. _..
~ .-
SECTION 01200
PROJECT MEETINGS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Project meetings
1..2 The CONSTRUCTION MANAGER'S RESPONSIBILITY
A. Construction Manager shall schedule and administer pre-
construction meeting, periodic progress meetings, and
specially called meetings throughout progress of the
Work.
1. Prepare agenda for meetings.
2. Provide notice of each meeting four days in advance
of meeting date, or provide as much advance notice
as possible.
3. Make physical arrangements for meetings.
4. Preside at meetings.
5. Record the minutes; include significant proceedings
and decisions.
6. Reproduce and distribute copies of minutes.
a. To participants in the meeting.
b. To parties affected by decisions made at the
meeting.
c. Furnish three copies of minutes to the
Architect.
B.
Representatives of the Contractors,
suppliers attending meetings shall
authorized to act on behalf of
represents.
subcontractors and
be qualified and
the entity each
C. The Architect and the Owner's Representati~e may attend
meetings to ascertain that the Work 1S expedited
consistent with the Contract Documents and construction
schedules.
1..3 PRE-CONSTRUCTION MEETING
A. Location: A central Site designated by the Construction
Manager.
B. Attendance:
1. The Owner's Representative.
11/21/91
PROJECT MEETINGS
01200 - 1
.f~:; _tK.:
2. The Architect and his professional consultants (as
required).
3. Construction Manager.
4. The Contractor's superintendent.
5. Major subcontractors.
6. Major suppliers.
7. others as appropriate.
C. suggested Agenda:
1. Distribution and discussion of:
a. List of major subcontractors and suppliers.
b. projected Construction Schedules.
2. Critical Work sequencing.
3. Major equipment deliveries and priorities.
4. project Coordination.
a. Designation of responsible personnel.
5. Procedures and processing of:
a. Field decisions.
b. proposal requests.
c. Submittals.
d. Change Orders.
e. Applications for Payment.
6. Adequacy of distribution of the Contract Documents.
7. Procedures for maintaining Record Documents.
8. Use of premises:
a. Office, work and storage areas.
b. The Owner's requirements.
9. Construction facilities, controls and construction
aids.
10. Temporary utilities.
11. Safety and first-aid procedures.
12. Security procedures.
13. Housekeeping procedures.
14. Distribute meeting minutes within (3) days.
1..4 WEEKLY PROGRESS MEETINGS
A. The Contractor's Project Manager and/or Superintendent
shall be required to attend a weekly scheduling meeting.
B.
Location of the meetings:
Manager.
Office of the Construction
C. Attendance:
1. The Architect and his professional consultants as
needed.
2. Contractors as appropriate to the agenda.
3. Suppliers as appropriate to the agenda.
4. others.
D. suggested Agenda:
11/21/91
PROJECT MEETINGS
01200 - 2
.~,. .-..... -- -. .~...",.....-, --...... .. -... -.....-......~.~.., ,"- .....,...... ..
. ....;.-....
1. Review of Work progress since previous meeting.
2. Field observations, problems, conflicts.
3. Problems which impede Construction Schedule.
4. Review of off-site fabrication, delivery schedules.
5. Corrective measures and procedures to regain
projected schedule.
6. Revisions to Construction Schedule.
7. Progress, schedule, during succeeding Work period.
8. Coordination of schedules.
9. Review submittal schedules.
10. Maintenance of quality standards.
11. Pending changes and substitutions.
12. Review proposed changes for:
a. Effect on Construction Schedule and on
completion date.
b. Effect on other contracts of the Project.
13. Other business.
14. Distribute meeting minutes.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01200
11/21/91
PROJECT MEETINGS
01200 - 3
.., .,..~.~!._'-t"".""--"- ....~.-.,--.. '~',:\"",,_-,,~,,"'i[o"'."": .- ",," ....' ;-"._o!',,"-_~,-,,:''''.T.. ',..,....~....., ._,...........;- ......~~.".'-"-...-,1.-',...'.,.. .. .'~ "".......'..-'.-_,,.'.. .\~,.... _ ....... "'--,.-- ,~r.'""".'__.""_____~""'- .
SECTION 01301
SUBMITTALS
PART 1 - GENERAL
1.1 SUMMARY
A. section includes:
1. Submit to the Construction Manager, shop drawings,
product data, certifications and samples required
by the technical sections.
2. Prepare and submit a separate schedule listing
dates for submission and dates for review.
B. Related sections:
1. section 00750 - GENERAL CONDITIONS
2 . Individual submittals required: refer to each
specific section, for certifications, shop
drawings, product data and sample requirements.
1.2 SUBMITTAL TRANSMITTAL FORM
A. Attached, and made a part of this section 01301, is a
copy of the submittal Transmittal Form, which shall be
filled out by the contractor and submitted with each and
every submittal. Follow the instruction sheet, also
attached, for directions on this procedure. It is
essential that the submittal Transmittal Forms are filled
out in their entirety for the system to function
properly.
B. Transmittal Form, originals for contractors use, will be
supplied by the Construction Manager, and is a 6-part
form.
1.3 SUBMITTAL SCHEDULE
A. The Contractor shall submit wi thin seven (7) days of
award of the Contract a preliminary "Submittal Schedule"
to the Construction Manager for review, modification and
response. No payment applications will be processed
prior to finalizing the submittal schedule. The
"Submittal Schedule" shall contain the following
information:
1. Specification section number and name.
2. Specification section paragraph identification
which describes submittal requirement.
3. Submittal information required, (i.e., sample, test
data, shop drawing, etc.).
08/20/91
SUBMITTALS (~DD.1)
01301 - 1
B. The Contractor shall also supply the following dates in
order to meet the project schedule.
1.
Date submittal is scheduled to be submitted and
received by the Construction Manager.
Date contractor has scheduled to order material or
equipment or the submittal item.
Date contractor has scheduled delivery to job-site
equipment or the submittal item.
Add any remarks or unique items that the CM or A/E
should be aware of.
2 .
3.
of material or
4.
c. The Contractor shall allow a minimum of (2) weeks for
review of submittal by A/E (in calendar days).
D. The submittal master record will then be used to track
submittals within the process.
1.4 SHOP DRAWINGS
A. Submit legible shop drawings in the form of positive
printing reproducible transparencies, commonly called
sepia prints, suitable for reproduction use on dry print
diazo type machines. Sepia prints which cannot be
reproduced will be returned to the Contractor for
resubmittal.
B. Provide shop drawings as complete submittals (no partial
sets) on original drawings or information prepared solely
by the fabricator or supplier. Deviation from complete
submittals will only be allowed by pre-arranged method.
C. Do not reproduce the Contract Drawings for shop drawing
submittals.
D. Sheet sizes shall not exceed the size of the Contract
Drawings.
E. Each sepia print shall have blank spaces large enough to
accept 4" x 4" review stamps of the Architect and the
Contractor.
F.
Each
1.
2 .
3 .
sepia print shall carry the following
Project name and contract number.
Date.
Names of:
a. The Architect
b. The Construction Manager
c. The Contractor
d. Supplier
e. Manufacturer
information:
08/20/91
SUBMITTALS (ADD.1)
01301 - 2
'1:
. - "':..{:
4. Identification of product or material.
5. Relation to adjacent structure or materials.
6. Field dimensions, clearly stated as such.
7. Specification section number.
8. Applicable standards such as ASTM or Federal
Specification.
9. Identification of deviations from Contract
Documents.
10. Reference to construction drawings by drawing
number and/or detain number.
G. Submit sepia prints without folds either as flat sheets
if size permits, or rolled in tubes.
H. The contractor shall submit (2) reproducibles and (4)
blueline or blackline sets to the CM. The CM will return
(1) reproducible to the contractor after review/return
from the A/E.
1.5 PRODUCT DATA
A. Product data such as catalog cuts, brochures or
manufacturer's sheets may be submitted in lieu of sepia
prints if adequately identified. Submit seven copies of
product data to the Construction Manager.
B. Modify product data sheets to delete information which is
not applicable to the Project. Provide additional
information if necessary to supplement standard
information.
C. Product data sheets that are submitted with extraneous
information not deleted and/or modified will be returned
without review to the Contractor for resubmittal.
D. The contractor shall submit at a minimum, (1) original
and (6) copies to the CM. The CM will return (2) copies
to the contractor after review/return by the A/E.
1.6 SAMPLES
A. Provide samples to illustrate materials, equipment or
workmanship, and to establish standards by which
completed work may be judged.
B. Construct mock-ups as required by the technical sections,
at the Project site in a location designated by the
Construction Manager. Construct mock-ups, including
adjacent work required, to demonstrate the final
appearance of the Work.
08/20/91
SUBMITTALS (ADD.l)
01301 - 3
C. The contractor shall submit (3) samples to the CM, and
(1) will be returned to the contractor after
review/return from the A/E.
1.7 CERTIFICATIONS
A. Provide certifications as required by various technical
sections on the Contractor's letterhead stationary.
certifications shall be identified to this Project, dated
and bear Contractor's signature in the same format used
for the Owner/Contractor agreement.
B. Clearly identify the materials referenced and state that
the material and the intended installation methods, where
applicable, are in compliance with the Contract
Documents. Attach manufacturer's affidavits where
applicable.
C. The contractor shall submit (1) original and (6) copies
to the CM. The CM will return (2) sets to the contractor
after review/return from the A/E.
1.8 THE CONTRACTOR'S RESPONSIBILITIES
A. Before making submittals to the Construction Manager,
review each submittal, make changes or notations as
necessary to conform to the Contract Documents, identify
such review with review stamp and forward reviewed
submittal with comments to the Construction Manager for
review. Return submittals not meeting Contract
requirements to subcontractors and do not forward such
submittals to the Construction Manager.
B. Submit catalog sheets, product data, shop drawings and
where specified, submit calculations, material samples,
color chips or charts, test data, warranties and
guarantees all at the same time for each submittal item.
C. Verify field measurements and product catalog numbers or
similar data.
D.
Clearly identify on the
Construction Manager
submittals from the
Documents.
submittal and transmittal to the
in writing of deviations in
requirements of the Contract
E. After the Construction Manager's and the Architect's
review, distribute copies with one copy to be maintained
at the Project site for reference use and other copies
distributed to suppliers and fabricators.
08/20/91
SUBMITTALS (ADD.1)
01301 - 4
"
F. Do not begin the Work which requires submittals until
return of submittals with the Construction Manager's and
the Architect's stamp and initials indicating review.
G. The Contractor's responsibility for errors and omissions
in submittals is not relieved by the Construction
Manager's or the Architect's review of submittals.
H. The Contractor's responsibility for deviations in
submi ttals from requirements of the Contract Documents is
not relieved by the Construction Manager's or the
Architect's review of submittals unless the Architect
gives written acceptance of specific deviations.
1.9 THE CONSTRUCTION MANAGER'S RESPONSIBILITIES
A. The Construction Manager will return to the Contractor,
without review, all submittals not bearing the
Contractor's review stamp or not showing it has been
reviewed by the Contractor.
B. After the Architect's review, the Construction Manager
will forward submittals to the Contractor and retain one
copy for the Owner. The Contractor shall distribute
copies including other copies distributed to suppliers
and fabricators. The Contractor shall supply copies of
reviewed submittals to the Construction Manager in
sufficient quantity to allow proper coordination of the
Contract.
1.10 THE ARCHITECT'S RESPONSIBILITIES
A. The Architect will review submittals with reasonable
promptness, checking only for conformance with the design
compliance of the Project and compliance with information
given in the Contract Documents.
B. The Architect will make changes or notations directly on
the submittal, identify such review with his review
stamp, obtain and record the Architect file copy and
return the submittal to the Construction Manager.
****************
END OF SECTION 01301
08/20/91
SUBMITTALS (ADD.1)
01301 - 5
" ^,:.'j -
;..;c'-i/2;~;~,.l::~;"J: I I I
,.'-'.. ',,- ,'.' I I I
'd,; . ....' , 'c.,. I
I I I
.,/,;.~, I -1 ~~'"
I >0
I I ~~8
~~ I
-
f- lj
Z ~
t.Ll
~
::>
u -
... 0 Gi
0 Q ~
u
g f t.Ll
C U
~ 8 z 6
~ ll.. ~ t.Ll z
,; C ~ ~
0 ~ ~
U u 0
ll.. III
U t.Ll ~
0 ;c ~
0 t> -g.. - ~
I I z III
~ ~ ~
g ~ Ul
0
g "' ,; e Z ~
0 tIl . ,g 0
Z ~. U 6
,; ~ z
a:l ,; g ~ C2
::> a:l '8 Ul
II) ::> tIl .. ll..
~ ::> u ::>
!3 ,; 0 p:: - II)
Z ~ Vl ~ U ~
~ ;;;
c
I I ~ f-- ,;
ll.. ~
tL.- -
O~
*,U
~ ,---
Ul
$' ~ -
] u
~ - co
~ 0
0 -
~
u
;;;
(:)
~ -
;Z 0
0 ~
::;; ~
~ U ~ ::E0
0 c:l ~
..J ::l U
0 ~ 2 Vl -
*'
0:: ~ Ul ~ ::E -
p... 0:: \i ~ 's t:-8
::;; .~ t: - E
0 or. tL. _
'" c
....... b f o ~
~ c
~~ ~ Ul E-< Z .;;
~ ~ ..., U Q &
0 i<
0- 0: (:) t~
{: ~ U
~ ~ - - '-'
~t) ~ ""'
U ~
.......1- V) ::>
U~ ::;; t:.J ;;;
c:: c
~ 00 00
>--p... 0 Vi
E- ~g u ~
0 '"
Z 0<"> ... ..!:!
;:J ~~ ;Z c ~
E- u c -
0 ...l _ U v
Of- :.:.l E 8
U UIIl V) ,g ..
ci~ z - ~ Z ~
W 0 "a '-'
...., ~ ~ l~
0 O~>- ;. 'II: ~
'u I
0:: ~V)~ u u ::E I
u I
z E 0: E I
0 0 u
Ul ;;;
II :E 0 0.. (:) I
III
f-
.
:-'
.........',!.-...
.~t'
~
<' A ch ~
-;<Oi 13il OZ5.
ijj i~ 1~ 11
sa ~: -u oi
9f -0 ~g a ~c~
...Q; f].!!;b fIl 1:
~ ~ o=~;g. ~~~
c ~ ~ 'S:'s'g~'. ~ ,g"li.
o _ c .~ ~.g.. ~ ~'ri .- u e-
8 208 ....."--..e Y..cc
: ~1~ fi~l:oi ~~~ ~-~
.. ::'::'s" :6<< ~ -= ~ :; "- 'Q .5. ::)
~ .g= ~~cg~ 'Qo~ ~~~
f ~! ~~g~~ ~~3.. ~~~
-c .. c~~l: cU"ol: u"e"-~
8 .:.: 5 ~ :g e l:: ""8 .g ::::-.... e :0 0. 8 rl 8
~"'u ~~fIl ~ "Ui::) ~J 0
E Ci.c ..-c~u ~'Q'Qc __u-~
0" .. ~ - N 0 ~ .2 ..'~ - 8 " .c .. 0. e 'Q 5 ~
..: 0. '-'---t'C~ eo -0.. vo.. =' c
.. o"'~u~_o ccge ~"eu~u
.. !l...t~~-=cl::~ ~c-~ e~"'~~~
'':: :..:: 'Q ... e u '-K.'~'S -=<< U e ::I.. C 'Q ~ 0
-e ....~2~- e~ U-o." cu~cu~
2.. ==..~::)~ "-~ c=o~ -~-....~
!c iieQ~~~u~ ~loc~J~lus.!!
2~ 2~~ ..~.c-=~ g::)~~"-fIlc~~~~
9 _ e f U ... - .... c ''::; - .. B ::I ~ c .!l c 0
~e~__~u-~~og~~~uce~~""o-
::.::C-uucb.....~u~ C ~-Ori...~~e..
u~.c-=u=:g~~e~e~&~l::'Qf~-=~eg
~.._ .c~ ..c" uU~ "-- u c~o
~~~~~~~~"-_z<=a~zfllQa"~..ue
c
~ ~~~ ~~~~~~~~ ~8
~
.s
S>
::I
t
X"
~
c
u
~
~
z
o
-=
~ ~
e a
f.,J : .0
~ ~.,'~
.5 .;; .; ~
~ -g.;a
_c ~~~
~ t U::l-
.-- :'="c
e ~ g: i .-
~- ::IE13
11: ~;:!Q,
c: :!i ~ ~ .~
oE'~9~u
S 8 'Q u 'S: .&>
.~ ,.g ~ 'u 0
E~UC~-
.D-~-Q...~
='s_u....lO
Vi:::~o8~
~ I 's ~ .!! l:
13z~~~P-8
:::"uVl'Q2::1
's ~ -= .. 'i 8.':
...~...."I..o'Qrt.!!
..cfJ- c::t:-
!e~!!~" 's
~-13:S"uc
.6 !! .- .- C 8 ~ ~
go] ] 8 Z &~
u
t...:f'll'l ~. '"
..
x'S
~
~
~ 2
x~
~
. ..
o
o
g!
.ll
~!
~
-~ ~ D
~~;
> . "
~\y
~ "" I- iG ~
@ D- z
c:
- ~
~
9 ~ ~ (~ ~'
~ g
~ l:J
.. U
::r
~ 8 @ g z iQ ~
.. l:J -
oX a: ~
@~ ~ B: @
I I .. UJ
0 "
~ b=; I)~
~ g ~ ~ i ,at
::( ::E 1=
! !: ~ ~ z
i := 0
:!: 1 <<.; ~G ~
OJ, 5 ... ~
il@ ~
5> '" z
oJ ~ ~
'" cS
..
G ~ ~ ~ :;--.,
I =~ y ~
~8 .. : ::I:
~ G \\
~ t
~ l 'y @
::>
@ :<
~ " "
z ~ ~
t;J z
:::E 9 c ~
t;J I f= E
> ~
0 q ~ ~
I -
:::: :::E ..
Q.. - - , "
:::E IV ,.. ] ::I: ,
;;:: v ,.. ~
..... , f= ! G~
<!:::E~ ~ - "
~ , ..
~ -
.....<< ~ .
'- :::: . it t :; " ~
=-cr :< i:
<at: ... .. i
u;:,:::::E ~ ~ :< @ ~
>-o..</) ~ ,
'- Z i ~ :: @
Z. <
IV ~
:::l 1= - z
0 - i
U v :,; .,
;.:J " i~ ;
a ~i ~~t-n~
:::::
~ ::1:"- :( ~ . ,"-
'-, ~
;, ! ':j' " 2 ,
l5
u
e
~
e
.g
~
i
...
e
.... .-
g ~
u ._
] ~ f~
o I::l 0"
~<~U]
.!! ~ '- g :5 ~
<<;13i.... 0
~ u .; - E E c !!
tc~c=2~ C
~~c~~~5 8
~ c e . ... ... -c u 0
e K. - .- .- .- 0
~..'Qsss.5 8~
v::IB___c. Og
~ .. u .- .- .- "u E
~uo..5~~fIla~::I
.-S6c:cC~ot::-
coo!!!! f!:::-oe
f-u---o..~->-
~!! !! !! ~ .~ 0 ~ c.
o 8 ~ .. ~ .. .- u 8 8
::E aaoaae u
~ . .. ~ g ~
~O::";:::~~NOii5:s:
cd
'0
o
....
'S
cr
o
....
'0 -
Q) ~
.E .... ~
f/} E"E '8 a
~.flo ;::I 0..
"";;;;~ .0 ~
~ "'0 V'l 0
o Vlfll Q)O
u~~>~ ~
"'0 "E ~ ad "'O~
~~2g.~....~
o 0.. 0. .... os: Q).s:
~o..o.aQ)-5Q)
~<<z~o~
~
<<CjUQO~
Vl
c.o
.5 ro ~ V'l
~ ~ .9 ~
~ "0 ..... .9
tI:l~c.o~~"'"
w~a":=:.;:~
"" 0. - c.., - "3
~aSEt:~
8~u~du
I.::J
c...
-.
~
'C
~ ~
~ ~
'8 e
.5 .~ 0
" "- ....
~ ~ ~ ~
...!! .... Q, 8
~ s u I::l';;; ~
~'~~~iY~
1o)2_~<rJ
~e"""....c
j _ ~ = 0';
_!!"-~!!u
.c.."-",,..""
~o<ii5a9
t:::~~~~
v
Vl
c
,9
.....
~
u
t:::
c:a
::I
.....0
~.~ -.......
~~~....Jr5
..........E:::-....
c: ['<j ~::I
~ Q .... 'C '0
t:.....~~~
~V'l.....~O
~~j~P:
. . ... ~ . .~:.; .. '~...-.~.. ""~ -.. .--......~.-,"+...... /~..."O-'.'.-~ t...., -:........, "'<""';' ~~ , . F"-'--. ",
__.._ ..' ~ _... ......, __,~.---,,_~"'__"_"""'~ ______~~_, _._ ~._ _____ __..~._____..._. ~... .....'____.._r.____'_....._.~_.... ..~__"....~.....'*-___......._..'_" _.._............. ....-0">-._ ...._.
It'",
. , ,~ ':~j-.~.,.-
.. .. . ,..,.. ~
. '.'~ ..'.~......
-, . .'. .~ ;:_.~~;;_ i:i:-:.:-'
SECTION 01310
PROGRESS SCHEDULES
PART 1 - GENERAL
1..1 SUMMARY
A. Section includes:
1. Progress schedules
2. Revisions to schedules
B. Related sections:
1. SCOPE OF WORK
C. Description:
1. Progress Schedules:
Promptly after award of the Contract, prepare and
submi t to the Construction Manager, construction
progress schedules for the work, with subschedules
of related activities which are essential to its
progress. Also incorporate manpower loading
related to each activity on the construction
schedule.
2. Revisions to Schedule:
Submit revised/updated progress schedules with each
payment application.
1. .2 FORMAT
A. Prepare Progress Schedules as a horizontal bar chart with
separate bar for each major portion of Work or operation,
identifying the first work day of each week.
B. Include numeric manpower loading associated with each
horizontal bar, clearly defined.
C. Scale and spacing: to provide space for notations and
revisions.
D. Sheet size: minimum 8 1/2" x 11".
1. . 3 CONTENT
A. Indicate complete sequence of construction by activity,
with dates for beginning and completion of each element
of construction.
OS/20/91
PROGRESS SCHEDULES
01310 - 1
B. Show the manpower loading for each activity.
C. Identify each item by Specification section number.
D. Identify work of separate stages and other logically
grouped activities.
E. Identify work of separate floors and other logically
grouped activities.
F. Provide sub-schedules to define critical portions of the
entire schedule.
G. Indicate accumulated percentage of completion of each
item and total percentage of Work completed, as of the
first day of each month.
H. Submit separate schedule of submittal dates for shop
drawings, product data, and samples, including the Owner
furnished products and products identified under
allowances and dates reviewed submittals will be required
from the Architect. Reference section 01301
Submittals.
I. Indicate delivery dates for the Owner furnished products.
J. Coordinate content with Schedule of Values specified in
section 01370.
1..4 REVISIONS TO SCHEDULES
A. Indicate progress of each activity to date of submittal,
and projected completion date of each activity.
B. Identify activities modified since previous submittal,
major changes in scope, and other identifiable changes.
1. Major changes in scope.
2. Activities modified since previous submission.
3. Revised projections of progress and completion.
4. Other identifiable changes.
C. Provide a narrative report as needed to define:
1. Problem areas, anticipated delays and the impact on
the schedule.
2. Corrective action recommended and its effect.
3. The effect of changes on schedules of other prime
contractors.
OS/20/91
PROGRESS SCHEDULES
01310 - 2
.~.__..~.
. .' .....- ..........; ,'. . . ". '. \,~...,.."
"~
".'r.
1. . 5 SUBMITTALS
A. Submit initial schedules within (3) days after award of
Contract.
1. The Construction Manager will review schedules and
return review copy within ten (10) days after
receipt.
2. If required, re-submit within seven (7) days after
return of review copy.
3. Submit revised Progress Schedules with each
Application for Payment.
1..6 DISTRIBUTION
A. Distribute copies of the reviewed schedules to:
1. Job site file.
2. Subcontractors.
3. Other concerned parties.
B. Instruct recipients to report promptly to the Contractor,
in writing, any problems anticipated by the projections
shown in the schedules.
Note: It is not incumbent upon the Construction Manager
to notify the Trade Contractor when to begin, to
cease, or to resume work nor to give early notice
of faulty or defective work, nor in any way to
superintend so as to relieve the Trade Contractor
of responsibility or of any consequence of neglect
or carelessness.
**************
END OF SECTION 01310
OS/20/91
PROGRESS SCHEDULES
01310 - 3
...-_-._.__.-.,.-.-.....,..:0:-;..... .- ..._...._..--_....n ,_...."..-.. ..... ~"'..
..... - .'--'-'~- ... .......
- .......... '---'- >--'--
...._............-Io'.;;,;~."....~....,.~-._,~~Z".,.--'~.,....'",._....;~.... '-''J_'1l_-'''-''''_'_- "''''........"....-......,...... """"-' ,-.. -'.'
.';.:
SECTION 01370
SCHEDULE OF VALUES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Schedule of Values allocated to the various
portions of the Work, submitted within three (3)
days after award of the Contract.
2. Upon request of the Construction Manager, support
the values with data which will substantiate their
correctness.
3. The Schedule of Values, unless objected to by the
Construction Manager, forms the basis for the
Contractor's Applications for Payment.
1..2 FORM AND CONTENT OF SCHEDULE OF VALUES
A. Type schedule on AlA G703 Form; the Contractor's standard
forms and automated printout will be considered by the
Construction Manager upon the Contractor's request.
Identify schedule with:
1. Title of Project and location.
2. The Architect and Construction Manager.
3. Name and Address of the Contractor.
4. Contract designation.
5. Date of submission.
B. List the installed value of the component parts of the
Work (broken down into labor and material and physical
location) in sufficient detail to serve as a basis for
computing values for progress payments during
construction.
C. Follow the Specifications as the format for listing
component items.
1. Identify each line item with the number and title
of the respective major section of the
Specifications.
D. Itemize separate line item cost for each of the following
general cost items:
1. Mobilization.
2. Bonds, Insurance and Permits.
3. General Conditions spread over project duration on
monthly basis.
04/30/91
SCHEDULE OF VALUES
01370 - 1
:J.,-'~?:{:,~<i~l'!",:.;__".
.~~"..;r;""'~
4. Clean-up.
5. Submittals.
6. Safety
E. For each major line item list sub-values of major
products or operations under the item.
F. For the various portions of the Work:
1. Include a directly proportional amount of the
Contractor's overhead and profit for each item.
2. For items on which progress payments ...d.ll be
requested for stored mater ials, break dmvn the
value into:
a. The cost of the materials, delivered and
unloaded, with taxes paid.
b. The total installed value.
3. Submit a subschedule for each separate s.tage of
work specified in section 00300.
G. The sum of values listed in the schedule shall e~lal the
total Contract Sum.
1..3 SUB SCHEDULE OF UNIT MATERIAL VALUES
A. Submit a subschedule of unit costs and quantiti€~s for:
1. Products on which progress payments ...dll be
requested for stored products.
B. The form of submittal shall parallel that of the Schedule
of Values, with each item identified the same as 1the line
item in the Schedule of Values.
c. The unit quantity for bulk materials shall include an
allowance for normal waste.
D. Provide unit values for the materials as follows:
1. Cost of the material, delivered and unloaded at the
site, with taxes paid.
2. Installation costs, including the Contractor's
overhead and profit.
E. The installed unit value multiplied by the quantity
listed shall equal the cost of that item in the Schedule
of Values.
1..4 REVIEW AND SUBMITTAL
A. After review by Construction Manager, revise and resubmit
schedule (and Schedule of Material Values) as required.
04/30/91
SCHEDULE OF VALUES
01370 - 2
'"
.... --'." ~ ..........,......~~. ~...._:.~.:~.~r:.:"':..~. lI+'n"=~:..-""",,",:,,,....=_;:'~~"'-=--_-.~::_.:,;~:-,-:-.-, -
';~~F.:'
B. Resubmit revised schedule in same manner.
*************
END OF SECTION 1370
04/30/91
SCHEDULE OF VALUES
01370 - 3
.... ,. ~
, "7'" .~;.;. .
... .
": -"l
I ;.
"j
SECTION 01385
DAILY CONSTRUCTION REPORTS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Requirement for Daily Construction Reports by each
Trade Contractor.
2. Scheduled submission times for Daily Construction
Reports.
1..2 FORM AND CONTENT OF DAILY CONSTRUCTION REPORTS
A. Daily Construction Reports shall be submitted by each and
every Contractor performing work on the project. Forms
to be used will be furnished by the Construction Manager.
Items to be addressed on the Report are:
1. Title of Project
2. Name of Trade Contractor
3. Date and day of Report information. For example,
you performed work on Thursday, April 18, 1991, so
you would therefore use "Thursday, 4/18/91." This
holds true even if you did not complete filling out
the Report until Friday, 4/19/91.
4. Contract designation.
5. Note any major Shipments received on that
particular day.
6. Note major equipment used that day.
7. Note manpower used, and designate what trades. For
example, if you were the mechanical contractor, you
would also list how many insulators, pipefitters,
etc. that you were also managing, even if they were
subcontractors. In addition, list the names of the
subcontractors that were on-site that day.
8. Note any deficiencies in your work, and corrective
actions taken to resolve the deficiencies.
9. Note any safety violations discovered, whether or
not caused by your forces.
10. Provide a full description of work performed that
day, and any problems or unusual conditions
discovered.
11. Report is to be signed by the authorized
representative of the contractor, and should the
signature not be legible, print the name of the
signer next to the signature.
11/21/91
DAILY CONSTRUCTION REPORTS
01385 - 1
1..3 SCHEDULE OF SUBMITTING DAILY REPORTS
A. Daily Reports are to be submitted at the designated
location described in the pre-construction meeting.
Contractors are to submit the original of their report,
and should keep a copy for their records. The
Construction Manager's photocopying facilities are not to
be used in the reproduction for submission of the
reports.
B. Submit Daily Reports no later than 9:00am the day
following the day of the work described in that
particular report. No exceptions to this rule will be
accepted. Should contractor fail to comply with these
instructions, the contractor's payment application for
the following month will be held in abeyance until such
time the contractor properly submits the delinquent
reports.
*************
END OF SECTION 1385
11/21/91
DAILY CONSTRUCTION REPORTS
01385 - 2
'~-,"","'~-'-~.:J'1!I.~..~.-,.-~.~~.-~,"" "~-);~~'"l,.'.''''~",:,"..'':':::-'_.'O'<l".",-.--",.:.,.:.-. .,'-,.-~-,. ~.--,.,.-\.,- - ,--,... .-oc"--.-".-" ~ .........."'~~,~~---:.,. C-'r' '.,-,-,,,,.~. A....._..-..... "','" ". - .__ ,. ".,r.. _ '_ ....... ___ ",-<>
...7.... _ ....._.."...~< ,.,......-,..__"'..-._ _'~ ,__ .","0__ ..' -r.-'''_ ._
_..._.-=........._-_..,.__.._.""""---......._......._...._....~...~..._.-----.....--..-... ",-'---"'~"_.-'."" ... - -....,,'...-, .,...,...,......_.~..............,,.. 'r:.,:. - "'o' ~ ,;, -,' .....if'''' ..,........ ......:'o...~:.::1Q!""" "z'.,...~........"'....~~~ ..... ~-::--~~...~--=-:.~~'t...~.c;i-:. ......
SECTION 01395
DOCUMENT CLARIFICATION REQUESTS (DCR)
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Notification of Construction Manager in the event
errors, field conflicts, and omissions are found in
the Contract Documents, or clarifications are
necessary.
2. utilization of DCR form.
B. Related Sections:
1. General Conditions Article 2.3
2. General Conditions Article 8.3.2
3. General Conditions Article 12.3
1.2 FORM AND CONTENT OF DOCUMENT CLARIFICATION REPORTS
A. All errors, field conflicts, and omissions in the
Contract Documents shall be brought to the attention of
the Construction Manager immediately. If clarifications
are necessary, the request is to be conveyed to the CM.
The DCR is a tool established to provide expedient
clarifications of contract drawings, specifications or
field conflicts. It is not meant to be a substitute for
good communication.
B. The DCR is not meant for formal notification of extra
work. Reference General Conditions paragraph 8.3.2 and
12.3, when formal correspondence is required for formal
notification of time extensions, and for cost change
notifications.
C. The contractor should propose a solution, and enter on
the form in sufficient detail necessary for the A/E or CM
to confirm the contractor's proposed solution.
D. The contractor is also required to mention all other
trade work which is affected by the problem, and all
trade work which will be affected by the proposed
solution.
11/21/91
DOCUMENT CLARIFICATION REQUESTS
01395 - 1
1.3 UTILIZATION OF DCR FORM
A. The CM will make available the DCR forms fOl: the
contractors use. Attached is a copy of the DCR forn t and
the instruction sheet.
*************
END OF SECTION 1395
11/21/91
DOCUMENT CLARIFICATION REQUESTS
01395 - 2
~. .
'o.t"'''''J ~",..~....~.~~_.....-w:;._A.""'"X_''' --"....-~ .'-'IIO:'.__._-..-......~------~._-'_....-_-_...__..,.,._-.....4_~_..............'__..~_..._"Wl._"".' '10'--..........-. ..1"..,........_-.~.-,.-... r..~..
- . ~~
o .. ..:,- ., '<.,"7"~~:.-',j::~~...;:t :"-. .., ...... ,'~~..~-;"" '. .'~,.~~.:.~r'~..;;.,),4,.".;:).... .,;,.~:~~.:7"
DOCUMENT CLARIFICA nON REQUEST :f:':"i.'
From:
Morrison~ Kn udsen/Gerrits
P. O. Box 5283
Key West, FL 33045
(305) 292-7845
Contract No.
Receipt
Logged:
Problem By:
AlE Projcct No.
Civil
Dwg/Spec No./RevisionlDetaiIlSect No.
Structural
Architectural _Sccurity _PLB
HVAC
Electrical
Specs '
Subject:
Problem & suggested solution:
MKJG Rc\'iew:
Solution:
Solution by:
Date:
MKJG:
Date:
DOC\JMINf OAlUnC\.TION lEQUES1' No. (&)
FIOIII: To: Morrison-Jr.nucloclWcnws Con.,.", No. C~j
'@ . r, O. Bod2lU
K.er WCSl., Fl 33Ool~ Ileceipt CD
.- -' 1)05) Z9J. 7lI4~ Loued:
I'tabl<m Blo (1. ) ~~ ....
- (1';
A!E '";0<< "" -(10) .
r,,5 _CiwII _krwa.ral """""".... s.c."'! 'LA HVAC' Ekanal ~
~ iCO I .
,roWcMi 6 "ff'CSWIlI aoI_uoa-
- -
(in
I .."oe; J<nww- ~.\
$oI.UOl.:
('\.., ,\'Y
~ (~.s It!c.I:. (ti,' l:i!& 111- I~ (I~
>-.....
-:'i-,.-
!;)'..COl"':r.actorf
.~:::~ _,~y. ::.-:,~:,_ 1:
.:1.A;i.TrOlIll<'I't-.e OCR ..ill a}-..'a}'5 be froll the prh>e contractor.
'J( ,.~:::,.Suhcontractora to the prba contrlkctor ..hlkll aubait OCR',
,43 ." ~_ throU,9l;1.their pr~lI>e CO:1trlletor.;
. .~: ~.,t.) I ~. ..., "
2. rroblelll BYl This can be the subcontractor, or the prhH
contractor, . or the t'st..bli5hed prilL. contracto'
representative, or the established subcontracto
representative.
- ~ ;,; .
Contract No.: This is the ,'pproved contract,
number.
4. Dra..'ing 'Ho.: Here insert as much info=ation as possibl.
to describe the location in the contract documents of th
pllrticular problem you are asking clarification. Includ.
revision level of dra,,'ings, and date. Include del-ai
numbers, include section numbers, include specificatio:
section nu~ers, paragraph locations, all as applicable
3.
.trac'
5. civil, structural, etc.: Here note the p<".rticula:
division of ~ork the OCR applies to.
6. Subject: Here insert brief, clear, concise captio'
subject, ~hich is representative of problem area.
7, Problem' suggested solution: Describe in as much detai
as necessary, the problem to ,,'hieh clarification i,
needed. If additional space is needed, add extra sheet
to back, and reference attachments in this area no. 7
Draw sketches it necessary. Make photocopy ot particul~
dra~in9 detail and attach if necessary.
B. By Morrison-Knudsen/Gerrits:
8. OCR No.: Humbers ~ill be assigned as follows:
xx-
Project
xxx-
Contractor No.
XXX
Sequential Ho.
For instance, the first OCR from the contractor e
Contract No. 001 on the New Detention Facility, ~ocld be
K,j-001-001
As another example: The seventh consecutive OCR loggf
on the Ne.... Detention Facility, was received frolll U
contractor of Contract No. 005, would be:
K,j-00S-007
9. Receipt Logged: This ~ill be the dllte received by tl
CH from the contractor, and ~ill serve as the referene
date.
10. A/E proj ect No.: The A/E I S proj ect nUIl',be I' ... ill
inserted here, ~here and ....hen applicable.
11. MK/G Revie~: This ....ill be the signature or initials (
the construction Manager, upon revie~ of the problee
~Ith the date of sign-Off.
12. MK/G Revie....: This ....ill be the signature or initials (
the Construction Manager, upon revie.... of the solctior.
13. Date:
off.
This ~ill be the date of MK/G revie~ and siq
C. By Architect/Engineer:
14. Solution: The A/E ~ill here insert the solution to t
probler.:, or ar.s...er in some other fashion t,
clarification being requested. The A/E Il'.ay l',er<.
confin=. the 'contractor's proposed solution.
15. Solution By: The entity providing the solution is
sign here. This Il',ay be the Construction Manager ...~,
particular clarifications are being requested that c.
be ans...ered by the CY.. Otherwise, it ,,'ill be the ;..
representative.
16. Date: This ,,'ill be the date of sign-off, or ce.s....er;:
the OCR by the A/E.
D. part-By-Part Distribution of 6-part OCR Form:
a. When the contractor submits OCR, he ~ill retain ;erL
copy.
b. Khen received by the contractor, CM ..'ill retain F:
copy.
c. The OCR then is submitted to the A/E. Once ans,,'ered, L.
A/E returns to CM, but retains ~ copy.
d, CM revie~s ans~er, and sends ~. copy back
contractor. CM ~ill retain original \o.'hite copy
office fiJ~~ 2~d f~'e copy ~ill gc to the jct-s~~e.
"
~i.'>~
,:,~:;.~.l '.. :. .
'.-',.,..-. .:",
SECTION 01410
TESTING LABORATORY SERVICES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Selection and payment
2. The Contractor submittals
3. Testing laboratory responsibilities
4. Testing laboratory reports
5. Limits on testing laboratory authority
6. The Contractor responsibilities
7. Schedule of inspections and tests
B.
1.
2.
3.
section 00750 - GENERAL CONDITIONS
section 01700 - CONTRACT CLOSEOUT
Individual Specification Sections: inspections and
tests required, and standards for testing.
1..2 REFERENCES
A.
ASTM D-3740 -
Practice for Evaluation of Agencies
in Testing and/or Inspection of Soil
and Rock as Used in Engineering
Design and Construction.
B.
ASTM E-329 -
Recommended Practice for Inspection
and Testing Agencies for Concrete,
Steel, and Bituminous Materials as
used in Construction.
1..3 SELECTION AND PAYMENT
A. The Owner will employ and pay for services of an
independent testing laboratory to perform specified
inspection and testing where so indicated to be performed
by the Owner in technical Specification sections.
B. Employment of testing laboratory shall in no way relieve
the Contractor of obligation to perform the Work in
accordance with requirements of the Contract Documents.
11/21/91
TESTING LABORATORY SERVICES
01410 - 1
:'Y";'~"-.---
~1!
1..4 QUALITY ASSURANCE
A. Comply with requirements of ASTM E-329 and ASTM D-3740.
B. Testing laboratory: authorized to operate in the state
of Florida.
C. Testing laboratory staff: maintain a full time
registered Engineer on staff to review services.
D. Testing Equipment: calibrated at reasonable intervals
with devices of an accuracy traceable to either National
Bureau of Standards (NBS) Standards or accepted values of
natural physical constants.
E. Meet "Recommended Requirements for Independent Laboratory
Qualification", published by American council of
Independent Laboratories.
1..5 TESTING LABORATORY RESPONSIBILITIES
A. Test samples of mixes.
B. Provide qualified personnel at the site. Cooperate with
the Architect, Construction Manager and the Contractor in
performance of services.
C. Perform specified inspection, sampling, and testing of
Products in accordance with specified standards.
D. Ascertain compliance of materials and mixes with
requirements of the Contract Documents.
E. Promptly notify the Construction Manager and the
Contractor of observed irregularities or non-conformance
of the Work or products.
F. Perform additional inspections and tests required by the
A/E and Construction Manager.
1..7 TESTING LABORATORY REPORTS
A. After each inspection and test, promptly submit three
copies of testing laboratory report to the Construction
Manager.
B. Include:
1. Date issued
2. Project title and number
3. Name of inspector
4. Date and time of sampling or inspection
11/21/91
TESTING LABORATORY SERVICES
01410 - 2
'''g'M~'' .
'1:'(~. ";~
, .....' -
:,;,:-. ,~>; 7.
~:
.;
5. Identification of product and Specifications
section
6. Location in the Project
7. Type of inspection or test
8. Date of test
9. Results of test
10. Conformance with the Contract Documents
C. When requested by the Construction Manager or AlE,
provide interpretation of test results.
1..8 LIMITS ON TESTING LABORATORY AUTHORITY
A. The testing laboratory may not release, revoke, alter, or
enlarge on requirements of the Contract Documents.
B. The testing laboratory may not approve or accept any
portion of the Work.
C. The testing laboratory may not assume any duties of the
Contractor.
D. The testing laboratory has no authority to stop the Work.
1..9 THE CONTRACTOR RESPONSIBILITIES
A.
B.
C.
D.
1. .10
Deliver to the testing laboratory at designated location,
adequate samples of materials proposed to be used which
require testing, along with proposed mix designs.
Cooperate with testing laboratory personnel, and provide
access to the Work and to the manufacturer's facilities.
Provide incidental labor and facilities to provide access
to the Work to be tested, to obtain and handle samples at
the site or at source of products to be tested, to
facilitate tests and inspections, storage and curing of
test samples.
Notify the Construction Manager and the testing
laboratory 48 hours prior to expected time for operations
requiring inspection and testing services.
E.
Employ services of a separate qualified testing
laboratory and pay for additional samples and tests which
are beyond the specified requirements.
RETEST RESPONSIBILITY
A.
Where the results of required inspections, tests, or
similar services prove unsatisfactory and do not indicate
11/21/91
01410 - 3
TESTING LABORATORY SERVICES
\?
compliance with the requirements of the Contract
Documents, the retests shall be the responsibility of the
Contractor regardless of whether the original test was
the Contractor's responsibility.
B. Retesting of the work revised or replaced by the
Contractor is the Contractor's responsibility where
required tests were performed on original work. Costs
and fees for retesting shall be paid by the Contractor.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01410
11/21/91
TESTING LABORATORY SERVICES
01410 - 4
SECTION 01510
TEMPORARY UTILITIES
PART 1 - GENERAL
1.1
SUMMARY
A.
section includes:
1. Temporary utilities required for construction.
PART 2 - PRODUCTS
2.1
A.
2.2
A.
MATERIALS - GENERAL
Materials shall be new, adequate in capacity for the
required usage, not create unsafe conditions, not violate
requirements of applicable codes and standards, and
comply with NEC Art. 305 - Temporary Wiring.
TEMPORARY ELECTRICITY
The Temporary Power Contractor shall furnish, install and
maintain, temporary electric power service for
construction needs throughout the construction period and
shall remove such service on completion of the work.
1. Primary temporary electrical underground feeder
will be provided and installed by temporary power
contractor under Bid Group 1, per drawing 1510- TP.
2. At Front Gate transformer location, the temporary
power contractor under Bid Group 1 has installed a
meter, mast, and main breaker panel Nema 3R, per
Detail "A" attached. The final location of each
panel shall be approved by the Construction
Manager.
3. Distribution panels have been provided by the Bid
Group 1 temporary power contractor per drawing 1510
- TP, and Details A, B, C and 0, and as follows:
a. Front gate area serving the construction
manager trailer, guard shack and area lights.
(20 ckt. min.)
4.
Power centers for miscellaneous tools and
used in the Work will be provided by the
1 Temporary Power Contractor as follows:
a. distribution boxes with minimum
of four
equipment
Bid Group
11/21/91
01510 - 1
TEMPORARY UTILITIES
double-duplex 15 Amp, 120-Volt grounded
outlets, with GFCI Protection for personnel.
See Detail "BIl.
b. located so that power is available at any
point of use with not more than 100 ft. power
cords.
c. minimum: one power center on each floor.
d. circuit-breaker protection for each outlet.
e. One panel each for Building Areas
A,B,C,D,E,F,K,L,M,N,O,P and Q.
5. The capacity of each power center in 4. above shall
be 120/240 volts single phase, minimum 50 Amps.
6. The Trade Contractors shall notify the Temporary
Power Contractor when unusually heavy loads, such
as for welding and other equipment with special
power requirements, will be connected so that the
Bid Group 3 Temporary Power Contractor can notify
the power company.
7. Any Trade Contractor requiring service of capacity
or characteristics other than that specified shall
arrange and pay for the additional service.
8.
The Temporary
install, and
required to
including the
Power Contractor shall furnish,
maintain all equipment and wiring
distribute the power, up to and
power services.
9. The Temporary Power Contractor shall pay all costs
of installation, maintenance, and removal of
temporary services.
10. The Construction Manager will pay the costs of
power needed, including deposits and fees
associated with City Electric except as outlined in
item 13 below
11. Materials shall be new, and must be adequate in
capacity for required usage, and must not violate
the requirements of applicable codes and standards.
Materials used for temporary service shall not be
reused in the permanent system.
12. The Temporary Power Contractor shall comply with
all applicable requirements specified in National
Electric Code Art. 305 when installing the
temporary electric power service, shall maintain
the system to provide continuous service and shall
modify and extend the service as the progress of
11/21/91
TEMPORARY UTILITIES
01510 - 2
13.
the Work requires.
wiring for Trade Contractor field
shall be installed by the
Contractor and paid for by the
requiring the service.
offices and sheds
Temporary Power
Trade Contractor
14. The Temporary Power Contractor shall completely
remove all temporary materials and equipment at
Project Completion. Underground lines may be
disconnected and abandoned in place with approval
of the Construction Manager. The temporary shed as
shown in Detail "c" shall remain the property of
Benson Electric.
15. Feeders to distribution panels from distribution
shed shall be 400 feet maximum length, with two hot
legs and one neutral of the same size as per NEC
Table 310-16 and Article 210-19a FPN.
16. Circuits to Power Centers from Distribution Panels
shall be installed per NEC Art. 305.
17. Feeders and Branch Circuits in 15. and 16. above
shall be protected from physical damage.
18. See Detail "C" for temporary power shed
requirements. This shall remain the property of
Benson Electric.
2.3
TEMPORARY SITE LIGHTING
The Temporary Power Contractor shall install and maintain area
lights on the meter poles as shown in Detail "A", 2 lights total.
Temporary Lighting power will be fed from the panels and power
centers covered under section 2.2 TEMPORARY ELECTRICITY.
2.4
TEMPORARY TELEPHONE SERVICE
A.
Each Trade Contractor shall be responsible for arranging
with the local telephone service company to provide
telephone service at the construction site for the use of
his personnel and employees. The Trade Contractor shall
pay all costs for installation, maintenance, removal and
service charges for such service. The Construction
Manager will not act as an answering service for Trade
Contractor's personnel and employees, and Trade
Contractor's personnel and employees will not be
permitted to utilize the Construction Manager's phones
except in cases of an emergency.
11/21/91
TEMPORARY UTILITIES
01510 - 3
2.5
2.6
A.
CONTINUING TEMPORARY ELECTRICITY MAINTENANCE
At the option of the Owner, the Temporary Power
Contractor shall provide a minimum of 1 person full time
for the duration of the construction, estimated to be 18
months. This person will maintain, relocate and repair
the temporary utilities covered under Articles 2.2, 2.3
and 2.4. The bid for this work shall be based on an
hourly rate for licensed electrician.
TEMPORARY LIGHTING
The Electrical Trade Contractor will be responsible for
the installation of the permanent electrical system and
shall also furnish, install and maintain temporary
lighting for construction needs throughout the
construction period and shall remove such temporary
lighting on completion of the Work.
1. Temporary artificial lighting shall be provided in
enclosed Work areas and all other work areas when
natural lighting does not meet minimum
requirements. Temporary artificial lighting in
Work areas shall produce uniform illumination of
20-foot candles.
2. Any Trade Contractor requiring temporary lighting
in addition to that specified, including lighting
for security, temporary offices, storage, shops and
other construction buildings, shall arrange and pay
for such additional temporary lighting.
3. Power requirements and source will be coordinated
with Article 2.2 above.
4. The Electrical Contractor shall comply with the
applicable requirements specified in sections of
Division 16 - Electrical. Materials shall be new,
and must be adequate for required usage, and must
not violate requirements of applicable codes and
standards.
5. Receptacles, fixtures and controls shall be
standard products, meeting UL standards.
6. The Electrical Contractor shall comply with all
applicable requirements specified in sections of
Division 16 Electrical, when installing the
temporary lighting, shall locate fixtures to
provide full illumination of required areas, shall
maintain the system to provide continuous service,
and shall modify and extend the service as the
progress of the Work requires.
7. The Electrical Contractor shall completely remove
temporary materials and equipment at Project
Completion, except for high voltage underground.
11/21/91
TEMPORARY UTILITIES
01510 - 4
2.7
A.
B.
C.
D.
2.8
TEMPORARY WATER
site Plumbing Contractor will arrange
service company, to provide water for
purposes.
with utility
construction
site Plumbing Contractor will provide temporary water at
locations of two (2) fire hydrants on fire water loop as
directed by Construction Manager; fire water loop will
be charged to provide construction water.
The Construction Manager will pay for water used for
temporary construction purposes.
Building Plumbing Contractor will maintain temporary
water systems, and will remove temporary water
appurtenances at completion of project.
E.
Each Trade Contractor shall be responsible for providing
any additional water (if needed) for construction
purposes. In addition, each Trade Contractor is
responsible for providing potable drinking water for his
personnel and employees, as well as suitable containers,
ice and salt tablets in sufficient quantity to meet the
needs of his labor force.
TEMPORARY HEATING, COOLING AND VENTILATING
Each Trade Contractor shall be responsible for providing, and
operating and maintaining temporary heating, cooling and
ventilating, as required, to maintain adequate environmental
conditions to facilitate the progress of his Work; to meet
minimum condition for the installation of materials; and to
protect materials and finishes from damage due to temperature
or humidity. Each Trade Contractor, subject to the approval
and direction of the Construction Manager, shall:
1. Provide adequate forced ventilation of enclosed
areas for curing of installed materials, to
disperse humidity, and to prevent ha zardous
accumulations of dust, fumes, vapors, or gases.
2. If portable heaters are required, utilize only UL
approved units complete with controls.
3. Insure that all safety devices specified for
operation of equipment are functioning properly.
4. Pay all costs of providing, operating, maintaining,
and removing such temporary heating, cooling, and
ventilating equipment as may be required.
11/21/91
01510 - 5
TEMPORARY UTILITIES
The foregoing obligations of the Trade Contractor are in
addition to his obligations under Article 10 of the General
Conditions.
2.9
TEMPORARY SANITARY FACILITIES
A.
The Owner will provide sanitary facilities in compliance
with laws and regulations.
B.
The Owner will service, clean and maintain facilities and
enclosures.
2.10
TEMPORARY FIRE PROTECTION
The Trade contractor responsible for the installation of the
permanent fire protection system shall furnish, install and
maintain temporary fire protection equipment, materials,
supplies and service within the buildings throughout the
construction period in accordance with the requirements of all
applicable codes and standards. Each floor shall have a
temporary fire protection system. Each Trade Contractor will
be responsible for fire protection required for his own work.
2.11
REMOVAL
A.
Completely remove temporary materials and equipment when
their use is no longer required.
B.
Clean and repair damage caused by temporary installations
or use of temporary facilities.
C.
Restore permanent facilities used for temporary services
to specified condition.
1. Prior to final painting, the
responsible for the permanent
system, shall remove temporary
new lamps.
Prior to final inspection, the Trade Contractor
responsible for the building mechanical system
shall replace filters and worn or consumed parts of
mechanical equipment.
Trade Contractor
building lighting
lamps and install
2.
***************
END OF SECTION 01510
11/21/91
TEMPORARY UTILITIES
01510 - 6
.~~.~.~ .
"
...,
.~
SECTION 01520
CONSTRUCTION AIDS
PART 1 - GENERAL
1.1 SUMMARY
A. section includes:
1. Construction aids
2. Temporary enclosures
1.2 REQUIREMENTS OF REGULATORY AGENCIES
B.
Comply with Federal,
regulations.
State and local codes and
PART 2 - PRODUCTS
2..1 MATERIALS - GENERAL
A. Materials may be new or used, suitable for the intended
use and shall not violate requirements of applicable
codes and standards.
2..2 CONSTRUCTION AIDS
A. Each Trade Contractor shall be responsible for
furnishing, installing, maintaining, and removing on
completion of the Work all scaffolds, staging, ladders,
stairs, ramps, runways, platforms, railings, chutes, and
other such facilities and equipment required by his
personnel to insure their safety and facilitate the
execution of the Work.
1. Each Trade Contractor shall comply with all
Federal, State and local codes, laws and
regulations governing such construction aids.
2. Each Trade Contractor shall relocate such
construction aids as required by the progress of
construction, by storage or work requirements, and
to accommodate the legitimate requirements of the
Owner or Construction Manager or other separate
contractors employed at the site.
3. Each Trade Contractor shall completely remove
temporary scaffolds, access, platforms, and other
such materials, facilities, and equipment, at the
completion of the Work or when construction needs
can be met by the use of the permanent
construction, provided the Construction Manager has
04/09/91
CONSTRUCTION AIDS
01520 - 1
'.~.;";>.;'
"
'I
I'
approved and authorized such use. Each Trade
Contractor shall clean up and shall repair any
damage caused by the installation or by the use of
such temporary construction aids. Each Trade
Contractor shall restore any permanent facilities
used for temporary purposes to their specified
condition.
The foregoing obligations of the Trade Contractor are in
addition to his obligations under Article 10 of the General
Conditions.
2..3 TEMPORARY ENCLOSURES
A. The Trade Contractor responsible for installing the
permanent closure in an opening in an exterior wall shall
be responsible for installing, maintaining, and removing,
as the Work progresses, a temporary weather-tight
enclosure for that opening as necessary to provide
acceptable working conditions, to provide weather
protection for interior materials, to allow for effective
temporary heating, and to prevent entry of unauthorized
persons.
1. Each Trade Contractor shall install such temporary
enclosures as soon as is practical after the
opening is constructed or as directed by the
Construction Manager.
2. Temporary enclosures shall be removable as
necessary for the Work and for handling of
materials.
3. Temporary enclosures shall be completely removed
when construction needs can be met by the use of
the permanent closures.
4. The Trade Contractor responsible for providing,
maintaining, and removing the temporary enclosure
shall clean and shall repair any damage caused by
the installation of such enclosure.
5. Each Trade Contractor shall remain responsible for
insuring that his work, material, equipment,
supplies, tools, machinery, and construction
equipment is adequately protected from damage or
theft and shall provide, maintain and remove such
addi tional temporary enclosures as may be deemed
necessary.
The foregoing obligations of the Trade Contractor are in addition
to his obligations under Article 10 of the General Conditions.
****************
END OF SECTION 01520
04/09/91
CONSTRUCTION AIDS
01520 - 2
--'\
.,..
I ,
SECTION 01550
ACCESS ROADS AND PARKING AREAS
A. Each Trade Contractor shall be responsible for installing
and maintaining, until the completion of his Work any
temporary access roads or parking facilities required by
his Work, other than that which has been provided by the
Owner.
B. Any Trade Contractor excavating across an access road or
parking area shall backfill and compact his excavation
and resurface the road or parking area to match the
existing surface. The Trade Contractor shall comply with
all applicable Specifications when so doing.
*********************
END OF SECTION 01550
04/09/91
ACCESS ROADS AND PARKING AREAS
01550 - 1
'.. ,,'p
1'~"
":~~~~..:~.. :
.__._~.__._._-_.__..~._._-_._-~--_._---..-.__.__.__. -'-'-~""-"--'--"'-- -_...._.~__......._,.-ro.""" ~...,,-__..._'" ~_ .~. "y~~... .......1'.111W':'~....,.
SECTION 01560
TEMPORARY CONTROLS
PART 1 - GENERAL
1..1 SUMMARY
A. section Includes:
1. Water control
2. Dust control
3. Erosion and sediment control
4. Pollution control
B. Related sections:
1. SCOPES OF WORK
1..2 WATER CONTROL
A. site Grading Contractor shall grade site to drain.
B.
Protect site from puddling or running water.
water barriers to protect site from soil
Maintain excavations free of water. Provide,
and maintain pumping equipment.
Provide
erosion.
operate,
1..3 DUST CONTROL
A. Execute the Work by methods to minimize raising dust from
construction operations.
Bo. Provide positive means to prevent airborne dust from
dispersing into atmosphere.
1..4 EROSION AND SEDIMENT CONTROL
A., Plan and execute construction by methods to control
surface drainage from cuts and fills, from borrow and
waste disposal areas. Prevent erosion and sedimentation.
B. Minimize amount of bare soil exposed at one time.
C. Provide temporary measures such as berms, dikes, and
drains, to prevent water flow.
D. Construct fill and waste areas by selective placement to
avoid erosive surface silts or clays.
E. Inspect earthvwrk to detect evidence of erosion and
OS/20/91
TEMPORARY CONTROLS
01560 - 1
sedimentation; promptly apply corrective measures.
1..5 POLLUTION CONTROL
A. Provide methods, means, and facilities to prevent
contamination of soil, water, and atmosphere from
discharge of noxious, toxic substances, and pollutants
produced by construction operations.
Two (2) 30 c.y. trash containers will be provided by the Owner.
The Masonry Contractor shall be responsible to provide his own
trash dumpsters for masonry waste disposal. Trash containers shall
be located in trash accumulation areas designated by the
Construction Manager. Each Contractor each day shall collect and
deposit in the containers, all rubbish, waste materials, debris,
and other trash from his operations, (excluding masonry), including
any trash generated by his employees during lunch periods or coffee
breaks. Shipping dunnage is to be removed by the receiving
contractor. Paper, boxes and bulk packaging shall be folded or cut
into reasonable sizes and shapes and confined to prevent lost of
trash container volume or wind relocation.
***************
END OF SECTION 01560
OS/20/91
TEMPORARY CONTROLS
01560 - 2
-.....
..
I ,
SECTION 01580
PROJECT IDENTIFICATION AND SIGNS
Trade Contractors informational signs on the site shall be limited
to those designating their temporary field offices and sheds. All
such informational signs shall be subject to approval by the
Construction Manager.
*************************
END OF SECTION 01580
11/21/91
PROJECT IDENTIFICATION AND SIGNS
01580 - 1
-'"\
..
I ,
SECTION 01590
FIELD OFFICES AND SHEDS
A. The Trade Contractor, if he deems it necessary, may
furnish, install, and maintain a temporary field office
for his use and the use of his employees during the
construction period.
B. The Trade Contractor shall furnish, install, and maintain
temporary storage and work sheds to adequately protect
his work, materials, equipment, supplies, tools,
machinery, and construction equipment from damage and
theft.
C. The Trade Contractor shall arrange his field office and
sheds so as not to interfere with the construction. The
locations of field offices and sheds shall be coordinated
with the Construction Manager. The type, size and
location of field offices and sheds is subject to
approval by the Construction Manager.
D. The Trade Contractor shall arrange and pay for temporary
electricity and telephone service for his field office
and sheds, if he should require such services.
E. The Trade Contractor shall relocate his field office and
sheds as directed by the Construction Manager, at no
additional cost to the Owner or Construction Manager.
F. The Trade Contractor shall completely remove his field
office and sheds on completion of the Work or when
directed by the Construction Manager. The Trade
,Contractor shall remove all debris and rubbish and shall
place the area in a clean and orderly condition.
G. The Construction Manager as soon as reasonably possible
will establish a field office on the site and will
maintain such an office during the entire construction
period. The Construction Manager I s field office will not
be used as field office by the Trade Contractor or his
employees.
**************
END OF SECTION 01590
04/09/91
FIELD OFFICES AND SHEDS
01590 - 1
. __:"__:':_~__:':~~'.~~~." _~ .q...::......_:..,~:----;;._~..: ,._~;,..:'~...."?'_::.._:...._.;:..__,.-.:~'"':;.:.,~.."" . ~\CT'::4....~~:_.~~~~~.~~~~.. ~__
CONSTRUCTION CLEANING
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Cleaning during progress of work.
1..2 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with
codes, ordinances, regulations, and anti-pollution laws.
1. Do not burn or bury rubbish and waste materials on
Project site.
2. Do not dispose of volatile wastes such as mineral
spirits, oil or paint thinner in storm or sanitary
drains.
PART 2 - PRODUCTS
2..1 MATERIALS
A. Use only those cleaning materials which will not create
hazards to health or property and which will not damage
surfaces.
B. Use only those cleaning materials and methods recommended
by manufacturer of the surface material to be cleaned.
C. Use cleaning materials only on surfaces recommended by
cleaning material manufacturer.
D. sweeping compounds used in cleaning operations shall
leave no residue on concrete floor surfaces that may
affect installation of finish flooring materials.
PART 3 - EXECUTION
3..1 DURING CONSTRUCTION
A. Execute cleaning to keep the Work, the site and adjacent
properties free from accumulations of waste materials,
rubbish and windblown debris, resulting from construction
operations.
B. Provide on-site containers for the collection of waste
04/09/91
CONSTRUCTION CLEANING
01595 - 1
"!" .
materials, debris, and rubbish.
C. Dispose of waste materials, debris and rubbish off the
site.
3..2 DUST CONTROL
A. Clean interior spaces prior to the start of the finish
painting and continue cleaning on an as-needed basis
until painting is finished.
B. Schedule operations so that dust and other contaminants
resulting from cleaning process will not fall on wet or
newly-coated surfaces.
C. Handle materials in a controlled manner with as little
handling as possible; do not drop or throw materials
form heights.
************
END OF SECTION 01595
04/09/91
CONSTRUCTION CLEANING
01595 - 2
,_,~,-' ""'""-r ~_,. -'---~',", ""'.- ,- .....-~ '-'--"n -,;",
SECTION 01600
.'. ':, ;~~1~t~-,.i/' \ '
.,o',II~:;r;" '
MATERIAL AND EQUIPMENT
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Products
2. Transportation and handling
3. Storage and protection
4. Security
1..2 PRODUCTS
A. Products: means new material, machinery, components,
equipment, fixtures, and systems forming the Work. Does
not include machinery and equipment used for preparation,
fabrication, conveying and erection of the Work.
Products may also include existing materials or
components required for reuse.
B. Do not use materials and equipment removed from existing
premises, except as specifically permitted by the
Contract Documents.
C.
Provide interchangeable components
manufacturer, for similar components.
of
the
same
1..3 TRANSPORTATION AND HANDLING
A. The Trade Contractor shall be responsible for the
transportation of all materials and equipment furnished
under this contract. The Trade Contractor shall also be
responsible for loading, receiving and Off-loading at the
site all material and equipment installed un der this
contract, whether furnished by the Trade Contractor or
the Owner. Unless otherwise provided, the Construction
Manager will not accept delivery on behalf of the Trade
Contractor for his materials and equipment. The Trade
Contractor shall be responsible for coordinating the
installation within the buildings of equipment that is
too large to pass through finished openings.
B. Transport and handle products in accordance with
manufacturer's instructions.
C. Promptly inspect shipments to assure that products comply
04/09/91
MATERIAL AND EQUIPMENT
01600 - 1
"',:";'~'~14(::';~':,":-':"o,:l~' ..:.:~""c.~~;~;j' ''', .-
'::-;:,;;,_ "~~>;.~-::J:_~; ...'.~- ,
"\
~
;' ~
with requirements, quantities are correct, and products
are undamaged.
D. Provide equipment and personnel to handle products by
methods to prevent soiling, disfigurement, or damage.
1..4 STORAGE AND PROTECTION
The Trade Contractor shall be responsible for the proper
storage of all materials, supplies, and equipment to be
installed under this Contract. Materials stored on site but
not adequately protected will not be included in estimates for
payment. Except for materials stored within designated and
approved storage sheds, vans, or trailers, the Trade
Contractor shall not bring onto nor store in any manner at the
site any materials and equipment which will not be
incorporated into the permanent Work within seven (7) days
from the delivery date. The Trade Contractor shall be
responsible for arranging and paying for the use of property
off the site for storage of materials and equipment as may be
required.
1..5 SECURITY
A. Each Trade Contractor shall be totally responsible for
the security of his work, materials, equipment, supplies,
tools, machinery, and construction equipment.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
*************
END OF SECTION 01600
04/09/91
MATERIAL AND EQUIPMENT
01600 - 2
SECTION 01630
POST-BID SUBSTITUTIONS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Post-bid substitutions
1.2 SUBSTITUTIONS
A. Base Bid shall be in accordance with the Contract
Documents.
B.
After the end of the bidding
requests will be considered only
1. Product unavailability
2. Other conditions beyond
Contractor.
period, substitution
in the case of:
the control
of the
c. Submi t a separate request for each substitution. Support
each request with the following information:
1. Complete data substantiating compliance of proposed
substitution with requirements stated in Contract
Documents:
a. Product identification, including
manufacturer's name and address.
b. Manufacturer's literature, identifying:
1) Product description.
2) Reference standards.
3) Performance and test data.
c. Samples, as applicable.
d. Name and address of similar projects on which
product has been used and date of each
installation.
2. Itemized comparison of the proposed substitution
with product specified, listing significant
variations.
3. Data relating to changes in construction schedule.
4. Effects of substitution on separate contracts.
5. List of changes required in other work or products.
6. Accurate cost data comparing proposed substitution
with product specified.
a. Amount of net change to Contract Sum.
7. Designation of required license fees or royalties.
8. Designation of availability of maintenance
services, sources of replacement materials.
04/09/91
POST-BID SUBSTITUTIONS
01630 - 1
D. Substitutions will not be considered for acceptance when:
1. A substitution is indicated or implied on shop
drawings or product data submittals without a
formal request from Bidder.
2. Acceptance will require substantial revision of
Contract Documents.
3. In judgement of Architect or Construction Manager,
the substitution request does not include adequate-
information necessary for a complete evaluation.
4. Requested directly by a subcontractor or supplier.
E. Do not order or install substitute products without
written acceptance of Construction Manager.
F. Architect will determine acceptability of proposed
substitutions.
G. No verbal or written approvals other than by Change Order
will be valid.
1..3 CONTRACTOR'S REPRESENTATION
A. In making formal request for substitution the Contractor
represents that:
1. The proposed product has been investigated and it
has been determined that it is equivalent to or
superior in all respects to the product specified.
2. The same warranties or bonds will be provided for
the substi tute product as for the product
specified.
3. Coordination and installation of the accepted
substitution into the Work will be accomplished and
changes as may be required for the Work to be
complete will be accomplished.
4. Claims for additional costs caused by substitution
which may subsequently become apparent will be
waived by the Contractor.
s. Complete cost data is attached and includes related
costs under the Contract, but not:
a. Costs under separate contracts.
b. Architect's costs for redesign or revision of
Contract Documents.
1..4 POST-BID SUBSTITUTION FORM
A. The form is attached to this section.
B. Substitutions will be considered only when the attached
form is completed and included with the submittal with
back-up data.
04/09/91
POST-BID SUBSTITUTIONS
01630 - 2
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
04/09/91
POST-BID SUBSTITUTIONS
01630 - 3
TO: Project Architect
HANSEN LIND MEYER INC.
c/o Morrison-Knudsen/Gerrits
P.O. Box 5283 5090 Jr. College Road, Key West, Fl. 33040
(305)292-7845 FAX (305)292-9697
We hereby submit for your consideration the following product insteQ_ of
the specified item for the above project:
DRAWING NO.
DRAWING NAME
SPEC. SEC.
SPEC. NAME
PARAGRAPH
SPECIFIED ITEM
Proposed Substitution:
Attach complete information on changes to Drawings and/or Specifications
which proposed substitution will require for its proper installation.
Submit with request necessary samples and substantiating data to prove
equal quality and performance to that which is specified. Clearly mark
manufacturer's literature to indicate equality in performance.
The undersigned certifies that the function, appearance and quality are
of equal performance and assumes liability for equal performance, equal
design and compatibility with adjacent materials.
Submitted By:
signature
Title
Firm
Address
Telephone
Date
Signature shall be by person having authority to legally bind his firm to
the above terms. Failure to provide legally binding signature will result
in retraction of approval.
For use by the Architect:
____Recommended ____Recommended as noted
____Not Recommended ____Received too late
____Insufficient data received
By
Date
r,>"/n0/0'1
D"~'T_:JTr'\ C::'T;'2C"T',TfllT'l""flT(''",''C::
n1r::,1"'\ - L1
Fill in Blanks Below:
A. Does the substitution affect dimensions shown on Drawings?
Yes
No
If yes, clearly indicate changes.
B. will the undersigned pay for changes to the building design,
including engineering and detailing costs caused by the requested
substitution?
If no, fully explain:
Yes
No
C. What effect does substitution have on other Contracts or other
trades?
D. What effect does substitution have on construction schedule?
E. Manufacturer's warranties of the proposed and specified items are:
Same
Different. Explain:
F. Reason for Request:
G.
Itemized comparison of specified item(s)
substitution; list significant variations:
with the proposed
H. This substitution will amount to a credit or extra cost to the Owner
of: dollars ($ ).
I. Designation of maintenance services and sources:
(Attach additional sheets if required.)
****************
END OF DOCUMENT 01630
-'"I
I ,
';
SECTION 01650
STARTING OF SYSTEMS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. starting systems
2. Demonstration and instructions
3. Testing, adjusting, and balancing
B. Related sections:
1. SECTION 01700 - CONTRACT CLOSEOUT
1..2 STARTING SYSTEMS
A. Coordinate schedule for start-up of various equipment and
systems.
B. Notify the Construction Manager seven days prior to
start-up of each item.
c. Verify that each piece of equipment or system has been
checked for proper lubrication, drive rotation, belt
tension, control sequence, or other conditions which may
cause damage.
D. Verify that tests, meter readings, and specified
electrical characteristics agree with those required by
the equipment or system manufacturer.
E. Verify wiring and support components for equipment are
complete and tested.
F.
Execute start-up under supervision
manufacturer's representative in
manufacturer's instructions.
of responsible
accordance with
G. Execute start-up under supervision of the responsible
Contractors' personnel in accordance with manufacturer's
instructions. All in-line and interface trades shall
cooperatively support and coordinate individual
components and systems to facilitate start-up activities.
H. When specified in individual Specification Sections,
require manufacturer to provide authorized representative
to be present at the site to inspect, check and approve
11/21/91
STARTING OF SYSTEMS
01650 - 1
"
...
.. :-
equipment or system installation prior to start-up, and
to supervise placing equipment or system in operation.
I. Submit a certified written report that equipment or
system has been properly installed and is functioning
correctly.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01650
11/21/91
STARTING OF SYSTEMS
01650 - 2
...c~.__.....'-.' '.....,_,..,__~'.
- -- _.. .
,..,..,.. ..'..c.. _".,_ ,..._
. -
SECTION 01670
SYSTEMS DEMONSTRATIONS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Procedures for demonstration of equipment operation
and instruction of the Owner's personnel.
1..2 QUALITY ASSURANCE
A. When specified in individual Sections, provide
manufacturer's authorized representative to demonstrate
operation of equipment and systems, instruct the Owner's
personnel and provide written report that demonstrations
and instructions have been completed.
B. The Owner will provide list of personnel to receive
instructions, and will coordinate their attendance at
agreed-upon times.
1..3 SUBMITTALS
A. Submi t preliminary schedule for the Owner's approval,
listing times and date for demonstration of each item of
equipment and each system, two weeks prior to proposed
dates.
B.- Provide operating and maintenance manuals to owner (4)
weeks prior to demonstrations.
c. Submit reports within one week after completion of
demonstrations, that demonstrations and instructions have
been satisfactorily completed. Give time and date of
each demonstration, and hours devoted to demonstration,
with a list of persons present.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
3..1 PREPARATION
A. Verify equipment has been inspected and put into
04/30/91
SYSTEMS DEMONSTRATIONS
01670 - 1
operation; testing, adjusting, and balancing has been
performed; and equipment and systems are fully
operational.
B.
Have copies
manuals at
instructions.
of completed operation and maintenance
hand for use in demonstrations and
3..2 DEMONSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of equipment and
systems to the Owner's personnel two weeks prior to date
of final inspection. For equipment requiring seasonal
operation, perform instructions for other seasons within
six months.
B. Use operation and maintenance manuals as basis of
instruction. Review contents of manual with personnel in
detail to explain aspects of operation and maintenance.
C. Demonstrate start-up, operation, control, adjustment,
maintenance, servicing, trouble-shooting and shutdown of
each item of equipment at agreed-upon times, at
designated location.
D. Prepare and insert additional data in operations and
maintenance manuals when need for additional data becomes
apparent during instructions.
3..3 TIME ALLOCATED FOR INSTRUCTIONS
A. The amount of time required for instruction on each item
of equipment and system is specified in individual
sections.
**************
END OF SECTION 01670
04/30/91
SYSTEMS DEMONSTRATIONS
01670 - 2
SECTION 01700
CONTRACT CLOSEOUT
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Closeout procedures
2. Adjusting
B. Related sections:
1. SECTION 01027 - APPLICATION FOR PAYMENT
2 . SECTION 01650 - STARTING OF SYSTEMS
3. SECTION 01730 - OPERATION AND MAINTENANCE DATA
4 . SECTION 01740 - WARRANTIES AND BONDS
s. SECTION 08710 - FINISH HARDWARE
6. SECTION 11196 - SECURITY HARDWARE
1..2 PROJECT TERMINATION
A. the Contract requirements are met when construction
activities have successfully produced, in this order,
these three terminal activities:
1. Substantial Completion
2. Final Completion
3. Final Payment
1..3 SUBSTANTIAL COMPLETION
A. Submit to the Construction Manager when the Work is
substantially complete:
1. A written notice that the Work, or designated
portion thereof, is substantially complete.
2. A list of items to be completed or corrected (Punch
List) .
3. Request Substantial Completion Observat.:on at a
mutually agreeable date.
4. certifications of systems and testing/balancing
final reports.
s. Submit evidence of compliance with requirements of
governing authorities:
a. certificate of Occupancy
b. Certificates of Inspection:
1) Elevators
2) Mechanical systems
3) Electrical systems
4) Kitchen equipment
04/09/91
CONTRACT CLOSEOUT
01700 - 1
5) Fire protection system
6) Security system
B. within a reasonable time after receipt of such notice,
the Architect, the Construction Manager, the
Contractor, and the Owner, will make an observation to
determine the status of completion.
C. Should the work be determined to not be substantially
complete the following will occur:
1. The Construction Manager will promptly notify the
Contractor in writing, giving the reasons.
2. The Contractor shall remedy the deficiencies in the
Work, and send a second written notice of
substantial completion.
3. The Work will be reobserved.
D. When the Work is considered substantially complete, the
following will occur:
1. The Construction Manager will prepare a Certificate
of Substantial Completion on AlA Form G704,
accompanied by the Contractor's Punch List of items
to ,be completed or corrected, as verified and
amended. Contract responsibilities are not altered
by inclusion or omission of required Work from the
punch list.
2. The certificate will be executed by all parties and
distribution made.
E. Complete or correct items identified on the punch list
and required by the Contract requirements within time
limit established by the certificate.
1..4 FINAL COMPLETION
A. To attain final completion, the Contractor shall complete
activities pertaining to substantial completion, complete
Work on punch list items and submit written request to
the Construction Manager for final inspection.
B. When the Work is complete, the Contractor shall submit
written certification that:
1. The Contract Documents have been reviewed.
2. Work has been inspected for compliance with the
Contract Documents.
3. hlork has been completed in accordance with the
Contract Documents.
4. Equipment and systems have been tested in the
presence of the Owner I s representative and are
operational.
S. Work is completed and ready for final observation.
04/09/91
CONTRACT CLOSEOUT
01700 - 2
C. The Architect, the Construction Manager, the Contractor
and the Owner will make an inspection to verify the
status of completion with reasonable promptness after
receipt of such certification.
D. Should the Work be considered incomplete or defective:
1. The Construction Manager will promptly notify the
Contractor in writing, listing the incomplete or
defective work.
2. The Contractor shall take immediate steps to remedy
the stated deficiencies and send a second written
certification to the Construction Manager that the
Work is Complete. _
3. The Work will be reinspected.
E. When the Work is acceptable under the Contract Documents
the Contractor shall make closeout submittals.
1..5 THE CONTRACTOR'S CLOSEOUT SUBMITTALS TO THE ARCHITECT
A.
Project Record Documents:
01720.
to requirements of SECTION
B. Operating and maintenance data, instructions to the
O~ner's personnel: to requirements of SECTION 01730.
C.
Keys and keying schedule:
08710 & 11196.
to requirements of SECTION
D. Spare parts and maintenance materials: to requirements
of individual sections.
E. Evidence of payment and release of liens: to
re~uirements of General and Supplementary Conditions.
1..6 FINAL ~JJUSTMENT OF ACCOUNTS
A. Submit a final statement of accounting to the Architect.
B. Stc~ement shall reflect adjustments to the Contract Sum:
1. The original Contract Sum
2. Additions and deductions resulting from:
a. Previous Change Orders
b. Allowances
c. unit Prices
d. Deductions for uncorrected Work
e. Penalties and bonuses
f. Deductions for liquidated damages
g. Deductions for reinspection payments
h. other adjustments
3. Total Contract Sum, as adjusted
04/09/91
CONTRACT CLOSEOUT
01700 - 3
4. Previous payments
S. Sum remaining due
c. The Construction Manager will prepare a final Change
Order, reflecting adjustments to the Contract Sum which
were not previously made by Change Orders.
1..7 FINAL APPLICATION FOR PAYMENT
A. The Contractor shall submit the final Application for
Payment in accordance with procedures and requirements
stated in the Conditions of the Contract.
PART 2 - PRODUCTS
Not used
PART 3 - EXECUTION
Not used
*****************
END OF SECTION 01700
04/09/91
CONTRACT CLOSEOUT
01700 - 4
SECTION 01710
FINJ>.L CLEANING
PART 1 - GENERAL
1. .1 SUH11ARY
A. Section includes:
1. Cleaning at completion of Work
1..2 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with
codes, ordinances, regulations, and anti-pollution laws.
1. Do not burn or bury rubbish and waste materials on
the Project site.
2. Do not dispose of volatile wastes such as mineral
spirits, oil or paint thinner in storm or sanitary
drains.
PART 2 - PRODUCTS
2..1 MATERIALS
A. Use only those cleaning materials which will not create
hazards to health or property and which will not damage
surfaces.
B. Use only those cleaning materials and methods recor,mended
by ranufacturer on the surface material to be cleaned.
C. Use cleaning materials only on surfaces recommended by
cleaning material manufacturer.
PART 3 -EXECUTION
3..1 DUST CONTROL
A. Handle materials in a controlled manner with a5 little
handling as possible.
3..2 FINAL CLEANING
A. Employ skilled workmen for final cleaning.
B. Remove grease, :,~astic, adhesives, dust, dirt, stains,
fingerprints, labels, and other foreign materia~s form
sight-exposed interior and exterior surfaces.
04/09/91
FINp.L CLEANING
01/10 - 1
C. Wash and shine glazing and mirrors.
D. Polish glossy surfaces to a clear shine.
E. Dust cabinet~ork and remove markings.
F. Vacuum as needed.
G.
Broom clean exterior paved surfaces;
surfaces of the grounds.
rake clean other
H. Prior to final completion, or the Owner occupancy,
conduct an inspection of sight-exposed inter ior surfaces,
exter ior surfaces and work areas, to verify that the
entire Work is clean.
I. Clean tunnels and closed off spaces of packing boxes,
wood frame members and other waste materials used in the
Construction.
J. Internally clean the entire system of piping and
equipment. Open dirt pockets and strainers, completely
blowing down as required and clean strainer screens of
accumulated debris.
K. Drain tanks, fixtures and pumps to be free of sludge and
accumulated matter.
L. Remove temporary labels and stickers from fixtures and
equipment. Do not remove permanent name plates,
equipment model numbers and ratings.
M. Thoroughly clean heating and air conditioning equipment,
tanks, pumps anj traps. Install or thoroughly clean
filters or filter media, including:
1. The c leaning of permanent f i 1 ters and the
replacer.-.ent of disposable f i l ters if ur;i ts \-:ere
operated during construction.
2. The cleaning of ducts, blm..'ers, and coils if the
u~its ~erE opera~0d duri~g co~structicn.
N. Remove fron the site all facilities of items ir.ste:lled or
used fer te~porary purposes during construction.
O. Restore all adjoining areas to their original or
specified condition.
****************
EHD OF SECTION 01710
04/09/91
FINJ>.L CLEANING
01710 - 2
SECTION 01720
PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Maintain at the job site one copy of:
a. Record Contract Drawings
b. Record Project Manual
c. Coordination drawings
d. Addenda
e. Reviewed shop drawings
f. Change Orders
g. Other modifications to the Contract
h. Field test records
1..2 GENERAL
A. Store documents in cabinets in temporary field office,
apart from documents used for construction.
B. Maintain documents in clean, dry, legible condition.
C. Do not use Project Record Documents for construction
purposes.
D. Make documents available for inspection by the
Construction Manager, the Architect and the Owner.
E. Failure to maintain documents up-to-date will be cause
for withholding payments.
F. Obtain from the Construction Manager (at no charge) two
sets of the Contract Documents for Project Record
Documents inClUding:
1. Specifications with all addenda.
2. Two complete sets of black line prints of all
Drawings.
3. One complete set of mylar prints of all Drawings.
1. . 3 RECORDING
A. Label each document "Project Record".
B. Keep record documents current.
01/06/92
PROJECT RECORD DOCUMENTS (ADD. 2)
01720 - 1
C. Do not permanently conceal any work until required
information has been recorded.
D. contract Drawings:
1. Required information may, as an option, be entered
on a "working set" and then at completion of
Project transfer the information to final submitted
IIproject Record" set.
2. Legibly mark to record actual construction:
a. Depths of various elements of foundation in
relation to survey data.
b. Horizontal and vertical location of
underground utilities and appurtenances
referenced to permanent surface improvements.
c. Location of internal utilities and
appurtenances concealed in construction
referenced to visible and accessible features
of structure.
d. Field changes of dimension and detail.
e. Changes made by Change Order or Construction
Change Directive.
f. Details not on original Contract Drawings.
E. Specifications and Addenda:
1. Legibly mark up each section to record:
a. Manufacturer, trade name, catalog number and
supplier of each product and item of equipment
actually installed.
b. Changes made by Change Order or Construction
Change Directive.
c. Other items not originally specified.
F. Conversion of schematic layouts:
1. Arrangement of conduits, circuits, piping, ducts
and similar items are in most cases shown
schematically on the Drawings.
2. Legibly mark to record actual construction:
a. Dimensions accurate to within 1" on the
centerline of items shown schematically.
b. Identify each item, for example, "cast iron
drain" "galvanized water".
c. Identify location of each item, for example,
"under slab", "in ceiling plenum", "exposed".
3. The Construction Manager may waive requirements of
schematic layout conversion, when in his opinion,
it serves no beneficial purpose. Do not, however,
rely on waivers being issued except specifically
issued by the Construction Manger in writing.
01/06/92
PROJECT RECORD DOCUMENTS (ADD. 2)
01720 - 2
1..4 SUBMITTAL
A. At completion of Project, deliver Project Record
Documents as delineated in paragraph 1.2 F. above, to the
Construction Manager prior to request for final payment.
B. Accompany submittal with transmittal letter, in
duplicate, containing:
1. Date
2. Project title and HLM Project number
3. The Contractor's name and address
4. Title and number of each record document
s. certification that each document as submitted is
complete and accurate.
6. Signature of the Contractor, or his authorized
representative.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
***************
END OF SECTION 01720
01/06/92
PROJECT RECORD DOCUMENTS (ADD. 2)
01720 - 3
SECTION 01730
OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1. . 1 Sln1M.ARY
A. section includes:
1. Format and content of manuals
2. Instruction of the Owner's personnel
3. Schedule of submittals
B. Related sections:
1. SECTION 01301 - SUBMITTALS
2. SECTION 01700 - CONTRACT CLOSEOUT
3. Individual Specifications sections: specific
requirements for operation and ~aintenance data.
1..2 QUALITY ASSURANCE
A. Prepare instructions and data by personnel experienced In
maintenance and operation of described products.
1..3 FORMAT
A. Prepare data in the form of an instructional manual.
B. Binders: commercial quality, 8-1/2" x 11" three-ring
binders with hardback, cleanable, plastic covers; 1-1/2"
maximum ring size. Hhen multiple binders are used,
correlate data into related consistent groupings.
c. Cover: identify each binder with typed or printed title
OPERJI.TION AND VJl.INTENJ."NCE H:STRUCTIO~;S; 1 ist title of the
Project and separate building; identify subject matter of
contents.
D. Arrange content by syste:ns under section ncr-bers and
sequence of Table of Contents of these Specifications.
E. Provide tabbed fly leaf for each separate product and
system, with typed descr iption of product and r:a j or
component parts of equipment.
F. Text: manufacturer's printed data, or typewritten data
on 20 pound paper.
G. Drawings: provide with reinforced punched binder tab.
Bind in with text; fold larger drawiDgs to size of text
OS/20/91
OPERATION l>Jm ViAINTENANCE L;TA
01730 - 1
pages.
1..4 CONTENTS, EACH VOLUME
A. Table of Contents: provide title of the Project; names,
addresses, and telephone numbers of the Construction
Manager, the Architect, consultants, and the Contractor
with name of responsible parties; schedule of products
and systems, indexed to content of the volume.
B. For each product or system: list names, addresses and
telephone numbers of subcontractors and suppliers,
including local source of supplies and replacement parts.
C. Product data: mark each sheet to clearly identify
specif ic products and component parts, and data
applicable to installation. Delete inapplicable
information.
D. Drawings: supplement product data to illustrate
relations of component parts of equipment and systems, to
indicate control and flow diagrams. Do not use the
Project Record Documents as maintenance drawings.
E. Type text: as required to supplement product data.
Provide logical sequence of instructions for each
procedure, incorporating manufacturer's instructions.
F. Warranties and bonds: bind in copy of each.
1. .5 !v',ANUAL FOR HATERIALS AND FINISHES
A. Building products, applied materials, and finishes:
include product data, with catalog number, size,
composition, and color and texture designations. Provide
information for re-order ing custom r,anufactured products.
B. Instructions for care and maintenance; include
manufacturer's recommendations for cleaning agents and
methods, precautions against detrimental agents and
methods, and recommended schedule for cleaning and
maintenance.
C. Moisture protection and weather exposed products:
include product data listing applicable reference
standards, chemical composition, and details of
installation. Provide recommendations for inspections,
maintenance, and repair.
D. Additional requirements; as specified In individual
product specification Sections.
OS/20/91
OPERATION F.ND HAINTENANCE DATA
01i30 - 2
1..6 ~~NUAL FOR EQUIPMENT AND SYSTEMS
A. Each item of equipment and each system: include
description of uni t or system, and component parts.
Identify function, normal operating characteristics, and
limiting conditions. Include performance curves, with
engineering data and tests, and complete nonenclature and
commercial number of replaceable parts.
B. panelboard circuit directories: provide electrical
service characteristics, controls and comnunications.
c. Include color coded wiring diagrams as installed.
D. operating procedures: include start-up, break-in, and
routine normal operating instructions and sequences.
Include regulation, control, stopping, shut-down, and
emergency instructions. Include summer, winter, and
special operating instructions.
E. J.:aintenance requirements: include routine procedures and
guide for trouble-shooting; disasse~bly, repair, and
reassembly instructions; and al igr:ment, adjusting,
balancing, and checking instructions.
F. Provide servicing and lubrication schedule, and list of
lubricants required.
G. Include manufacturer's printed operation and maintenance
instructions.
H. Include sequence of operation by controls manufacturer.
1.
Provide original manufacturer's
illustrations, assembly drawings, and
for naintenance.
r:arts
diasraT:1s
list,
required
J. Provide control diagrams by controls manufacturer as
installed.
K. Provide the Contractor's coordination drao".' i:J.gs, with
coler coded piping diagrams as installed.
L.
Provide charts of valve tag numbers,
function of each valve, keyed to
diagrams.
with location and
flow and control
11.
Pre':ide list of original manufacturer's spare
current prices, and recommended ~uantities
maintained in storage.
parts,
to be
OS/20/91
OPERATION AND MAINTENANCE D~TA
01730 - 3
N. Include test and balancing reports.
o. Additional requirements: as specified in individual
product specification sections.
P. Provide a listing in Table of Contents for design data,
with tabbed fly sheet and space for insertion of data.
1..7 INSTRUCTION OF THE OWNER PERSONNEL
A. Before final inspection, instruct the Owner's designated
personnel in operation, adjustment, and maintenance of
products, equipment, and systems, at agreed upon times.
B. For equipment requiring seasonal operation, perform
instructions for other seasons within six months.
C. Use operation and maintenance manuals as basis for
instruction. Review contents of manual with personnel in
detail to explain all aspects of operation and
maintenance.
D.
Prepare and insert addi tiona 1
Maintenance Manual when need
apparent during instruction.
data in
for such
Operation and
data becomes
1..8 SUBMITTALS
A. Submit two copies of preliminary draft or proposed
formats and outlines of contents before start of the
Work. The Construction Manager and Architect \\'ill review
draft and return one copy with comments.
B. For equipment, or component parts of equipment put into
service during construction and operated by the Owner,
submit documents within ten days after acceptance.
C. Subt'lit one copy of completed volumes in final form 15
days prior to final inspection. Copy will be returned
after final inspect ion, \\'i th Construct ion Manager and
Architect comments. Revise content of docu~ents prior to
final submittal.
D. Submit two copies of revised volumes of data ln final
forD within ten days after final inspection.
OS/20/91
OPERATION AND MAINTENANCE DATA
01730 - 4
PART 2 - PRODUCTS
Hot Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01730
OS/20/91
01730 - 5
OPERATION AND }~INTENANCE DATA