07/15/1992
New Detention Facility
Contract KJ-022, Roofing
First Choice Roofing Systems, Inc.
I.
II.
A
B.
D.
E.
F.
A
B.
e.
D.
E.
F.
G.
Form of Agreement
Public Construction Bond
Certificate of Insurance
Table of Contents
Schedule of Drawings
Scope of Work - Bid Package #30
Milestone Schedule
Proposal Form, pages 00130-1 through 00130-5 signed by bidder and dated June 11, 1992.
Bid Bond from International Fidelity Insurance Company of New Jersey.
Sworn Statement on Public Entity Crimes.
Lobbying and Conflict of Interest Clause.
Non-Collusion Affidavit.
III. Conditions of the Contract
A General Conditions
B. Supplementary Conditions
C. Project Safety and Health Plan
D. Contractor's Quality Control Plan
E. Substantial Completion & Owner's Acceptance
F. General Requirements
Application for Payment
Change Order Procedures
Security Project Procedures
Project Meetings
Submittals
Progress Schedules
Schedule of Values
Daily Construction Report
Document Clarification Requests
Testing Laboratory Services
Temporary Utilities
Construction Aids
Access Roads and Parking Areas
Temporary Controls
Project Identification and Signs
Field Offices and Sheds
Construction Cleaning
Material and Equipment
Post-Bid Substitutions
Starting of Systems
Systems Demonstrations
Contract Closeout
Final Cleaning
Project Record Documents
Operation and Maintenance Data
THE AMERICAN INSTITUTE OF ARCHITECTS
r I L F ri L ,-' i
r, ._,
t
[' I' [: r
'92 AUG 1 7 .1\ 8 : 1 3
l,
~lfJHR()i
llf'1
~ '. "-
r l.t-.
AlA Document A101/CM
CONSTRUCTION MANAGEMENT EDITION
Standard Form of Agreement Between
Owner and Contractor
where the basis of payment is a
STIPULATED SUM
1980 EDITION
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH
AN ATTORNEY IS ENCOURAGED.
This document is intended to be used in conjunction with AlA Documents
A201/CM, 1980; B141/CM, 1980; and B801, 1980.
AGREEMENT Contract No. KJ-022, Roofing
made as of the . I ~ day of
Hundred and n I~+y--h-vt> (IQq2-).
:SCAly
in the year of Nineteen
BETWEEN the Owner:
Monroe County Board of County Commissioners
500 Whitehead Street
Key West, FL 33040
the Project:
First Choice Roofing Systems, Inc.
10267 NW 46th Street
Sunrise, FL 33351
(305) 749-6960
New Monroe County Detention Facility
5501 College Road, Stock Island
Key West, FL 33040
and the Contractor:
the Construction Manager:
Morrison-Knudsen/Gerrits
the Architect:
Hansen Lind Meyer/Gonzalez
The Owner and the Contractor agree as set forth below.
Copyright 1975, @ 1980 by The American Institute of Architects, 1735 New York Avenue, N.W., Washington, D.C. 20006. Re-
production of the material herein or substantial quotation of its provisions without written permission of the AlA violates the
copyright laws of the United States and will be subject to legal prosecution.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT' CONSTRUCTION
MANAGEMENT EDITtON . JUNE 1980 EDITION . AIA<!I> . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006
A101/CM -1980 1
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
ARTICLE 1
THE CONTRACT DOCUMENTS
The Contract Documents consist of this Agreement, the Conditions of the Contract (General, Supplementary and
other Conditions), the Drawings, the Specifications, all Addenda issued prior to and all Modifications issued after
execution of this Agreement. These form the Contract, and all are as fully a part of the Contract as if attached to this
Agreement or repeated herein. An enumeration of the Contract Documents appears in Article 7.
ARTICLE 2
THE WORK
The Contractor shall perform all the Work required by the Contract Documents for
(Here insert the caption descriptive of the Work as used on other Contract Documents.)
Bid Group 3, Bid Package No. 30, Roofing.
ARTICLE 3
TIME OF COMMENCEMENT AND SUBSTANTIAL COMPLETION
The Work to be performed under this Contract shall be commenced on the date as established in the Notice to
Proceed,
and, subject to authorized adjustments, Substantial Completion of the Work shall be achieved not later than
(Here insert any specia' provisions for liquidated damages relating to failure to complete on time.)
the time indicated in Section 00353 Milestone Schedule.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT' CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA~ . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101/CM -1980 2
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
t.
ARTICLE 4
CONTRACT SUM
The Owner shall pay the Contractor in current funds for the performance of the Work, subject to additions and
deductions by Change Order as provided in the Contract Documents, the Contract Sum of
Three Hundred Forty Five Thousand Nine Hundred Dollars.............................. $345,900.00
The Contract Sum is determined as follows:
(State here the base bid or other lump sum amount, accepted alternates and unit prices, as applicable.)
Base Bid............................................................................ $345,900.00
ARTICLE 5
PROGRESS PAYMENTS
Based upon Applications for Payment submitted to the Construction Manager by the Contractor and Project Certificates
for Payment issued by the Architect, the Owner shall make progress payments on account of the Contract Sum to the
Contractor as provided in the Contract Documents for the period ending the Twenty Fi fty (25) . drvlof each
month as follows: approxlma e y
Not later than Thi rty (30) days following the end of the period covered by the Application for Payment,
Ninety percent ( 90 %) of the portion of the Contract Sum properly allocable to labor, materials and
equipment incorporated in the Work and Ni nety percent ( 90 %) of the portion of the Contract
Sum properly allocable to materials and equipment suitably stored at the site or at some other location agreed upon
in writing, for the period covered by the Application for Payment, less the aggregate of previous payments made by
the Owner; and upon Substantial Completion of the Work, a sum sufficient to increase the total payments to
One Hundred percent (100 %) of the Contract Sum, less such amounts as the Architect shall determine for
all incomplete Work and unsettled claims as provided in the Contract Documents.
(/1 not covered elsewhere in the Contract Documents, here insert any provision lor limiting or reducing the amount retained alter the Work reaches a certain
stage of completion.!
Reference Section 00800 Substantial Completion and Owner Acceptance.
.p.a.,.~~lle~~IlR~-t~~~_~~~~.eb..U-Qlil~!:-.j.~t&~.t..!~~.da.t~_fl~)'I'Jl6O.t_io;..QIl€-~~.j;be-r-a4e
~ered -bel('),."..,-(')I";.I't-1:~a:b!el'tee-t:hef'etlf;-'*"~-Iegal-1'lt~fl1'e...1l'i.hng.'lI.t-t~f'J'!-~<<_~ -Pr~et-:
r/'/l!t1! 1tn7!fr ':l1Tj'" r:rrt!'"(J"'/~n.T~r :rg1~n.)
(Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's
and Contractor's principal places 01 business, the location 01 the Proiect and elsewhere may affect the validity 01 this provision. Specific legal advice should
be obtained with respect to deletion, modification or other requirements such as written disclosures or waivers.)
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT . CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIM> . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101/CM -1980 3
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
ARTICLE 6
FINAL PAYMENT
Final payment, constituting the entire unpaid balance of the Contract Sum, shall be paid by the Owner to the
Contractor when the Work has been completed, the Contract fully performed, and the Architect has issued a Project
Certificate for Payment which approves the final payment due the Contractor.
ARTICLE 7
MISCELLANEOUS PROVISIONS
7.1 Terms used in this Agreement which are defined in the Conditions of the Contract shall have the meanings
designated in those Conditions.
7.2 The Contract Documents, which constitute the entire agreement between the Owner and the Contractor, are listed
in Article 1 and, except for Modifications issued after execution of this Agreement, are enumerated as follows:
(List below the Agreement, the Conditions of the Contract [General, Supplementary and other Conditions], the Drawings, the Specifications, and any Addenda
and accepled alternates, showing page or sheet numbers in all cases and dates where applicable.)
I. Bidding Documents
A. Bid Group 3 Bid Documents for New Monroe County Detention Facility, which include Bidding Documents,
Contract Documents, Conditions, Drawings, General Requirements and Technical Specifications, and
which are enumerated in the attached Table of Contents, contained in Bid Group 3, pages 00001-1
thru 00001-9, dated 03/24/92, and in the attached Schedule of Drawings contained in Bid Group 3,
pages 00993-1 thru 00993-19, dated 05/02/92, all as amended by the addenda listed below.
B. Addendum No. 1A dated November 26, 1991
Addendum No. 1B dated December 11, 1991
Addendum No. 1 dated Decmeber 20, 1991
Addendum No. 2A dated January 3, 1992
Addendum No. 2 dated January 6, 1992
Addendum No. 3 dated January 9, 1992
Addendum No. 4 dated January 13, 1992
Addendum No. 5 dated February 18, 1992
Addendum No. 6 dated March 4, 1992
Addendum No.7 dated March 10, 1992
Addendum No. 8 dated March 25, 1992
Addendum No.9 dated April 3, 1992
Addendum No. 10 dated April 16, 1992
Addendum No. 11A dated April 21, 1992
Addendum No. lIB dated April 24, 1992
Addendum No. 11C dated May 1, 1992
Addendum No. 11 dated May 5, 1992
Addendum No. 12A dated May 8, 1992
Addendum No. 12B dated May 13, 1992
Addendum No. 12C dated May 15, 1992
Addendum No. 12 dated May 21, 1992
Addendum No. 13 dated June 1, 1992
II. Proposal Documents submitted by First Choice Roofing Systems, Inc., on June 11, 1992:
A. Proposal Form, pages 00130-1 thru 00130-5, signed by bidder, and dated June 11, 1992.
B. 5% Bid Bond from International Fedelity Insurance Company, New Jersey.
C. Sworn Statement on Public Entity Crimes.
D. Lobbying and Conflict of Interest Clause.
E. Non-Collusion Affidavit.
AlA DOCUMENT A101/CM . OWNER-CONTRACTOR AGREEMENT. CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA@ . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 173S NEW YORK AVE., N.W, WASHINGTON, D.c 20006 A101/CM -1980 4
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
7.3 Temporary facilities and services:
(Here insert temporary facilities and services which are different from or in addition to those included efsewhere in the Contract Documents.)
Reference the documents issued for bidding.
7.4 Working Conditions:
(Hete list any special conditions affecting the Contract.)
Reference the documents issued for bidding.
(Seal)
Attest: Danny L. Kolhage, Clerk of the Court
DANNY L. :K'.OLHAGE, Clerk
By: ~L~~4
(~y~~k)
Date: ~-I.!J --f II
"Approved as to Fonn and Legal Sufficiency"
By, c9~~
Oat., A~io- ~y' f'Z-
This Agreement entered into as of the day and year first written above.
OWNER
CONTRACTOR
~,~untv Boar~ of co~ommi=,~'oners
~..II d _ . ~ ~ .,
- ..- . ~ - ~.
B :
Its: CI/4111"1411/
First
Inc.
By:
Its:
ClJ
CAUTION: You should sign an original AlA document which has this caution printed in red.
An original assures that changes will not be obscured as may Occur when documents are reproduced.
AlA DOCUMENT Al0l/CM . OWNER-CONTRACTOR AGREEMENT. CONSTRUCTION
MANAGEMENT EDITION . JUNE 1980 EDITION . AIA@ . @1980 . THE AMERICAN
INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE., N.W., WASHINGTON, D.C. 20006 A101/CM -1980 5
WARNING: Unlicensed photocopying violates U.S. copyright laws and is subject to legal prosecution.
PUBLIC CONSTRUCTION BOND
Bond No. 000888646-92
First Choice Roofing International
BY THIS BOND, We Systems, Inc. , as Principal and Fidelity Insurance
Company , a corporation, as Surety, are bound to Monroe County ,
herein called Owner, in the sum of $ 345,900.00 for payment of
which we bind ourselves, our heirs, personal representatives,
successors, and assigns, jointly and severally.
THE CONDITION OF THIS BOND is that if Principal:
1. Performs the contract dated July 15 ,19~, between New Monroe County
Principal and Owner for construction of Contract KJ-022, Roofing,! Dete,ntion Facil-
the contract being made a part of this bond by reference, at the ity
times and in the manner prescribed in the contract; and
2. Promptly makes payments to all claimants, as defined in
Section 255.05(1), Florida Statutes, supplying Principal with
labor, materials, or supplies, used directly or indirectly by
Principal in the prosecution of the work provided for in the
contract; and
3. Pays Owner all losses, damages, expenses, costs, and
attorney's fees, including appellate proceedings, that Owner
sustains because of a default by Principal under the contract;
and
4. Performs the guarantee of all work and materials furnished
under the contract for the time specified in the contract, then
this bond is void; otherwise it remains in full force.
Any changes in or under the contract documents and compliance
with any formalities connected with the contract or the changes
does not affect Surety's obligation under this bond.
DATE ON July 27 , 19-R..
~hh':SEE RIDER - EXHIBIT "A" AITACHEIJ;'dd:
Robert Barra (AS ATTORNEY IN FACT) & Fla. Resident
Agent #0140523520
International Fidelity Insurance Company
(NAME OF SURETY)
BY
11/20/91
PUBLIC CONSTRUCTION BOND
00610 - 1 .
I t.11,' ",
':~'\ ('''''I"
. . "." ,
-. r-.
),) '.:
l,
RIDER - EXHIBIT "A"
To be attached to an form a part of Performance & Payment
Bond No.000888646-92
dated the 27th
day of
July
19 92 , issued by the International
Fidelity Insurance Company
, as Surety on behalf of
First Choice Roofing Systems, Inc.
as Principal,
in the penal sum of Three Hundred Forty Five Thousand Nine Hundred and 00/100
Dollars ($ 345,900.00
), and in favor of Monroe County
In consideration of the premium charged for the attached bond, it is hereby
agreed that the attached bond be amended as follows:
This bond is executed and accepted upon the expressed
condition precedent that the surety shall not be liable
for any provisions of the subcontract, general contract
or specifications respecting guarantees for maintenance
or repairs except for defects in workmanship and materials
occuring within one year of completion of the subcontract
nor is the surety obligated to furnish any other bond
covering such provisions of the subcontract, general contract,
or specifications.
Provided, however, that the attached bond shall be subject to all its agreements,
limitations and conditions except as herein expressly modified, and further that
the liability of the Surety under the attached bond and the attached bond as amended
by this rider shall not be cumulative.
This rider shall become effective as of the 27th
day of
July
1992
Signed, sealed and dated this
27th
day of
July
1992
International Fidelity Insurance Co. (SEAL)
W
Robert Barra,
~
Attorney-In-Fact & Fla. Resident
Agent #0140523520
.,. .. . ..., ,..,....', ,.. ....""., ".. .", .....".........,.. .... ..... ,......,.,.. ., ,... ,..",..
.. "".....". ."..""...", .. "".". ".. ............ ........."............ .... ."...
.. . ''''', .......", ...., .. . "....... .".. ..... .." ..". ".".... ....".",..
. . ""... .. . ."....".....".. . ... "....
.., , ,.. .." ."... .... "" . "... ....." ..",,,..
','" ."..".......... .." ",,,. ""....".... .. ""."......" ... '" "..
"'."'" " ",........ ...""".",.", .. , . .. .", ..... ... ,.. ...
. .."..... ., ."......... . ."., ....... .. ......".." ".......... ....
...". "'..,. ..... .......... , "",,,,..,,, ."..""..."...." ".... ... ..", .
.... .. """." '" .......".". "'. .... ""....".. ". .... ".."."."..""... ...."..".
..,.., '" . ,"'" .. .."... ..." ,....,...." ""..... ..""..""....", ..... .."...
CERTIFICATE .OF.INSURANCE..
~~<1~
\I)\IU,lllIRl1J BY FElSW
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS
NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AMEND,
EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
,tJDUCER 441
R.G. BOND & ASSOCIATES, INC.
POBOX 8066
FORT LAUDERDALE FL 33310-8066
ATTENTION CERTIFICATE HOLDER: If you have any questions,
please contact CYNDE BAREFOOT 1-800-226-3224,
2601 Cattlemen Road, Sarasota, FI 34232-6249
COMPANIES AFFORDING COVERAGE
INSURED
FIRST CHOICE ROOFING SYSTEMS INC
10267 NW 46TH ST
SUNRISE FL 33351-7963
Company Letter A FCCI/SELF INSURERS FUND
Company Letter B:
THIS IS TO CERTIFY THAT POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NO, WITHSTANDING ANY REQUIREMENT, ,EnM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH
THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE
TERMS, EXCLUSIONS, AND CONDITIONS OF SUCH POLICIES.
CO
L T
TYPE IN INSURANCE
POLICY NUMBER
POLICY POLICY
EFFECTIVE EXPIRATION
DATE. (MM/DD/YY) DATE (MM/DD/YY)
ALL LIMITS IN THOUSANDS
GENERAL LIABILITY
COMMERCIAL GENERAL LIABILITY
CLAIMS MA.DE C OCCURJlENCE
OWNEJlS &. CONTJlACTOJlS PROTECTIVE
GENERAL AGGREGATE
$
PRODUCTS-COMP/OPS AGGREGATE $
PERSONAL & ADVERTISING INJURY
EACH OCCURRENCE
AUTOMOBILE LIABILITY
ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
HIRED AUTOS
NON-OWNED AUTOS
GARAGE LIABILITY
F(D
CSL
$
BODIL Y
INJURY
(PER
PERSON)
BODILY
INJURY
~E~IDENT) $
$
EXCESS LIABILITY
EACH
OCCURRENCE
OTHER THAN UMBRELLA FORM
WORKERS' COMPENSATION
AND
EMPLOYERS' LIABILITY
718-20810-001-001 01/01/92 12/31/92
$
$
$
OTHER
DESCRIPTION OF OPERATIONS/LDCATIONS/VEHICLES/RESTRICTIONS/SPECIAL ITEMS
MONROE COUNTY
DETENTION FACILITY
DBA:
A4~4tlll.~'T"q;flTIFICA TE OF INSURANCE ISSUE D7A;;(~;;~IYY)
~ (. "..' , '~'-, .
PRODUCER ..' '.' " '--THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND
,..' {:"" CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE
DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE
PQUCl ES,J~J;.bOvt,_______
';RiE~wICH :RlSK MANAGEMENT, INC.
, . .." '." ' ,
r ;0. BQX, 1209, '
BQC'A.%TON ,,'FL ,33429
COMPANIES AFFORDING COVERAGE
"
f~T~~NY A
MARYLk~D CASUALTY COMPANY
INSURED
f~T~~NY B
, \ V f] \q-J
L()~\ll
FIRST CHOICE ROOFING
10267 NW 46TH STREET
SUNRISE, FL 33351
f~T~~NY C
f~T~~~NY D
f~T~~NY E
COVERAGES
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OB...MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS ANDCONDtl'10J'l'$~6F\SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS,
.... . ... . ..,,It
CO
LTR
\
LIMITS
POLICY EFFECTIVE POLICY EXPIRATION
DATE (MMIDDIYY) DATE (MMIDDIYY)
TYPE .OF;INSURANCi;:
POLICY NUMBER
. .,
GENERAL LIABILITY, , .,
A X COMMERCIAL GENER~LL,JA~L1l'Y
CLAIMS M,ADE X, OCCUR. ,
OWNER'S.& CONTRACtOR'S PROT,
TBA 5/01/92 6/01/93
GENERAL AGGREGATE $
PRODUCTS.COMPIOP AGG, $
PERSONAL & ADV, INJURY $
EACH OCCURRENCE $
FIRE DAMAGE (Anyone fire) $
MED, EXPENSE (Anyone person) $
AUTOMOBILE LIABILITY
x: ANY AUTO
ALL OWNED AUTOS
SCHEDULED AUTOS
X HIRED AUTOS
X NON.OWNED AUTOS
GARAGE LIABILITY
5/01/92
6/01/93
COMBINED SINGLE $
LIMIT
BODIL Y INJURY $
(Per person)
BODIL Y INJURY $
(Per accident)
PROPERTY DAMAGE $
EACH OCCURRENCE
AGGREGATE
TBA
EXCESS LIABILITY
UMBRELLA FORM
OTHER THAN UMBRELLA FORM
2,000,000
1,000,000
1,000,000
1,000,000
50,000
'i,OOO
1,000,000
WORKER'S COMPENSATION
AND
EMPLOYERS' LIABILITY
STATUTORY LIMITS
EACH ACCIDENT
$
DISEASE-POLICY LIMIT $
DISEASE-EACH EMPLOYEE $
OTHER
A PHYSICAL DAMAGE
5/01/92
COMPo $250.
COLL. $500.
6/01/93
TBA
DESCRIPTION OF OPERATIONSILOCATIONSIVEHICLES/SPECIAL ITEMS
PROJECT: MONROE COUNTY DENTENTION FACILITY
CERTIFICATE HOLDERS ARE ADDITIONAL INSUREDS AS PER POLICY FORMS, AS THEIR INTEREST MAY APPEAR.
CERTIFICATE HOLDER
CANCELLATION
MORRISON-KNUDSEN & GERRITS
AND
MONROE COUNTY BOARD OF COUNTY
COMMISSIONERS
5090 JUNIOR COLLEGE ROAD
KEY WEST, FLORIDA 33040
ACORD 25-S (?/90)
TABLB 01' CONTENTS
BID GROUP 3
1. Bidding Documents (Volume I)
03/24/92
section 00030
section 00050
section 00100
section 00113
section 00114
section 00115
section 00116
section 00117
section 00118
section 00119
section 00120
section 00121
section 00127
section 00128
section 00129
section 00130
section 00131
section 00132
Section 00133
section 00134
section 00135
section 00136
section 00137
section 00138
section 00139
section 00140
section 00141
section 00142
section 00148
section 00149
section 00143
section 00144
section 00145
section 00146
Notice of Calling for Bids
project Summary
Instructions to Bidders
Proposal Forms:
Security systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
Fire Protection System
Food Service Equipment
Laundry Equipment
Loading Dock Equipment
Pneumatic Tube System
Metals-Ooors-Glazing
Masonry
Concrete
Roofing
stairs & Miscellaneous Metals
sprayed Insulation
Sealants
Gypsum Board, Lath & Plaster
Carpentry
Special Flooring
Access Flooring, Resilient Flooring &
Carpet
Ceramic Tile
Acoustical Ceilings
Painting & Wallcovering
Fence & Gates
Asphaltic Concrete Paving
Wastewater Treatment Plant & utilities
Landscaping
Schedule of Unit Prices:
security Systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
TABLE OF CONTENTS (ADD. 8)
00001 - 1
03/24/92
section 00141
section 00157
section 00163
section 00220
section 00230
section 00303
section 00305
Section 00307
section 00309
Section 00310
section 00311
section 00312
section 00313
section 00314
section 00315
section 00316
section 00317
section 00318
Section 00319
section 00320
section 00321
section 00321
section 00328
Section 00329
section 00330
Section 00331
section 00332
section 00333
section 00334
section 00335
section 00336
section 00331
section 00338
section 00339
section 00340
Section 00341
Section 00342
Section 00343
section 00344
section 00353
Fire Protection System
Metals-Doors-Glazing
Pre-Bid Substitutions
Geotechnical Data
site survey
Scopes of Work for Reference (BG-1 and
BG-2) :
site Electrical & Temporary Power
site Grading & Caissons
Concrete Foundations
site Plumbing
Precast Concrete
Hydraulic Elevators
Precast Embeds
Scopes of Work:
Security systems
Prime Electrical Contract Zones
A,B,C,D,E
Mechanical Process and HVAC
Prime Plumbing Contract Zones A,B,C,D,E
Fire Protection System
Food Service Equipment
Laundry Equipment
Loading Dock Equipment
Pneumatic Tube System
Metals-Doors-Glazing
Masonry
Concrete
Roofing
stairs & Miscellaneous Metals
sprayed Insulation
Sealants
Gypsum Board, Lath & Plaster
Carpentry
special Flooring
Access Flooring, Resilient Flooring &
Carpet
Ceramic Tile
Acoustical Ceilings
Painting & Wallcovering
Fence & Gates
Asphaltic Concrete Paving
Wastewater Treatment Plant & utilities
Landscaping
Milestone Schedule
TABLE OF CONTENTS (ADD. 8)
00001 - 2
section 00410 Bid Bond - AIA Document A310, February
1970 edition
section 00420 Sworn Statement on Public Entity Crimes
section 00425 Lobbying and Conflict of Interest Clause
Section 00430 Non-Collusion Affidavit
Section 00440 Proposed Subcontractor Listing
section 00450 Contractor's Qualification statement -
AlA Document A30S
2. Contract Documents (Volume I)
section 00500 Standard Form of Agreement Between Owner
and Contractor - AlA Document A101/CM,
June 1980 edition
section 00610 Public Construction Bond
3. Conditions (Volume I)
section 00750 General Conditions, AlA Document
A201/CM, June 1980 edition
section 00800 Substantial Completion and Owner
Acceptance
section 00805 Supplementary General Conditions
Section 00900 Application & certificate for Payment -
AlA Document G702/G703
section 00905 Contractor's Affidavit of Payment of
Debts and Claims
section 00908 Contractor's Affidavit of Release of
Liens
section 00910 Consent of Surety to Final Payment - AlA
Document G707, April 1970 edition
section 00915 Affidavit and Partial Release of Lien
Section 00970 project safety and Health Plan
section 00980 Contractor Quality Control Plan
03/24/92
TABLE OF CONTENTS (ADD. 8)
00001 - 3
4. orawinqs
section 00993 Schedule of Drawings, Bid Group 3
5. General Requirements (Volume I)
section 01027
section 01028
section 01130
section 01200
section 01301
Section 01310
section 01370
section 01385
section 01395
section 01410
section 01510
section 01520
section 01550
Section 01560
section 01580
section 01590
section 01595
section 01600
section 01630
section 01650
section 01670
section 01700
Section 01710
section 01720
section 01730
Application for Payment
Change Order Procedures
Security Project Procedures
Project Meetings
Submittals
Progress Schedules
Schedule of Values
Daily Construction Reports
Document Clarification Requests
Testing Laboratory Services
Temporary utilities
Construction Aids
Access Roads and Parking Areas
Temporary Controls
Project Identification and Signs
Field Offices and Sheds
Construction Cleaning
Material and Equipment
Post-Bid Substitutions
starting of systems
Systems Demonstrations
Contract Closeout
Final Cleaning
Project Record Documents
operation and Maintenance Data
03/24/92
00001 - 4
TABLE OF CONTENTS (ADD. 8)
6. Technical specifications, Bid Group Three, (Volume II, dated
November 11, 1991)
ADDENDA
Addendum No. 1, section 00901, pages 00901-1 thru
00901-7.
Addendum No. 2, section 00902, pages 00901-1 thru
00902-7.
Addendum No. 3, section 0090.3, pages 00903-1 thru
00903-7.
Addendum No. 5, section 00905, page 00905-1, with
Revisions to Contract Documents No. 1, pages 1 and 2.
Addendum No. 6, section 00906, page 00906-1, with
Revisions to Contract Documents No. 2, page 1.
Addendum No. 7, section 00907, page 00907-1.
DIVISION 2 - SITEWORK
section 02211
section 02215
section 02222
section 02226
section 02510
section 02518
section 02520
section 02580
section 02644
section 02721
section 02730
section 02732
section 02733
section 02800
section 02810
Section 02830
section 02835
section 02930
section 02950
Rough Grading
Finish Grading
Excavating, Backfilling And Compacting
For Structures
Excavating, Backfilling and Compacting
For utilities
Asphaltic Concrete Paving
Concrete unit Pavers
portland Cement Concrete Paving
Pavement Marking
Water Mains
Sewer Structures
Sanitary sewerage
Sewage Force Mains
Sewage Pump station
site Improvements
Irrigation System
Fence And Gates
Barbed Tape
Lawns
Trees, Shrubs And Ground Cover
DIVISION 3 - CONCRETB
section 03100
Section 03200
section 03300
section 03520
Section 03600
Concrete Formwork
Concrete Reinforcement
cast-in-Place Concrete
Insulating Concrete Decks
Grout
03/24/92
00001 - 5
TABLE OF CONTENTS (ADD. 8)
DIVISION 4 - MASONRY
section 04200 Unit Masonry
DIVISION 5 - METALS
section 05180
section 05500
section 05510
Section 05810
Miscellaneous Structural Steel
Metal Fabrications
Metal stairs
. Expansion Joint Covers Assemblies
DIVISION 6 - WOOD AND PLASTIC
section 06100
section 06200
Rough Carpentry
Finish Carpentry
DIVISION 7 - THERMAL AND MOISTURE PROTECTION
section 07115
section 07210
section 07215
Section 07272
section 07530
section 07730
section 07900
Sheet Waterproofing
Building Insulation
Sprayed Insulation
Firestop And Penetration Sealing System
single Ply Roofing
Roof Accessories
Joint Sealers
DIVISION 8 - DOORS AND WINDOWS
section 08100
section 08211
section 08300
section 08305
section 08320
section 08410
section 08660
section 08710
Section 08800
section 08842
section 08902
Metal Doors And Frames
Flush Wood Doors
Special Doors
Access Panels And Doors
Security Metal Doors And Frames
Aluminum Entrances
Security Windows
Door Hardware
Glazing
Security Glazing
Aluminum Window Walls
DIVISION 9 - PINISHES
section 09110
Section 09200
section 09250
section 09300
section 09510
section 09650
section 09680
section 09700
section 09800
Non-Load Bearing Wall Framing Systems
Lath and Plaster
Gypsum Board
Tile
Acoustical Ceilings
Resilient Flooring
Carpet
Special Flooring
Special coatings
03/24/92
00001 - 6
TABLE OF CONTENTS (ADD. 8)
DIVISION 9 - FINISHES. cont'4
section 09830
Section 09900
section 09950
Elastomeric coating
Painting
Wallcovering
DIVISION 10 - SPECIALTIES
section 10100
,Section 10160
section 10200
Section 10270
section 10350
section 10500
Section 10520
section 10550
section 10606
section 10800
section 10900
Chalkboards And Tackboards
Solid Plastic Toilet Partitions
Louvers and Vents
Access Flooring
Flagpole
Steel Lockers
Fire Extinguisher Cabinets
Postal Specialties
Security Fencing Assembly
Toilet Accessories
Miscellaneous Specialties
DIVISION 11 - EOUIPMENT
section 11110
section 11160
section 11197
section 11200
section 11202
section 11203
Section 11204
section 11205
section 11206
section 11208
section 11211
section 11212
section 11217
section 11218
section 11222
section 11224
section 11400
section 11480
section 11704
Laundry Equipment
Loading Dock Equipment
security/Detention Equipment
Basic Electronic Security Requirements
System Central Processing Unit
Fire Alarm Interface
Programmable Logic Controller
Address Panels
Relay Cabinets
Card Access Control
situation Man-Down Equipment
Closed Circuit video Equipment
Vehicle Loop Detection
operational Intercom System
Inmate/Attorney Telephones
Metal Detection Equipment
Food Service Equipment
Athletic Equipment
Ice Machines
DIVISION 13 - RADIATION PROTECTION
section 13090 Radiation Protection
DIVISION 14 - CONVEYING SYSTEMS
section 14700 Pneumatic Tube system
section 14240 Hydraulic Elevators
03/24/92
00001 - 7
TABLE OF CONTENTS (ADD. 8)
DIVISION 15 - HECHANIC~
Section 15000
Section 15050
Section 15060
Section 15085
Section 15100
Section 15110
Section 15130
Section 15140
Section 15160
Section 15175
Section 15242
Section 15252
Section 15290
Section 15330
Section 15403
Section 15404
Section 15408
Section 15410
Section 15430
Section 15440
Section 15460
Section 15470
Section 15490
Section 15517
Section 15540
Section 15684
Section 15714
Section 15770
Section 15785
Section 15855
Section 15858
Section 15880
Section 15884
Section 15885
Section 15890
Section 15894
Section 15936
Section 15950
Section 15965
Section 15992
Section 15995
General Provisions
Water Treatment
Pipe and Pipe Fittings
Piping Identification
Valves
Heat Trace System
Thermometers and Gages
Pipe Hangers And Supports
Pumps
Variable Speed Motor Control for Fans
and Pumps
Vibration Isolation
Pipe And Equipment Insulation
Ductwork Insulation
Wet-Sprinkler System
Water Booster Pumps
Domestic Water Softener
Soil, Waste and Vent System
Storm Drainage System
Plumbing Specialties
Plumbing Fixtures and Accessories
Sump Pumps
Hot Water Storage Heater
Fuel storage And Dispensinq Systems
Hydronic Specialties
Emergency Generator Auxiliaries
Centrifugal Chillers
Blow Thru Cooling Tower
Make-Up Air Units
Fan Coil Units
Air Handling Units
Fans
Fire Dampers
Combination Smoke And Fire Dampers
Air Filters
Ductwork
Air Terminal Units
Grilles, Registers, Diffusers
Automatic Temperature Control Systems
Building Automation System
Tests - Piping Systems
System Balancing and Testing
03/24/92
00001 - 8
TABLE OF CONTENTS (ADD. 8)
DIVISION 16 - ELECTRICAL
section 16010
Section 16111
section 16111
section 16120
section 16155
section 16161
section 16170
section 16199
section 16300
section 16351
section 16400
section 16425
section 16450
section 16461
section 16470
section 16471
section 16472
section 16500
section 16601
Section 16605
section 16660
section 16721
section 16781
section 16930
Electrical General provisions
Conduit Systems - Bid Group 3
Conduit Systems - Bid Group 2
Wire and Cable
Combination Motor Starters
Motor Control Centers
Disconnect switches
Wiring Devices and Plates
Standby Power Generation
Uninterruptible Power Supply
Service and Power Distribution Systems
Main service switchboard
Electrical Systems Grounding
Dry Type Distribution Transformers
Distribution Panelboards - Circuit
Breaker Type
Feeder and Branch Circuits and Emergency
wiring
Branch Circuit panelboards - Circuit
Breaker Type
Lighting
Lightning Protection System
Transient voltage/Surge Protection
Wiring for Equipment Furnished by Others
Fire Alarm System
Telephone Conduit Systems
Lighting Control Equipment
03/24/92
00001 - 9
TABLE OF CONTENTS (ADD. 8)
SECTION 00993
SCHEDULE OF DRAWINGS
NUMBER
0.00
0.01
0.02A
0.03
0.04
0.05
1.00A
1.00B
1.00C
1.01A
1.02A
1.03A
1.04A
1.05A
1. 06
1.06A
1.07A
1.08A
1.09A
DRAWING TITLE
Cover
Index of Drawings
Symbols and Abbreviations (Architectural)
Life Safety Plan Ground Floor
Life Safety Plan First Floor
Life Safety Plan 2nd Floor
Existing Conditions North
Existing Conditions central
Existing Conditions South
Not Used
Not Used
Final site Layout central
Final site Layout and Grading South
Final Grading North
Rough Grading and Drainage
Final Grading and Drainage Central
Not Used
Final Site utilities central
Not Used
1.10 Entrance Enlarge~ent
1.11 Landscape Plan North
1.12 Landscape Plan Central
DRAWING
LATEST
REVISION DATE
Rev 11/11/91
1 Rev 11/11/91
2 Rev 01/09/92
2 Rev 01/09/92
2 Rev 01/09/92
1 Rev 11/11/91
1 Rev 11/11/91
1 Rev 11/11/91
~-He-v-----B-2--fB+f9-2-
~.Rev 04/03/92
Be 3 ~~
1. Rev 04j03/92
1 Rev 11/11/91
4 Rev 02/18/92
-:l n c \' G~+(J:J-I-9;:;
2 Rev 04/03/92
-2----Rcv 02/07 /-9;:;
3 Rev 04/03/92
1 Rev 02/07/92
BG3 10/15/91
1 Rev 02/07/92
n
05/02/92 BG-3 SCHEDULE OF DRAI'i'INGS (ADD. 11)
00993 - 1
1. 13 Landscape Plan South
1. 14 Irrigation Plan North
1. 15 Irrigation Plan Central
1. 16 Irrigation Plan South
1.17 Pump station Grinder Details
1.18 Not Used
1.19 Not Used
1. 20 site Details Fencing and Paving
1. 21 Landscape Irrigation Details
1. 22 civil Details
3.01 Not Used
3.02 Foundation Plan, Ground Floor Zone B
3.03 Not Used
3.04 Not used
3.05 Not Used
3.06 Not Used
3.07 Framing Plan First Floor Zone A
3.08 Framing Plan First Floor Zone B
3.09 Framing plan First Floor Zone C
3.10 Framing Plan First Floor Zone D
3.11 Framing Plan First Floor Zone E
3.12 Framing Plan first Floor Zone F Alternate
3.13 Framing plan Second Floor Zone A
3.14 Framing Plan Second Floor Zone B
3.15 Framing plan Second Floor Zone C
BG3 10/15/91
BG3 10/15/91
1 Rev 02/07/92
BG3 10/15/91
1 Rev 11/11/91
~~~-fH-f9-'2-
3..R~yg412 8 /92
BG3 10/15/91
BG3 10/15/91
1 Rev 02/18/92
3 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
6 Rev 02/07/92
6 Rev 02/07/92
BG3 11/11/91
5 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
BG-3 SChEDULE OF DRAI'HNGS (ADD. 11)
00993 - 2
05/02/92
3.16 Framing Plan }~ezzanine Level Zone D 5 Rev 02/07/92
3.17 Framing Plan Mezzanine Level Zone E 5 Rev 02/07/92
3.18 Framing Plan Mezzanine Floor Zone F BG3 11/11/91
Alternate
3.19 Framing Plan Hechanical Plenum Zone D BG3 11/11/91
3.20 Framing Plan Mechanical Plenum Zone E BG3 11/11/91
3.21 Framing Plan Mechanical Plenum Zone F BG3 11/11/91
Alternate
3.22 Framing Plan Roof Level Zone A 4 Rev 02/07/92
3.23 Framing Plan Roof Level Zone B 3 Rev 02/07/92
3.24 Framing plan Roof Level Zone C 3 Rev 02/07/92
3.25 Framing Plan Roof Level Zone D 5 Rev 02/07/92
3.26 Framing Plan Roof Level Zone E 5 Rev 02/07/92
3.27 Framing Plan Roof Level Zone F Alternate BG3 11/11/91
3.28 Not Used
3.29 Not Used
3.30 Not Used
3.31 Foundations, sections and Details 4 Rev 02/18/92
3.32 Typical Details 4 Rev 02/07/92
3.33 sections & Details 4 Rev 02/07/92
3.34 Sections & Details 3 Rev 02/07/92
3.35 Precast Wall Schedule & Details 4 Rev 02/07/92
3.36 Precast Column Schedule & Details 4 Rev 02/07/92
3.37 General Notes & Abbreviations & Typical 4 Rev 02/07/92
Details
3.38 sections & Details 3 Rev 02/07/92
3.39 sections & Details 5 Rev 02/07/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
00993 - 3
05/02/92
4.01 Exterior Building Plan Ground Floor Zone A 1 Rev 02/07/92
4.01A Building plan Ground Floor Zone A 1 Rev 02/07/92
4.02 Exterior Building Plan Ground Floor Zone B BG3 11/11/91
4.02A Building Plan Ground Floor Zone B BG3 10/15/91
4.03 Exterior Building Plan Ground Floor Zone C BG3 11/11/91
4.03A Building Plan Ground Floor Zone C BG3 10/15/91
4.04 Exterior Building Plan Ground Floor Zone D BG3 11/11/91
4.04A Building Plan Ground Floor Zone D Housing BG3 10/15/91
4.05 Exterior Building Plan Ground Floor Zone E BG3 11/11/91
Housing
4.05A Building Plan Ground Floor Zone E Housing BG3 10/15/91
4.06 Exterior Building plan Ground Floor Zone F BG3 11/11/91
Housing Alternate
4.06A Building Plan Ground Floor Zone F Housing BG3 10/15/91
Alternate
4.07 Exterior Building Plan First Floor Zone A 1 Rev 02/07/92
4.08 Exterior Building Plan First Floor Zone B BG3 11/11/9.L
4.09 Exterior Building plan First Floor Zone C 4 Rev 02/07/92
4.10 Exterior Building Plan First Floor Zone D BG3 11/11/91
Housing
4.11 Exterior Building Plan First Floor Zone E BG3 11/11/91
Housing
4.12 Exterior Building Plan First Floor Zone F BG3 11/11/91
Housing Alternate
4.13 Exterior Building Plan Second Floor Zone A 4 Rev 02/07/92
4.14 Exterior Building plan Second Floor Zone B BG3 11/11/91
4.15 Exterior Building Plan Second Floor Zone C 3 Rev 02/07/92
4.16 Exterior Building plan Hezzanine Level 4 Rev 04/03/92
Zone D Housing
BG-3 SCHEDULE OF DRA\\lINGS (ADD. 11)
00993 - 4
05/02/92
4.17 Exterior Building Plan Mezzanine Level
Zone E Housing
4.18 Exterior Building Plan Mezzanine Level
Zone F Housing Alternate
4.19 11echanical Plenu~ Plan Zone D
4.20 Mechanical Plenun plan Zone E
4.21 Mechanical plenun Plan Zone F Alternate
4.22 Building Plan Roof Level Zone A
4.23 Building Plan Roof Level Zone B
4.24 Building Plan Roof Level Zone C
4.25 Building plan Roof Level Zone D
4.26 Building plan Roof Level Zone E
4.27 Building plan Roof Level Zone F Alternate
4.28 Exterior Elevations
4.29 Exterior Elevations
4.30 Exterior Elevations
4.31 Exterior Elevations
4.32 Exterior Elevations
4.33 Exterior Elevations
4.33A Exterior Elevations
4.34 Wall sections
4.35 Wall sections
4.36 Wall sections
4.37 Wall sections
4.38 Exterior Details
4.39 Exterior Details
4.40 Exterior Details
BG3 11/11/91
BG3 11/11/91
BG3 11/11/91
BG3 11/11/91
BG3 11/11/91
4 Rev 02/07/92
3 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
BG3 11/11/91
2 Rev 02/07/92
1 Rev 02/07/92
3 Rev 02/07/92
3 Rev 02/07/92
BG3 11/11/91
BG3 11/11/91
2 Rev 02/07/92
4 Rev 02/07/92
3 Rev 02/07/92
2 Rev 02/07/92
5 Rev 02/07/92
4 Rev 02/07/92
4 Rev 02/07/92
5 Rev 02/07/92
05/02/92 BG-3 SCEEDCLE OF DRAWINGS (ADD. 11)
00993 - 5
4.41
4.41A
4.41B
4.42
4.43
4.44
4.45
4.46
4.47
4.47A
4.48
4.49
4.50
4.51
4.52
4.53
4.54
~.55
4.56
4.57
4.58
4.59
4.60
4.61
Exterior Details
Exterior Details
Exterior Details
Metal Door & Window Frame Elevations &
Details, Door Schedule
Not Used
Not Used
Not Used
stair Plans & sections
stair Plans & sections
stair Plans & sections
stair Details
Elevator Plans & sections
Elevator Details
Enlarged Cell - Plans & Elevations
Not Used
Interior Building Plan First Floor Zone A
Interior Building Plan First Floor Zone B
Interior Building Plan First Floor Zone C
Interior Building Plan First Floor Zone 0
Housing
Interior Building Plan First Floor Zone E
Housing
Interior Building Plan First Floor Zone F
Housing Alternate
Interior Building Plan Second Floor Zone A
Interior Building plan Second Floor Zone B
Interior Building Plan Second Floor Zone C
05/02/92
BG-3 SCHEDULE OF DRA\HNGS (ADD. 11)
BG3 11/11/91
13G3 11/1 1/9'
3 Rev 02/07/92
3 Rev 12/20/91
BG3 11/11/91
3 Rev 02/07/92
13G3 11/11/91
BG3 11/11/91
2 Rev 02/07/92
2 Rev 02/07/92
BG3 11/11/91
3 Rev 02/07/92
2 Rev 01/09/92
1 Rev 11/11/91
2 Rev 01/09/92
2 Rev 01/09/92
1 Rev 01/09/92
2 Rev 02/07/92
1 Rev 11/11/91
1 Rev 11/11/91
00993 - 6
4.62
4.63
4.64
4.65
4.66
4.67
4.67A
4.68
4.69
4.70
4.71
4.72
4.73
4.74
4.75
4.76
4.77
4.78
4.79
4.79A
4.80
6.01
6.02
Interior Building Plan Mezzanine Level D
Housing
Interior Building Plan Mezzanine Level
Zone E Housing
Interior Building Plan Mezzanine Level
Zone F Housing Alternate
Building sections
Building Sections
Not Used
Partition Types
Interior Details
Interior Details
Interior Details
Interior Details
Interior Details
Door Schedule
Door Schedule
Door Schedule
H.M. Elevations
Door and Window Details and Buck Types
Finish Schedule
Finish Schedule
Finish Schedule
Miscellaneous Details
Reflected ceiling Plan Ground Floor Zone A
Not Used
1 Rev 02/07/92
2 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
2 Rev 01/02/92
2 Rev 02/07/92
2 Rev 02/07/92
1 Rev 02/07/92
2 Rev 02/07/92
1 Rev 02/07/92
2 Rev 02/07/92
3 Rev 01/09/92
4 Rev 01/09/92
2 Rev 01/09/92
1 Rev 01/09/92
BG3 10/15/91
4 TIc\' -D-4/-B~-f-iH
5 Rev 04/28/92
~v--B4-f-f)~
5 Rev 04/28/92
~-R~v 12f2-G-fIH:
5 Rev 04/28/92
BG3 10/15/91
1 Rev 02/07/92
05/02/92
00993 - 7
BG-3 SCHEDULE OF DRA\\lINGS (ADD. 11)
6.03
Reflected Ceiling plan Ground Floor Zone C
6.04 Not Used
6.05
6.06
6.07
6.08
6.09
6.10
6.11
6.12
6.13
6.14
6.15
6.16
6.17
6.18
6.19
6.20
7.00
7.01
7.02
7.03
7.04
05/02/92
Not Used
Not Used
Reflected ceiling Plan First Floor Zone A
Reflected ceiling Plan First Floor Zone B
Reflected ceiling Plan First Floor Zone C
BG3 10/15/91
1 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
Reflected Ceiling Plan First Floor D Housing BG3 10/15/91
Reflected Ceiling Plan First Floor Zone E
Housing
Reflected Ceiling Plan First Floor Zone F
Housing Alternate
Reflected Ceiling Plan Second Floor Zone A
Reflected Ceiling Plan Second Floor Zone B
Reflected Ceiling Plan Second Floor Zone C
Reflected Ceiling Plan Mezzanine Level
Zone 0 Housing
Reflected Ceiling Plan Mezzanine Level
Zone E Housing
Reflected Ceiling Plan Mezzanine Level
Zone F Housing Alternate
Ceiling Details
Ceiling Details
standard Mounting Heights
Not used
Not used
Equipment plan Ground Floor Zone C
Not Used
BG3 10/15/91
BG3 10/15/91
1 Rev 02/07/92
1 Rev 12/20/91
BG3 10/15/91
1 Rev 02/07 ~
1 Rev 02/07/92
BG3 10/15/91
2 Rev 02/07/92
2 Rev 04/03/92
1 Rev 11/11/91
BG3 10/15/91
00993 - 8
BG-3 SCHEDULE OF DRA\\lINGS (ADD. 11)
7.05
Not Lsed
7.06
Not Csed
7.07 Equipment Plan First Floor Zone A
7.08 Equip~ent Plan First Floor Zone B
7.09 Equipment Plan First Floor Zone C
7.10 Equipnent Plan First Floor Zone D Housing
7.11 Equipment Plan First Floor Zone E Housing
7.12 Equipment Plan First Floor Zone F Housing
Alternate
7.13 Equip~ent Plan Second Floor Zone A
7.14 Equipment Plan Second Floor Zone B
7.15 Equipment Plan Second Floor Zone C
7.16 Equipment Plan Mezzanine Level Zone D
Housing
7.17 Equipment Plan Mezzanine Level Zone E
Housing
7.18 Equipment plan Mezzanine Level Zone F
Housing Alternate
7.19 Enlarged Toilet/Shower Equipment Plan
7.20 Enlarged Plans
7.21 Millwork Elevations
7.22 Mill~ork Elevations
7.23 Mill~ork Elevations
7.24 Mill~ork Elevations
7.25 Mill~ork Details
7.26 Mill~ork Details
FS-l Food Service Equipment Schedule
FS-2 Food Service Equipment Plan
05/02/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
1 Rev 11/11/91
BG3 10/15/91
BG3 10/15/91
1 Rev 11/11/91
1 Rev 11/11/91
1 Rev 11/11/91
1 Rev 04/03/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 02/07/92
1 Rev 02/07/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 01/02/92
BG3 10/15/91
BG3 10/15/91
00993 - 9
fS-3 Food Service J'~echan i ca 1 Plan BG3 10/15/91
fS-4 Food Service Electrical Plan BG3 10/15/91
fS-5 Food Service Plt:=-:-;bing Plan BG3 10/15/91
fS-6 Food Service Eq-...:ipment Details BG3 10/15/91
FS-7 Food Service Equipment Details BG3 10/15/91
L-1 Laundry Equipment Plan and Schedule BG3 10/15/91
L-2 Laundry Mechanical Plan BG3 10/15/91
L-3 Laundry Electrical Plan BG3 10/15/91
L-4 Laundry Plumbing Plan BG3 10/15/91
Vol.IJ:_
0.00 Cover
0.01 Index of Drawings Rev 11/11/91
8.00 Plumbing Legend BG3 10/15/91
8.00A Plumbing Schedules 1 Rev 12/20/91
8.01 Plumbing Ground Floor Zone A 3 Rev 02/07 ""2
8.02 plurr,bing Ground Floor Zone B BG3 10/15/91
8.03 Plumbing Ground Floor Zone C 3 Rev 01/02/92
8.04 Plumbing Ground Floor Zone D Housing 2 Rev 01/09/92
8.05 Plurrbing Ground Floor Zone E Housing BG3 10/15/91
8.06 Plur:.bing Ground Floor Zone F Housing 1 Rev 11/11/91
Alternate
8.07 Plurbing First Floor Zone A 2 Rev 02/07/92
8.08 Plurbing First Floor Zone B BG3 10/15/91
8.09 PluT:'_bing First Floor Zone C 1 Rev 01/02/92
8.10 plur,bing First Floor Zone D Housing 2 Rev 01/09/92
8.11 PluT:',bing First Floor Zone E Housing 1 Rev 12/20/91
05/02/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
00993 - 10
8.12 Plunbing First Flcor Zone F Housing 1 Rev 11/11/91
Alternate
8.13 PluIT,bing Second Floor Zone A 1 Rev 01/09/92
8.14 Plumbing Second Floor Zone B BG3 10/15/91
8.15 Plumbing Second Floor Zone C 2 Rev 12/20/91
8.16 Plumbing Hezzanine Level Zone D Housing 1 Rev 12/20/91
8.17 Plumbing Mezzanine Level Zone E Housing BG3 10/15/91
8.18 Plumbing Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
8.l9 Plumbing Plenum Plan Zone D Housing 1 Rev 01/09/92
8.20 Plumbing Plenum Plan Zone E Housing BG3 10/15/91
8.21 Plumbing Plenum Plan Zone F Housing BG3 10/15/91
Alternate
8.22 Plumbing Schedules and Details 1 Rev 01/02/92
8.23 Plumbing Riser Diagram 2 Rev 02/07/92
8.24 Plumbing Riser Diagram 1 Rev 01/09/92
8.25 Plumbing Riser Dic.gram 1 Rev 01/09/92
8.26 Plumbing Riser Dic.gram BG3 10/15/91
8.27 Plumbing Riser Diagram BG3 10/15/91
8.28 Plur.,bing Riser Dic.gram BG3 10/15/91
8.29 Plumbing Riser Diagram BG3 10/15/91
8.30 Plumbing Riser Dic.gram BG3 10/15/91
8.31 Plur..bing Riser Dic.gram BG3 10/15/91
8.32 pluDbing Riser Dic.gram 1 Rev 11/1] /91
8.33 Plunbing Riser Dic.gram BG3 10/15/91
8.34 Plur.:bing Riser Di2.gram BG3 10/15/91
8.35 PI ur.:bing Kitchen Plan 1 Rev 01/02/92
05/02/92
BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
00993 - 11
8.36
9.01
9.02
9.03
9.04
9.05
9.06
9.07
9.08
9.09
9.l0
9.1l
9.12
9.13
9.14
9.15
9.l6
9.17
9.18
9.l9
9.20
9.21
9.22
10.01
Waste Handling system Details
Not Used
Not Used
Not Used
Not Used
Not used
Not Used
piping Plan First Floor Zone A
piping Plan First Floor Zone B
piping Plan First Floor Zone C
Piping Plan First Floor Zone D Housing
piping Plan First Floor Zone E Housing
piping Plan First Floor Zone F Housing
Alternate
piping Plan Second Floor Zone A
piping Plan Second Floor Zone B
piping plan Second Floor Zone C
piping Plan ~ezzanine Level Zone D Housing
piping plan ~ezzanine Level Zone E Housing
Piping Plan Mezzanine Level Zone F Housing
Alternate
l~ot used
l~ot Csed
Fuel Oil Details
piping Diagrams
Not Used
10.02 HVAC Plan Ground Floor Zone B
05/02/92 BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
1 Rev 01/02/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG 3 10/15/ ':JJ...
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
00993 - 1:->
10.03 HVJ...C Plan Ground Floor Zone C BG3 10/15/91
10.04 HVAC Plan Ground Floor Zone D Housing BG3 10/15/91
10.05 HVJ...C Plan Ground Floor Zone E Housing BG3 10/15/91
10.06 HVAC Plan Ground Floor Zone F Housing BG3 10/15/91
Alternate
10.07 HVJ...C Plan First Floor Zone A 1 Rev 02/07/92
10.08 HVAC Plan First Floor Zone B BG3 10/15/91
10.09 HVAC Plan First Floor Zone C BG3 10/15/91
10.10 HVAC plan First Floor Zone D Housing 1 Rev 01/09/92
10.11 HVAC plan First Floor Zone E Housing 1 Rev 01/09/92
10.12 HVAC Plan First Floor Zone F Housing 1 Rev 01/09/92
Alternate
10.13 HVAC Plan Second Floor Zone A 1 Rev 02/07/92
10.14 HVAC Plan Second Floor Zone B 1 Rev 12/20/91
10.15 HVAC Plan Second Floor Zone C 1 Rev 01/09/92
10.16 HVAC Plan Mezzanine Level Zone D Housing BG3 10/15/91
10.17 HVAC Plan Mezzanine Level Zone E Housing BG3 10/15/91
10.18 HVAC Plan Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
10.19 HV1\C Plenum Plan Zone D Housing BG3 10/15/91
10.20 HVAC Plenum Plan Zone E Housing BG3 10/15/91
10.21 HV.;'C Plenum Plan ZCDe F Housing Alternate BG3 10/15/91
10.22 Not Used
10.23 Not Used
10.24 HVAC Plan Roof Level Zone C 1 Rev 01/09/92
10.25 Not Used
10.26 Not Used
BG-3 SCHEDULE OF DRAivINGS (ADD. 11)
00993 - 13
05/02/92
10.27
Not Used
10.28
Enlarged Mechanical Room Plan
10.29
HVAC Details
10.30
HVAC Details
10.31
HVAC Details
10.32
HVAC Schedules
10.33
HVAC Schedules
10.34
HVAC Schedules
10.35
Central Plant Control Diagrams
10.36
HVAC Temperature Control
10.37
HVAC Smoke Control
11.00
Electrical Symbols and Notes
11.00A
Electrical site Lighting Plan
11.01
Power and Lighting Plan Ground Floor
Zone A
11.02
Power and Lighting Plan Ground Floor
Zone B
11.03
Power and Lighting Plan Ground Floor
Zone C
11.04 Power and Lighting Plan Ground Floor
Zone D Housing
11.05 power and Lighting Plan Ground Floor
Zone E Housing
11.06 Power and Lighting Plan Ground Floor
Zone F Housing Alternate
11.07 power Plan First Floor Zone A
11.08 Lighting Plan first Floor Zone A
11.09 Power plan First Floor Zone B
11.10 Lighting plan First Floor Zone B
BG3 10/15/9'
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
1 Rev 11/11/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
1 Rev 02/07/92
BG3 10/15/9J..
1 Rev 01/02/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
BG3 10/15/91
00993 - 14
05/02/92 BG-3 SCHEDuLE OF DRAWINGS (ADD. 11)
11.11
11.12
11.13
11.14
11.15
11.16
11.l7
11.l8
11.19
11.20
11.21
11.22
11.23
11.24
11.25
11.26
11.27
11.28
11.29
11.30
Power Plan First Floor Zone C
Lighting Plan First Floor Zone C
Power Plan First F~oor Zone D Housing
Lighting Plan First Floor Zone D Housing
Power Plan First Floor Zone E Housing
Lighting Plan First Floor Zone E Housing
Power Plan First Floor Zone F Housing
Alternate
Lighting Plan First Floor Zone F Housing
Alternate
Power Plan Second Floor Zone A
Lighting plan Seco~d Floor Zone A
Power Plan Second Floor Zone B
Lighting Plan Second Floor Zone B
Power Plan Second Floor Zone C
Lighting Plan Second Floor Zone C
Power Plan Mezzanine Level Zone 0 Housing
2 Rev 03/04/92
BG3 10/15/91
3 Rev 03/04/92
BG3 10/15/91
3 Rev 03/04/92
BG 3 10/ 15/9 1
2 Rev 01/02/92
BG 3 10/15/91
1 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
1 Rev 12/20/91
1 Rev 03/04/92
BG3 10/15/91
2 Rev 03/04/92
Power Plan Mezzanine Level Zone E Housing
Lighting plan Mezzanine Level Zone 0 Housing BG3 10/15/91
2 Rev 03/04/92
Lighting Pla~ Mezzanine Level Zone E Housing BG3 10/15/91
Power Plan Mezzanine Level Zone F Housing
Alternate
1 Rev 12/20/91
Lighting Plan Mezzanine Level Zone F Housing BG3 10/15/91
Alternate
11.31 Power and Lighting Plan Plenum Plan Zone D
Housing
11.32 Power and Lighting Plan Plenum Plan Zone E
Housing
11.33 Power and Lighting Plan Plenum Plan Zone F
BG 3 10/15/91
BG3 10/15/91
BG 3 10/15/91
05/02/92 BG-3 SCHEDVLE OF DRAWINGS (ADD. 11)
00993 - 15
11.34
11.35
11.36
11. 37
11.38
11.39
11.40
11.4l
11.42
11.43
11.44
11.45
11.46
11.47
11.48
11.49
11.50
11.51
11.52
12.01
12.02
12.03
12.04
12.05
05/02/92
Housing Alternate
Power Plan Roof Level Zone A
Power Plan Roof level Zone B
Power plan Roof Level Zone C
power Plan Roof Level Zone D
power Plan Roof Level Zone E
Power Plan Roof L~vel Zone F Alternate
Electrical Enlarged Kitchen Plan
Electrical Enlarged Laundry Plan
Lightning Protection Plan
Lightning Protection Plan Details
Electrical Riser Diagram Part 1
Electrical Riser Diagram Part 2
Electrical Schedules and Details
Electrical Schedules and Details
Electrical Schedules and Details
Electrical Schedules and Details
Electrical Sctedules and Details
Electrical Schecules and Details
Not Used
Communicatic~s Plan Ground Floor Zone A
communications plan Ground Floor Zone B
communications Plan Ground Floor Zone C
communications Plan Ground Floor Zone D
Housing
Cornmunicatic~s Flan Ground Floor Zone E
Housing
BG-3 SCHEDCLE OF DRAWINGS (ADD. 11)
BG3 10/151"1
BG3 10/15/91
1 Rev 01/09/92
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
2 Rev 01/02/92
1 Rev 11/11/91
BG3 10/15/91
5 Rev 031 /92
1 Rev 11/11/91
2 Rev 01/09/9~
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
BG3 10/15/91
1 Rev 03/04/9:
BG3 10/15/91
BG3 10/15/91
00993 ---
12.06
12.07
12.08
12.09
12.10
12.11
12.12
12.13
12.14
12.15
12.16
12.17
12.18
12.19
12.20
12.21
12.22
12.23
12.24
12.25
12.26
12.27
communications plan Ground Floor Zone F
Housing Alternate
communications plan First Floor Zone A
communications Plan First Floor Zone B
communications Plan First Floor Zone C
communications plan First Floor Zone D
Housing
communications Plan First Floor Zone E
Housing
communications Plan First Floor Zone F
Housing Alternate
communications Plan Second Floor Zone A
communications Plan Second Floor Zone B
communications Plan Second Floor Zone C
communications Plan Mezzanine Level Zone D
Housing
communications Plan Mezzanine Level Zone E
Housing
communications Plan Mezzanine Level Zone F
Housing Alternate
Fire Alarm Riser Diagram
Telephone Riser Diagram and Elevator
Fire Alarm System
Not Used
Not Used
Not Used
Security plan Ground Floor Zone A
Security Plan Ground Floor Zone B
Security Plan Ground Floor Zone C
Security Plan Ground Floor Zone D Housing
BG3 10/15/91
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
BG3 10/15/91
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
1 Rev 03/04/92
BG3 10/15/91
BG3 10/15/91
1 Rev 12/20/91
1 Rev 12/20/91
1 Rev 12/20/91
1 Rev 12/20/91
1 Rev 12/20/91
05/02/92
00993 - 17
BG-3 SCHEDULE OF DRAWINGS (ADD. 11)
12.28
12.29
12.30
12.31
12.32
12.33
12.34
12.35
12.36
12.37
12.38
12.39
12.40
12.41
12.42
12.43
12.44
13.01
13.02
13.03
13.04
13.05
13.06
05/02/92
Security Plan Ground Floor Zone E Housing 1 Rev 12/20/91
Security plan Grcund Floor Zone F Housing 1 Rev 12/20/91
Alternate
Security plan First Floor Zone A 3 Rev 03/04/92
Security Plan First Floor Zone B 3 Rev 03/04/92
security Plan First Floor Zone C 2 Rev 03/04/92
Security plan First Floor Zone D Housing 3 Rev 03/04/92
security Plan First Floor Zone E Housing 3 Rev 03/04/92
security Plan First Floor Zone F Housing BG3 10/15/91
Alternate
Security Plan Second Floor Zone A 5 Rev 03/04/92
security Plan Second Floor Zone B 1 Rev 12/20/91
Security Plan Second Floor Zone C 3 Rev 03/04/92
security Plan Mezzanine Level Zone D 3 Rev 03/04/92
Housing
security Plan Mezzanine Level Zone E 3 Rev 03/04/92
Housing
Security Plan Mezzanin Level Zone F 1 Rev 12/20/91
Housing Alternate
Security systems Riser Diagram 2 Rev 02/07/92
Details 1 Rev 02/07/92
Details 1 Rev 12/20/91
Fire Protection Ground Floor Zone A BG3 10/15/91
Fire Protection Ground Floor Zone B BG3 10/15/91
Fire Protection Ground Floor Zone C BG3 10/15/91
Fire Protection Ground Floor Zone D Housing BG3 10/15/91
Fire Protection Ground Floor Zone E Housing BG3 10/15/91
Fire Protection Ground Floor Zone F Housing BG3 10/15/91
Alternate
BG-3 SCHEDULE OF DRA\HNGS (ADD. 11)
00993 - lR
13.07 Fire Protection First Floor Zone A BG3 10/15/91
13.08 Fire Protection First Floor Zone B BG3 10/15/91
13.09 Fire Protection First Floor Zone C BG3 10/15/91
13.10 Fire Protection First Floor Zone D Housing BG3 10/15/91
13.11 Fire Protection First Floor Zone E Housing BG3 10/15/91
13.12 Fire Protection First Floor Zone F Housing BG3 10/15/91
Alternate
13.13 Fire Protection Second Floor Zone A BG3 10/15/91
13.14 Fire Protection Second Floor Zone B BG3 10/15/91
13.15 Fire Protection Second Floor Zone C BG3 10/15/91
13.16 Fire Protection Mezz. Level Zone D Housing BG3 10/15/91
13.17 Fire Protection Hezz. Level Zone E Housing BG3 10/15/91
13.18 Fire Protection Mezz. Level Zone F Housing BG3 10/15/91
Alternate
13.19 Not Used
13.20 Not Used
13.21 Not Used
13.22 Not Used
13.23 Not Used
13.24 Not Used
13.25 Not Used
13.26 Not Used
13.27 Not Used
13.28 Fire Protection Details BG3 10/15/91
13.29 Fire Protection Details BG3 10/15/91
05/02/92
BG-3 SCHEDULE OF DRJlJ'HNGS (ADD. 11)
00993 - 19
::./ .~
~: .
'" .
SECTIC~ 00330
SCOPB OF WORK
Bid package No. 30
Roofing
1.1 General Scope
Provide all labor, supervision, engineering, materials,
supplies, equipment, tools, transportation, surveying and
layout, and protection, to install complete operating
systems, and proper execution and completion of all Work
specified on the drawings, in the bid package, and the
sections of the specifications, which include, but are not
limited to the listing that follows. The bidder shall review
all drawings, and specification sections that are not
specifically listed, but which are listed in the schedule of
drawings, for any additional requirements in order to complete
the scope of work described herein. Drawings are available
for review at the (2) plan rooms as listed in the Notice of
Calling for Bids, and at the office of the Construction
Manager.
Primary sections and Descriptions of the Work
03520 Insulating Concrete Decks
06100 Rough Carpentry
07210 Building Insulation
07525 Modified Bitumen Roofing system
07530 ~ingle Ply Rosfin!
l,t,~~~lj1IDf1t1t!iftl
07900 Joint Sealers
Related sections and Descriptions
Note:
03410
03412
03420
03490
04200
05810
07215
07272
10200
11400
The following (4) Precast Concrete specifications
can be viewed at the office of the Construction
Manager.
Precast Concrete Hollow Cored Planks (BG-2)
Precast Concrete Panels (BG-2)
Precast Prestressed Concrete Sections (BG-2)
Precast Concrete Modular Cell (BG-2)
Unit Masonry
Expansion Joint Covers Assemblies
sprayed Insulation
Firestop and Penetration sealing System
Louvers and Vents
Food Service Equipment
05/18/92
00330 - 1
ROOFING SCOPE OF WORK (ADD. 12)
15330
15408
15410
15770
15858
15890
16111
16199
16601
Wet-Sprinkler System
Soil, Waste and Vent System
Storm Drainage System
Make-up Air Units
Fans
Ductwork
Conduit Systems
Wiring Devices and Plates
Lightning Protection System
1.2 Special provisions
The following Special Provisions are intended to clarify the
scope of work, or highlight features of the work, or modify,
change, add to, or delete from the General Scope of this Bid
Package.
.1 All licenses required in order to perform the scope of
work in the specified location, shall be procurred and
maintained by the contractor and his subcontractors.
Contractor shall submit copies to the Construction
Manager. Contractor shall be responsible for applying
for, and procuring the construction permit as required by
the City of Key West; however, the Owner shall literally
pay the fee for the permit.
.2 Contractor shall maintain As-Built drawinqs. (Record
Drawings per section 01720), of his work progression. A
50% progress of field work submittal, will be required.
.3
Provide, replace, and maintain a roof level
warning barricade system with appropriate
Maintain throughout the life of the
scaffolding/stairs.
temporarv
setbacks.
temporary
Provide, replace, and maintain any safetv rails and
barricades removed as necessary by this trade contractor
during the process of work, or during deliveries of
materials or equipment.
This contractor shall also maintain adequate
of openinqs to prevent water intrusion
particular opening has been assigned to
contractor.
protection
until the
follow-on
.4 Contractor is to review Division 1 General Requirements
for additional responsibilities required in order to
perform the work under this Bid Package.
Contractor shall pay particular attention to section
01710 Final Cleaning, which shall be performed as
scheduled by the CM, which will be at or near the
04/28/92
00330 - 2
ROOFING SCOPE OF WORK (ADD. 11)
completion of the project.
.5 utility Routing and Coordination of the Work
This contractor shall be responsible to coordinate his
work with other multiple prime contractors both in the
scheduling of field work activities and in the
integration of individually furnished items into final
composite installations. Coordination drawings
procedures shall consist of, but are not limited to,
utility Routing Drawings and Base Trade Installers
Drawings. The utility Routing coordination shall consist
of three phases.
Phase I
The first phase shall constitute the routing of the
precasters erection mylar or sepia drawings for utility
routing 'over-lay' of each trade contractor's work. This
shall be done by routing first to the sheet metal
contractor, then to the plumber, thirdly to the fire
protection contractor, fourthly to mechanical piping,
fifthly to electrical and lastly to the security
contractor, who shall return the composite overview to
the CM. Each trade contractor shall have noted each
service by name & size of carrier (pipe, duct, etc.) and
insulation/hanger cross sectional dimensions, i.e., 3"
Greywater (6"), 24" x 12" Supply (26" x 14"), 2" ltg, 1"
Comm, etc. Additionally, each trade contractor shall
have specified location, size, and type of precast embed
or block out required to accommodate the installation of
his work. The intent at this level of coordination is to
specify interface information from trade contractors to
the precast concrete contractor which will allow the
precaster to prepare piece casting drawings and begin
precast production.
Pha ~g__!..I
Upon review by the Owner's representative to identify
congested areas, Backqround Drawings shall be produced as
generally listed below.
1. Corridors and halh:ays-Plan & Elevation 1/4" = 1',
cross sections 1" = l'
2 . Kitchen-Plan & Elevation 1/4"= 1', cross sections
1"= l'
3. Housing chases and plenums-Plan & Elevation 1/4" =
1', cross sections 111 l'
4. Mechanical rooms-Flc!l & Elevation 1/4" = 1', cross
sections 1" = l'
04/28/92
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 3
5. Laundry-Plan & Elevation 1/4"= 1', cross sections
1"=1'
6. Electrical rooms-Plan & Elevation 1/4"= 1', cross
sections 1"= l'
7. All other areas-conventional scale with chases of
enlarged scale.
These drawings shall be routed and marked up by the
utility Trade Contractors in the same manner as Phase One
drawings, except 'over-lay' work shall show more detail
depicting all items and features such as radius fittings,
valves, specialties, space between pipes, graphic and
written elevations and dimensions, and hanger/support
details. The owner's representative may conduct job site
meetings to resolve and finalize any conflicts which are
not answered during drawing 'over-lay' routing.
Item number 3. above and zone 'A' shall be submitted
within (10) ten calendar days of Award of Contract.
Phase III
Shop or background drawings shall be prepared and
submitted by the masonry, non-load bearing wall, ceiling,
raised floor, roofer and cast-in-place concrete
contractors. These drawings shall be routed in the same
manner as the previous phases and each trade contractor
shall provide all information necessary for installation
of items furnished by their contract scope of work and
which will require embedment or blockout in the walls,
ceiling or floors.
The requirements of this section are separate from other
drawings and submittals required in the technical
specifications or record drawing sections of the contract
documents.
The precast concrete is in the process of being designed,
and the bidder is required to familiarize himself with
the current status.
Reference Phase I of the utility Routing Coordination
plan in the scope of work of the applicable bid packages
as noted above. In order to facilitate timely
information to the precast contractor, the Construction
Manager is in the process of early review and development
of suggested routing of all major utility installations,
for Zone A and Zone D cell horizontal and vertical chases
for the purpose of precast coordination only. The CM
will conduct an analysis of structural and utility
interface information presented in the contract documents
and in accordance with industry standards, and provide
04/28/92
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 4
the precast contractor with sufficient information to
proceed with precast piece detailing and production.
This contractor shall review and include the drawings
listed in Attachment 'C', which comprise the current
status and listing of CM Phase I coordination drawings.
Any required precast penetrations above and beyond what
is identified by the CM in these specific areas shall be
the responsibility of the contractor.
.6 Furnish to the appropriate trade contractor, for
installation in precast concrete, non-load bearing walls,
masonry, and cast-in-place concrete, all frames, sleeves,
anchors, weld plates and other similar inserts or devices
required to facilitate and coordinate the Work in this
Bid Package. Submit routing shop drawings showing wall
elevation, floor and ceiling plans with requirements for
location and size suitable for field location and
installation. Coordinate and verify correctness of
installation as the work progresses. Verify prior to
casting in form work, or during line and grade
installation of major feature progress.
.7 Materials and Equipment Furnished by Others All
materials furnished by the Owner, other contractors for
the Owner, or by the CM for the Owner, for installation
by this contractor shall upon delivery, be unloaded,
transferred, stored and fully protected by the contractor
until installed. Any demurrage or similar charge
incurred due to failure of the contractor to promptly
unload the materials and equipment shall be the
responsibility of the contractor.
The contractor shall carefully examine all materials and
equipment furnished by the Owner, or any of his
designees, (other contractors or the CM). The contractor
shall complete receiving reports describing the quantity
and condition of the materials or equipment. The
contractor shall be responsible for subsequent damage or
loss until installation is completed and accepted by the
Owner.
Should the contractor fail to report any visible signs of
damage in the receiving report as indicated above, then
all parties in interst may assume that the damage
occurred while the materials and equipment were in the
care, custody and control of the receiving contractor.
Any material furnished by the Owner, at an off-site
location, on other than a charge basis in connection with
the contract, shall be deemed as held by the contractor
on consignment. All such materials not used in the
04/28/92
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 5
fabrication of materials or equipment required under the
contract shall be returned to the applicable party, as
directed, at their expense; and, if not accounted for or
so returned, shall be paid for by the contractor.
.8 It will be the full responsibility of this trade
contractor to properly seal and maintain rated assemblies
in accordance with manufacturer's recommendations,
affected by his work, and in accordance with Section
07272 Firestop and Penetration Sealing System, and
section 07210 Building Insulation.
.9 Contractor shall perform all required testing and
inspections, and provide adequate personnel in order to
complete all testing to the requirements of governing
agencies.
.10 All incoming materials and equipment shall be coordinated
with other trades and the CM is to be notified, in order
that proper laydown, staqinq and stockinq areas are
developed, prior to release for shipping. within the
building, areas shall be restricted and stocking areas
will be authorized in writing.
.11 If in the event of conflicting, or overlapping
requirements in any area of the bidding documents,
technical specifications, or drawings, the most stringent
condition shall be bid and constructed. Notify the CM in
any event, in order to not compromise the Ownu 's right
to make appropriate decisions.
.12
Coordinate with the Masonry
installation of masonry parapet
scheduling of work.
Contractor,
walls, and
and his
for timely
.13 Furnish and install InsulatL,g COJ}e: Jecks, in
accordance with Section 03520. T': s shall irlclude
insulation boards, perimeter joint fillers, and all
forming, form stopping, penetrati nn seaU "; I and pouring.
Reference section 07210 Building Insulation, Section
06100 Rough Carpentry, and Section 07900 Joint Sealers.
Verify compatibility of Insulating Concrete Deck product
with---EPBM roofing system. No warranty mod;rications will
be allowed.
.14 Furnish and install fully o.dhcrcd EPDH specified roofing
system. This shall include all wood blocking, . flashings,
boots, stainless steel, neoprene, mastic, sealants,
C;XF;:-illsion joints, and f iresaf ing. Roof ing products shall
be as approved by roofing system manufacturer. Roofing
ldetails' used shall be as approved by roofing system
04/28/92
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 6
T
manufacturer. Verify compatibi 1 i ty of roof ing system
with insulating concrete deck. No warranty modifications
will be allowed.
.15 The Roofing Contractor shall be responsible for
coordinating prior to roof installation, and providing
all roof penetrations, which are required by other trade
contractors.
.16 This contractor shall provide all rough carpentry for
insulating concrete decks, and roofing system, including
curbs, nailers, flashings and accessor ies. Refer to
section 06100.
. 17 Provide inspections for leaks during wet per iods as
requested by the Construction Manager.
Provide inspections during other trades installation
throughout the project duration in order to mitigate
damage. Provide suggested mcmbranc.,!"qQt.:~D9 protection
methods, and police during installatT()ri.~:rrispect other
trade work upon completion, in order to support roof
warranties and guarantees issued upon project substantial
completion.
.18 Install roof curbs supplied by other trade contractors.
.19 Contractor shall maintain cleanliness of the roof area at
all times.
.20 Assist and coordinate with other trades in the
installation of their work. This shall include
installation of roof top units (by the Food Service
Equipment Contractor and Mechanical Contractor), ladders
(which mayor may not be a part of roof scuttle),
electrical appurtenances (lightning protection and
power), plumbing and other items.
.21 Embeds Schedule, Attachment lA'
Find attached to this scope of work Attachment' A' 1
EMBEDS SCHEDULE, (6) pages, outl ining the entity
responsible for embedded metal. In the 'Responsibility'
column, all items with a '6', are the direct
responsibility of the Roofing Contractor to furnish and
install. This schedule shall serve as a guide, and not
be 1 imi ted to the items del ineated, and the Roofing
Contractor shall be responsible for determining the total
extent of embeds required under this bid package.
04/28/92
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 7
.22 Alternate 30-01: Temporary Accessways
Provide an alternate add price to furnish, install and
maintain temporary scaffold stairways at two locations as
directed by the Construction Manager with provisions for
egress to the 1st floor, 2nd floor and roof level.
Temporary stairways will be used for general construction
use. For bid purposes provide stairs at completion of
precast erection of Area 'A' for a period of (90) days
and a set of stairs at completion of erection of Area IC'
for a per iod of (60) days. The term completion used
herein shall mean complete to the stage which shall allow
full occupancy by other trades as determined by the CM
which shall be documented by written notice.
Modification of these specified time intervals will be
facilitated by change order.
.23 Owner option No. 30-01: Zone 'F' Roofing and Insulating
Concrete Deck:
At the option of the Owner, furnish and install Zone IFI
Roofing and Insulating Concrete Deck, similar to Zones
I D' and IE'.
This area is defined as the area bound by column lines G
to La, and 17 line to 24 line, as well as column lines 37
to X, and U line to 42 line.
.24 Zone IAI Terrace Precast Panels. The Precast Concrete
Contractor shall supply installed Fry Reglet with
connectors similar to Fry springlok Flashing system, Type
CO. Roofing Contractor shall provide and install finish
flashing with windlock clips and mcmbro.ncxo.9t~rig
termination detail ing. Reglet open end closurearid:ffrial
precast vertical joint installation detailing shall be
the responsibility of the Roofing Contractor. Reglet
elevation will be based on top of concrete curb at window
wall, and this contractor shall make necesary flashing
height adjustments as necessary.
.25 Cameras and other equipment intended for installation on
the roof, may not be shown or detailed on the plans. The
Roofing Contractor shall review the installation details
of the various trade contractors, for their equipment to
be installed on the roof, and compl::-t-p roofing
installation and detailing in accordance with
manufacturers instructions and approved details.
.26 For Zone IB' windows as shown typically in section detail
2 on sheet 4.08; Furnish and install wood blocking,
galvanized metal studs, sealants (except for glazing
sealants), galvanized flashing and plywood.
ROOFING SCOPE OF WORK (ADD. 11)
00330 - 8
04/28/92
\~~.
05/18/92
ROOFING SCOPE OF WORK (ADD. 12)
00330 - 8a
~
tJ.
~
I
~
BLa..
~8
~~
CJ
c:ao..
..... ~f=
=>
~ ~
t-
V) ~
......
z~ t- e::.
~u w ~
" <( -.J
o:>~ f- ~
,~ ::> ~
If')o CJ ~
~~ Cl:
,
> ~
.' rr
u
(.1
, t--.l
"lit Q
(\J
+t
~
u
u~
cr:tY:
l:)~
~ CJ
~l4..
~
00
V
fi
"')
~
U
U~
Ck::~
~O:C
~ 0
..--l~
t-
~
::::l
CL...J
ZW
OZ
U~
0...
>~D
, t-
Cl..
'" ~
vu
-, ~
Mo)
-
~
t
!
~
~~
Qz
Wo
V)t--t
01-
Q...:::)
D.-J
tYD
0-(.1)
~-1
D-.JVJ
u.... .:.r r--
:3z
U
1-1f--
J-w
~Q..
'<[
W~
I<!
~Q..
FRY SPRINGLOK FLASHING SYSTEM: TYPE CO - CONCRETE
~ A proven design for use wilh poured-in-ploee (precast) eonerele consh.Jcjjon, Shipped to joo s:te with protective
CIOT~ lope ccvering face ord ends of regle110 prevent g'out or CC:lcre1e from gettrg inlo reglet opening, 'iris
f:ashing system IS rot recommendea 'or use on till-up constructicn
___-..A_~l~
t .....' / / A
,;;' ,. / I
" '/)
" "J, /~,"
" ,;' X/' //1'
.. " ,. ;' ,
.." ,;;" /Y /
. "):' I
,/' h'/ // /' /
." ,. "
.. / ,.",,' ,,/, /" // i .r/
,,' 't.>',," // /' i !
.. .. '\... " /
,." ',;';0( " /'
,," .. ,/' 'r/ .-
I' ,. / \
to I,",""'.. /// "I ~
J, / "
", / """ /
,.,1:'//"/ /// /: f#
".." ,
/ / I
/ I
/ ,
/ I
I
I
r(-~'
I " ~ ~!
I (; -!
..:;.... ;
I "
I
....
L
~
/ !
./
/
?
II ~ '~~ ili
, 11\
I
I I //
I <: I
:: 0 ~_,_~~_~~
__.___.J.~_,_~, ~__'
./
/
dwgS. not to scale
ACCESSORIES
CONNECTOR CUP
FOR CONCRETE :<CGli:l,
PROVIDES POSITIVE
AlIGN''''ENT AT JC1N-S
PREVENTS LEAKAGE
OF CO:~CRETE DL.RNG
PCUR:NG.
/
,--+- . Jt--
I Cl \ '
"
I,
I ' . J- .
~'
I ,
-<
I.
<:
'"
~ ! (}L6 .
/ / ;~~ '
~' la 0 ~
".// 1, I' ..6 ~ ;;:
WATER~;?O:)F ~
TAPE
511a" I
17" MIN.
I
I
c
~
--L I
,
J
i L
,I
.,
,'~,
Il ,'~
., :';~,
-~~._-~
J <; <:;::J (] 0 I
'--f~---- --~-'-~
. C;:ening of reglat Is '/...
1 ~.
(]
. : 6
.J--
I
, d
~
Connector Clips - To provide positive aiignment at join:s and prevent :eo.:oge 0: co:!c~e~e dJring pouring,
Installation Staples - To secure reg let to forms prior to pouring cancete
Prefabricated Reglet Corners - Factory manufactured mitered end sealed corr,e~s fa redcce installation time
Wlndlok Clips - Addllional reinforcement for flashing to solve prob~ems cy wind uCiift.
~
~~'!nI' ~~~~
i'~ ~... t"1li
-~"""IIJ :~
... lIi"'" . . ,,' ~.n ..
~ -t:; [';i ""."i~' t~"""< !;, .'i';J ~
Attachment 'A'
EMBEDS SCHEDULE
RESPONSIBILITY LEGEND:
1. PRECAST SUPPLIER - Bid Group 2 (pomco Associates, Inc.)
* 2. MISCELLANEOUS METALS SUPPLIER - Bid Group 2 (National
Detention Group, Inc~)
3. MISCELLANEOUS METALS SUPPLIER - Bid Group 3 (Stairs &
Miscellaneous Metals)
4. SECURITY FENCHIC INSTALLER Bid Croup 3 (Fencing) NOT
O$$D
5. ELEVATOR SUPPLIER - Bid Group 2 (Mowrey Elevator Co.)
6. ROOFING - Bid Group 3
7. BID GROUP1 - Under Contract
8. MASONRY - Bid Group 3
9. CAST-IN-PLACE CONCRETE - Bid Group 3
10. MISCELLANEOUS METALS SUPPLIER - B.P. 27 Metals-Doors-
Glazing
11. Bid Group 3, B.P. 17 Fire Protection Contractor
* 2s designates ship to site
2p designates ship to precaster
(
DETAIL #
ITEM NO. ITEM
-----------------
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
(
Angle, Tube, Anchor
Assembly - 12/4.41a
Angle - 7/4.38
Channel - M
Anchor Slot - 4
Embed - 11
Metal flashing cap, clip,
and railing
Angle, tube, and anchor
assembly - 4/10-4.40
Tube - 5
Anchor slots - 1,2,4 thru
8, and 11
Angle - 12
Ladder/Post/Scuttle - 12
Not Used
Embed - 1
Security Bar - 1
Embed - 4
Security Bar & anchors-4
Angle/Anchors - 2
SHEET I
RESPONSIBILITY
--------------
4.34
4.36
4.36
4.38
4.38
-4- j
-4- 3
7
1
2p
4.38
3
4.39
4.39
3
3
4.41
4.41
4.41
1
6
6
4.42
4.42
4.42
4.42
4.42
2p
10
2p
2
2p
03/11/92
00330 - 9
ROOFING SCOPE OF WORK (ADD. 8)
3
3
2
2P
18. Ladder - 1, both shown 4.46
19. Frame - B 4.46
20. Frame - A 4.46
21. Plate det. A/4.46 as shown 4.47
in detail ES-8, DS-3, ES-3,
FS-3, DS-1, CS-1
2S
Except for Plates to be 4.47
installed in cast-in-place
concrete, Ground Floor
22. Plate det. B/4.46 as shown
in detail CS-1, DS-1, ES-8 4.47
23.
24.
25.
26.
27.
27.a
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
45.a
46.
47.
48.
03/11/92
Angles and plates shown in
ES-8, DS-3, ES-3, FS-3,
DS-6, ES-6, FS-6
Angle/Bolts - 5
Ladder -6
Stairs/Rails
Angl/Frame/Lad
sill angle per
section 7
Angles - Y,A
Embed - X
Plates - X
Rail - X
Embeds - B,A,-2-
Embeds - BC,2B
Embeds - A.,...-2-,D
Embeds - 2,..-9
Embeds ----2-,C
Frame - 3
Frame - 3
Embeds - Note 1
Embeds - Note 7
Embeds - Note 8
Embeds - 2B
Embeds - 2B
Angle and fastener -
Breakaway Wall
Angle and anchor assembly
- Exterior Secure
Typical Interior Secure
Wall, steel reinforcing
Angle/Plate Shear Conn.
Plate - stairbase and
reinforcing
Reinforcing assembly,
weldment and tablebase
4.46
- All 4.49
BG-2 Add.l,
3
4.47
3
4.47A
4.47A
thru 4.48
& 4.50
3
3
3
5
4.50
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
4.51
5
2s
1
3
3
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
2p
8
4.67A
4.67A
8
4.67A
3.32
8
1
3.32
9
3.32
9
ROOFING SCOPE OF WORK (ADD. 8)
00330 - 10
49.
49.a
50.
51.
52.
53.
54.
55.
56.
56.a
57.
58.
58.a
59.
60.
61.
62.
63.
64.
(
65.
66.
67.
68.
69.
70.
71.
72.
73.
74.
75.
76.
77.
78.
78.;1
79.
80.
81.
82.
83.
84.
03/11/92
Embed/Plate, dbl T bear-
ing on beam
Reinforcing for above
Angles - Typ.Opening
Plate and reinforcing
- Cooling Tower
Embeds/Plate
Embed - 9
Channel - 9
Plate - 10
Angle - 10
Reinforcing for above
Angle - 12
Plate - 12
Reinforcing for above
Embed - 7A, 7B
Embed - 8
Angle - 13
Plate - 13
Embed - 15
Embeds--& DBA's & Weld
Plit~s~- 1, 2, 3,4A, 6,
1J\8A,8B, 10,~ 14,
15 ,16 19, 20
Embed - 1,18,20
Embed/Plate - 5
Bent Plate - l1A, lIB
All metals 1,2,3
Reinforcing ~6~
Embed/Angle/Bolt - 3
Plates, DBA's-5,6,7
Embed - 10
Embeds - 2
Embed - 5
Embeds - Typ.Col.Base
All but anch. bolts
Embeds - Typ.Beam to col
Connection
Embed/Plate Typ.Lat
support est mas wall past
structure
Embed - Typ Precast Beam 3.37
to Slab Conn @ Discont Slab
Pl;1tc and DBA on above 3.37
Embed - Typ Beam Bearing 3.37
on CIP Col
Embed - Elev.Rail Conn. 3.37
Angle/Bolt - Elev.Sill 3.37
Embed - 4 3.38
Embed - 6A, 6B, 7A, 7B, 15 3.38
Plate & Dowel 7A, 7B 3.38
3.32
3.32
3.32
1
9
9 & 1
3.32
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.33
3.34
9
1
1
1
1
1
9
1
1
9
1
1
1
1
1
1
3.34
3.34
3.34
3.35
3.35
3.35
3.35
3.35
3.36
3.36
3.36
1
1
1
1
9
1
1
2p
1
1
1
3.36
1
3.37
1
1
9
1
2P
5
1
1
2S
ROOFING SCOPE OF WORK (ADD. 8)
00330 - 11
85.
86.
87.
88.
89.
90.
91-
92.
93.
94.
95.
96.
97.
98.
99.
100.
101.
102.
103.
104.
105.
106.
107.
108.
109.
Angles - 10
Embeds & Plates & DBA
Emb/Ang/Blt - 12, 13, 17
Embed - 18
Angles & DBA 19A, 19B
Embed - 20
Plates & Angles - 14A,14BC
Embed - 7
Emb/Ang/Blt - 15A, 15B
16, 17
Metal Shapes - 11, 18
Metal Necessary for typ
Beam Bearing @ CIP Col.
All stirrup reinforcing &
struct. shapes for
composite beams
Metal Necessary for shear
wall base det.
Typ Precast Beam to
Precast Element Conn
(except @ 1st FLR)
Typical CIP slab
Typical non load bearing
cell wall on lot fIr.,
wwf and compre~3ible
filler
Reinforcing Section 4,5,
11,11A,14,16,17,19, 20
Topping Reinforcing only,
sections 2A,B,C,18
Loyer reinforcing only,
oectiono 2A,B,C,18
Composite beam reinforc-
ment, sections 1A,B
Typical elevator sill
Typical lateral support
detail for exterior
masonry wall running past
structure - angle, anchor
weld and sheetmetal
Typical control joint
in topping slab- topping
reinforcing
Typical construction
joint in topping slab-
topping reinforcing,
and dowels
Typical elev. rail
support beam connection
beam, clip and bolts
3.38
3.38
3.38
3.38
3.38
3.38
3.38
3.39
3.39
3.39
3.39
3.32
1
1
1
1
2s
1
1
1
1
1
1
1
3.32
1
3.35
1
3.37
1
3.32
1
3.32
9
3.33
9
3.33
9
3.33
1
3.33
3.37
1
5
3.37
9
3.37
9
3.37
9
3.37
5
03/11/92
00330 - 12
ROOFING SCOPE OF WORK (ADD. 8)
110. Topping and curb rein-
forcing, section 1 3.38
Ill. Curb reinforcing, sec. 5 3.38
112. Conc. reinforcing, sec. 8 3.38
113. CIP trough stirrups, L's,
and reinforcing 3.38
114. CIP trough, sec. 10 3.38
115. Reinforcing steel and
reinforcing metals 3.38
116. Reinforcing steel, sec.
14A,B,C 3.38
117. vertical dowels, sec. 19B 3.38
118. Slab/curb reinforcing stl 3.38
119. Topping reinforcing,
section 18 3.38
120. Reinforcing steel, sec. 12 3.39
121. Reinforcing steel, sec. 8 3.39
122. All curb, steps, topping
reinforcing; DBA's; plates
and shapes 3.34
123. vcrtic~l do~cl ~3ocmbly,
Gcction 18 3.34
124. Pipe enclosure - det. P 4.40
125. Det. 8/4.41A, Det. 9/4.41A 4.41A
126. Channels for louvers, Det.
7/4.41A 4.41A
127. 2" sched. 40 pipe sleeve
for sprinkler head 4.51
128. Details 2 & 3 - Bench &
Bunk Mounting :
Rebar - 4.80
Plate embed - 4.80
129. Detail 7 - stool Mounting:
Rebar - 4 . 80
Plate embed - 4.80
130. Masonry Anchors detail 7 4.41B
131. Door Subf;amEl4~tails1/4..50
2/10, 11. .
132 ...Typical Slaboridouble.. <: 3d. 32
1::eei..spariri~n9..p~rall.E!:f..~CJ
t:ectangularbeiAntf <iet.ail
Weld Plate. dddd.
133.. st~el.. Reip~Ql:"cInqf:9P:Y iY3..~ 32.
134.~It~alP~~~a~~Sl~~~1td<dj....32.d:.. .
t:t11dat.dQuble tees R.............
w~ldpl~t:.~~d' . d. ... . .ddd.
.1.j.$:.~...... ..~~@~f6h~.~.~~I~~:.i:~i.~8.X.2...~. ......1.3..t..........~.... 3.2.......
):~/d1?,~bt+~t1..? ....... ... ..
(
9
9
9
9
9
1
9
8
9
9
9
9
9
8
3
3
By Mechanical
11
8
10
9
10
8
2p
<1.
03/11/92
ROOFING SCOPE OF WORK (ADD. 8)
00330 - 13
136. Section lB-MasonryDowels 3.34
.1
***************
END OF EMBEDS SCHEDULE
03/11/92
ROOFING SCOPE OF WORK (ADD. 8)
00330 - 14
ATTACHMENT 'C'
PHASE I COORDINATION DRAWINGS
NUMBER
1
1.1
1.2
2
2.2
(
3
3.2
4
4.1
5
6
7
8
9
(
03/11/92
DRAWING TITLE
First Floor utility Chase
Total Composite
First Floor utility Chase
Total Composite With Rain Leader
First Floor utility Chase
Handicapped Total Composite
First Floor utility Chase
Sub Composite
First Floor utility Chase
Handicapped Sub Composite
First Floor utility Chase
Sub Composite
First Floor utility Chase
Handicapped Sub composite
Mezzanine Floor utility Chase
Total Composite
Mezzanine Floor utility Chase
Total Composite With Rain Leader
Mezzanine Floor utility Chase
Sub Composite
Mezzanine Floor utility Chase
Sub Composite
TOp of utility Chase with Rain Leader
Top of utility Chase
Horizontal Chase Left Hand View
ROOFING SCOPE OF WORK (ADD. 8)
LATEST
DRAWING
REVISION DATE
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
2Mar92
00330 - 15
9.1 Horizontal Chase Left Hand View
with Rain Leader
2Mar92
10 Horizontal Chase Right Hand View
2Mar92
10.1 Horizontal Chase Right Hand View
With Rain Leader
2Mar92
11 Zone A First Floor Precast
Penetration Layout
2Mar92
12 Zone A Second Floor Precast
Penetration Layout
2Mar92
13 Zone A Roof Precast Penetration
Layout
2Mar92
14 Zone A Ground Floor Plumbing
2Mar92
15 Zone A First Floor Plumbing
2Mar92
16 Zone A Second Floor Plumbing
2Mar92
31 Zone 0 First Floor Precast
Penetration Layout
2Mar92
32 Zone D Mechanical Plenum Precast
Penetration Layout
2Mar92
33 Zone 0 Mezzanine Floor Precast
Penetration Layout
34 Zone D Roof Precast Penetration
Layout
2Mar92
2Mar92
03/11/92 ROOFING SCOPE OF WORK (ADD. 8)
00330 - 16
SECTION 00353
MILESTONE SCHEDULE
The bar chart and associated activity listing presented in
this section depicts the approximate duration, sequence, and
flow of ~ork of major work groups. Not all activities are
shown and groupings are subjective. Logic diagrams
generating the presented document are available for bidder
review in the office of the Construction Manager.
Contractors will be required to submit construction
schedules to meet the requirements of the presented
milestones and in accordance with the Master Project
Schedule.
The Contractors are to note the following special milestone
dates required for the Project.
Building Temperature and Humidity
controlled for Finishes & Follow-on
Work . . . . . . . . .
a.
.11/15/92
b. Start Contractor Completion In~pections.Ol/11/93
c.
Start Prefinal Inspections . . . . .
.03/02/93
d.
Project Completion . . .
. . 07 / 0 1-1!rl
03/16/92
MILESTONE SCHEDULE (ADD. 8)
00353 - 1
r
z
...
-,
CJ
>
:::>
z
-
~--'
:::>
.Cl.
-"
.'"
...
.-:0
~
~
~ !~ ~
: II.I! n "
!i !I,ii! jld]
,[!d ,,!
i,l i F (
~ '::1
\ I ~l ~:
\( T-~ h--
j
..
"
~
>
.z
-
.n
z
I ~
\ ~
! 50
.
-. ~
!; !i
~
~
~
~
1-
9
;j
>-
.....-
t
R
f
~
~
~ W
<1J U .-l
U<1J=>
~ li. C)
L LJJ
o e I
r~ 0 U
1L. ~~ V1
+J
. e C)
>-OJ~
~ ~ en
e OJ
:::l C) r
o
U >- 0..
....1 =>
illeD
o :::l 0:
L 0 C)
C U
Cl C)
:::E cu ~
oeD
L
c
o
:::E
Id
IIII
Ii I !'
!i II
\i ! ,I
;; , :1
k ~ ~'i_
! ~,t 11
~' ~- ~ ~
C"
S
-~._- ~
<> .
. c !
- ~
- . ~ v
. ~ ~ : c
"I' I ~
~ .,;
~ ~ ~ ~ ~
~ - ~
! ~}5: '"
~ ~
z l ~~i en
I ~
I a
I 1 I ::.
I 1 t
-
~..... ... ................................ ...................... --.. --.................................................................................................................. ............................................................. ~ .
~oor~ CQU'lty. Florida PRI~'VERA PROJECT PLA~NER Konr~ COU'"lty Detention F&ci lit)'
RT DATE '90EC91 RUN 1fO. 50 Konroe County Oetentioo Facility START DATE 1AUG91 FIN DATE 1 JL
16:28
SCHED REPORT - I i lie sUp by' e-ctivity code DATA DATE 1&lO'o'91 PAGE I/O.
. .. .. .... .......... ...... ..... ......... ... ..... .................... .......... ......-. ..... ........................ .................................... .......... ................ ............... .. .. .. . ........ .............. .....
ACTIVITY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 OUR OUR " START FINISH
....... ......... .................- .......................................................................................--......... ...... .. . .. ..... ............ ..-............. - .. ... .... ... ..... ......
Site Utilit.i~
5 1 0 100 NTP . Site Utilities 9OCT91A 9OCT91A
1325 5 5 0 S~ - Zone C - Sub-Slab Sanitary Q loading Dock 4AAR92 10MAR92
1330 5 5 0 ~ . Zone C . Storm Drain (JB 28-0 & Upstream) 4KAR92 10MAR92
1340 5 5 0 ~ . Zone C . Storm Drain (Inlet 1-12 & Upstream 4KAR92 100R92
2000 30 5 83 sw . Utilities - Underground Submittals 13SEP91A 22NO'o'91
2005 10 10 0 SW - Utilities - AlE Apvl of U/G Submittals 25NOV91 9OEC91
2010 15 15 0 SW - Utilities - Install Outfall Structures 1OCEC91 31DEC91
2015 5 5 0 SW - Utilities - Instl U/G Temporary Pwr & Tele 1OCEC91 16OEC91
2020 5 5 0 ~ - Utiliti~ - Sanitary Trunk line. LOg Dock 100EC91 16OEC91
2025 10 10 0 SW _ Utilities - Remainder of Sanitary Trunk lin 17DEC91 31DEC91
2030 10 10 0 SW - Utilities . El~trital Cuctbank and Tele 17DEC91 31DEC91
2035 15 15 0 SW- Utiliti~ - lnstl Greyweter line 2JA~92 22JAI/92
2040 15 15 0 SW- Utilities' Instl Come~tic ~ater Line 2JAI/92 22JAI/92
2045 15 15 0 SW- Utilities - Instl Effluent line 2JAI/92 22JAH92
2050 15 15 0 SW - Utilities - Instl Gas line 2JAH92 22JAH92
3005 10 10 0 SW . Entrance Road . Effluent line 13JAN92 24JAN92
3010 10 10 0 SW - Entrance Road . Dornestic/F~ Hain 13JAH92 24JAN92
3015 10 10 0 SW - Entrance Road . Test/Flush/Oisinf~t D~/F~ 27JAH92 7FEB92
3020 5 5 0 SW - Entrance Road . Tie-in D~/F~ line to FKAA 10FEB92 14FEB92
3050 15 15 0 SW- Utilities' Overhead Power/Telephone line 13JAH92 31JAN92
3055 5 5 0 SW- Utilities' Temporary Pwr/Tele Startup 3FEB92 7FEB92
5000 '5 15 0 5\1- Utilities - Storm Drain Trunk lines 17JUI/92 8JUL92
5005 15 15 0 5\1 . Utilities - SO laterials & Trench Drain 17JUN92 8JUl92
SOlO 15 15 0 SW - Utilities' Sanitary laterals 17JUN92 8JUl92
Caissons
'025 10 0 100 SW - Caisson load Test 7OCT91A 17OCT9'"
1030 10 0 100 SW- AlE Review of Caisson load Test Data l8OCT91A 6HO'o'91"
1035 40 0 100 $\/- Caisson Rebar Submittals - Start 13AUG91A 6OCT91"
1040 15 0 '00 S~ - Caisson Rebar Submittals - Complete 7OCT91A ~JC191A
1045 5 0 100 5\1 - AlE Review of Caisson Rebar Submittals 300cT91A 6H0V91A
1050 10 9 10 SW - Fabricate & Deliver Caisson Rebar 13H0'o'9'''' 29HO'o'91
lOSS 25 0 100 S\I - ~indl~ Modification Pricing 6OCT91A '3HOv91A
'060 1 1 0 SW wee Apvl of I/indload Change 20H0'o'91- 20N0V91
1100 15 15 0 S~ - Zone A - Caissons COEC91 200EC91
1150 15 15 0 SW - Zone 0 - Caissons 23OEC91 '4JAH92
1200 10 '0 0 SW - Zone S - Caissons 15JAH92 28JAN92
1250 15 15 0 SIJ - Zone f - Ca i ssons 29JAJ.:92 18fEB92
1300 10 10 0 SIJ - Zone C - Caissons 19FEB92 3KAR92
Colurns
,,05 15 15 0 SIJ - Zone A - Columns & Kise Concrete 23DEC9' '4JAN92
"'0 5 5 0 S~ - Zone A - Verify locations of Colurns 15JAH92 2'JAN92
1"5 20 20 0 $\/ - ZOIie A - Column Concrete Cure Period 15JAN92 l1FEB92
1155 15 15 0 SIJ - Zone 0 - Columns & Hise Concrete 15JAH92 4FEB92
..... .~.................... ~. ... ~..... .... ~ ................ ~.. -...... ................. ...~....... -.............. ................. ...... ....-...-................... ...-.......... -........................ ..-..
Konroe County, Florida
PRlKAvtRA PROJECT PLA~NER
~onfoe County Cet(~tlon Fac1lit
REPORT DATE 19DEC91 RUN NO. SO
16:28
SCHED REPORT - line s~ip by activity code
~onfoe County Detention Facility
START DATE 1AUG91
FIN DATE
DATA DATE 18~0Y91
PAG '.
.. .. .. - ... ......... .. - .. .. . .. -.. . .. -.............-.............................-................. ..........-..-- .. .. .. .. .. .. .. .. .. . .. - .. .. .. .. .. . .. .. .. .... .. . . .. - - .. .. ..
ACTIVITY ORIG REM ACTIVITY DESCRIPTION SCHEDUlEO
10 DUR DUR X START FIN 1 SH
......... . . .... .. .. - . .. .. .... .. .. .. ...........-............ -............... ................ .--............-........ -....... ................ ............... ..........--.. - .. .. - - - .. ..
Colurns
"60 5 5 0 S'J- Zone 0 - Verify locations of Columns SFE8n 1HEBn
1165 20 20 0 S'J- Zone 0 - Colunn Concrete Cure Period SFEBn 3HAR92
1205 10 10 0 5\1- Zone 8 - Columns & Mise Concrete 29JANn 1 HEBn
1210 5 5 0 5\1- Zone B . Verify locations of Columns 12FEBn 18FEB92
1215 20 20 0 SIJ - Zone 8 - Column Concrete Cure Period 12FE8n 10KAR92
1255 15 15 0 S'J- Zone E - Columns & Mise Concrete 19FEB92 10KARn
1260 5 5 0 5\1- Zone E - Verify locations of Columns 11KAR92 17HAR92
1265 20 20 0 5\1- Zone E - Colunn Concrete Cure Period 11KARn 7APR92
1305 10 10 0 $\/- Zone C Columns & Mise Concrete 4KAR92 17XAR92
1310 5 5 0 5\1- Zone C - Verify locations of Columns 1~ARn 24KAR92
1315 20 20 0 $\/- Zone C - Column Concrete Cure Period 1WRn 14APRn
\320 20 20 0 S'J- Zone C - F/R/P/C Concrete loading Dock lJo:AR92 31KARn
Erection Drawings
7020 15 15 0 Precast - Column Interface Details 21NOY91 12DEC91
7030 15 15 0 Precast - Area A. - framing Dr8'\olings 21NOY91 12DEC91
704a 10 10 0 Pre-cast - Area A. - A/E Apvl of framing Drawings 13DEC91 27OEC91
7100 15 15 0 Pre-cast - Areas B & 0 . Framing Drawings 13DEC91 6JAN92
7110 10 10 0 Precast - Areas B & 0 - A/E Apvl of Framing Dwgs 7JAf./92 20JAN92
noo 15 15 0 Precast - Areas C & E - framing Drawings 7JANn 27JAII92
n10 10 10 0 Precast - Areas C & E - A/E Apvl of Framing Dwgs 28JAN92 10FEBn
Utilities/Precast Coordination Effort
7005 10 0 100 Coordination ~ethod Decision 1110Y91A 1SNOW1A
7050 20 20 0 pre-cast Area A. - Utl/Pest Coordination 181010\191 160EC91
7120 20 20 0 Pre-cast Areas B & 0 - UtI/Pest Coordination 17OEC91 1SJAIo:92
n20 '5 1S 0 Pr ecast Areas C & E - Utl/Pcst Coordination 16JAIo:n SFEB92
Deta i I Drawings
7060 15 15 0 Precast . Area A. - Detail Drawings 3ooEC91 20JAN92
7070 10 10 0 Precast - Area A - A/E Apvl of Detail Drawings 21JAN92 3FEB92
7130 '5 1S 0 Precast Areas B & D - Detail Drawings 21JAlln 'OFEBn
7140 10 10 0 Precast - Areas B & 0 - A/E Apvl of Detail Dwgs 1HEB92 24FE8n
n30 15 15 0 Precast - Areas C & E Detai l Drawings 11FEB92 2KAR92
n40 10 10 0 Precast - Areas C & E - A/E Apvl of Detail Dwgs 3i'.AR92 16/{1..R92
Fabricllt ion
70BO 20 20 0 Precast - Area A. Fabrication 4FEBn 2i'.ARn
7090 5 5 0 Precast Area A. - B~in Shipping to Site 3KAR92 ~.AR92
71S0 20 20 0 Precast - Area B - Fabrication 2SFEB92 23KARn
7160 10 10 0 Precast - Area B - B~in Shipping to Si te 24i'.AR92 6APR92
7170 40 40 0 Precast - Area 0 Fabrication 2SFEB92 2CAPR92
7180 10 10 0 Precast - Area D - B~in Shipping to Site 21APR92 4KA)'92
nso 25 25 0 Pre<:ast - Area C - Fabrication 2SKAR92 28APR92
n60 5 5 0 Precast - Area C Begin Shipping to Site 29APR92 SKA)'n
n70 40 40 0 Precast - Area E - Fabrication 18XARn 12HA)'92
7250 5 5 0 Precast Area E Begin Shipping to Site 13KA)'92 j~A)'92
....... ........ ..-.....O' ..._.... ................. ....... .........-.... ......... ........-..-..... --...-.......-... -- -........... -............... ...- ........... ........ .......---.. ....... ....... ......----
I<onrc.e CCV1ty, Florida PR1K'YERA PROJECT PL~~NER I<onroe County Oetentlon facility
~T DAlE 19DEc91 RUN NO. SO I<onroe County Detention Facility START DATE 'AUG91 FIN DAlE 1 Jl
16:28
SCHED REPORT . l ilie s(lp by activity code DATA DATE 1&iO~'91 PAGE HO. :3
.... ... .. - .. .. . .. .. .. - .. ......... .. .. ... .. - -.. .. O' .. .....................-.....................-..................-..........--......-.. .......-....... .............. ......-.....-- . .. - .. .. . .. .. ..
ACTIVITY ORIG REM ACTIVI1Y DESCRIP1ION SCHEDULED
10 OUR DUR X START fINISH
........ ----- . . .... - .. ........ ... ..-.........................-................--.........-................-....-.......-... .................. ..........-"- ..--.......- ..........-.... --
Precast Erect ion
10000 40 40 0 Precast . Arel A . Erection 100R92 4JolA Y 92
20000 30 30 0 Precast . Area B - Erection 5~Y92 16JUH92
30000 30 30 0 P reces t - Arel C . Erection 17JUN92 29JUL92
40000 30 30 0 Precast . Arel 0 - Erection S~Y92 16JUN92
50000 30 30 0 Precast . Area E - Erection 17JUH92 29JUL92
Roof
10050 10 10 0 Area A . Roof. Roofing 3JUN92 16JUH92
20050 10 10 0 "rea B Roofing 9JUl92 22JUL92
30050 '0 10 0 Area C . Roofing 20AUG92 2SEP92
40050 10 10 0 Area 0 . Roofing 9JUL92 22JUL92
50050 10 10 0 Area E . Roofing 20AUG92 2SEP92
Stairs
10010 5 5 0 "rea A . T~rary Access Stairs SKA Y92 11~Y92
20'20 10 10 0 Area B . Erect Stairs 16JUL92 29JUL92
30080 10 10 0 Area C . Erect Stairs 27AUG92 10SEP92
40120 10 10 0 Area 0 . Erect Stairs 16JUL92 29JUL92
43050 '5 15 0 Area 0 . 2nd Fl . "ezz Handrails 6AUG92 2bAUG92
43060 '0 10 0 "rea D . htFl . Interior Stairs 6AUGn '9AUG92
50080 '0 10 0 Area E - Er~t Stairs 27AUGn 'OSEP92
53050 '5 15 0 Area E . 2nd Fl - "ezz Handrails '8SEP92 8OC192
53060 10 '0 0 Area E - 1st Fl - Interior Stairs '8SE P92 1OC192
Elevators
10100 '5 15 0 Area A - Elevators . Rough-In 9JUL92 29JUL92
'01 '0 5 5 0 Area A . Elevators . Car & Platfonl 30JUL92 5J.UG92
10120 5 5 0 Area" . Elevators . Doors & Frames bAUC92 '2.A~G92
'0130 20 20 0 "rea A . Elevators . Construct Cabs & Trim-out '3AUG92 10SEP92
Slab Errt>eds
1 , 000 15 15 0 Area A 1st Fl . "/E/P/S Slab Embeds '2XA r92 2JUN92
'2000 20 20 0 Area A - 2nd rl . "/E/P/S Slab Erlbeds '2."'.Ayn 9JUH92
21000 10 10 0 Area B . 1st Fl . "/E/P/S Slab Embeds , 7 JUlin 30JUN92
22000 15 '5 0 Area B 2ndfl . "/E/P/S Slab Embeds '7 Juw92 8JUl92
31000 '0 10 0 Area C . 1st Fl - "/E/P/S Slab Errt>eds 30JUL92 , 2.AuG92
32000 15 15 0 Area C . 2nd F l . HIEIPIS Slab Embeds 22JUL92 11AUG92
4'000 15 15 0 "rea 0 - 1st Fl . H/E/P/S Slab Embeds '7 JUH92 8JUL92
42000 20 20 0 Area 0 . 2nd f l - HIEIPIS Slab Embeds '7JUl\92 15JUl92
5 1000 '5 '5 0 Area E . 1stfl . HIEIPIS Slab Embeds 30JUL92 19AUG92
52000 20 20 0 Area E . 2nd Fl . H/E/P/S Slab Embeds 30JUL92 26,1.UG92
Slabs
10030 5 5 0 Area A . Roof . lopping 19MY92 2&"AY92
110'0 '0 '0 0 Area A . 1st Fl . F/R/P/C Slab 3JUH92 16JUII92
12010 10 '0 0 "rea A - 2nd FI - FIR/PIC Slab 17 JUII92 30JUlI92
20020 5 5 0 Area B . Roof Topping 24JUH92 30JUH92
2'0'0 '0 '0 0 Area B - 1st Fl . FIR/PIC Slab 1JUl92 15JUl92
.. -.....-...- -...... - - -.....-..- -.-........... - ................. ....--..... ..-- - -...... - -.......... ---..........- ---....- -..... - ----........ _..- .......-............ ....... -- ....... - ....-.... ....... ...........-
~ooroe Ctx.nty. Fl or ide PRlKAVERA y~JECT PLA~kER ~rve County Detrntlon Facllit
REPORT DATE 19OEC91 RUI/ wo. 50 ~onroe CC"Jlty Detent Ion F &<: i l i ty START DATE 1AUG91 fIll DATE
16:28
SOlED REPORT . II fie skip by activity code DATA DATE 1840'191 PAG '.
-.. .. .... .. . .. .... .. . .. .. .. - . - .. .. .... - - - -.. -...................- --- --.. ..--.................... ---...... -....... - .. - - ... .... - - ... - - ... .. .. .............. .. .. . . ... .. ... ...
ACTIVITY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 DUR DUR X START fINISH
- - .. .. ... .. ... .. ......-----.....-..-.." -....- ...... ......-..............- ....-..-..-..- -- -.. ... .. . .. .. .. .. .. ... .. .. .. .. .. - ... .. .. -.. .. .. ..........-...
Slabs
22010 10 10 0 "rea B - 2rd Fl - fiR/PIC Slab 16JUL92 29JUL92
22200 10 10 0 "rea B - 2rd Fl - fiR/PIC Piers & Supports 30JUL92 12AUG92
22300 10 10 0 !>.rea B - 2rd F l - Insulation Soard & Slab. M 16O<:T92 29O<:T92
30020 S 5 0 Area C - Roof Topping 6AUG92 1 2AUG92
31010 10 10 0 Area C - 1st Fl - flR/P /C Slab 13AUG92 26AUG92
32010 10 10 0 Mea C - 2rd Fl - fiR/PIC Slab 3SEP92 17SEP92
40020 S 5 0 Area 0 Roof Topping 24JUlI92 30 JUfi92
41010 10 10 0 Area 0 - 1st Fl - Form & Rebar for Slab 17JUN92 30JUN92
41020 10 10 0 "rea 0 - 1st Fl Pour/Cure Slab 9JUL92 22JUL92
42010 10 10 0 "rea 0 - 2rd Fl - F 0[11\ & Rebar for Slab 17JUIi9Z 30JUl<92
42020 10 10 0 "rea 0 - 2rd Fl - Pour/Cure Slab 2.3JUl9Z 5AUG92
1.,2040 5 5 0 Area 0 2rd f I - Poor EG'_dp peds 13AUG92 19AUG92
50020 5 5 0 Mea E - Roof T0f9ing UUG92 12AuG92
51010 10 10 0 Mea E - 1st fl - Form & R~J3r for Slab 30JUL92 12AUG92
51020 10 10 0 Area E . 1st fl - Poor/Cure Slab 20AUG92 2SEP92
52010 10 10 0 /..rea E - 2rd F l Form & Rebar for Slab 30JUL92 12AUG92
52020 10 10 0 Mea E - 2rd fl - Pour/Cure Slab 3SEP92 17SEP92
52040 5 5 0 .&.rea E 2rd F l - Pour Equip pads 25SEP92 1OCT92
Masonry
11020 5 5 0 Area A - 1st Fl . layout Part/Set Fr~oes/Vnd ~al 17JU)(92 23JUN92
11040 15 15 0 Area A 1st fl - ~csonry . Bathrooms 16JUL92 5AUG92
11050 35 35 0 Area A - 1st fl Bathroom & Sh~r Tile 6AUG92 24SEP92
nOlO 20 20 0 Area A - 1st fl Masonry. Offices & Dorm Areas 24 JUl<92 22JUL92
12020 5 5 0 .&.rea A - 2rd F l - layout Partitions/Set fr&mes/W 1JUL92 8JUL92
12050 15 15 0 Area A 2rd Fl - Masonry 9JUL92 29JUL92
12210 15 15 Q Area A - 2rd fl - CerClmic Ti Ie 90C T 92 2%(T92
20100 10 10 0 "rea B - Masonry. Stairs 17JUN92 30JU)(92
20110 10 10 0 "rea B - Cure Masonry. Stairs 1 JUL92 15JUL92
21020 5 5 0 Area B . 1st fl Layout Part/Set f r ames/IJrd ~a I 16JUL92 22JUL92
21040 10 10 0 "rea B - 1st fl Jo(asonry ; BR 6AUG92 19AUG92
21050 10 10 0 Area 8 - 1st fl Ceramic Tile. 3R 20AUG92 2SEP92
21070 20 20 0 Area B - 1st fl ~asonry 23JUL92 19AUG92
22020 5 5 0 "rea 8 - 2rd fl - Lay-oot Part/Set Door Frarres/IJ 30JUL92 5AUG92
22040 10 10 0 .'rea B 2rd FI - loIasonry . BR 20AUG92 2SEP92
22050 15 15 0 Area 8 - 2rd fl - Jo(asoory Support Sys t em; 1\C".J9h- 6AUG92 26AUG92
22060 15 15 0 .&.rea 8 - 2rd fl - Masonry 6AUG9Z 26AUG92
2221>0 10 10 0 Area 8 - 2rd fl - Complete Exterior Masonry 1SSEP92 1 OC 192
30060 10 10 0 Area C - Masonry. Stairs 30JUL92 12.'UG92
30070 10 10 0 Area C - Cure Masonry. Stairs 13AUG92 26AUG92
31020 5 5 0 Area C - 1st Fl - Lay.out Part/Set Dr F r i!>"'2s/W 27AUG92 2SEP92
31040 15 15 0 Area C . 1st fl - ~esonry 3SEP92 21.SEP92
32020 5 5 0 Area C - 2rod Fl layout Part/Set Frames/IJrod ~al 1SSEP92 21.SEP92
32040 15 15 0 Area C - 2rd Fl ~asonry 25SEP92 15OCT92
...... ........... ........ ........-.... ......... ........................ ...... ....- ................... ....................... .................... ............ ....................... .................... ......-...- -... ........ .............. - ...-.... --....... ............ .............
~onroe County, Florida
RT D~lE 190EC91 RUI/ I/O. 50
16:28
~~~tD REPORT. line sKip by activity code
~CTIVITY
10
MlIsonry
40100
40\10
41030
41050
41070
42030
43010
43020
50060
50070
51030
5W.0
51050
51070
52030
53010
53020
DrYWllll
12030
12200
ORIG REM
OUR OUR
Spray-on Insulation
12070 10
12080 5
22080 10
22090 5
32060 5
32070 5
43070 10
53070 10
Utility R0V9h-in
10020 5
10040 5
10060 10
1 1030 15
\1 060 20
12040 25
12060 15
20010 5
20030 5
20040 10
21030 10
21060 20
22030 10
PRIKAVERA PROJECT PLA~kER
Monroe County Detention facility
......... -_.- ............. .................................................................. ............................-... .................
10
10
5
15
10
5
10
25
10
10
5
15
15
10
5
10
25
10
10
5
15
10
5
10
25
10
10
5
15
15
10
5
10
25
25
15
1
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
25
15
o
o
10
5
10
5
5
5
10
10
o
o
o
o
o
o
o
o
5
5
10
15
20
25
15
5
5
10
10
20
10
o
o
o
o
o
o
o
o
o
o
o
o
o
~CTIVITY DESCRIPTION
. -.................. - .................. ........ ............... -..............................................
~rea 0 - Masonry. Stairs
~rea 0 . Cure Masonry - Stairs
Area 0 . 1st Fl - layout Part/Set Frames/~nd ~al
Area 0 . 1st Fl - Masonry - 1st level walls
~rea 0 . 1st Fl - Masonry. BR
Area 0 . 2nd fl - layout Part/Set frames/~nd ~al
Area 0 - 2nd Fl - Masonry - 2nd level
Area 0 - 1st Fl - High Bay Masonry Valls
~rea E - Masonry ~ Stairs
~rea E - Cure Masonry. Stairs
Area E - 1st Fl - layout Fart/Set Frames/~nd Val
~rea E . 1st Fl Masonry Support Systems R/I
Area E . 1st Fl - Masonry. 1st level ~alls
~rea E . 1st Fl - Masonry. BR
~rea E . 2nd Fl - layout Part/Set Frdmes/~nd Val
Area E . 2nd Fl . MasOnry - 2nd level
Area E - \st Fl - High Bay Masonry 'JaIls
Area A - 2nd Fl - Drywall Framing
Area A . 2nd fl Drywall/Tape/Plaster Valls
Area A . 2nd Fl
Area A . 2nd Fl
Area 8 - 2nd Fl
~re8 8 - 2nd fl
Area C . 2nd Fl
Area C . 2nd Fl
Area 0 . 2nd Fl
Area E - 2nd fl
- Spray-on Insulation -
. Spray-on Insulation -
. Spray-on Insulation
. Spray-on Insulation
- Spray-on Insulation Prep
. SprllY-on Insulation - Spray
- Spray-on Insulation
. Spray-on Insulation
Pr~p
Spray
Prep
~rea A . Roof - Penetrations & Roof Accessories
Area A . Roof . Curbs
Aree A - Roof . Roof Drainage
Area A - 1st fl . Plumbing R/I ; Bathrooms
Area A - 1st Fl . Masonry R/I Support (~/E/P/S)
Area A . 2nd fl . Masonry R/I Support (M/E/P/S)
Area A - 2nd Fl - Ceiling ~nchors & Hangars
Area B - Roof - Penetrations & Roof ~ccessor;es
Area B - Roof Curbs
Area 8 - Roof Drainage
Area 8 1st Fl - Plumbing Rough-in. BR
Area B - 1st Fl Masonry Support, Systems R/l
Area 8 2nd fl Plumbing Rough-in ~ BR
Monroe County Detention facility
START DAlE 1AUG91 fiN DATE 1JL/..
DATA DATE 1B!10V91 PAGE NO. S
SCHEDULED
START fiNISH
17JUN92 30JUN92
1JUL92 1SJUL92
23JUL92 29JUL92
30JUL92 19AUG92
20AUG92 2SEP92
6AUG92 1 ZAUG92
3SEP92 17SEP92
6AUG92 10SEP92
30JUL92 12AUG92
13AUG92 26AUG92
3SEP92 10SEP92
11SEP92 IOC192
11SEP92 IOCl92
2SSEP92 8OCT92
1aSEP92 24SEP92
9O<:T92 22OC192
1aSEP92 22OCT92
9 JUL 92 1 ZAUG92
1aSEP92 8OCT92
30JUL92
13AUG92
6AUG92
27AUG92
90<:192
16OCT92
2OCT92
6//01192
12M Y92
27'AAY92
19HAY92
24JUN92
24JU//92
9JUL92
9JUL92
17JUN92
1JUL92
24JUN92
23JUL92
23JUL92
6AUG92
1 ZAUG92
19AUG92
19AUG92
2SEP92
15OCT92
22OC192
15OC192
1910101192
18XAY92
2JUN92
2JUN92
1SJUL92
22JUL92
1ZAUG92
29JUL92
23JUN92
8JUL92
8JUL92
5AUG92
19AUG92
19AUG92
.....~........ -....- ---.......... -.. -. - ---......... -.-....-...... -.... - ...................... ..... ...- -.. -....-........ ....- .-...... ............................. ...........- ........-............... ..........................Oo
~Jnroe County, Florida
PI<. 1 KA YH.A PROJECT PLAIo:~ER
I<omoe C<Xr\ty Detentfon Fadlit)
REPORT DATE 19DEC91 RUW WOo 50
16:28
SCHEO REPORT - line sKip by activity code
~onroe County Detention Facility
START DATE 1 AUG91 FIH DATE 1.
DATA DAlE 1SNO\~1 PAGr
- .. - .... ... -.. ... . - . - ... .. - .. - .. .....- --........-...... -...- - --. ......... ...........Oo. _..... .......... _......_ ...__ ... ... ... .. .. ... .... .... - . . .. .. ... - - .. .. - .. ...... .......... - .... .
AC11YI TV ORIG REM ACTIVITY DESCRIPTION SCHEDULED
10 DUR DUR X START FI~lSH
........... ........... ..-..-Oo"-"''' .. .. ... .. ... - ... .. . ... .. - - .. ..... .. .. .. ..... .. .. .. ................. -.... - .... ... .. - .. .. - .. ... .. ..... .. .. .. ... .. .. . - .. .. ... .... ..... ... --......-..... -....--...... ..
Utility Rough-in
30010 5 5 0 Area C . Roof . Penetration & Roof Accessories 30JUl92 5AUG92
30030 5 5 0 Area C Roof Curbs 13AUG92 19AUG92
30040 10 10 0 Area C . Roof Drainage 6AUG92 19AUG92
3i030 15 15 0 Area C - 1st Fl - ~asonry Support. Systems R/I 3SEP92 24SEP'92
31070 is i5 0 Area C . 1st Fl - Plumbing Rough-in; BR 3SEP92 24SEm
32030 15 15 0 Area C - 200 F l - Kasonry Support. Systems R/I 25SEP92 15OCl92
32050 10 iO 0 Area C - 200 Fl - Ceiling Anchors & Ha~ers 25SEP92 80C T 92
32iOO iO 10 0 Area C - 200 Fl - Plumbing Rough-in; BR 25SEP92 80C 192
400iO 5 5 0 Area 0 - Roof - PL~trations & Roof Accessories 17JUN92 23JUw92
40030 5 5 0 Area o - Roof Curbs 1JUl92 8JUL92
40040 10 10 0 ~rea 0 - Roof Drainage 24JUN92 8JUL92
41040 is is 0 Area o - 1st Fl - Masonry Support Systems R/I 30JUl92 19AUG92
41060 iO iO 0 Area o - 1st fl - Plumbing Rough-in. Sr 30JUL92 '2AUG92
43000 10 10 0 Aree D . 200 F l - Masonry Support Systems R/I 3SEP92 17SEP'92
43030 10 10 0 Area 0 . 2nd Fl - Ceiling/Plenum Hangers & Sprts 18SEP92 1OCT92
.
500iO 5 5 0 Area E - Roof - Penetrations & Roof Accessories 30JUL92 5AUG9Z
50030 5 5 0 Area E Roof Curbs 13AUG92 19AUG92
50040 10 10 0 Area E - Roof Drainage bAUG92 19AUG92
5i060 iO iO 0 Area E . 1st F l . Plumbing Rough-in. S'r 11 SEP92 24SE?92
53000 10 10 0 Area E - 2rd fl - ~asonry Support Systems R/I 90C T 92 22OCl92
53030 iO iO 0 Area E - 200 fl - Cei ling/Plenum Hal"lgers & Sprts 23OCl92 5 WOV'92
Bulle. Installatioo of Uti l ities
1i08O 25 25 0 Area A - 1st fl - HVAC DuctworK BulK Instl 23JUl92 26AUG92
1 i iOO 25 25 0 Area A . 1st fl - HYAC Piping Bulle. Instl 23JUl92 26AUG9Z
1i120 25 25 0 Area A - 1st fl . PI UTbing Bulle. Instl 23JUl92 26AUG92
Ii 140 25 25 0 Area A - 1st fl - Pwr/ltg Conduit BulK Inst 23JUl92 26AUG92
1 i i60 25 25 0 Area A . ist Fl See/Coom Conduit Bulk Install 23JUl92 26AUG9Z
i i i80 25 25 0 Area A - 1st Fl . Fire Protection Bulk Instl 23JUl92 26AUG92
12 090 20 20 0 Area A 200 fl - HYAC Ductwork BulK Instl 20AUG92 17SE?92
12100 15 15 0 Area A - 200 fl HYAC Piping Bulk Instl 2CAUG92 10SEP92
12110 i5 15 0 Area A - 200 F I PIUTbing Bulk lnstl 20AUG92 iOSEP'92
12i20 15 15 0 Area A - 200 Fl - P~r/ltg Conduit BulK Instl 20AUG92 1 OSE P'92
i 2 130 15 is 0 Area A. - 200 F l . Se-curi ty/Cc.";J'll Condui t Bul K Ins 20AUG92 10SEP'92
12140 15 15 0 Area A 2nd F l - Fire Protection BulK Instl 20AUG92 i OSE?92
2i080 15 is 0 Area S - 1st fl . HVAC Ductwork - Bulk Install 20AUG92 10SEP'92
2i09O 5 5 0 Area B - ist fl - HVAC Piping - Bulk Install 20AUG92 26,AUG92
21100 iO 10 0 Area B - 1st Ft - PIUTbing - Bulk Install 20AUG92 2SEP'92
2i 110 15 15 0 Area B - ist Ft - P..r/ltg CorO.Jit . BulK Install 20AUG9Z iOSEP92
2i120 iO 10 0 Area B - 1st Fl Sec/Comm Conduit - Bulk Instal 20AUG92 2SEP92
21130 10 10 0 Area B - ist Fl - fire Protection - Bulk Install 20AUG92 2SE?92
22iOO 10 10 0 A.rea B 200 Ft - HYAC Ductwork - BulK In5tall 3SEP92 17SEP92
221 iO 15 is 0 Area B - 2nd Fl - HVAC Piping - Sulk Install 3SEP92 24SEP'92
22120 iO iO 0 Area B 200 Fl . PIUTbing . BulK Installation 3SEP92 17SEP'92
.. . .. . .. .. .. . ... ... . .. ... ... . . . . . ... . .. . . . . . ~ . . ... . .. . .. .. . .. ... .. .. . .. . .. . - .. ... .. .. .. .. .. .. . . .. ... .. .. .. .. .. .. .. .. . . .. . .. ... ... .. ... ... . .. .. .. .. .. ... .. .. - ... . .. .. ... . .. .. .. - .. . . ... .. .. . .. .. ... .. .. ... . .. . .. ... . .. - . .. ... .. .. . . ... ..
Konroe C~ty, Florida
1<T DATE 19t:lEC91 RUN NO. 50
16:28
..MED REPORT - line skip by activity code
ACTIVITY
10
ORIG REM
DUR DUR
........ ......... .......- ........ ..
PRlKAVERA PROJECT PlA~wER
Konroe County Detention Facility
Monroe C~ty Detent I on Faci lit)'
SlART DATE 'AUG91 flM DAlE 1;
DAIA DATE 1~0V91 PAGE NO.
.................... .....--.-..-............-...........................................-........... ......-.... ............... ....-....-... ................ ..
x
ACTIVITY DESCRIPTION
SCHEDULED
START FINISH
.................... .........................................-..................-.-..................... ................ ............ ..--......-. ............... ..
Bulk Installation of Utilities
22BO
22'40
22150
22.3 1 0
31050
3'000
:31CSO
31090
:3 1 '00
31"0
32CSO
:3 2 C'9O
321'0
32i20
32130
32'40
43100
431'0
43120
43BO
43200
43210
43220
02..30
43300
43330
53100
53"0
53120
53130
53200
532iO
53220
53230
53300
53330
Cel I ing fra::-,ing
i , 200
"2'0
11220
"230
1,150
21140
15
'0
10
15
15
5
15
20
20
15
15
10
10
15
10
10
15
15
15
15
15
15
15
15
30
20
15
15
15
'5
15
15
15
15
30
20
15
10
10
15
15
5
15
20
20
15
15
10
10
15
,0
10
15
15
15
15
15
15
15
15
30
20
15
15
15
15
15
15
15
15
30
20
5
5
5
5
15
10
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
5
5
5
5
15
10
o
o
o
o
o
o
Area 8 . 2nd Fl . Pwr/Ltg Conduit. Sulk Install
Area 8 . 2nd fl . Sec/C~ Conduit. Sulk Instal
Area 8 - 2nd fl - fire Protection. Bulk Install
Area 8 . 2nd fl - Ancilliary Pipe
Area C . 1st fl - HVAC Ductwork Bulk Install
Area C . 1st Fl . HVAC Piping' Bulk Install
Area C . 1st fl - Plumbing. Bulk Install
Area C - 1st Fl . Pwr/Ltg Conduit - Bulk Install
Area C - 1st fl - Sec/Comm Conduit - Bulk Instal
Area C - 1st fl - Fire Prot~tlon - Bulk Install
Area C . 2nd fl . KVAC Duct~rk . Bulk Install
Area C - 2nd fl . HVAC Piping. Sulk Install
Area C - 2nd fl - Plumbing - Bulk Install
Area C - 2nd fl . Pwr/Ltg Conduit. Sulk Install
Area C - 2nd fl - Sec/Comm Conduit - Bulk Instal
Area C - 2nd fl - Fire Protection' Bulk Install
Area 0 - 1st fl HU 1 Side A - vert chase utl
. Area 0 . 1st Fl - HU 1 Side B . vert chase utl
Area 0 . 2nd Fl . HU 1 Side A - horiz chase utl
Area 0 . 2nd Fl . HU 1 Side B . hor!z chase uti
Area 0 - 1st Fl . HU 2 Side C - vert chase utl
Area 0 . 1st Fl - HU 2 Side D . vert chase uti
Area 0 - 2nd fl . HU 2 Side C . horiz chase utl
Area 0 - 2nd fl . HU 2 Side 0 . horlz chase utl
Area 0 . 2nd Fl - Kechanlcal Room Utilities
Area 0 - Dayroom/Office Utilities
Area E - 1st fl . HU 3 Side E . vert chase utl
Area E - 1st Fl . HU 3 Side f - vert chase utl
Area E - 2nd Fl HU 3 Side E . horiz chase uti
Area E . 2nd Fl HU 3 Side F - horiz chase uti
Area E - 1st Fl - HU 4 Side G vert chase utl
Area E . 1st Fl - KU 4 Side H - vert chase uti
Area E . 2nd Fl . KU 4 Side G horiz chase utl
Area E - 2nd fl . HU 4 side H . horiz chase uti
Area E . 2nd Fl ~echanical Room Utilities
Area E - Dayroom/Office Util
Area A - 1st Fl
Area A 1st Fl
Area A . 1st Fl
Area A - 1st Fl
Area A . 2nd Fl
Area B . 1st Fl
- Ceiling framing
- Cei I ing fr,,;ning
. Ceiling framing
- Ceiling Framing
. Ceiling fro~ing
Ceiling Framing
in Al000
in A1029
in ....,039
in A1049
3SEP92
3SEP92
3SEP92
16OC192
25SEP92
25SEP92
25SEP92
25SEP92
25SEP92
25SEP92
23O<:T92
23OCT92
230C192
23O<:T92
23O<:T92
230C192
l6OCT92
6110'192
61o/0\'92
1DEC92
16OCT92
6II0V92
6II0V92
lDEC92
16OC192
i6OCT92
2010/0\'92
15DEC92
15DEC92
7JAIo/93
20110\'92
15DEC92
15DEC92
7JAIo/93
20"ov92
20110\'92
27AUG92
:3SEP92
11 SEP92
185E?92
18SE?92
11 SEP92
24SEP92
17SE?92
17SE?92
SIl0V92
150<:T92
10<:T92
150<:T92
220<:192
220<:T92
150<:T92
12N0V92
5110\'92
510/0>'92
12110'192
S"0V92
SIoI0V92
5NO'>'92
301o/0\'92
301l0V92
21DEC92
5 101 OV92
301l0V92
30110\'92
21DEC92
30ijC'V92
12":','92
14nEC92
6JAN93
6J,l..N93
27 JA~93
14DEC92
6JAli93
6JklI93
27 J.IJ/93
6JAli93
21DEC92
2SEi'92
10SE?92
17SE?92
24SE1>92
BOCT92
24SEP92
....-... .....-.-. -....Oo.......... ..... ......Oo.................. -.. ........... ....... - -.. - ........ ..................... .....-.... ............. ........................................... .................. ................
Monroe County, ftorida
PR1~.VERA PROJECT PlkH~ER
jo\Oilr~ Ccxnty Det ent Ion f 8<:1 lit'
REPORT CATE 190EC91 RUH HO. 50
'6:28
SCKED REPORT . lir~ skip by activity code
Monroe COIrity Detffitloo Fad t ity
START DATE 'AUG91 fIN DAlE ,.
DATA DATE 1SJ.10V91 PACF "'.
........ .. .. . .. .. ... ........ ................... ..-........ -...... ........ ..-...................... ........... ......Oo............ . . .. .. .. .. .... ................ ............... .............
ACT IVI TY ORIG REM ACTIVITY DESCRIPTION SCHEDULED
ID DUR DUR X START FINISH
......... .......... ... ... .. .. .. .. .. - .. .. .. .. ... .. ... .. .. ..... - .. .. ........ .. ..... .. ........ .. . ..... .... .......... ........ .. .. .. .. .. .. .. . .. .. .... . . ... . .. .. . .. ............... .. .. .. .. .. .. ... ................ ..
Cei l ing Frllllling
22070 10 10 0 Area B . 2nd Fl . Ceiling Anchors & Ha~ers 6AUG92 19AUG92
22160 5 5 0 Area B . 2nd F l . Cei ling Frllllling 25SE1'92 1OCT92
31'30 5 5 0 Area C . 1st fl . Cei ling FrlloTiing . Start 230C T 92 290C T 92
31't.0 5 5 0 Area C . 1st Fl - Cei ling framing . C(X1~lete 300cT92 SNOY92
:m6<> '0 '0 0 Area C - 2nd Fl . Ceiting Framing 13H0V92 30NOY92
'3340 '0 '0 0 Area D . Cei t ing framing 13NOY92 30NOY92
53340 '0 '0 0 Area E - Ceiling Framing 22DEC92 6JAH93
System Drops I Testing / Punch-out
\1240 10 10 0 Area A . 'st fl - Systems Drops . Start 3SEP92 17SE1'92
n250 5 5 0 Aree A . 1st Fl - Systems Drops - Complete 25$EP92 IOCT92
1126<> 5 5 0 Area A . 'st Fl . Test Utility Piping Systems 2OCT92 8OCT92
',270 5 5 0 Area A . 1st Fl - Punch-out Above Ceiling Vork YO<; T 92 1SOCT92
\2',60 '5 15 0 Area A 2nd Fl - Utility System Drops. Start , SSE 1'92 80C T 92
12170 5 5 0 .....rea " . 2nd F I . Utility System Drops - Cpl YO<; T 92 15OCT92
12'80 5 5 0 Area A - 2nd F l . Test Utility Piping Systems 16OCl92 22OCT92
\2'90 5 5 0 Area A . 2nd F l Punch-out Above Ceiling Vork 230C T 92 29O<:T92
2"50 10 '0 0 Area B - 1st Fl . System Drops - Start 1 'sEP92 245E1>92
2116<> 5 5 0 Aree B - 1st fl . Systems Drops. Complete 25sE1'92 1OCI92
2,nO 5 5 0 Area B - 1st Fl . ~tems Test 2OCT92 80C 192
2' '80 5 5 0 Area B - 1st fl Punch-out 9O<:T92 '5OCT92
22170 5 5 0 Area B . 2nd Fl Systems Drops 2OCT92 BOCT 92
22400 '0 '0 0 Area B 2nd Fl - Systems Test 6lol0Y92 '9~0Y92
224\0 5 5 0 .....rea B . 2nd Fl . punch-out 20~OY92 30~OV92
3' '50 5 5 0 Area C . 'st Fl - System Drops. Start 300cT92 SNOY92
31160 5 5 0 Area C . 1st Fl - Systems Drops - Complete 6,Ii 0\'92 '2H0V92
31170 5 5 0 Area C . 1st fl - Systems Test 13!10V92 '91/0\'92
3"80 5 5 0 Area C . 1st Fl System PIXXh-out 20NOV92 301/0',192
32'70 5 5 0 Area C . 2rd Fl System Drops - Start 13 N0Y92 19HOV92
32'80 5 5 0 .....rea C - 2nd fl . System Drops - Complete 'DEC92 lDEC92
32190 5 5 0 Area C Zr,d f I . System test &lEC92 , 4.t>E c92
32200 5 5 0 Area C 2nd F l Punch-out 1SDEC92 21DEC92
-3310 5 5 0 "ree 0 2rd FI . Test Systems 22DEC92 290E<:92
'3320 5 5 0 Area 0 - 2rd Fl - Punch-out 300EC92 6JA~93
43350 5 5 0 Area D - System Drops - both floors 'DEC92 lDEC92
i,:B6O 5 5 0 Area D Systems Test . DayrrrJOff - both ftoors 8OEC92 14DEC92
1.3370 5 5 0 Area 0 Punch-out - Dayrm/Off - both floors 'SDEC92 21DE<:92
53310 5 5 0 },rea E . 2rd Fl . Test Systems 28JAI/93 3FEB93
53320 5 5 0 A,ea E 2rod fl . Punch - out 4FEB93 'OFEB93
53350 5 5 0 Area E System Drops - both floors 7JAI/93 13JA!/93
53:>60 5 5 0 Area E . Systems Test - Dayrm/Off - both floors 14JAII93 20JAH93
53370 5 5 0 Area E Punch-out. Dayrm/Off - both floors 2'JA1I93 27 JAII93
Cei l i....5
11280 20 20 0 Area A 1st Fl - Ceiling Soard/Tape/Plaster 16OC192 12NOV92
............... ......... ..-...................................... ..--.......... ....... ..... ........................... ..-.. .............-. -.... ............................. -~ ......-........ ....... ..-. ........................-..... ...... ........
Kooroe CO<J\ty, Florida
)RT C,l,TE 190EC91
16:28
.y~Eo ~E~T . line
ACTIVITY
10
Finishes
4 :Y.8O
U490
43500
43510
43520
43530
53040
53045
53400
5Jio 10
53440
534S0
53490
53500
53510
53520
53530
RUN NO. 50
skip by activity code
ORIG REM
OUR OUR
15
15
15
15
10
10
15
10
20
10
5
15
15
15
15
10
10
15
15
15
15
10
10
15
10
20
10
5
15
15
15
15
10
10
Electrical Equipment
20350
20360
20370
20380
20400
20410
20420
20430
20450
20460
2C>470
20480
15
5
1
70
15
5
1
120
15
5
1
145
~echanical Equipment
20200
20210
20220
20230
20250
20260
20270
20280
20300
203'0
20320
20330
15
5
1
70
15
5
1
1'0
15
5
1
80
PRIK~VERA PROJECT PLAWNER
~onroe CO'JIty Detention Facility
~Dnroe CO'JIty Cetentlon Facility
START DATE
1ALX;91
,.
FIN DATE
DATA DATE
18N0V91
PAGE 110.
..............-..-... ...-...........--........................-.........-............................................ ...-...-..... ................ ................. .................
x
ACTIVITY DESCRIPTION
SCHEDULED
START fiNISH
-..-................... .......................-...................-..................................-............-............ ................. .............-.. ......--....... ................ ..
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
15
5
1
70
15
5
1
120
15
5
,
145
o
o
o
o
o
o
o
o
o
o
o
o
'5
5
1
70
15
5
1
no
15
5
1
80
o
o
o
o
o
o
o
o
o
o
o
o
Area 0 . Casework - both floors
Area 0 . Glazing - both floors
Area D - Door Hardware' both floors
Area 0 - Acoustical Ceiling - both floors
Area 0 . floor prep - both floors
Area 0 - Floor covering - both floors
Area E - 1st fl - Cell Furniture
Area E . 2nd Fl . Cell Furniture
Area E - Cell Doors & Door fr~s . both floors
Area E . Grout Cell Door FrbffieS - both floors
Area E . Doors & Grilles - both floors
Area E - Cas~rk . both floors
Area E Glazing - both floors
Area E Door Hardware - both floors
Area E - Acoustical Ceiling - both floors
Area E - Floor prep - both floors
Area E . Floor covering - both floors
Area B - Switchgear' Generate P.O.
Area B Switchgear - Select Vendor
Area B Switchgear. Issue PO
Area B Switchgear - Fab & Delver
Area B Emer~ Ceo - Generate P.O.
Ar~a B . Emerg Ceo . Select Vendor
Area B . E"~rg Geo - Issue PO
Area B - Emerg Geo - Fab & Deliver
Area B - UPS System Cenerate P.O.
Area B UPS Syst~ - Select Vendor
Area B UPS System - Issue PO
~rea B UPS System - Fab & Deliver
Area B - ~ - Cenerate P.O.
Area B . CWT . Select Vendor
Area B - CWT - Issue PO
Area B - CWT - Fab & Deliver
Area B . Chillers - Generate P.O.
Area B - Chillers - Select Vendor
Area B - Chillers - IsslJt' PO
Area B . Chillers - Fab & Deliver
Area B - AHU - Generate P.O.
Area B AHU Select Vendor
Area B AHU - Issue PO
Area B AHU Fab & Deliver
<IF E B93
4FEB93
4FEB93
4FEB93
4fEB93
25fEB93
2OCT92
23OCT92
201-/0\'92
22DEC92
18fEB93
1 1~R93
I1~R93
llKAR93
11KAR93
l1KAR93
1APR93
13JAN92
3FEB92
10fEB92
lHEB92
13JAI-/92
3FEB92
10H!l92
IHEB92
13JAI-/92
3fEB92
10FEB92
11fEB92
13JAN92
3FEB92
WHB92
l1fEB92
13JAN92
3FEB92
10FEB92
l1fEB92
13JAN92
3FEB92
10FEB92
l1FEB92
24FEB93
24FEB93
24FEB93
24FEB93
17FEB93
1 Ol-IAR93
22ocT92
5 N0\'92
21DEC92
6JAN93
24FEB93
311'.AR93
31KAR93
31MAR93
31KAR93
WlAR93
14APR93
31 JA'/92
7FEB92
IOFEB92
1&v.Y92
31JAI/92
7FEB92
10FEB92
29JUL92
31JAI/92
7fEB92
10fES92
2SEP92
3'JAN92
7FEB92
10FEB92
1 E,,".A Y92
31JAN92
7FEB92
10FEB92
15JUL92
31JAN92
7FEB92
WHB92
2JUI-/92
~onroe County, FlorIda
PRlMAVE~A PROJECT PlA~~ER
... ......................-----....... ............ --- ....................- ............. .--.-..-..-.. .....",.... ..... ............ ..--....... ---..- -_.- --_..- ...---.......................... -........... --..-.........................
~o<oroe Co.....nty DetE:!"ltlOt'l f&dllty
REPORT DATE 190EC91 RUN NO. 50
16:28
SCHED REPORT. line skip by activity code
Xonroe County Det~tlon facility
START DATE 1AUG91 fIN DAlE 1J
DATA DATE 1&10\'91 PAGE
ACTIVITY
10
ORIG REM
DUR OUR
ACTIVITY DESCRIPTIOH
..................... ....................................-.............................-----.......--....... .............-- -----......
.. .. ... .... ...........
x
SCHEDULED
STAAT FINISH
.. --......... ....... ..... ........--.......... ............... ........... ........... ...-- ...-- ..-----...---- ---.............
...--..- ..-......
Xe<henlcal Equiprr~t
22290 10 10
32>00 10 10
32310 10 10
32320 10 10
32330 '0 10
32340 5 5
40500 15 15
40510 5 5
40520 1 1
40530 40 40
50500 15 15
505'0 5 5
50520 1 1
50530 40 40
lal.X"d ry E qu i pren t
20500 15 15
20510 5 5
20520 5 5
2053{) 85 85
Kitchen Equi~t
30100 25 25
30110 5 5
3{)115 5 5
30'20 50 50
30'30 '5 '5
30140 35 35
30'50 150 150
32150 5 5
32480 5 5
Set Equiprent
222'0 10 '0
22220 '0 '0
22230 '0 10
('2240 '0 '0
22250 '0 '0
22260 '0 10
22270 '0 10
32460 15 '5
42050 5 5
52050 5 5
~echanical System Check"out
7'005 20 20
72005 20 20
o
o
o
o
o
o
o
o
o
o
o
o
o
o
Area B 2nd Fl - Erect CWT
Area C - 2nd fl - Cooler Floors - Install
Area C - 2nd Fl . Cure floors
Area C . 2nd fl - Cooler framing
Area C - 2nd fl - Cooler Panels. Install
Area C . 2nd Fl - Cooler Trim 'out
Area 0 . AHU's - Generate P.O.
Area 0 . AHU's - Select Vendor
Area 0 - AHU'S . Issue PO
Area 0 . AHU'S - fab! Deliver
Area E . AHU's . Generate P.O.
Area E - A~J's - Sel~t Vendor
Area E AHU'S' Issue PO
Area E AHU's. fab & Deliver
o
o
o
o
Area B . laundry Equip' Generate P.O.
Area B . laundry Equip . Sel~t Vendor
Area B lcundry Equip' Issue PO
Area 8 . laundry EqJlp . Fab & Deliver
o
o
o
o
o
o
o
o
o
Area C . Kitchen Equip. Generate P.O.
Area C - (itchen Equip' Staff Revi~
Area C - Kitchen Equip' Award P.O.
Area C . Kitchen Equip. Shop Orawinss
Area C . (itchen Equip - AlE Revi~ & Approval
Area C (itchen Equip' Fnl Coord wI others
Area C (itchen Equip' fab & Deliver
Area C . 2nd Fl - Install Kitchen Hoods
Area C - 2nd fl Kitchen Equipment Trim-out
Area 8 2nd Fl Set M Equi pnent
Area B 2nd fl - Set Chiller Equipr.~t
Area B . 2nd Fl - Set AHU Equiprr~t
Area 8 - 2nd Fl . Set Switchgear
Area 8 2nd fl . Set Emergency Generator
Area B - 2nd fl - Set UPS System
Area B - 2nd fl - Set laundry Equipr.~t
Area C - 2nd Fl . Set Kitchen Equipr.~nt
Area D - 2nd Fl - Set AHU's 01 ~nd 02
Area E . 2nd Fl - Set AHU's . E1 and E2
o
o
o
o
o
o
o
o
o
o
& Balancing
o
o
Area A
Area 8
~e<:h System Tie- in & Initial HV,4.C T&8
~ech System Tie-in & Initial HVAC T&8
?oc T92
16O<:T92
:>OOC 192
BN0V92
10EC92
15DEC92
13JAN92
3fEB92
10FEB92
l1FEB92
BJAH92
3FEB92
10FEB92
11FEB92
BJAI/92
3FEB92
10FEB92
17fEB92
13JAH92
17fEB92
24FEB92
2..~Rn
"1'..4. Y92
2JU~n
2JL:Hn
23OCT92
25~R93
BAUG92
13AUG92
BAUG92
13AUG92
13AUG92
3SEP92
13AUG92
l.KAR93
20AUG92
2OCT92
14JAk93
1 HEB93
15OC192
290C T92
12HO\'n
301l0V92
14DE cn
21DEC92
31JAH92
7FEB92
10fEB92
6APR92
31 JAH92
7fEa92
'OFEB92
6APR92
31JAH92
7FEB92
14FEB92
'SJUII92
14fEB92
21FEB92
28FE992
eJoi.A Y92
lJUH92
2'JUL92
5JAH93
29OCT92
3 il".AR93
26AUG92
26AUG92
26AUG92
26AUc92
26AUG92
'7SEP92
26AUG92
241".A,,93
26,4.UG92
&x192
10fEB93
1 o "'.A R 93
................ -.... ...... ......... ..........-.. ................. ...... ........... ....-........................ ...... ..................- ........ .-...... ...-.... .......... ....-...... ..... ........... ................ ......... ...............
Ilonroe CO<.C'ty, Florida PRlKAVERA PROJECT PLA~~ER Monroe Ccx.nty D~tentioo Facility
Jl<T DAle 19OEC91 RUN NO. SO Monroe Ccx.nty Det~tion Facility START DATE 1 AUG91 flN DATE 1JUL
16:28
~..,,(D REPQI(T . l i r>e skip by activity code DATA DATE 1&<0V91 PAGE NO. 9
......... .. . .. . .. .. - .. . ......... .. .. .. .. .. ... .. . .. .. ....... -...-... .......... .......................... ............................................ .. -.... .. ... .. .. ................ .. .. ... .. .. .. .. .. .. .... .. .. .. . - - "
ACT IV) TY OR I G REM ACTIVITY DESCRIPTION SCHEDULED
ID DUR DUR ~ START fIlIlSH
......... .. .. . - .. ............-...... ..... .............................................. ...........-....-.......................... ................. .. .. .. .... - . ... ................ - .. .... .... .. ..
C~itlngs
12220 15 15 0 Area A. - 2nd fl . Orywall/Tape/Plast~r Ceilings 300c192 191-10V92
21200 15 15 0 Area 8 - 1st f l Ceiling Board/Tape/Plaster 160CTn SI-I0V92
22430 10 10 0 Area B . 2nd f I - Drywall/Tape/Plaster Ceilings 10EC92 140EC92
31200 15 15 0 Area C . 1st Fl - Ceiling Board Tape & Plaster 10EC92 210ECn
32410 15 15 0 Area C . 2nd f I - Ceilings 14JAII93 3fEB93
433S0 15 15 0 Area 0 . Drywall/Tape/Plaster Ceilings' both fl 22DEC92 13JA1I93
53380 15 15 0 Area E Drywall/Tape/Plaster Clgs - both floors 28JAII93 17FEB93
....i re Pulls
1 1300 10 10 0 Area A . 1st Fl . ....ire Pulls 131-10V92 301WV92
12240 10 10 0 Area A - 2nd fl . ....ire Pulls 201l0V92 7'DEC92
21220 15 15 0 Ar~a 8 - 1st fl ....ire Pull 6110V92 301l0V92
22450 20 20 0 Area 8 - 2nd f l . ....ire Pull 1SDEC92 13J,&,1/93
31220 15 15 0 Area C . 1st Fl - Wi re Pull 22DEC92 13JA1I93
32400 15 15 0 Area C . 2nd f I . Wire Pull 22DEC92 13JA1I93
43420 10 10 0 Area 0 - IJi re Pull . start - both floors 3ooEC92 13'JA1I93
43430 5 5. 0 Area 0 - wi re Pull - complete - both floors 14JAN93 20J,&,1I93
53420 10 10 0 Area E . \Jire Pull - start. both floors 4fEB93 17FEB93
53430 5 5 0 Area E - ....ire Pull - complete - both floors 18FEB93 24ffB93
Trim"out Utilities
11330 15 15 0 Area A - 1st Fl H/E/P/S Trim-out 1SDEC92 6JAII93
122BO 15 15 0 Area A 2nd f l H/E/P/S Trim"out 22DEC92 13JAl/93
21260 15 15 0 Area B . 1st Fl - H/E/P/S Trim-out 1 SDE C92 6JAJ/93
221.&) 10 10 0 Area 8 - 2nd Fl . H/E/P/S Trim-out 28J,&,N93 10fE893
31260 10 10 0 Area C - 1st Fl . H/E/P/S Trim-out 28J,&,1I93 10fEB93
32470 10 10 0 Area C 2nd f I . H/E/P/S Trim-out 4KAR93 17l'.AR93
43470 15 15 0 Area 0 - H/E/P/S trim-out - both floors 4fE693 24fEB93
53470 15 15 0 Area E - H/E/P/S trim-out . both floors 11KAR93 31KAR93
Painting
11310 10 10 0 Area A - 1st f\ - Prep for Bulk Painting 13!10V92 30JlOV92
11320 10 10 0 Area A - 1st Fl - Bulk Paint lng 1DEC92 14OEC92
12250 10 10 0 Area A - 2nd Fl - Prep for Bulk Painting 20JlOV92 7'DEC92
12260 10 10 0 Area A - 2nd F I - Bulk Painting BoECn 210EC92
21230 10 10 0 Area B - 1st Fl - Painting Prep 6J10V92 19kOV92
21240 10 10 0 Area B . 1st Fl - Bulk Painting 10EC92 14DEC92
22l.6O 10 10 0 Area 8 - 2nd Fl - Painting Prep 1S0Ecn 29OEC92
22470 10 10 0 Area 8 - 2nd Fl Bulk Painting 14JAII93 27JA~93
31230 10 10 0 Area C - 1st Fl - Painting Prep 220EC92 6JAJo>93
31240 10 10 0 Area C 1st Fl - Bulk Painting 14JAII93 27 JAJl93
32430 10 10 0 Area C - 2nd fl - Paint Prep 14JAII93 27JAN93
32440 10 10 0 Area C 2nd f l - Bulk Painting 4FEB93 17FEB93
43450 10 10 0 Area 0 Paint prep' both floors 22DEC92 6JAI/93
4 3l.6O 10 10 0 Area 0 - Bulk Paint - both floors 21JAII93 3fEB93
53450 10 10 0 Area E - Paint prep - both floors 28JAJl93 10fEB93
. . ... ... .. . ... . .. . ... .. ... . .. . . ... .. . .. .. . .. . .. .. .. ... .. .. .. .. .. .. .. . .. .. .. .. . . . .. . .. . .. ... . .. .. .. ... .. .. ~ .. . .. .. .. .. .. .. ... . ... .. . .. .. .. .. . .. . .. .. ~ .. ... .. . .. .. - .. - .. ... .. .. .. ... . .. .. - .. .. .. .. ... .. ... .. .. ... ... .. .. .. .. .. .. .. .. .. ... .. .. .. .. . .
KOCIr~ Ccx.nty, Florida
PRj~~\~kA PROJECT PLA~~ER
Kiflr~ Ccx.nty Detention f&cillt)
REPORT DATE '9OEC91 RUN NO. 50
16:28
SCHED REPORT - li~ skIp by activity code
Konr~ County Detention facility
START DAlE 1AUG91 FIN DATE t.
C,A1A DATE 1S-'10'l91 p~Gr
......... ........... .. .. .. .. .. - .. . .. .. .. --.................. .......... -.... ................. .--..... ...... .........-..- ................. -...-......... .. .. .. .. .... ..... ................. .
ACTIVIlY CRIG REJol ~C1IVITY DESCRIP1ION SCHEDULED
10 OUR DUR X START FINISH
......... ......... . .. .. -... . .. .. .. .. ... ...........-... .............. ............-....--............. ........ -.. .............. ... .. .. .. ... ... .. .. .. ..... .. . . .. .. .. .. .. ... .. .. .... .............. ...
Painting
5~ 10 10 0 Area E - Bulk Ptlint . both floors 25FEB93 1 C/-',AR93
77020 30 30 0 Painting . Interior TO<.JCh-\..9 (start) 181-1AR93 28APR93
77030 10 10 0 Painting - Interior TO<.JCh-\..9 (coopl) 13KAY93 26XAY93
77QI. 0 60 60 0 Painting - Exterior Building 5FEB93 29,l,PR93
Finishes
11m 10 10 0 Area A - 1st Fl - Install Doors & Gri lls 13110'192 30110'192
1B40 15 15 0 Area A . 1st Fl . Case>lOrlt 15DEC92 6JAI/93
1n50 15 15 0 Area A . 1st Fl . Glazing 15DEC92 6JAN93
11>60 15 15 0 Area A . 1st Fl - Door Hardware 150EC92 6JAN93
1 13 70 10 10 0 /..rea A - 1st Fl - floor & Vall Cover!r~s 7JAH93 20JA!lI93
122.30 10 10 0 Area A - 2rd Fl . Instl Doors & Grills 201l0V92 7DEC92
12270 10 10 0 Area A - 2rd F l - Case-l/Ork 22.oEC92 6JAlI93
12m 15 15 0 ~rf:a A . 2rd Fl - Acoust ical Ti le 22OEC92 BJAh'93
12300 15 15 0 Area A 2rd Fl Door Har~are 22OEC92 BJAN93
12.310 15 15 0 Area A 2rd Fl - Glazing 22DEC92 BJAH93
12320 15 15 0 Area A - 2rd Fl . Floor & Uall Coverings 14JAN93 3FEB93
21190 10 10 0 Area B 1st Fl Fl oor Prep 160<:192 290CT92
21210 15 15 0 Area B 1st Ft Coors & Gr; lles 6110'192 30NO'l92
21250 15 15 0 Area B . 1st Fl . Acoustical Tile 150EC92 6JAlI93
21270 10 10 0 Area B - 1st Fl - Door llerd'.lare 15DEC92 29OEC92
21280 10 10 0 Area B - 1st Ft - Gl azing 15DEC92 2S'0EC92
21m 15 15 0 Area B - 1st Fl . floor & Vallcoverings 7JAN93 27JAN93
22420 10 10 0 Area B - 2rd F l . Floor Prep 10EC92 1 {,,')EC92
22440 10 10 0 Area B - 2rd Fl - Coors & Grilles - TrlStall 15DEC92 mE e92
22490 5 5 0 ~rea B - 2rd Fl - Coor Hardware 28JAli93 3FEB93
22500 5 5 0 Area B . 2rd Ft . Gl az Ing 28JAN93 3FE 893
22510 5 5 0 Mea 6 - 2rd F\ Acoustical Tile 28JAN93 3FEB93
22520 5 5 0 Area B . 2rd Fl - Floor & Uallcoverings 1 HEB93 17FEB93
31120 10 10 0 Area C - 1 st fl . Ceramic Ti le 25sEP92 80C T 92
31190 10 10 0 Area C - 1st Fl - Floor Prep 1DEC92 14DEC92
31210 10 10 0 Area C - 1st Fl . Coors & Grilles 22DEC92 6JAh'93
31250 5 5 0 Area C - 1st Fl - ~c ous t I ca I T i l e 28JAN93 3FEB93
31270 10 10 0 Area C , st Fl - Door Hardware 28JAN93 10FEB93
31280 10 10 0 Area C - 1st F\ - Gl 8Z ing 28JAN93 10FE893
31290 10 10 0 Area C htFl - Fl oor Cover i ng 11fEB93 24FEB93
32420 10 10 0 Area C 2rd Fl - Install Doors & Gr i I I es 1'JAI<93 27JAN93
32450 10 10 0 Area C 2rd Fl Seaml ess Fl oors 18FEB93 3K6.R93
321.90 10 10 0 Area C - 2rd F I . Other Flooring 4,11~R93 1 ~.AR93
43040 1S 15 0 Area 0 . 1st Fl - Cell Furniture 20AUG92 10SEP92
43045 10 10 0 Area D 2rd F\ Cell Furni ture 11 SEP92 24SEP92
431.00 20 20 0 Area 0 - Cell Doors &.Door Frames 16OC192 121010','92
43410 10 10 0 Area 0 Gr~Jt Cell Door Frames - both floors i3HOV92 30NOV92
43440 5 5 0 Area 0 - Doors & Grilles - both floors 14JAk93 20JAI/93
............. .... ............. ......................................................................................................... ........ ...-. .................... -.. -................... .........-..... -.... ..........
~onroe County, Florida
PRHV.\'ERA H:OJECT PLAl\l\ER
~onroe County Detention Facility
RT C~TE 190EC91 RUN NO. 50
16:28
~_..~O REPORT - line ski p by act ivi ty c~
~onroe County Oetention Facility
START DATE lAUG91 FIN D~TE 1JUL
DATA DATE 18~OV91 PAGE ~O. 13
............... ....................................................................................-.. ........... .............- .................. ...........-.. ....
ACTIVITY
10
ORIG REM
OUR DUR
ACTIVITY DESCRIPTION
SCHEDULED
START FINISH
x
................... ........................................................................................... ................ ................ .................. ............. .....
~echanic81 System Check-out & Balancing
73005 20 20 0 Area 0 . Mech System Tie-in & Initial KYAC as 25FE893 24/'.AR93
74005 20 20 0 Area C - Kech System Tie-in & Initial KVAC T&8 1&l.AR93 14APR93
75005 20 20 0 Area E - Mech System Tie-in & Initial KYAC 1&8 1APR93 28APR93
75500 10 10 0 KVAC System - Final Test & Balance 29APR93 12HAY93
75600 10 10 0 Building 0 & H System' Verification / Checkout 13101.AY93 26MY93
nOlO 10 10 0 Chlorinate & Flush Drinking Vater Lines 29APR93 12HAY93
Electrical / Security Device Verification
71020 '5 15 0 Area A - Point to Point Device Verification 14JA~93 3fEB93
nOlO 15 15 0 Arell S Point to-Point Device Verification 11fEB93 3HAR93
73010 15 15 0 Area 0 . Point to Point Device Verification 25FEB93 '7l".AR93
74010 '5 15 0 Area C Point to Point Oevice Verification 1 &".AR93 7APR93
75010 15 15 0 .lrea E - Point to Point Device Verification 1APR93 2'APR93
rire Protection System final Test
75 700 20 20 0 Fi re Protection System - final Testi~ 29APR93 26HAY93
~ecurity System Operational Tests
71010 5 5 0 Instl Security System Coo-p.Her Equip; Ctl Room 1 HE 893 17fEB93
71015 5 5 0 Load Security System Programs '8FEB93 24fEB93
71025 15 15 0 Area A - Security System Operational Tests 25FEB93 17HAR93
no,s '5 15 0 Area B Security System Operational Tests ~".AR93 24KAR93
73015 15 15 0 Area 0 Security System Operational Tests , &w.AR 93 7APR93
740'5 15 15 0 Area C Security System Operational T es ts B,t.PR93 28APR93
75015 15 15 0 Area E - Security System Operational Tests 22APR93 121-1AY93
Security System Integrated Tests
76000 10 10 0 Security System - Int€-grate-d Test (start) 13KAY93 26HAY93
76010 20 20 0 Security System - I ntegrat e-d Tes t (C0091) 27r'.A Y93 24JUfl93
final PlXlCh
n050 15 15 0 AlE Building C~nt Puncnout 27'KA Y93 17JUN93
Owner / .lE Oemonstrations\
acooo 5 5 0 ~ner/AE Demonstrations & Final IJalkthru 25 JUt.;93 1JUL93
SECTION 00130
PROPOSAL FORM
Bid Package No. 30
Roofing
BID TO
MONROE COUNTY PURCHASING DEPARTMENT
PUBLIC SERVICE BUILDING, CROSS WING,
ROOM 002, 5100 COLLEGE ROAD, STOCK
ISLAND, KEY WEST, FLORIDA 33040
~~(;:~ff7lfJ ~~~~S lAC.
5.L//V.e/~J I::" L 3"3 3S- I
BID FROM:
The undersigned, having carefully examined the Work and Drawings,
Specifications, Proposal, and Addenda thereto and other Contract
Documents for the construction of:
Bid Package No. 30, Roofing
and having carefully examined the site where the Work is to be
performed, having become familiar with all local conditions
including labor affecting the cost thereof, and having
familiarized himself with material availability, Federal, state,
and Local laws, ordinances, rules and regulations affecting'
perfqrmance of the Work, does hereby propose to furnish all
labor, mechanics, superintendents, tools, material, equipment,
transportation services, engineering support, and all incidentals
necessary to perform and complete said Work and work incidental
hereto, in a workman-like manner, in conformance with said
Drawings, specifications, and other Contract Documents including
Addenda issued thereto.
The undersigned further certifies that he h~s personally
inspected the actual location of where the ~ork is to be
performed, together with the local sources of supply and that he
understands the conditions under which the Work is to be
performed. The successful bidder shall assume the risk of any
and all costs and delays arising from the existence of any
subsurface or other latent physical condition which could be
reasonably anticipated by reference to documentary information
provided and made available, and from inspection and examination
of the site.
05/18/92
ROOFING PROPOSAL FORM (ADD. 12)
00130- 1
Note:
PROPOSAL FORM
rt BGz1T'~ ~/ N &l.E' R- y
Items are 'furnish and install' where
as specified in the Scope of Work.
Lump Sum Base Bid
1. Mobilization
2. Bond
3. Sales Tax
4. Submittals
5. Inaulating Concrete Decko
6. Roofing
7. Miscellaneous Items (use if work items
cannot be categorized in items 1-6 above)
TOTAL BASE BID, Items 1-7, (figures)
applicable,
$ ~ ()(X)
$ LfJqOO
$ / 3 ~IJO
$ ~~t'O
$
$ g,2~{)OO
$ ~
: ~cqa:>
_:.2___-=~___
TOTAL BASE BID, (words) 1~ ;tNtZe.t? h2TY nvtiE. --r-J./t:JtISLJND
NnJ~ J-I.uNDJ?~f7 DOLLARS
.
05/18/92
ROOFING PROPOSAL FORM (ADD. 12)
v
l
pi
. 00130 - 2
t
,.
Alternate 30-01: Temporary Accessways
ADD
Alternate 30-01, (figures)
~~~e=
hve ~N006P
DOLLARS
Alternate 30-01, (words) {7jV~ -r-~4AND
Zone 'A' stairway - maintain
stairway beyond (90) day time-
frame, on a weekly basis, ADD.
Zone 'A' stairway - DEDUCT on
a weekly basis, before end of
(90) day timeframe. $/wk
7::; (jO
$
Note:
Unit Price is to be given, as the same for
ADD or DEDUCT.
Zone 'c' stairway - maintain
stairway beyond (60) day time-
frame, on a weekly basis, ADD.
Zone 'c' stairway - DEDUCT on
a weekly basis, before end of
(60) day timeframe. $/wk
$ 75.0()
9. Owner Option 30-01: Zone F Roofinq ~nd In3ulntinQ Concrete
Bee*:
~ DEDUCT (Circle One)
Owner option 30-01, (figures)
Owner option 30-01, (words)
:a!;:e~ld=
6~HTY ONE ~v~o
DOLLARS
05/18/92
ROOFING PROPOSAL FORM (ADD. 12)
~OlJO ~ 3
. .'
10. Owner Option 30.;;;02: Maint.enanCe PrOGraM (J 0 ye p~l0r0
O.wrier 'OptioTl36...62/> ff1.gU.6:is)'.
.........................................................q/<..........~r::::I.J
. .. -....... .....",.
Po/-J'i~j:....bpElqfl...3.()*q~>..U(W8#a:~). .......G#~...q;-~?~14::>.).. ......<ii......U....i:...)...\:: ............
Maintenance:
Provide for bi-annual roof inspection to determine if any mechanical damage
has occurred to roof. Roof system warranty will protect owner from any labor
or product failure.
At time of inspection, remove roof-top debris and clean debris from drain.
Advise owner of any mechanical damage and determine cause.
05/18/92
ROOFING PROPOSAL FORM (ADD. 12)
00130 - 4
#
I acknowledge receipt of Addenda No. (s) 1- /~
I have i~ded pages 1-4--'Sof the Proposal Form '9it Price
Schedule , and attached the required Bid security , Lobbying
and Conflict of Interest Clause ~Sworn statement of Public
Entity Crimes ~ and Non-Collusion Affidavit~
(Check mark items above, as a reminder that they are included.)
Mailing Address:
,/;';:; r- ~ tC.6"
/dJ,.-ro '7 /l/t.I.J
.
c-? ,.-
~.A:/~j<"Aor /L
~~s S;~~~~!
~~ ~ 5r~r- .
~..c I
~qC
Phone Number:
-3c:?y-- 7</'9- C; .y~ 0
Date:
h ~/ /.,. z--
/ /
Signed:
witness:
d~-
V
~.79.r LJ ?~~/I~
(Name)
;/1 ~ j;b;:$ I~~ 71
(Title)
CJa~ 't4{~tiA-u
tit" (Seal) .
05/18/92
ROOFING PROPOSAL FORM (ADD. 12)
00130 - 5
~
SWORN STATEMENT PURSUANT TO SECTION 287.133(3) (a),
FLORIDA STATUTES, ON PUBLIC ENTITY CRIMES
THIS FORM MUST BE SIGNED AND SWORN TO IN THE PRESENCE OF A NOTARY
PUBLIC OR OTHER OFFICIAL AUTHORIZED TO ADMINISTER OATHS.
1. This sworn statement is submitted to:
ffL1??Ro6 {~V"""~ ~Ae'"7'lAJ>/;?< .t:bP-1JrL-r/?7d/?r
[print n me of the public e6tity]
/7/~4 ~ /~ ;;:?L,.~.../~&~ iff ;//cr; MG$ /~n r
[print individual's name and title]
~sr ~~/r~- Ro~~5 -5ii s/&"/7?.s i /A/'c .,
[print name of entity s bmitting/sworn statement]
whose business address is /C>Z6 -7 A/ t.....J 4, 1h' S7/?;;;Gr--
~..,.I..-v,e/~ ~t:- 3'3~D
and (if applicable) its Federal Employer Identification Number
(FEIN) is bs.--- 003 7q'i!;' z- . (If the entity has no
FEIN, include the Social Security Number of the individual
signing this sworn statement: ) .
by
for
2. I understand that a "public entity crime" as defined in
Paragraph 287.133(1) (g), Florida Statutes, means a violation
of any state or federal law by a person with respect to and
directly related to the transaction of business with any
public entity or with an agency or political subdivision of
.any other state or of the United states, including, but not
limited to, any bid or contract for goods or services to be
provided to any public entity or an agency or political
subdivision of any other state or of the united states and
involving antitrust, fraud, theft, bribery, collusion,
racketeering, conspiracy, or material misrepresentation.
3. I understand that "convicted" or "conviction" as defined in
Paragraph 287.133(1) (b), Florida statutes, means a finding of
guilt or a conviction of a public entity crime, with or
without an adjudication of guilt, in any federal or state
trial court of record relating to charges brought by
indictment or information after July 1, 1989, as a result of
a jury ve~dict, nonjury trial, or entry of a plea of guilty or
nolo contendere.
4. I understand that an "affiliate" as defined in Paragraph
287.133(1) (a), Florida Statutes, means:
03/02/92,
PUBLIC ENTITY CRIMES (ADD. 6)
00420 - 1
-fJ
,;
1.
A predecessor or successor of a person convicted of
public entity crime: or
An entity under the control of any natural person who is
active in the management of the entity and who has been
convicted of a public entity crime. The term "affiliate-
includes those officers, directors, executives, partners,
shareholders, employees, members, and agents who are
active in the management of an affiliate. The ownership
by one person of shares constituting a controlling
interest in another person, or a pooling of equipment or
income among persons when not for fair market value under
an arm's length agreement, shall be a prima facie case
that one person controls another person. A person who
knowingly enters into a joint venture with a person who
has been convicted of a public entity crime in Florida
during the preceding 36 months shall be considered an
affiliate.
2.
I
i.
,
,
I
'~
I
~
I'
I
5.
I understand that a "person" as defined in Paragraph
287.133(1) (e), Florida statutes, means any natural person or
entity organized under the laws of any state or of the united
states with the legal power to enter into a binding contract
arid which bids or applies to bid on contracts for the
provision of goods or services let by a public entity, or
which otherwise transacts or applies to transact business with
a public entity. The term "Person" includes those officers,
directors, executives, partners, shareholders, employees,
members, and agents who are active in management of an entity.
6. Based on information and belief, the statement which I have
2arked b low is true in relation to the entity submitting this
sworn atement. [indicate which statement applies.)
Neither the entity submitting this sworn statement, nor
any officers, directors, executives, partners, shareholders,
employees, members, or agents who are active in the management
of the entity, nor any affiliate of the entity has been
charged with and convicted of a public entity crime subsequent
to July 1, 1989.
The entity submitting this sworn statement, or one or
more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in
the management of the entity, or an affiliate of the entity
has been charged with and convicted of a public entity crime
subsequent to July 1, 1989.
The entity submitting this sworn statement, or one or
03/02/92
PUBLIC ENTITY CRIMES (ADD. 6)
00420 - 2
~
1""
t
,J,
,)) ,
more of its officers, directors, executives, partners,
shareholders, employees, members, or agents who are active in
the management of the entity, or an affiliate of the entity
has been charged with and convicted of a public entity crime
subsequent to July 1, 1989. However there has been a
subsequent proceeding before a Hearing Officer of the state of
Florida, Division of Administrative Hearings and the Final
Order entered by the Hearing Officer determined that it was
not in the public interest to place the entity SUbmitting this
sworn statement on the convicted vendor list. [attach a copy
of the final order]
I UNDERSTAND THAT THE SUBMISSION OF THIS FORM TO THE CONTRACTING
OFFICER FOR THE PUBLIC ENTITY IDENTIFIED IN PARAGRAPH 1 (ONE) ABOVE
IS FOR THAT PUBLIC ENTITY ONLY AND, THAT THIS FORM IS VALID THROUGH
DECEMBER 31 OF THE CALENDAR YEAR IN WHICH IT IS FILED. I ALSO
UNDERSTAND THAT I AM REQUIRED TO INFORM THE PUBLIC ENTITY PRIOR TO
ENTERING INTO A CONTRACT IN EXCESS OF THE THRES OLD AMOUNT PROVIDED
IN SECTION 287.017, FLORIDA STATUTES FOR CAT ORY TWO OF ANY CHANGE
IN THE INFORMATION CONTAINED IN THIS FORM
re]
<h~0~Z-
/
STATE OF
- Date:
,,:J;i ~-~LCe" V
P'~-vV{;L-~.c~---
I
COUNTX OF
PERSONALLY APPEARED BEFORE ME, the undersigned authority,
711011-711$ tv. rc?U[)J)EfCf!}CO,TJI: who, after first being sworn by me,
[name of individual signing]
affixed his/her
/ / 'r!:- day of
signature in the space provided above on this
~Cf'.-~ 19 qJ-.-- .
~_.--
.. . (NOTARY PUBLIC STATE OF FLORIDA
commlSSlon explres: MY COH~ISSI0N EXP. MAY 20,1993
BOt/OED THRlJ CEliERAL I,.,OS. UHO.
My
Form PUR 7068 (Rev. 04/10/91)
03/02/92,
PUBLIC ENTITY CRIMES (ADD. 6)
00420 - 3
~
LOBBYING AND CONFLICT OF INTEREST CLAUSE
SWORN STATEMENT UNDER ORDINANCE NO. 010-1990
MONROE COUNTY, FLORIDA
,,/?A.r /%/c.= ?r5 5"~ /4<:
(Compan
"
II warrants that it has not employed, retained or otherwise had
act on its behalf any former County officer or employee subject
to the prohibition of section 2 of Ordinance No. 010-1990 or any
County officer or employee in violation of section 3 of Ordinance
No. 010-1990. For breach or violation of this provision the
county may, in its discretion, terminate this contract without
liability and may also, in its discretion, deduct from the
contract or purchase price, or otherwise recover, the full amount
of any fee, commission, percentage, gift, or consideration paid
to the former County officer or emPIOY~
~(~~:)
Date: ~~/~7_
STATE OF FLore I D fJ
COUNTY OF /312Gg{()II/~b
PERSONA~LY APPEARED BEFORE ME, the undersigned authority,
77/Oln(t 5 w- t2uODtJ:tJu./..P1Who, after first being sworn by me, affixed
his/~er signature (name of ~diVidual~ the space
provJ.ded above on this II - day of - , 19-Z2--
~/Z~",,"~d'cv'-cJ
T Y PUBLIC
My commission expires:
..... -..-
NOTARY PUBLIC STATE OF FLORIDA
11Y CGr-1:-1! 5S ION EXP . MAy 20.1993
PONDED THRU GENERAL INS. UNO.
07/25/91 LOBBYING AND CONFLICT OF INTEREST CLAUSE
00425 - 1
~
_.~~
,
. -----. --.------------.- --
, I,~~~ U/~..,,//~~/7LI' of the city of ~".,(,.,$eLU~( ;::z
according to law on my oath, and under penalty of perjury, depose
and say that;
1.) I am f///b /;;?6S/Z:S::~ of the firm of hR.$r
~~/C~ /If~'A~ ~~~~~ /~', the bidder making the Proposal for the
project 'd crib d in the notice for calling fo: bids for ~~~~
, and that I executed the sald proposal Wl h
full authority to do so;
2.) the prices in this bid have been arrived at
independently without collusion, consultation, communication or
agreement for the purpose of restricting competition, as to any
matter relating to such proces with any other bidder or with any
competitor;
3.) unless otherwise required by law, the prices which have
been quoted in this bid have not been knowingly disclosed by the
bidder and will not knowingly be disclosed by the bidder and will
not be knowingly disclosed by the bidder prior to bid opening,
directly or indirectly, to any other bidder or to any competitor;
and
4.) no attempt has been made or will be made by the bidder
to induce any other person, partnership or corporation to submit,
or not to submit, a bid for the purpose of restricting
competition;
5. )
correct,
upon the
awarding
the statements contained in this affidavit are true and
and made with full knowledge that Monroe County relies
truth of the statements contained in his affidavit in
contracts for said project.
Bidder)
STATE OF r~L-OfCIDIf
COUNTY OF /~ f2u W /l-Ie-D
._ PERSONALLY APPEARED ~FORE ME, the undersigned authority, _
/7f(l f/J--l N S (/LJ. R. U b.L) G-;;eoL{), .-Lt.L--who, after first being sworn by me,
(name of individual signing)
affixed hi~/her Signatu~pace
/ / r - day of -
provided above on this
, 19 9 1.---.
1ft .. /
ff~ /u~
, ~. OTARY PUBLIC
NOTARY PUBlIC~STATE OF FlORIDA
My commission expires: My CGrlMISSION EXP. MAy 20,1993
BONDED THP.U GENFlMl INS. UPro.
11/20/91
NON-COLLUSION AFFIDAVIT
00430 - 1
~
THE AMERICAN INSTITUTE OF ARCHITECTS
I
BOND NO. 000883978-92
AlA Document A310
Bid Bond
KNOW All MEN BY THESE PRESENTS, that we First Choice Roofing Systems, Inc.
as Principal, hereinafter called the Principal, and International Fidelity Insurance Company
a corporation duly organized under the laws of the State of New Jersey
as Surety, hereinafter called the Surety, are held and firmly bound unto
Monroe County
5 % of bid amount, not to exceed
as Obligee, hereinafter called the Obligee, in the sum of
Thirty TWo Thousand Five Hundred Dollars & 00/100------ Dollars ($ 32 500.00 l.
for the payment of whIch sum well and tryJy to be made, the said Principal and the said Surety, bind
ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by
these presents.
WHEREAS, the Principal has submitted a bid for
Monroe County Detention Center
NOW, THEREFORE, .f the Obligee shill iccept the bid of the Principii ind the PrinCipAl shall enter into i ContrAct
with the Obligee in iCcordince with the terms of such bid, And give such bond or bonds as may be specified in the bidding
or ContrAct Documents with good ind sufficient surety for the fAithful performAnce of such ContrAct And for the prompt
payment of labor And mAteriA' furnished in the prosecution thereof. or in the event of the failure of the Principal to enter
sum Contract And give such bond or bonds, if the Principal ShAll PAY to the Obligee the difference not to exceed the penAlty
hereof between the Amount specified in ~id bid ind such lArger imount for which the Obligee may in good faith contract
with another party to perform the Work covered by said bid, then this obligAtion shall be null And void, otherwise to remAin
in full force And effect.
20th
day of April
19 92
(Witness)
Insurance Company
(Sea/)
~~~
Burton Harris
(Tide) Attorney-In-FacL&
Fla. Resident Agent #0336265901
AlA DOCUMI:NT A31. . BID BOND. AlA. . FEBRUARY 1970 ED . THE AMERICAN
INSTITUTE Of ARCHITECTS, 173S N.Y. AVE., N.W., WASHINGTON, D. C. 20006
1
sbai - 208
SE\r~URlrv BOND ASSOCIATES, INC., 10131 S.W. 40th Street, Miami, Florida 33165-3947 (305) 552-5414
.. ._- "-'-_.-"'--'-~--'--""-,~--,-,,",--~--, ..-.-...-.---. -.------.-....-.--.-.-....., ..... - -.,.-
THE AMERICAN INSTITUTE OF ARCHITECTS
.
AlA Document A201/CM
CONSTRUCTION MANAGEMENT EDITION
General Conditions of the Contract
for Construction
THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENcEs; CO,\'SULTATlON
WITH AN ATTORNEY IS ENCOURAGED.
1980 EDITION
TABLE OF ARTICLES
1. CONTRACT DOCUMENTS
8. TIME
2. ADMINISTRATION OF THE
CONTRACT
9. PAYMENTS AND COMPLETION
3. OWNER
10. PROTECTION OF PERSONS AND
PROPERTY
4. CONTRACTOR
11. INSURANCE
5. SUBCONTRACTORS
12. CHANGES IN THE \\lORK
6. WORK BY OWNER OR BY
SEPARATE CONTRACTORS
13. UNCOVERING AND CORRECTION
OF WORK
7. MISCELLANEOUS PROVISIONS 14. TERMINATION OF THE CONTRACT
rTn CAUTION: You should use an original AlA document which has this caution printed in red.
~ An original assures that changes will not be obscured as may occur when documents are reproduced.
Copyright 1975, @ 1980, by The American Institute of Architects, 1735 New York A\enue, N.\\'., Washington, D.C. 20006.
Reproduction of the material herein or substantial quotation of its provisions without" r;tten pemission of the AlA violates
the copyright laws of the U:1;ted Stales and will be subject to legal prosecution.
AlA DOCUMENT A201/CM . GESERAL CO,>DITIONS Of THE CONTRACT fOR CONSTRUCT JON
CONSTRUCTION MANAGEMENT EDITION . JUNE 1980 EDITION . AIA~ . @ 19BO . THE
A.'v\ERICAN INSTITUTE Of ARCHITECTS, 1;35 NEW YORK AVE., N.W., WASHINGTON, D.C 2O:Xl6
A201/CM -1980 1
Acceptance of Defective of Non.Conforming Work. .6.2.2, 13.3
Acceptance of Work................. .9.5.5, 9.8.1, 9.9.1, 9.9.3
Access to Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.3.6, 6.2.1
Accident Prevention. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .2.3.5, 10
Acts and Omissions............. .4.18.3,7.4, 7.6.2, 8.3.1, 10.5
Addenda, Definition of .............................. .1.1.1
Additional Costs, Claims for ......................... ..12.3
ADMINISTRATION Of THE CONTRAO ............. .2,4.3.3
Agreement, Extent of .............................. .1.1,1.2
All Risk Insurance.. ., .,. . .. . .. . ... ....... .. . . .. . .,. .11.3.1
Allowances .......................................... .4.8
Applications for Payment, Contractor's. ., . .. .2.3.8,9.2.1,9.3.1,
9.3.3.,9.5.3,9.7.1,9.8.2,9.9.1,9.9.3,9.9.5, 11.3.1, 14.2.2
Applications for Payment,
Project................ .2.3.8,2.3.9,9.3.1,9.4,9.6.1,9.7.1
Approvals. . . . . .. .. .. .. ., ..... . .2.3.18. 3.4, 4.3.3, 4.5, 4.12.4,
4.12.5,4.12.6,4.12.8,4.13.2,7.7,9.3.2
Arbitration. . . . . ...2.3.15, 2.3.23, 6.2.5. 7.9, 8.3.1, 11.3.7, 11.3.3
Architect, Definition of .... . ... . . .. . . .. . ., . . . . . . . . . . . . . .2.1
Architect, Extent of Authority....... .2.3,3.4,4.12.8,5.2, 7.7.2,
8.1.3,8.1.4,8.3.1,9.2,9.3.1,9.4,9.5.3,9.6,9.8, 9.9.1, 9.9.3,
12.1.1,12.1.4,12.3.1,12.4.1,13.1,13.2.1,13.2.5,14.2
Architect, Limitations of Authority and Responsibility. . . . .2.3.2
through 2.3.5,2.3.13 through 2.3.18, 2.3.22, 4.12.b,
5.2.1,9.4.2,9.5.4,9.5.5,12.4
Architect's Additional Services. ..3.4,7.7.2,13.2.1, 13.2.5,14.2.2
Architect's Approvals. .., . .2.3.18,3.4,4.5,4.12.6,4.12.8, 4.18.3
Architect's Authority to Reject Work... .2.3.16,4.5,13.1.2,13.2
Architect's Copyright. . ., . ., ....... .. ... . .. .. . . . . . . . . . . .1.3
Architect's Decisions. . . . . . . . .... ..2.3.10 through 2.3.16, 7.7.2,
7.9.1,9.2,9.4,96.2,9.8.1,12.1.4,12.3.1
Architect's Inspections........ .2.3.16,2.3.21,9.4.2,9.8.1,9.9.1
Architect's Instructions......... .2.3.16,2.3.19,7.7.2, 12.4, 13.~
Architect's Interpretations........ .2.3.10 through 2.3.13, 12.3.2
Architect's On.Site Observations...... .2.3.4,2.3.6,2.3.9,7.7.1,
7.7.4,9.4.2,9.6.1,9.9.1
Architect's Relationship with Contractor. . . . . .1.1.2, 2.3.5, 2.3.6,
2.3.13,2.3.16,4.3.3,4.5,4.7.3,4.12.6,4.18,11.3.6
Architect's Rplationship with
Subcontractors................. .1.1.2,2.3.16,9.5.3,9.5.4
Architect's Representations........ ..... . . . .9.4.2, 9.6.1, 9.9.1
Artistic Effect...................... .1.2.3,2.3.14,2.3.15,7.9.1
Attorneys'Fees .......................... .4.18.1, 6.2.5, 9.9.2
Award of <.epar3te ContractS. ... . ..... .., . ... . .. ., . . .. .6.1.1
Award of Subcontracts and Other Contracts for
Portions of the Work. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .5.2
Boiler and Machinery Insurance...................... .11.3.2
Bonds, Lien ....................................9.3.3, 9.9.2
Bonds, Performance, labor and Material Payment. . . . .7.5,9.9.3
Building Permit....................................... .4.7
Ctrtificate oi Substantial Completion... .9.8.1,9.8.2,9.8.3,9.8.4
Certificates of Inspection, Testing or Approval........... .7.7.3
Certificates of Insurance....................... .9.3.2,11.1.4
Certificates for Payment, Project. . .. .. . .2.3.9,2.3.21,9.4,9.5.1,
9.5.5,9.6.1,9.7.1,9.8.2,9.9.1,9.9.3, 12.1.4,14.1.1, 14.2.2
Change Orders.............. .1.1.1,2.3.19,3.4,4.8.2.3,4.11.1,
52.3,7.7.2,8.3.1,9.7,9.9.3,11.3.1,11.3.5,11.3.7,
12.1,122.1,12.3.1,13.1.2,13.2.5,13.3.1
Change Orders, Definition of ............. . . . . . . . . . . . .12.1.1
CHANGES IN THE WORK................. .2.3.19,4.11.1,12
INDEX
Claims for Additional Cost or Time.... .8.3.2, 8.3.3, 12.2.1, 12.3
Claims for Damages.............. .6.1.1, 6.2.5, 7.4, 8.3, 9.6.1.2
Claims and Disputes Between Contractor
and Owner............. .2.3.12,2.3.15,2.3.23,4.18.2,7.9
Cleaning Up ..................................... .4.15, 6.3
Commencement of the Work, Conditions Relating to .3.2.1,4.2,
4.7.1,4.10,5.2.1,6.2.2,75,9.2,11.1,11.3.4
Communications. .. . . ., ., . . ., . . .. . . . . .2.3.2, 3.2.6, 4.9.1, 4.16
Completion,
Conditions Relating to.. .2.3.21, 4.11,4.15,9.4.2,9.9,13.2.2
COMPlETION, PAYMENTS AND..........................9
Completion of the Project, Substantial...... .8.1.4, 9.8.3, 9.B.4,
9.9.4,9.9.5,9.9.6,13.2.1,13.2.2
Completion of the Work, Substantial....... .2.3.21, 8.1.1, 8.1.3,
8.2.2,9.8,9.4.2,9.9.3,11.3.9
Compliance with laws........... .1.3,2.1.1,4.6,4.7,4.13,7.1,
7.6.1,7.7.1,10.2.2,14.2.1
Concealed Conditions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .12.2
Consent, Written ................... .2.3.22,4.14.2,7.2,7.6.2,
9.8.1,9.9.2,9.9.3,11.3.9
Construction Manager, Definition of .....................2.2
Construction Manager's Approval.............. .4.10.1,4.13.2
Construction Manager's
Additional Services........ .3.4,7.7.2,13.2.1,13.2.5,14.2.2
Construction Manager's Authority and Responsibility. . . . .2.3.3,
2.3.5,2.3.16,2.3.10,2.3.22,4.8.1,4.17.1,4.1B.3,
7.7.4,9.2,10.2.5,11.3.6,12.1.4,14.1.1
Construction Manager's Confirmation. . . . . . . . . . . . . . . . . . .9.9.3
Construction Manager's Consultation with the Architect .2.3.12,
2.3.16,2.3.19,2.3.21,3.4.1,9.6.1,9.8.1,12.1.4,12.3.1,1
Construction Manager's Coordination and Scheduling. . . . L__.I,
2.3.17,4.3.1,4.10.1,4.12.4
Construction Manager's Decisions. . . . . . ., . .. .,. .. . .6.3, 8.3.1
Construction ,"'1anager's Determinations. .2.3.3, 6.3.1, 7.7.2,8.3.1
Construction Manager's Interests............... .11.3.1,11.3.2
Construction Manager's Recommendations... .2.3.8, 2.3.9, 9.3.1,
9.4.1,9.7.1,9.9.1,12.1.1
Construction Ma!1ager's Relationship
with Architect.................. .1.1.2, 2.3.1, 2.3.3, 2.3.21
Construction Manager's Relationship with Contractor. . . . .1.1.2,
2.3.15,2.3.16,3.2.6,4.2.1,4.3.3,4.5,4.7.3, 4.11.1, ".12.4, 4.12.6,
4.16.1,4.17.1,4.18,5.2,6.2.1,6.2.2,7.6.2,7.7, 7.9.1, 7.9.2,
8.3.1,8.3.2,9.4.1,9.5.4,9.8.1,9.9.1,10.2.6,11.1.4,11.36
Construction Manager's Relationship
with Subcontractors. . . . . . . . . . . . . . . . . . .1.1.2, 2.3.16, 5.3.1
Construction Manager's Review. .. . . . . . . . . . .2.3.8,2.3.17, 5.2.1
Construction Schedule, Contractor's. . . . . . . . . . . . . . . . . . . . .4.10
Contract, Definition of .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .1.1.2
Contract Administration. . . . . . . . . . . . . . . . . . . . . . . . . . .2.3, 4.3.3
Contract Award and Execution,
Conditions Relating to..... .4.7.1, 4.10, 5.2, 7.5, 11.1, 11.3.4
CONTRACT DOCUMENTS ..........;....................1
Contract Documents,
Copies Furnished and Use of .., . ~. . . . . . . . . .1.3, 3.2.5, 5.3
Contract Documents, Definition of .................... .1.1.1
Contract Modifications. . . . . . . ... . .. . . . . . . . . . . .... . .1.1.1, 12
Contract Sum, Definition of ...........................9.9.1
Contract Termination. .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . ., .14
Contract Time, Definition of . . .. . . . . . . . . . . . . . . . . . . . . . . .8.1.1
CONTRACTOR .........................................4
Contractor, Definition of ......................... .4.1,6.1.2
Contractor's Construction Schedule. . . . . .. . . . . . . . . . . . . . .4.10
2 A201/CM-1980
AlA DOCUMENT A201/CM . GENER-"l COl"DI110NS OF THE COSTRACT fOR COI"STRU,-. ,ON
CONSTRUCTION MA"AGEMEI"T EDI110N . JUNE 1980 EDITION . ^I.,-! . <01980 . THE
AMERICAN INSTITUTE OF ARCHITECTS. 1,35 NEW YORK AVE., N.W.. WASHI"-'GTON, D.C. :?Q'Xl6
.- <l.,'r: ll...;'~".-'s'''''': -~. r'cr:.r"~".~c" 11?<?~..1.'.~ (~-~"'~-:Cl,t ;;- .<": -:,. 'di~ S
. ~0 !:.-'..-.' r-,..~~rs: ,',,,>,,
Contractor's Employees. . . . . .43.2,4.4.2,4.8.1,4.9,4.18, 10.2.1
through 10.2.4, 10.2.6, 10.3, 11.1.1
Contractor's liability Insurance........................ .11.1
Contractor's Relationship with Architect. . . . . .1.1.2, 2.3.5, 2.3.6,
2.3.13,2.3.16,4.3.3,4.5,4.7.3,4.12.6,4.18,11.3.6
Contractor's Relationship with Construction ,\1anager . ... .1.1.2,
2.3.15,23.16,3.2.6,4.2.1,4.3.3,4.5,4.7.2, 4.11.1, 4.12.4,
4.12.6,4.16.1,4.17.1,4.18,5.2,6.2.1,6.2.2,7.6.2, 7.7, 7.9.1,
7.9.2,8.3.1,8.3.2,9.4.1,9.5.4,9.8.1,9.9.1,10.2.6, 11.1.4, 11.3.6
Contractor's Relationship with Separate Contractors
and Owner's Forces........................... .3.2.7,6
Contractor's Relationship with
Subcontractors. . . . . .. . . .1.2.4, 5.2, 5.3,9.5.2, 11.3.3, 11.3.6
Contractor's Representations.......... .1.2.2,4.5,4.12.5,9.3.3
Contractor's Re~ponsibility for Those
Performing the Work.................... .4.3.2,4.18, 10
~ontractor's Review of Contract Documents. . . .1.2.2, 4.2, 4.7.3
Contractor's Right to SlOp the Work. . . . . . . . . . . . . . . . . . . . .9.7
Contractor's Right to Terminate the Contract. . . . . . . . . . .. .14.1
Contractor's Submittals.............. .2.3.18,4.10,4.12,5.2.1,
5.2.3,9.2,9.3.1,9.8.1,9.9.2,9.9.3
Contractor's Superintendent. . . . . . . . . . . . . . . . . . . . . . .4.9, 10.2.6
Contractor's Supervision and
Construction Procedures. . . . . . . . . .1.2.4, 2.3.5, 4.3, 4.4, 10
Contractual liability Insurance................ .... .,. .11.1.3
Coordination and Correlation........ .1.2.2, 1.2.4, 4.3.1, 4.10.1,
4.12.5,6.1.3,6.2.1
Copies Furnished of Ora" in!;s and Specifications. .1.3, 3.2.5, 5.3
Correction of Work.................... .3.3,3.4,10.2.5,13:2
Cost, Definition of ................................. .12.1.4
Costs...... .3.4, 48.2, -1.15.2,5.2.3,61.1,6.2.3,6.2.5,6.3,7.7.1,
7.7.2,9.7,11.3.1,11.3.5,12.1.3,12.1.4,12.3,13.1.2, 13.2, 14.2.2
Cutting and Patching oi Work............... .... . ..... .4.14
Damage to the Work........... .4.14.2,10.2.1.2,10.2.7,11.3.1
Damage to Work............ .4.14.2, 4.18.1, 6.2.4,625,9.6.15,
102.1.3,10.22,10.25, 10.3,13.2.6
Damages, Claims for................. .6.1.1, 6.2.5,7.4,9.6.1.2
Damages for Delay.............:........... .6.1.1,8.3.4,9.7
Day, Definition 01 .. ................................. .8.1.5
Decisions of tne Architect........ .2.3.10 through 2.3.16, 7.7.2,
7.9.1,92,9.4,9.6.1,9.8.1,12.1.4,12.3.1
Decisions of the Construction .\\anager . . . . .. . . . . . . . .6.3, 8 3.1
Defective or 'on-Cuniorming Work, Acceptance,
Rejection and Correction 01 . . .. . .2.3.4,2.3.16, 3.3, 3.4, ';:;,
6.2.2,6.2.3,9.6.1.1,9.9.4.2,13
Definitions.............. .1.1, 2.1, 2.2,3.1,4.1,4.12.1 through
4.12.3,5.1,6.1.2,8.1,9.1.1,12.1.1,12.1.4
Delays and Extensions of Time. . . . . . . . . . . . . . . . . . . . . . . . . .8.3
Disputes................ .2.3.12, 2.3.15, :.'.3.23, 6.2.5, 6.3, 79.1
Documents and Samp:e~ at the Sill' .......... .., . .. .... .4.11
Drawings and Specifications,
Use and Owner>hip of ............... .1.3,3.2.5,4.11,5.3
Easements. . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . .3.2.3
Emergencies ........................................ .10.3
Employees, Contractor's.......... .4.3.2, .:'4.4, 4.8.1, 4.9, 4.18,
10.2.1 through 10.2.4, 10.2.6, 10.3, 11.1.1
Equipment, Labor, Materials and..... .1.1.1, 4.4, 4.5, 4.12, 4.13,
4.15.1,6.2.1,9.3.2,9.3.3,9.6.1.3,9.9.2,
10.2.1.2,11.3.1,12.1.4,13.2.2,13.2.5,14
Execution and Progress of the Work........ .1.1.3,1.2.3,2.3.4,
2.3.5,2.3.11,4.2,4.4.1,4.5,4.7.1,6.2.2,7.9.3,
8.2.2,8.3.1,8.3.2,9.6.1,10.2.3,10.2.4,14.2
Execution, Correlation and Intent of
the Contract Documents.. . . . . . . . . . . . . . . . . . . . .1.2, 4.7.1
Extensions of Time....................... .8.3,12.1.1,12.1.2
Failure of Payment by Owner. . . . . . . . . . . . . . . . . . . . . . .9.7, 14.1
Failure of Payment of Subcontractors. . . . . .9.6.1.3, 9.9.2, 14.2.1
Failure to Carry out the Work... . ... . .. . . . . . . .... ..... .2.3.5
Final Completion and Final Payment. . .2.3.15,2.3.21,9.9,13.3.1
Financial Arrangements, Owner's . . . . . . . . . . . . . . . . . . . . . . .3.2.1
Fire and Extended Coverage Insurance...........,.... .11.3.1
Governing law. . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . .7.1
Indemnification.. .. .. .. . .. .... . . . . .. . . .4.17, 4.18, 6.2.5, 9.9.2
Identification of Contract Documents.. . . . . . ., .. . . ..... .1.2.1
Identification of Subcontradors and Suppliers. . . . . . . . . .. .5.2.1
Information and Services Required of
the Owner.......... .............. .3.2, 6.1, 9, 11.2, 11.3
Inspections............. .23.16,2.3.21,4.3.3,7.7,12.1.2,9.9.1
Instructions to Bidders............................... .1.1.1
Instructions to the Contractor. . . . . . . . . .2.3.2,3.2.6,4.8.1,7.7.2,
12.1.2,12.1.4
INSURANCE ..............................,.......9.8.1,11
Insurance, Contractor's liability ....................... .11.1
Insurance, loss of Use. . ..... .. , . . . . .. . . . . . .. .. . . . " .. .11.4
Insurance, Owner's liability. . . . . . . . . . . . . . . . . . . . . . .. . . . .11.2
Insurance, Property.................................. .11.3
Insurance, Boiler and Machinery............. ........ .11.3.2
Insurance, Special Hazards.......................... .11.3.5
Insurance, Stored Materials.... . . . ... . .. . . . .. . ...9.3.2,11.3.1
Insurance Companies, Conse~tto Partial Occupancy. . .. .11.3.9
Insurance Companies, Settle'-'ent With. . .. .. . . .. .., ... .11.3.8
Intent 01 the Contract
Documents............. .1.2.3,2.3.10,2.3.13,2.3.14,12.4
Interest ......................... 78
Interpretations, Written . . . . . . . .1.1.1: 2~i1'1', '2.3.'1'2,' 2.3:; 3: ; 2:4
labor, \\aterials and Equipm~'t ...... .1.1.3, 4.4, 4.5, 4.12, 4.13,
4.15.1,6.2.1,9.3.2,9.3.3,9.6.1.3,9.2.2.10.2.1.2,
11.3.1,12.1.4,13.2.2,13.2.5,14
labor a'1d .\1aterial Payment Sond ...................... .7.5
Labor D'~putes . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . .. . ... .. .8.3.1
Laws a'1d Regulations............ .1.3,2.1.1,4.6,4.7,4.13,7.1,
. 7.6.1,7.7.1,10.2.2,14
Liens ....................................9.3.3, 9.9.2, 9.9.4.1
limitatIons ot Authority................. .2.3.2,11.3.8,12.4.1
limitations of liability.......... .2.3.13, 2.3.16, 2.3.18, 3.3, 4.2,
4.73. -1.12.6,4.17,4.18,6.2.2,7.6.2,9.4.2,
. . . ?5.4, 9.9.4, 9.9.5,102.5,11.1.2,11.3.6
limitations of Time, Genera: ....... .2.3.11,2.3.18,3.2.1,3.2.4,
4.2,4.7.1,4.7.3,4.12.4,4.15.1,5.2.1,5.2.3,6.2.2,7.4,
7.7,7.9.2,82,9.5.2,9.6.1,9.8,9.9,11.3.1,11.3.4,
. .. . 11.3.9,12.1.4,12.4,13.2.1,13.2.2,13.2.5
llmltat.ons of Time, Speciii~ ........ .3.4,4.10,7.9.2,8.2,8.3.2,
8.3.3, 9.~. 9.3.1,9.4.1,9.5.1,9.7,11.1.4,11.3.8,
. . . ;2.2,12.3.1,13.2.2,13.2.7,14.1,14.2.1
Llmltat:ons, Statutes of ...................7.9.2, 13.2.2, 13.2.7
Loss ot Use Insurance................................ .11.4
AlA DOCUMEST A201iCM . G[S[R.~L COSDITIO'-S Of TH[ CO,-TR.~Cl fOR CO,qRl CTiON
CO!\:STRUCTIO'- \\A!\:AGE \\[,T [DITtOS . JL.:'E 1980 [01110' . .',lAc!> . @1930 . THE
Af\\[RICA"l I!\:STITL.:TE OF ARCHITECTS, 1735 ...;E\\' )ORK AV[ . '\\', \\ ,",Slil'GTON, D.C. :0006
A201/CM-1980 3
'\Iaterials, labor and Ec;uipment ...... .1.1.3, 4.4, 4.5, 4.12, 4.13,
4.15.1.6.2.1,9.32,93.3,9.6.1.3,9.9.2,
10.2.1.2,11.3.1,12.1.4,13.22,132.5,14
Material Suppliers....................... .4.12.1,5.2.1,9.3.3
,"'Ieans, Methods, Techiques, Sequences and
and Procedures c/ Construction. . . . . . . . .2.3.5, 4.3.1, 9.4.2
Minor Changes in the Work............... .1.1.1,2.3.19,12.4
MISCELLANEOUS PROVISIONS ...........................7
Modifications, Defini:;on of .......................... .1.1.1
Modifications to the Contract....... .1.1.1,1.1.2,2.3.2, 2.3.22,
4.11.1,4.7.3,12
Mutual Responsibility ..................................6.2
/';on.Conforming \"'o~k, Acceptance of Defective or ...... .13.3
/';otice, Written........... .2.3.11,2.3.15,4.2, 4.7.3, 4.7.4, 4.9,
4.12.6,.4.12.7,5.2.1,7.3,7.4,7.9.2,8.1.2,8.3.2,8.3.3,
9.4.1,9.6.1,9.7,9.9.1,9.9.5,10.2.6,11.1.4,11.3.1,
11.3.5,11.3.7,11.3.8,12.2,12.3,13.2.2,13.2.5,14
~otices, Permits, Fees and............ .2.3.2, 4.7, 4.13.1, 10.2.2
"otice of Testing and Inspection~ ....................... .7.7
"otice to Proceed................................... .8.1.2
Ob~ervations, Contractor's...................... .1.2.2, 4.7.3
Occupancy........................ .8.1.3,8.1.4,9.5.5,11.3.9
On.Site Inspections
by the Architect.......... .2.3.16,2.3.21,9.4.2,9.8.1,9.9.1
On-Site Observations by the Architect. ..... . .2.3.4,2.3.6,2.3.9,
7.7.1,7.7.4,9.4.2,9.6.1,9.9.1
Orders, Written................. .3.3,4.9,12.1.4,12.4.1,131
O\\'NER ...............................................3
Owner, Definition ................................. .3.1
Owner, Information a~d Scrl'ice~
Required of the......... .3.2, 4.7.1, 6.1.3, 6.2,9,11.2,11.3
0" ner's Authority....... .......... .2.3.21, 7.7.2,9.3.1,9.3.2,
9.8.1,11.3.8,12.1.2,12.1.4
Owner's Financial CaiJ3bility ..........................3.2.1
Owner's liability In~;;rance ........................... .11.2
Owner's Relationship with Subcontractors.. . . . . . . . .1.1.2, 9.5.4
Owner's Right to Carey Out the Work. . . . . . . . . . . . . .3.4, 13.2.4
Owner's Right to Clfa" Up ......... . . . . .. . . . . . . . .4.15.2, 6.3
Owner's Right to Pe"J~m Work and to
Award Separate Contracts.......................... .6.1
O\\ner's Right to Tc'"'''nate the Contract................ .14.2
0\\ nefs Right to 51' , 1',e Work. . . . . . . ... . . . . . . . .. . . . . . .3.3
Ownership 'and Use :;: Docume:1ts .. . . . . . . . . . . . .1.3,3.2.5, 5.3
Patching of Work, C:tlng and........................ .4.14
Pa:ents, Royalties anc ............................... .~.17.1
Pa\ men! Bond labv and .\Iatcial . . ., . ... . . . . . . . . . . . . . . .7.5
Pa~ment, Cont'raclor; .-\pplications for..... .2.3.8,9.2,9.3.9.4,
9.5.3,96.1,9.7.1, 982, 9.9.1,9.9.5,1.-1.:12
Payment, Project Ce';:iicates for....... .2.3.9,2.3.21,9.4,9.5.1,
9.55,9.61, Q.7.1, 982. 9.9.1, 9.93, 12.1.4, 14.1.1, 14.2.2
Pa\ment, Failure of ............... .9.5.2,9.6.1.3,9.7,9.9.2,14
Pa~ment Final.................... 2.3.15, 2.3.21,9.9, 13.3.1
Pa;'ment~, Progress......... .~.8, 7.9.3, 9.55,9.8.2,9.9.3,12.1.4
PA YMENTS AND CO\WlETION ..........................9
Pavments to Subco~~:actors ......... .9.5.2,9.5.3,9.5.4,9.6.1.3,
. 11.3.3,1.U.l
Payments Withheld ........................ . . . . . . . . . . . .9.6
Performance Bond and labor and 1,laterial Payment Bond . . .7.5
Permits, Fees and Notices............. .3.2.3,4.7,4.13,10.2.2
PERSONS AND PROPERTY, PROTEClION OF . . . . . . . . . . . . . .10
Product Data, Definition of ......................... .142.2
Product Data, Shop Drawings, Samples and. . .2.3.18,4.2.1,4.12
Progress and Completion................... .2.3.4,7.9.3,8.2
Progress Payments......... .7.8,7.9.3,9.5.5,98.2,9.9.3,12.1.4
Project, Definition of ............................... .1.1.4
Project Construction Schedule. . . . . . . . . . . . . . . . . . . . . . . . . .4.10
Property Insurance................................... .11.3
PROTECTION OF PERSONS AND PROPERTY. . . . . . . . . . . . . .10
Record Documents................ .................. .4.11
Regulations and laws.............. .1.3,2.1.1,4.6,4.7,4.13.1,
7.1, 10.2.2,14
Rejection of Work ........................2.3.16, 4.5.1, 13.2
Releases of Waivers and liens. . . . . . . . . . . . . . . . . . . .9.9.2, 9.9.4
Repre,entations ........... .1.2.2,4.5,4.12.5,9.4.2,9.6.1,9.9.1
Representatives... .2.1,2.2,2.3.2,2.3.22,3.1,4.1,4.9,5.1,9.3.3
Re,-ponsibility ior Those Periorming the Work.... .2.3.5,4.3.2,
6.1.3,6.2,9.8.1
Retainage ..................... .9.3.1,9.5.2,9.8.2,9.9.2,9.9.3
Review of Contract Documents by the Contractor...... .1.22,
42,4.7.3
Reviews of Contractor's Submittals by Owner and
Architect.............. .2.3.18, 4.10, 4.12, 5.2.1, 5.2.3, 92
Rights and Remedies. . . . . . . . . . . . .1.1.2, 2.3.15, 2.3.16, 3.3, 3.4,
5.3,6.1,6.3,7.6,7.9,8.3.1,9.6.1,9.7
10.3,12.12,122,13.2.2,14
Royalties and Patents................................ .4.17
Safety of Persons and Property. . . . . . . . . . . . . . . . . . . . . . . . .10.2
Saiety Precautions and Programs................. .2.3.5,10.1
Samples, Definition of .............................. .412.3
Samples, Shop Drawings, Product Dala and..... .2.3.17,2.3.18,
4.2,4.12
Samples at the Site, Documents and. . . . . . . . . . . . . . . . . . . .4.11
Schedule, Contractor's Construction........ ............ .4.10
Schedule, Project Construction. . . .. . . . . . . . . . . . . . . . . . . . .4.10
Schedule oi Values ....................................9.2
Separate Contracts and Contractors.... .4.14.2,6,11.3.6,13.1.2
Shop Drawings, Definition.......................... .4.12.1
Shop Dra\\'ings, Product Data and Samples............ .23.17,
2318.42. .l12
Site, Use oi ................... ................. .4.13,62.1
Site Inspections........... .1.2.2,2.3.4,23.21,1.7,9.8.1,9.9.1
Site Visits, Alchitect's ................ .2.3.4, 2.3.6, 2.3.9, 7./.1,
7.7.4,9.4 2,9.6.1,9.9.1
Special Inspection and Te<ting ................... .2.3.16,7.1
Special Hazards Insurance..... .. ...... ...... . ....... .11.3.5
Specifications............... ........ . . ..... .1.1.1,12.4,1.3
Statutes oi limitations................... .1.9.2. 132.2, 132.1
Stopping the Work..................... .33, 97.1, 10.3, 14.1
Stored .\\aterials ........... .f).2.1, 9.3.2, 102.1.2,11.3.1,132.5
SUBCONTRACTORS ....................................5
Subcontractors, Dei,nition of ......................... .5.1.1
Subcontractors, Work by ..............1::'.4, 2.3.5, 4.3.1, .l 3.2
Subcontractual Relations ...............................5.3
Submittals................. .1.3,2.3.18,4.10,4.12,5.2.1,52.3,
92,931,9.81,9.9.1,9.9.3
4 A201/o.i-1980
AlA DOCUMENT A201!CM . GE'ERAl CO~DI110'S OF TH[ CO'l RACT fOR CCJ'~1RL'ClI0'
CO',~Rl)CTIO." .\\;'AGE\\['T [DITIO~ . jL:,E 1980 EDITIO' . AlA" . (['1980 . THE
'\\\E':IC-\~ INSTITUTE OF .-\RCHITECT~. T735 '[I\' YORK .~\'[. '1\'., \\'A~HI'GTO~. D.C ;(\X'1(,
1':'!...Q"
Subrogation, \Vaiver of ..............................11.3.6
Substantial Completion of the Project. . . . . . . .8.1.4, 9.8.3, 9.8.4,
9.9.4,9.9.5,9.9.6,13.2.1,13.2.2
Substantial Completion of the Project, Definition of ..... .8.1.4
Substantial Completion of the \\ork ....... .2.3.21,8.1.1,8.1.3,
8.2.2,9.42,9.8,9.9.3,11.3.9
Substantial Completion of the Work, Definition of . . . . . . . .8.1.3
Substitution of Subcontractors. .. . . . . . . . . . . . . . . . . .5.2.3, 5.2.4
Substitution of the Architect..... . .. . .. . . . . ., . . . " . . . .2.3.23
Substitution of the Construction Manager.. .... . . . .. . . .2.3.23
Substitutions of Materials....................... .4.5, 12.1.4
Sub.subcontractors, Definition oi .. . . . . . . . . . . . . . . . . . . . . .5.1.2
Subsurface Conditions.............................. .12.1.1
Successors and Assigns. . . . . . ... . . . . . . . . . . . . . . . . . . . . . . . .7.2
Supervision and Construction Procedures. . . . . . . . . .1.2.4, 2.3.:>,
4.3, 4.4, 10
Superintendent, Contractor's. .. . . . . . . . . . . . . . . . . . . .4.9, 10.2.6
Surety, Consent of ..............................9.9.2, 9.9.3
Surveys. . . . . . . . . . . . . .. . . .. .... . ... ..... . .. . . . .3.2.2, 4.18.3
Taxes ................................................4.6
Termination by the Contractor... . . . .. . . . . . . . . . . . . . . . . .14.1
Termination by the Owner............................ .14.2
Termination of the Architect........................ .2.3.23
Termination of the Construction \\anager ......... .... .2.3.23
TERMINATION OF THE CONTRACT. . . . . . . . . . . . . . . . . . . . . .14
Tests..... .._.............. ......... .2.3.16,4.3.3,7.7,9.4.2
TIME ..................................................8
Time, Definition of ....................................8.1
Time, Delays and Extensions of ......... .8.3,12.1,12.3,13.2.7
Time limits, Specific.............. .3.4,4.10,7.9.2,8.2,8.3.2,
8.3.3,9.2,9.3.1,9.4.1,9.5.1,9.7,11.1.4,
11.3.8,12.2,12.3.1,13.2.2,13.2.7,14.1,14.2.1
T rtle to Work ..................................9.3.2, 9.3.3
UNCOVERING AND CORRECTION OF WORK. . . . . . . . . . . . .13
Uncovering of Work. . . . . . . . . . . . . . . . . . . . . . . . . .. . . .. .. .13.1
Unforseen Conditions........................... .8.3.1,12.2
Unit Prices.. . . . . .. . . . . . . . . . . . . . . . . . . . .... . .12.1.3.2, 12.1.5
Use of Documents. . . . . . . . .. . . . . . .. . . . . .. . . . . .1.3, 3.2.5, 5.3
Use of Site. .. . . . . .. . . . . . . . . . . . . . . . . . . .. . . . . .. . .4.13, 6.2.1
Values, Schedule of ....... . . . . . . . . . . . . . . . . . . . . . . . . . . . . .9.2
\-Vaiver of Claims by the Contractor. . . .7.6.2, 8.3.2, 9.9.5, 11.3.6
Waiver of Claims by the Owner..... .7.6.2,9.9.4,11.3.6,11.4.1
Waiver of liens ......................................9.9.2
Warranty and Warranties. . . . . . . . . . . . . .2.3.21, 4.5, 9.3.3, 9.8.4,
9.9.4, 13.2.2, 13.2.7
Weather Delays. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .8.3.1
Words, Recognized Meaning of ....................... .1.2.3
Work, Definition of ................................. .1.1.3
WORK BY OWNER OR BY SEPARATE CONTRACTORS.......6
Written Consent......... .2.3.22, 4.14.2, 7.2, 7.6.2, 9.8.1, 9.9.3
Written Interpretations.................. .1.1.1,2.3.11,12.3.2
Written ~otice ...... .2.3.11,2.3.15,4.2,4.7.3,4.7.4,4.9,4.12.6,
4.12.7,5.2.1,7.3,7.4,7.7.2,7.9.2,8.1.2,8.3.2, 8.3.3, 9.4.1,
9.6.1,9.7,9.9.1,10.2.6,11.1.4,11.3.1,11.3.5,11.3.7,
11.3.8,12.2,12.3,13.2.2,13.2.5,14
Written Orders. .. . . . . . . . . . . . . . . . .3.3,4.9, 12.1.4, 12.4.1, 13.1
AlA DOCUMENT A201iCM . GENER~, CO'Df110NS OF THE CONTR."CT fOR CONSiRUClrON
CONS1RUClION MN,AGE'IENT EDI-:)' . JUNE 1980 EDIIION . ...IA@ . @ 1980 . THE
A.'IERICAN r'SiIlUH OF ARCHITEG> 1~35 SEW YORK AVE.. NW. WASHINGTON, D.C :'iA106
A201/CM-1980 5
GENERAL CONDITIONS OF THE CONTRACT FOR CONSTRUCTI~~-~-__l
[
ARTiClE 1
CONTRACT DOCUMENTS
1.1 DEFINITIONS
1.1.1 THE CONTRACT DOCUMENTS
The Contract Documents consist of the Owner-Contractor
Agreement, the Conditions of the Contract (General, Sup-
plementary and other Conditions), the Drawings, the
Specifications, and all Addenda issued prior to and all
Modifications issued after execution of the Contract. A
Modification is (1) a written amendment to the Contract
signed by both parties, (2) a Change Order, (3) a written
interpretation issued by the Architect pursuant to Sub-
paragraph 2.3.11, or (4) a written order for a minor
change in the Work issued by the Architect pursuant to
Paragraph 12.4. The Contract Documents do not include
Bidding Documents such as the Advertisement or Invita-
tion to Bid, the Instructions to Bidders, sample forms, the
Contractor's Bid or portions of Addenda relating to any
of these, or any other documents unless specifically enu-
merated in the Owner-Contractor Agreement.
1.1.2 THE CONTRACT
The Contract Documents form the Contract for Construc-
tion. This Contract represents the entire and integrated
agreement between the parties hereto and supersedes all
prior negotiations, representations or agreements, either
written or oral. The Contract may be amended or modi-
fied only by a Modification as defined in Subparagraph
1.1.1. The Contract Documents shall not be construed to
create any contractual relationship of any kind between
the Architect and the Contractor, between the Construc-
tion Manager and Ihe Contractor or between the Archi-
tec! and the Construction Manager, but the Architect and
the Construction Manager shall be entitled to perform-
ance of the obligations of the Contraclor intended for
their benefit and 10 enforcement thereof. Nothing con-
tained in the Contract DociJments shall create any con-
tractual relationship between Ihe Owner, the Construc-
tion Manager or the Architect and any Subcontractor or
Sub-subcont ractor.
1.1.3 THE WORK
The \Vork comprises the completed construction requi red
of the Contractor by the Contract Documents, and in-
cludes all labor necessary to produce such construction,
and all materials and equipment incorporated or to be
incorporated in such construction.
1.1.4 THE PROJECT
The Project, as defined in the Owner-Contractor Agree-
ment, is the total construction of which the 'Nork per-
formed under the Contract Documents is a part.
1.2 EXECUTION, CORRElATION AND INTENT
1.2.1 The Contract Documents shall be signed in not
less than quadruplicate by the 0\\ ner and the Contractor.
If either the Owner or the Contractor or both do not sign
the Conditions of the Contract, Drawings, Specifications
or any of the other Contract Documents, the Architect
shall identify such Documents.
1.2.2 Execution of the Contract by the Contractor is a
representation that the Contractor has \'isited the site be-
come familiar with the local conditions under whicf~ the
Work is to be performed, and has correlated personal
observations with the requirements of the Contract Docu-
ments.
1.2.3 The intent of the Contract Documents is to include
all items necessary for the proper execution and comple-
tion of the Work. The Contract Documents are comple-
mentary, and what is required by anyone shall be as
binding as if required by all. \Vork not covered in the
Contract Documents will not be requ;red unless it is con-
sistent therewith and is reasonably inferable therefrom as
being necessary to produce the intended results. \Vords
and abbreviations which have well-known technical or
trade meanings are used in the Contract Documents in
accordance with such recognized meanings.
1.2.4 The organization of the Speciiications into divi.
sions, sections and articles, and the arrangement of Draw-
Irlgs shall not control the Contractor in dividing the Work
among Subcontractors or in establishing the extent of
Work to be performed by any trade.
1.3 OWNERSHIP AND USE OF DOCUMENTS
1.3.1 All Drawings, Specifications and copies thereof
furnished by the. Architect are and shJII remain the prop-
erty of the Architect. They are 10 be used only with re-
spect to th}s Project and are not to be used on any other
prOJect. V\ Ith the exceptiOn of one contract set for each
party to the Contract, such documents are to be returned
or suitably accounted for to the Architect on request at
the completion of the Work. Submission or distribution
to me~t official regulatory requiren:ents or for other pur-
poses In connection With the Project is not to be con-
strued as publication in derogation of the Architect's
common law copyright or other reser\ ed rights.
ARTiClE 2
ADMINISTRATION OF THE CONTRACT
2.1 THE ARCHITECT
2.1.1 The Architect is the person lawfully licensed to
pr~ctice architecture, or an entity lawfully practicing ar-
chitecture, Identified as such in the Owner-Contractor
Agreement. The term Architect means the Architect or
the Architect's authorized representative.
2.2 THE CONSTRUCTION MANAGER
2.2.1. The Construction !\Ianager is the person or entity
Identified as such Irl the Owner-Contractor Agreement.
The term Construction Manager means the Construction
,\Ianager or the Construction Manager's authorized
representative.
2.3 ADMINISTRATION OF THE CONTRACT
2.3.1 The Architect and the Construction Manager will
AlA DOCUMENT A201iCM . GESER....l CO~DI110NS Of THE CONTRACT fOR CO"STRUCTIOS
CO"STRUCTIO/'; MA"'AGEMENT EDITION . JUNE 1980 EDITION . AIA~ . @ 1980 . THE
"'IE RICAN INSTITLTE Of ARCHITECTS. 1735 NEW YORK AVE., N.W., WASHING10N, DC. 2()()(){'
A201/CM - 1980 6
pro\ide administration o( the Contract as hereinafter
descflbed.
2.3.2 1he A~chit('ct and the Com:-uction Mi1nager will
be the Owner's repre~entati\'es du.,ng construction and
until final p2: ment to all contractors is due. The Archi-
tect and the Construction Manager \\ ill advise and con-
suit" ith the Owner. All instructicns to the Contractor
shall be for\'.2rded through the Comtruction Manager.
The Architect and the Comtruction "'~anager will have
authorit\. to ,'ct on behalf of the 0\\ ;-.er only to the extent
provided in the Conlrdcl Documents. unle~s otherwi~e
modilied b\. "ritten instrument in 2ccordance with Sub-
paragraph 2322.
2.3.3 The Construction .fy~anager \\ill determine in gen-
eral that the Work of the Contractor is being performed
in accordance with the Contract Documents, and will en-
dea\'or to guard the Owner <1gaimt defects and deficien-
cies in the Work of the Contractor.
2.3.4 The Architect will \'isit the site at intervals appro-
priate to the <tage of comtruction to become generally
familiar with the progress and quality of the Work and to
determine in general if the \"'ork is proceeding in accord-
ance with the Contract Documents. However, the Archi-
tect will not be required to make exhaustive or con-
tinuous on-<i:e inspections to check the quality or quan-
tity 01 the Work. On the basis of on-site observations as
an architect. the Architect will keep the Owner informed
01 the progre~s of the \\'ork, and \', III endea\'or to guard
the Owner 2gainst defects and deficiencies in the Work
of the Contractor.
2.3.5 Neither the Architect nor the Construction .\1.1n-
ager will be responsible for or have control or charge of
construction means, methods, techniques, sequences or
procedures, or for safety precautions and programs in
connection \\' ith the Work, and neither will be respon-
Sible lor the Contractor's failure to carry out the \",'ark in
accordance \\ ith the Contract Documents. ~either the
Architect nor the Construction Ma:lager will be respon-
sible for or [-,ave control or charge O\er the acts or omis-
sions of the Contractor, Subcontractors, or any of their
agents or errployees, or any other persons performing any
of the \Vorl.,
2.3.6 The :\rchi1ect and the Con-truction Manager shall
at al1 times ha\e acce~s to the \\'ork whele\'er it is in
preparation and progress. The Co:.tractor shall pro\ ide
facdities for such access so that ~he Architect and the
Conqruction ,"anager mav perform their functions under
the ContraC: Documents,
2.3.7 The Construction Manager will schedule and coor-
dinate the \\'ork of all contractors on the Project includ-
ing their u-e of the site, The Cons~ruction 1\~i1nager will
keep the Contractor informed of t!--.e Project Construction
Schedule te enable the Contractor to plan "nd perform
the Work p~(>perly.
2.3.8 The Construction Manager \\ ill review all Applica-
tion; for Pal ment by the Contractor, including final pay-
ment. and I\dl assemble them "i;h similar applications
from other contractors on the Prcject into a combined
Project Application for Payment. The Construction :\\an-
ager will then make recOlllmend2:'ons to the Architect
for certification (or pa\ment
2.3.9 Based on the Architect's ob:,ervations, the recom-
mendations of the Construction ....\anager and an evalua-
tion of the Project Application for Payment, the Architect
will determine the amount owing to the Contractor anr
will issue a Project Certificate for Payment incorporatir.,
such amount, as provided in Paragraph 9.4.
2.3.10 The Architect will be the interpreter of the re-
quirements of the Contract Documents and the judge of
the performance thereunder by both the Owner and the
Contractor.
2.3.11 The Architect will render interpretations neces-
sary for the proper execution or progress of the Work,
wilh reasonable promptness and in accordance with
"greed upon time limits. Either party to the Contract may
make written request to the Architect for such interpreta-
tions.
2.3.12 Claims, disputes and other matters in question
between the Contractor and the Owner relating to the
execution or progress of the Work or the interpretation
of the Contract Documents shall be referred initially to
the Architect for decision. After consultation with the
Construction Manager, the Architect will render a deci-
sion in writing within a reasonable time.
2.3.13 All interpretations and decisions of the Architect
shall be consistent with the intent of and reasonably in-
ferable from the Contract Documents and will be in writ-
ing or in graphic form. In this capacity as interpreter and
judge, the Architect will endea\'or to secure faithful per-
formance by both the Owner and the Contractor, will not
show partiality to either, and will not be liable for the
result of any interpretation or decision rendered in good
faith in such capacity.
2.3.14 The Architect's decisions in matters relating to
artistic effect will be final if consistent with the intent (
the Contract Documents.
2.3.15 Any claim, dispute or other matter in question
between the Contractor and the Owner referred to the
t\rchitect through the Construction Manager, except those
relating to artistic effect as provided in Subparagraph
2,3.14 and those which have been waived by the making
or acceptance of final payment as provided in Subpara-
graphs 9.9.4 through 9.9,6, inclusive, shall be subject to
arbitration upon the written demand of either party,
Ho\\e\'er. no demand for arbitration of any such claim,
dispute or other matter may be made until the earlier of
(1) the date on "hich the Architect has rendered a writ-
ten decision, or I)) the tenth day after the parties ha\'e
pre<ented their evidence to the Architect or ha\e been
gi\en a reasonable opportunity to do ~o, if the Architect
has not rendered a written decision by that date. When
~uch a written decision of the Architect states (1) that the
deci~ion is final but subject to appeal, and (2) that any
demand for arbitration of a claim, dispute or other matter
co\ered b\' such decision must be made within thirt\' da\'s
after the date on \\'hich the party making the dema~d r~-
cei\'e~ the written decision, failure to demand arbitration
within said thirty day period will result in the Architect's
deci~ion becoming final and binding upon the Owner
and the Contractor. If the Architect renders a decision
after arbitration proceedings have been initiated, such
decision may be entered as evidence but will not <uper-
sede any arbitration proceedings unless the decision is
acceptable to all parties concerned.
7 A201/CM - 1980
.AIA DOCL'.\\[ST A2Gl/CM . GENERAL CONDITIONS Of THE CONTRACT fOR CONSTRL'CTI0 '
CONSTRLCTION MANAGE\\ENT EDITION' JUNE 1980 EDITION . AIA~ . IJ; 1980 . THE
A\\LRIC'.'\ I.'\STITUTE Of ARCHIHCTS. ~-3) ,'IE\\' )ORK AVE.. .N\\', \\'ASHINGlON. DC. 20006
\"! ;:<~t~~C: : 'rY.
'\'810'_':--:::''.' .:~ \'10';-1,_,'3 u_.:~ C'o:.,,:;,~>..,,~ taws: l1d is ~,l.~;~ -. tc 't-!Jel p:-:-,~-:-.,,:,cu~ivn.
2.3.16 The Architect will ha\e authorit\ to reject \".'ork
"hlch does not conform to the Contract Documents, and
to require ~pecial in~p('ction or te~tIng, but will take such
action only after consultation with the Construction "~an-
ager. Subject to review by the Architect. the Con~truction
Manager will have the authoritv to reject Work which
does not conform to the Contract Documents. Whenever,
in the Con~truction "~anager's opinion. It IS con"idered
necessary or advisable for the implementction of the in-
tent of the Contract Documents, the Construction .\~an-
a~er will have authority to require ~pecial impection or
:~qing of the Work in accordance with Subparagraph
7.:-.2 whether or not such \Vork be then fabricated, in-
stalled or completed. The foregoing authority of the Con-
qruction Manager will be subject to the provisions of
Subparagraphs 2.3.10 through 2.3.16, inclusive, with re-
spect to interpretations and deci~ions of the Architect.
However, neither the Architect's nor the Construction
Manager's authority to act under this Subparagraph 2.3.16,
nor any decision made by them in good faith either to
exercise or not to exercise such authoritv shall give rise
to anv duty or responsibility of the Architect or the Con-
struction Manager to the Contractor, anv Subcontractor,
anv of their agents or employees. or anv other person
performing any of the Work.
2.3.17 The Construction Manager will receive from the
Contractor and review all Shop Drawing<. Product Data
and Samples, coordinale them with information contained
in related documents, and transmit to the Architect those
recommended for approval.
2.3.18 The Architect will review and approve or take
other appropriate action upon the Contractor's submittals
such as Shop Drawings, Product Data and Samples, but
onlv for conformance with the design concept of the
\",'o'rk and the information gi\'en in the Contract Docu-
ments. Such action shall be taken" ith reasonable prompt-
ness so as to cause no delay. The Architect's approval of
a specific item shall not indicate approval of an assembly
of which the item is a component.
2.3.19 Following consultation with the Construction
.\\anager, the Architect will take appropriate action on
Change Orders in accordance with Article 12, and will
have authority to order minor changes in the \\'ork as
provided in Subparagraph 12.4.1.
2.3.20 The Construction Manager will r1ainlain at the
Project site one record copy of 211 Cont'2cts, Drawings,
Specifications, Addenda, Change Orders 2nd other Modi-
fications pertaining to the Project, in good order and
marked currently to record all change;; made during
construction, and approved Shop Dra\\ings, Product
Data and Samples. These shall be available to the Archi-
tect and the Contractor, and sh211 be delivered to the
Architect for the Owner upon completion of the Project.
2.3.21 The Construction Manager will as;;ist the Archi-
tect in conducting inspections to determi:le the dates of
Substantial Completion and final completion, and will
receive and forward to the Owner for the Owner's review
written warranties and related documents :equired by the
Contract and assembled by the Contracto:. The Architect
will issue a final Project Certificate for Payment upon
compliance with the requirements of Paragraph 9.9.
2.3.22 The duties, responsibilities and limitations of
authority of the Architect and the Conqruction Manager
as the Owner's representatives during construction as set
forth in the Contract Documents, will not be modified or
extended without written consent of the Owner, the Con-
tractor, the Architect and the Construction Manager,
which consent shall not be unreasonably withheld. Failure
of the Contractor to respond within ten days to a \Hillen
request shall constitute consent by the Contractor.
2.3.23 In case of the termination of the employment of
the Architect or the Construction Manager, the Owner
shall ,'ppoint an architect or a construction manager
against whom the Contractor makes no reasonable objec-
tion and whose status under the Contract Documents
shall be that of the former architect or construction man-
ager, respectively. Any dispute in connection with such
appointments shall be subject to arbitration.
ARTICLE 3
OWNER
3.1 DEFINITION
3.1.1 The Owner is the person or entity identiiied as
such in the Owner-Contractor Agreement. The term
Owner means the Owner or the Owner's authorized
representative.
3.2 INfORMATION AND SERVICES REQUIRED Of
THE OWNER
3.2.1 The Owner shall, at the request of the Contractor,
at the time of execution of the Owner-Contractor ;\gree-
ment furnish to the Contractor reasonable evidence that
the Owner has made financial arrangements to fulfill the
Owner's obligations under the Contract. Unless such
reasonable evidence is furnished. the Contractor is not
required to execute the Owner-Contractor Agreement or
to commence the Work.
3.2.2 The Owner shall furnish all surveys describir:g the
physical charJeteristics, legal limitations and utilit\ loca-
tions for the site of the Project, and a legal descrip:'on of
the site.
3.2.3 Except as provided in Subparagraph 4.7.1. the
Owner shall SeCure and pay for necessary approvals. ease-
ments, assessments and charges required for the construc-
tion, use or occupancy of permanent structures or for
permanent changes in existing facilities.
3.2.4 Information or services under the 0\\ne1$ entrol
shall be furnished by the Owner with reasonable pr'::;mpt-
ness to avoid dela\ in the orderly progress of the \\'.Jrk.
3.2.5 Unless otherwise provided in the Contract Docu-
ments, the Contractor will be furnished, free of c~Jrge,
all copies of Drawings and Specificllion" reasonabl\ nec-
essary for the execution of the \Vork.
3.2.6 The Owner shall forward all instructions to the
Contractor through the Construction ,Io,,1anager, with ':nlul-
taneous notification to the Architect.
3.2.7 The foregc:ng are in addition to other dutie; and
responsibilities 0; the O\\ner enumerated herein al'd es-
pecially those in respect to \^.Iork By Owner or B\ Sepa-
rate Contractors. Payments and Completion, and insur-
ance in Articles 6. 9 and 11, respectively.
AlA DOCUMENT A201/CM . GENERAL CO'DITIO'S C' THE CONTRACT fOR CO:--':STRUCTION
CO"-STRUCTION MAI'-;AGEMENT EDITION . Jt,;',E 1<;.) EDITION . AIA@ . @ 1980 . THE
A\IERICAN I:--':STITUTE OF ARCHITECTS. 1735 'E\\' YOP. AVE.. N.W., WASHINGTON, D.C. 20006
A201/CM - 1980 8
3.3 OWSER'S RIGHT TO STOP THE WORK
3.3.1 If the Contractor fails to correct defective Work as
required bv Paragraph 13.2, or persistently fails to carry
out the Work in accordance with the Contract Docu-
ments, the Owner. by a written order signed personally or
by an agent ~peciiically so empowered by the Owner in
writing, m2Y order the Contractor to stop the \-\'ork, or
any portion thereof, until the cause for such order has
been eliminated; however, this right of the Owner 10 stop
the Work shall not give rise to any duty on the part of the
Owner to exercise this right for the benefit of the Con-
tractor or any other person or entity, except to the extent
required by Subparagraph 6.1.3.
3.4 O\\'SER'S RIGHT TO CARRY OUT THE WORK
3.4.1. If the Contractor defaults or neglects to carry out
the \\lork in accordance with the Contract Documents,
and fails \\ ithin ~even days after receipt of written notice
irom the Owner to commence and continue correction of
such deiault or neglect with diligence and promptness,
the Owner may, after seven days following receipt by the
Contractor of an additional written notice and without
prejudice to any other remedy the Owner may have,
make good ~uch deficiencies. I n such case an appropriate
Cl1ange Order shall be is~ued deducting from the pay-
ments then or thereafter due the Contractor the cost of
correcting ~uch deficiencies, including compensation for
the t\rchitect's 2nd the Construction Manager's additional
services made necessary by such default, neglect or fail-
ure. Such 2ction by the Owner and the amount charged
to the Contractor are both subject to the prior approval
of the Architect, after comultation with the Construction
/-.\anager. Ii the payments then or thereafter due the Con-
tractor are not sdiicient to cover such amount, the Con-
traclor sh211 p.:l\ the difference to the Owner.
ARTICLE 4
CONTRACTOR
4.1 DEFlSlTION
4.1.1 The Contractor is the person or entity identified as
~uch in the 0\\ ner-Contractor Agreement. The term Con-
tractor mean> the Contractor or the Contractor's author-
ized repre;entatl\'e.
4.2 REVIEW OF CONTRACT DOCUMENTS
4.2.1 The Con:ractor shall carefully study and compare
the Contrc.ct Documents and shall at once report to the
Architec, 2nd ::-.e Con;truction ,\\anager any error, incon-
~i;tency or om;"ion that may be disco\'ered. The Con-
tractor sha!1 not be liable to the Owner, the Architect or
the Con5lruction \1anager for any damage re~ulting from
any ~uch eno:" inconsistencies or omissions in the Con-
tract Document-. The Contractor shall perform no portion
of the \\o,k at any time without Contract Document~ or.
\\ here reC;uired appro\ed Shop Drawings, Product Data
or Sample; for <l!ch portion of the \-\lork.
4.3 SL:PER\'ISIO~ AND CONSTRUCTION
PROCEDL:RES
4.3.1 T~e Con:ractor ~hall ~upervise and direct the
Work. u;ng the Contractor's best ~kill and attention. The
Contractor ;ha!l be ~olelv re~ponsible for all construction
means, method,. techniques, sequences and procedures;
and shall coordinate all portions of the work under the
Contract, subject to the o\'erall coordination of the Con-
~truction ,l.,~anager.
4.3.2 The Contractor shall be responsible to the Ownt..
for the acts and omissions of the Contractor's employees,
Subcontractors and their agents and employees, and any
other persons performing any of the \\'ork under a con-
tract with the Contractor.
4.3.3 The Contractor shall not be relieved from the
Contractor's obligations to perform the Work in accord-
ance with the Contract Documents either by the activities
or duties of the Construction Manager or the Architect
in their administr.:ltion of the Contract, or by inspections,
tests or approvals required or performed under Paragraph
7.7 by persons other than the Contractor.
4.4 LABOR AND MATERIALS
4.4.1 Unless otherwise provided in the Contract Docu-
ments, the Contractor shall provide and pay for all labor,
materials, equipment, tools, construction equipment and
machinery, water, heat, utilities, transportation, and other
facilities and services necessary for the proper execution
and completion of the Work, whether temporary or per-
manent and whether or not incorporated or to be incor-
porated in the \-\lork.
4.4.2 The Contractor shall at all times enforce strict dis-
cipline and good order among the Contractor's em-
ployees and shall not employ on the Work any unfit per-
son or anyone not skilled in the task assigned them.
4.5 WARRANTY
4.5.1 The Contractor warrants to the Owner, the Archi-
tect and the Construction Manager that all materials and
equipn;ent furnished under this Contract will be new l
less otherwise specified, and that all Work will be of gOL--
quality, free from faults and defects and in conformance
with the Contract Documents. All Work not conforming
to the~e requirements, including substitutions not prop-
erly approved and authorized, may be considered defec-
tive. If required by the Architect or the Construction Man-
ager, the Contractor shall iurnish ~atisfactory evidence as
to the kind and quality of materials and equipment. Thi~
warranty is not limited b\ the pro\.isions of Paragraph
13.2.
4.6 TAXES
4.6.1 The Contractor shall pay all sales, consumer, use
and other similar taxes for the \\lork or portions thereof
provided by the Contractor which are legallv enacted at
the time bids are received, whether or not yet ei1ecti\.e.
4.7 PERMITS, FEES AND NOTICES
4.7.1 Unless otherwise provided in the Contract Docu-
ments, the Owner shall ~ecure and pay for the building
permit and the Contractor shall secure and pay for all
other permits and governmental fees. licenses and inspec-
tions necessary for the proper execution dnd completion
of the \\lork which are cu~tomarily secured after execu-
tion oi the Contract and \\ hich are legally required at the
time bids are received.
4.7,2 The Contractor shall give all notices and comph
with all laws. ordinance,. rules, regulations and lawful
orders oi any public authority bearing on the perform-
ance of the Work.
9 A201!CM -1980
AlA DOCVMEQ Al01/CM . GE~ERAl CO'DITIO'S Of THE CO~TRACT fOR CO'STRLC1" ,
CO"~TRL:CTIC' \\A~AGEMENT EDITION . )l.J,E 10",) EDITIO~ . AIA<'> . @ 1980 . THE
..\\'lRIC\" 1"-lTl'H OF ARCHITECTS. 1~35 NEW YOp,: .\VE., ~.\\'. \\',\SHI'G10~, D.C. cr.:>"
4.7.3 It is not the responsibility of the Contractor to
make certam that the Contract Documents are in accord-
ance with applicable laws, statutes, building codes and
regulations. If the Contractor observes that any of the
Contract Documents are at variance therewith in any re-
spect, the Contractor shall promptly notify the Architect
and the Construction ....~anager in writing, and any neces-
sary changes shall be accomplished by appropriate
"odification.
4.7.4 If the Contractor performs any Work knowing it
to be contrary to such laws, ordinances, rules and regula-
tions, and without such notice to the Architect and the
Construction Manager, the Contractor shall assume full
H'5ponsibility therefor and shall bear all costs attributable
thereto.
4.8 AllOWANCES
4.8.1 The Contractor shall include in the Contract Sum
all allowances stated in the Contract Documents. Items
covered by these allowances shall be supplied for such
amounts and by such persons as the Construction Man-
ager may direct, but the Contractor will not be required
to employ persons against whom the Contractor makes a
reasonable obj2ction.
4.8.2 Unless otherwise provided in the Contract Docu-
ments:
.1 these allowances shall cover the cost to the
Contractor, less any applicable trade discount,
of the materials and equipment required by the
allowance, delivered at the site, and ali appli-
cable taxes;
.2 the Contractor's C05tS for unloading and han-
dling on the site, labor, installation costs, over-
head, profit and other expenses contemplated
(or the original allowance shall be included in
the Contract Sum and not in the allo\\ance;
.3 whenever the cost is more or less than the
allowance, the Contract Sum shall be adjusted
accordingly by Change Order. the amount of
1\ hich will recognize changes. ii anI'. in han-
dling costs on the site, labor, installation costs,
overhead, profit and other expenses.
4.9 SUPERINTENDENT
4.9.1 The Contractor shall employ a competent superin-
tendent and necessary assistants who shall be in attend-
ance at the Project site during the progress of l~e \Vork.
The supe:intendent shall represent the Contractc' and all
communications given to the superintendent srall be as
binding as if given to the Contractor. Important commu-
nications shall be coniirmed in writing. Other communi-
cations s!-dl be ~o confirmed on written reque,: in each
case.
4.10 CO~TRACTOR'S COSSTRUCTION SCHEDULE
4.10.1 The Contractor, immediatelv after being awarded
the CGn:ract, shail prepare and submit for the~Construc-
tion -"",nager's 2.pproval a Contractor's Construction
Schedule for :he Work which shall prO\ ide fa: expedi-
tious and practic1ble execution of the "\lark. H,;s ~ched-
ule shall be coordinated by the Construction \\anager
with the Project Construction Schedule. The Contractor's
Construction Schedule shall be revi5ed a5 required by the
conditions of the Work and the Project. subject to the
Construction Manager's approval.
4.11 DOCUMENTS AND SAMPLES AT THE SITE
4.11.1 The Contractor shall maintain at the Project site,
on a current basis, one record copy of all Drawings,
Specifications, Addenda, Change Orders and other Modi-
fications, in good order and marked currently to record
all changes made during construction, and approved Shop
Drawings, Product Data and Samples. These shall be
available to the Architect and the Construction Manager.
The Contractor shall advise the Construction Manager on
a current basis of all changes in the \'\Iork made during
construction.
4.12 SHOP DRAWINGS, PRODUCT DATA AND
SAMPLES
4.12.1 Shop Drawings are drawings, diagrams, schedules
and other data specially prepared for the \Vork by the
Contractor or any Subcontractor, manufacturer, supplier
or distributor to illustrate some portion of the VVork.
4.12.2 Product Data are illustrations, standard schedules,
performance charts, instructions, brochu res, diagrams and
other information furnished by the Contractor to illustrate
a material, product or system for some portion of the
Work.
4.12.3 Samples are physical examples which illustrate
materials, equipment or workmanship, and establish
standards by which the \\lork will be judged.
4.12.4 The Contractor shall prepare, review, approve and
submit through the Construction Manager, with reason-
able promptness and in such sequence as to cause no de-
lay in the Work or in the work of the Owner or any sepa-
rate contractor, all Shop Drawings, Product Data and
Samples required by the Contract Documents. The Con-
tractor shall cooperate with the Construction Manager in
the Construction .\1anager's coordination of the Contrac-
tor's Shop Drawings, Product D,1ta and Samples with
those of other separate contractors.
4.12.5 By preparing, approving and submitting Shop
Drawings, Product Data and Samples, the Contractor rep-
resents that the Contractor has determined and verified
all materials, iield measurements and field construction
criteria related thereto, or will do so with reasonable
promptness, and has checked and coordinated the infor-
mation contained within such submillals with the require-
ments of the Work, the Project and the Contract Docu-
ments.
4.12.6 The Contractor shall not be relieved of responsibil-
ity for any de\iation from the requirements of the Con-
tract Documents by the Architect's approval of Shop
Drawings. Product Data or Samples under Subparagraph
2.3.18, unles5 the Contractor has specifically iniormed the
Architect and the Construction Manager in writing of
such deviation at ,he time of submis~ion and the .-\rchi-
tect has gi\ en \\ ritten approval to the ~peciiic deliation.
The Contractor 5hall not be relieved irom re~pon5ibili1\'
for errors or omi-sions in the Shop Dral\ ings, Product
Data or Sample5 bv the Architect's apprOl'al of them.
4.12.7 The Contractor shall direct specific attention, in
writing or on resubmitted Shop Drawings. Product Data
or Samples, to re\isions other than those requested by the
Architect on previous submittals.
~IA DOCl"\E!'o;T A201,CM . Gl"lR,~L CO...DIOIO...S Of THE C:J" TR,~CT FOR CO'5TRlCTIO!'
CO...STRLCIO'< ,'\A',~GE\\E"T EDITION. JV,E 1~30 EDI- ON . AIA~ . if) 1980 . THE
I"ERIC~" l"qITUH or ,\RCHIHCTS. 1735 "EI\' YO,I; AVE " \\,,, 1\ ASHISGTO.... D,e. :'(l()!} ,
A201/CM --1980 10
4.12.8 No portion of the Work requiring submission of a
Shop Drawing, Product Data or Sample shall be com-
menced until the submittal has been approved by the
Architect as prO\rded in Subparagraph 2.3.18. All such
portions of the Work shall be in accordance with ap-
pro\ed submittals.
4.13 USE OF SITE
4.13.1 lhe Contractor shall confine operations at the site
to areas permitted bv law, ordinances, permits and the
Contract Documents, and shall not unreasonably encum-
ber the site with any materials or equipment.
4.13,2 The Contractor shall coordinate all of the Contrac-
tor's operations with. and <ecure approval from, the Con-
qruction Manager before using any portion of the site.
4,14 CUTTING AND PATCHI~G OF WORK
4.14.1 The Contractor shall be responsible for all cutting,
fitting or patching that may be required to complete the
Work or to make its se\'eral parts fit together properly.
4,14,2 The Contractor shall not damage or endanger any
portion of the Work or the work of the Owner or any
separate contractors by cutting, patching or otherwise
altering any work, or by excavation. The Contractor shall
not cut or otherwise alter the work of the Owner or any
separate contractor except with the written consent of the
Owner and of such separate contractor. The Contractor
sh.111 not unreasonabk withhold from the Owner or any
separate contractor consent to cutting or otherwise alter-
ing the' \'Vork.
4.15 ClEANING UP
4.15.1 The Contractor shall at all times keep the premises
free from accumulation of waste materials or rubbish
caused by the Contractor's operatiorls. At the completion
of the \~'ork, the Conl~actor shall remo\'e all the Contrac-
tor's waste materials and rubbish from and about the
Project as well as all the Contractor's tools, construction
equipment. machinery and surplus materials.
4.15.2 If the Contractor iails to clean up at the comple-
tion of the \Vork, the O\\ner may do so as pro\ided in
Paragraph 3.4 and the cost thereof shall be charged to the
Contractor.
4.16 COMMUNICUIONS
4.16.1 The Contractor sh,,;1 forward all communications
to the Owner and the A~chitect through the Construction
.\\anager.
4,17 ROYALTIES A.\D PAHSTS
4.17.1 The Contractor shall pay all royalties and license
fees, shall defend all suits or claims for infringement of
any patent right5 and shall save the Owner and the Con-
struction Manager harmless from loss on account thereof,
except that the Owner, or the Construction .\1anager as
the case may be, shall be responsible for all such loss
when a particular design. process or the product of a par-
ticular manufacturer or manufacturers is selected by such
per50n or 5uch person's ;;gent. If the Contractor, or the
Construction Manager as the case may be, has reason to
belie\'e that the design. p-ocess or product selected is an
infringement of a patent. that party shall be responsible
for such loss unless such information is promptly gi\en to
the others and also to the Architect.
4.18 It'>;DEMSIFICA110N
4.18.1 To the fullest extent permitted bv law, the Con-
tractor shall indemnify and hold harmless' the 0\\ ner, lh
Architect. the Construction Manager, and their agents anL.
employees from and against all claims, damages, losses
and expenses, including, but not limited to, attorneys'
fees arising out of or resulting from the performance of
the \Vork, provided that any such claim, damage, loss or
expeme (1) is attributable to bodily injury, sid.ness, dis-
ease or death, or to injury to or destruction of tangible
propertv (other than the Work itself) inciuding the loss of
use re,.ultlng therefrom, Jnd (2) is caused in whole or in
part by any negligent act or omission of the Contractor,
any Subcontractor, anyone directly or indirectly employed
by an\' of them or anyone for whose ac ts any of them
may be liable, regardless of whether or not it is caused
in part by a party indemnified hereur.der. Such obligation
"hall not be comtrued to negate, abridge or otherwise
reduce any other right or obligation of indemnity which
would otherwise exist as to any party or person described
in this Paragraph 4.18.
4.18,2 In any and all claims against the Owner, the Archi-
tect, the Construction Manager or any of their agents or
employees by any employee of the Contractor, any Sub-
contractor, anyone directly or indirectly employed by any
of them or anyone for whose acts any of them may be
liable, the indemnification obligation under this Para-
graph 4.18 shall not be limited in any way by an\' limita-
tion on the amount or type of damages, compensation or
benefits payable by or for the Contractor or any Sub-
contractor under workers' or \\orkmen's compensation
acts, disability benefit acts or other employee benefit acts.
4.18.3 The obligations of the Contractor under this Para.
graph 4.18 "hall not extend to the liability of the :\rchitec
or the Construction Manager, their agents or employees,
arising out of (1~ the preparation or approval of m.lps,
drawings, opinions, reports, surveys, Change Orders, de-
signs or specifications, or (2) the giving of or the iailure to
give directions or instructions by the Architect or the
Construction ,\1anager, their agents or emplo\ees, pro-
\'ided such gi\'ing or failure to give is the primarv cause
of the injury or damage.
ARTiClE 5
SUBCONTRACTORS
5.1 DEFI~11I0N
5,1.1 A Subcontractor is a person or entity \\no has a
direct contract with the Contractor to perform any of the
Work at the site. The term Subcontractor means a Sub-
contractor or a Subcontractor's authorized repre,.entati\.e.
The term Subcontractor does not include am' sepna!e
contractor or am' separate contractor's <ubcontr.'ctors.
5.1,2 A Sub-subcontractor is a per"on or entil\ who has
a direct or indirect contract with a Subcontractor to per-
form any of the \\'ork at the sileo The term Sub-subcon-
tractor means a Sub-subcontractor or an authorized rep-
resentati\'e thereof.
5,2 AWARDS OF SUBCONTRACTS A~D OTHER
CONTRACTS FOR PORlIONS OF lHE WORK
5.2.1 Unless otherwise required by the Contr2ct Docu-
11 A201/CM --1980
AlA DOCU'1E~T A~Ol.'CM . GE....cRAL CO'-Dl1rO....S OF THE CO....1RACT FOR CO'-,lRl;CliO,
CO....S~Rl:cTIO.... .'\A....AGE\~E....T EDITIO.... . Jl'....E 1980 EDITIO~ . AIAf . (I; ~9S0 . THE
"\\E~'CA"" r....Sllll TE OF ARCH1HCTS.1~3; ....EW YORK AVE., .....\\'.. \\ ""Hr....GTO'- D.C. :'0Xl"
'- _! ,~ ., - .~, _:....
.'.,,.-
ments or the Bidding Documents, the Contractor, as soon
as practicable after the a\\ ard of the Contract, shall fur-
nish to the Construction "'\anager in writing for review
by the Owner, the Architect and the Construction ,'-.1an-
ager, the names of the persons or entities (including those
who are to furnish materials or equipment fabricated to
a special design) proposed for each of the principal por-
tions of the \Vork. The Construction Manager will
promptly reply to the Contractor in writing stating
whether or not the Owner, the Architect or the Con-
struction Manager, after due investigation, has reasonable
objection to any such proposed person or entity. Failure
of the Construction Manager to reply promptly shall con-
stitute notice of no reasonable objection.
5.2.2 The Contractor shall not contract with any such
proposed person or entity to whom the Owner, the Ar-
chitect or the Construction Manager has made reasonable
objection under the provisions of Subparagraph 5.2.1. The
Contractor shall not be required to contract with anyone
to whom the Contractor has a reasonable objection.
5.2.3 If the Owner, the Architect or the Construction
Manager has reasonable objection to any such proposed
person or entity, the Contractor shall submit a substitute
to whom the Owner, the Architect and the Construction
Manager have no rea<,onable objection, and the Contract
Sum shall be increased or decreased by the difference in
cost occasioned by such substitution and an appropriate
Change Order shall be issued; however, no increase in
the Contract Sum shall be allowed for any such substitu-
tion unless the Contractor has acted promptly and re-
sponsively in submitting names as required by Subpara-
graph 5.2.1.
5.2.4 The Contractor :,hall make no substitution for any
Subcontractor, person or entity previously selected if the
Owner, the Architect or the Construction Manager makes
rea<,onable objection to such substitution.
5.3 SUBCONTRACTUAl RELATIONS
5.3.1 By an appropriate agreement, written where legally
required for validity, the Contractor shall require each
Subcontractor, to the extent of the Work to be performed
by the Subcontractor, to be bound to the Contractor by
the terms of the Contract Documents, and to assume to-
ward the Contractor all the obligations and responsibili-
ties \\ hich the Contractor, by these Documents, assumes
toward the Owner, the Architect and the Construction
.".1anager. Said agreement shall pre<,erve and protect the
right, of t~e O\\[\er, the :\rchitect and the Construction
Manager under the Contract Documents with respect to
the Work to be performed by the Subcontractor so that
the subcontracting thereof will not prejudice such rights,
and shall clioI\' to the Subcontractor, unless specifically
pro\ ided othcm ise in the Contractor-Subcontractor
Agreement. the benefit of all rights, remedies and redress
against the Contractor that the Contractor, by these Docu-
ments, has agair.st the Owner. \Vhere appropriate, the
Contractor shall require each Subcontractor to enter into
~imilar agreements \\ ith their Sub-subcontractors. The
Contract;r shall make 2\'ailable to each proposed Sub-
contractor, prior to the execution of the Subcontract,
copies of the Contract Documents to which the Subcon-
tractor will be bound by this Paragraph 5.3, and identify
to the Subcontractor any terms and conditions of the pro-
posed Subcontract which may be at variance with the
Contract Documents. Each Subcontractor shall similarly
make copies of such Documents available to their Sub-
subcontractors.
ARTICLE 6
WORK BY OWNER OR BY
SEPARATE CONTRACTORS
6.1 OWNER'S RIGHT TO PERFORM WORK AND TO
AWARD SEPARATE CONTRACTS
6.1.1 The Owner reserves the right to perform work re-
lated to the Project with the Owner's own forces, and to
award separate contracts in connection with other por-
tions of the Project or other work on the site under these
or similar Conditions of the Contract. If the Contractor
claims that delay, damage or additional cost is involved
because of such action by the Owner, the Contractor shall
make such claim as provided elsewhere in the Contract
Documents.
6.1.2 When separate contracts are awarded for different
portions of the Project or other work on the site, the term
Contractor in the Contract Documents in each case shall
mean the Contractor who executes each separate Owner-
Contractor Agreement.
6.1.3 The Owner will provide for the coordination of the
work of the Owner's own forces and of each separate
contractor with the Work of the Contractor, who shall
coopera te therewith as provided in Paragraph 6.2.
6.2 MUTUAL RESPONSIBILITY
6.2.1 The Contractor shall afford the Owner, the Con-
struction Manager and separate contractors reasonable
opportunity for the introduction and storage of their ma-
terials and equipment and the execution of their work,
and shall connect and coordinate the Work with theirs
as required by the Contract Documents.
6.2.2 If any part of the Contractor's \\'ork depends for
proper execution or results upon the work of the Owner
or any separate contractor, the Contractor shall, prior to
proceeding with the Work, promptly report to the Con-
struction Manager any apparent discrepancies or defects
in such other work that render it unsuitable for such
proper execution and results. Failure of the Contractor so
to report shall constitute an acceptance of the Owner's
or sepa rate contractor's work as fit and proper to receive
the Work, except as to defects which may subsequently
become appa rent in such work by others.
6.2.3 Any costs caused by defective or ill-timed work
shall be borne by the party responsible therefor.
6.2.4 Should the Contractor wrongfully cause damage to
the work or property of the Owner, or to other work or
property on the site, the Contractor shall promptly rem-
edy such damage as provided in Subparagraph 10.2.5.
6.2.5 Should the Contractor wrongfully delay or cause
damage to the work or property of any separate contrac-
tor, the Contractor shall, upon due notice, promptly at-
tempt to settle with such other contractor by agreement,
or otherwise to resolve the dispute. If such ::eparate con-
tractor sues or initiates an arbitration proceeding against
the Owner on account of any delay or damage alleged to
have been caused by the Contractor, the Owner shall
AlA DOCU.'.\[ST A~O'C.'.\ . CE....ERAL cO.'.oITIOSS OF THE CO'TRo\CT FOR COSSTRUCTIOr-.:
CO....STIWCTIC'l ....\A.....~CE.\\E' T EDITION . JUNE 1980 EDITIOS . AIA~ . @ 1980 . THE
A.,,\E~:C.~'I I....STITUlE OF ARCH!lECTS, 1735 ....EW YORK AVE., NI\'.. WASHINGTON, D.C. 20006
A201/CM -1980 12
notify the Contractor I\ho ,hall defend such proceedings
at the Owner's e>-peme, and if any judgment or award
against the Owner ari5es therefrom, the Contractor shall
payor satisfy it and shall reimburse the Owner for all
attorneys' fees and court or .1fbitration costs which the
Owner has incurred.
6.3 OWNER'S RIGHT TO ClEAN UP
6.3.1 If a dispute ari5es bel\veen the Contractor and
separate contractors as to their responsibility for cleaning
up as required by Paragraph 4.15, the Ol\ner may clean
up and charge the cost thereof to the contractors respon-
sible therefor as the Construction Manager shall deter-
mine to be just.
ARTIClE 7
MISCEllANEOUS PROVISIONS
7.1 GOVERNING LAW
7.1.1 The Contract shall be gO\erned by the law of the
place where the Project is located.
7.2 SUCCESSORS AND ASSIGNS
7.2.1 The Owner and the Contractor, respectively, bind
themselves, their partners, successors, assigns and legal
representatives to the other party hereto and to the part-
ners, successors, assigns and legal representatives of such
other party with respect to all covenants, agreements and
obligations contained in the Contract Documents. :--':either
party to the Contract shall assign the Contract or sublet it
as a whole without the written consent of the other.
7.3 WRI1TEN NOTICE
7.3.1 Written notice shall be deemed to have been duly
served if delivered in person to the individual or mem-
ber of the firm or entitv or to an ofiicer of the corpora-
tion for whom it was intended, or if delivered at or sent
by registered or certified mail to the last business address
known to the party giving the notice.
7.4 ClAIMS FOR DAMAGES
7.4.1 Should either party to the Contract suffer injury or
damage to person or property beCJuse of any act or omis-
sion of the other party or of any of the other party's
employees, agents or others for whose acts such party is
legally liable, claim shall be made in \\riting to such
other party within a reasonable time after the first observ-
.1nce of ,uch inJur~ or carnage.
7.5 PERFORMANCE BO~D AND lABOR AND
MATERIAL PAYME~T BOND
7.5.1 The Owner shall have the r:ght to require the
Contractor to furnish bonds co\ering the faithful pe,form-
ance of the Contract and the payment of all obligations
arising thereunder if and as required in the Bidding Doc-
uments or the Contract Documents.
7.6 RtGHTS AND REMEDIES
7.6.1 The duties dnd obligations if"lposed by the Con-
tract Documents and the rights and remedies a\ailable
thereunder shall be in addition to, and not a limitation of,
any duties, obligations, rights and remedies othem:se im-
posed or available bv law.
7.6.2 :--':0 action or i2i1ure to act by the Owner, the Ar-
chitect, the Conqruc:ion Manager or the Contractor shall
constitute a wai\er oi any right or duty afiorded any of
them under the Contract, nor shall any such action or
failure to act constitute an approval of or acquiescence in
any breach thereunder, except as may be specifically
agreed in writing.
7.7 TESTS
7.7.1 If the Contract Documents, laws, ordinances, rules.
regulations or orders oi any public authority having juris-
diction require any portion of the V'/ork to be inspected,
tested or apprO\ ed, tr:e Contractor shall give the Architect
and the COn5truction \1anager timely notice of its readi-
ness so the Architect and the Construction .\1anager may
observe such inspection, testmg or approval. The Con-
tractor shall bear all costs of such inspections, tests or
approvals conducted by public authorities. Unless other-
wise provided, the Owner shall bear all costs of other in-
spections, tests or approvals.
7.7.2 If the Architect or the Construction Manager deter-
mines that any \"/ork requires special inspection, testing
or approval which Subparagraph 7.7.1 does not include,
the Construction ,\12nager will, upon written authoriza-
tion from the Owner, instruct the Contractor to order
such special inspection, testing or approval, and the Con-
tractor shall gi\'e notice as provided in Subparagraph
7.7.1. If such special j:lspection or testing releals a failure
of the Work to compi, with the requirements of the Con-
tract Documents, the Contractor shall bear all costs
thereof, including cocnpensation for the Architect's and
the Construction .\1an.'iger's additional services made nec-
essary by such failure; otherwise the O\\ner shall bear
such costs, and an 2ppropriale Change Order shall be
issued.
7.7.3 Required cerL;'icates of inspection, testing or ap-
proval sh2:1 be secu'ed by the Contractor and the Con-
tractor sh,,;: prompt:\. deliver them 10 the Construction
,\.1anager ;'or tra nsml, :al to the Architect.
7.7.4 If the Architect or the Construction Manager wishes
to obsene the inspections, tests or apprO\'als required by
the Contract Documents, they will do so prompt'\' and,
where practicable, at the source of supply.
7.8 I:-:UREST
7.8.1 Pa\ments due :,nd unpaid under the Contract Doc-
uments shail bear interest from the date palment is due
.:t ,ucn rc'.~ as the ;:.'-ti('s may .1gree upor .n \\r:::ng or
In the absence thereoi, at the legal rate pre\ailing at the
place of the Project.
7.9 ARBITRATION
7.9.1 All claims, dis;:Jutes and other matters in ouestion
between t~e Contractor and the Ol\ner arising o~t of or
relating te the Contrcct Documents or the b,each t:~~reof.
e>-cept as pro\ iced ~,Subparagraph 2.3.1'; \lith re'pect
to the Arcnitec:'s dec:sions on matters relat:ng to artistic
eNec!. anc except fe- claims \\ hieh hale been 11',0;1 cd by
the lllaki'1g or 2cce:: '.~nce of flll.,1 pJVrnel~t as prol ided
by SlIbpar2gra;Jhs c, =--1 through 9.96, inc!u'!I'e, ,hall be
deCided b ar::>::ratlc':I in accordance with the Construc-
tion Induslr\ ,-\rbitr2:ion Rules of the :'\meican :'\rbitra-
tion ;'\ssoc:2tion ther. obtaining unless the pcrties IT.utllally
13 A201/CM--1980
AlA DOCUMENT A~Ol.'CM . Gl";:;C CC'DI~ :"'s OF lHE CO'''>\CT FC" cO";,, (liON
CO'."RUCTIO,", .\~A"AGE.\~c" ,::::,!c'; . : _ 'E 1980 EDITION . AIA~ . (f) 1~E~ . THE
,\.\\,;;IC.-\", I';STlllTE or .,,0,.',C1' '-]] ,c:.... YORK -,,\'E, '; 1\'.. \\\,HI'."O', l C cOOl'\(,
J ~ '.'-
agree otherwise. ~o arbitration arising out of or relating
to the Contract Documents shall include, by consolida-
tion, joinder or in any other manner, the Archi:ect, the
Construction .\1anager, their employees or consultants
except by written consent containing a specific reference
to the Owner-Contractor Agreement and signed by the
Architect, the Construction Manager, the Owner, the
Contractor and any other person sought to be joined. No
arbitration shall include by consolidation, joinder or in
any other manner, parties other than the Owner, the
Contractor and any other persons substantially involved
in a common question of fact or law, whose presence is
required if complete relief is to be accorded in the arbi-
tration. No person other than the Owner or the Contrac-
tor shall be included as an original third party or addi-
tional third party to an arbitration whose interest or re-
sponsibility is insubstantial. Any consent to arbitration
involving an additional person or persons shall not con-
stitute consent to arbitration of any dispute not described
therein or with any person not named or described
therein. The foregoing agreement to arbitrate and any
other agreement to arbitrate with an additional person or
persons duly consented to by the parties to the Owner-
Contractor Agreement shall be specifically enforceable
under the prevailing arbitration law. The award rendered
by the arbitrators shall be final, and judgment ma\ be en-
tered upon it in accordance with applicable la\\ in any
court having jurisdiction thereof.
7,9.2 Notice oi the demand for arbitration shall be filed
in writing with the other party to the Owner-Contractor
Agreement and with the American Arbitration Associa-
tion, and a copy shall be filed with the Architect and the
Construction ,""anager. The demand for arbitration shall
be made within the time limits speciiied in Subp2~agraph
2.3.15 where applicable, and in all other cases \\ ithin a
reasonable Clme after the claim, dispute or other matter
in queqion has arisen; and in no event shall it be made
after the date when institution of legal or equit2~le pro-
ceedings based on such claim, dispute or other matter in
queqion would be barred by the applicable statute of
limitations.
7.9.3 L:nless otherwise agreed in writing, the Contractor
shall carr\' on the Work and maintain its progre>s during
anv arbit~ation proceedings, and the Owner shall con-
tinue to make payments to the Contractor in accordance
\\ ith the Contract Documents.
ARTICLE 8
TIME
8.1 DEfINITIONS
8.1.1 L'nless otherwise pro\ ided, the Contract Time is
the period of time allotted in the Contract DocurT".fnts for
Substantial Completion of the Work as defined :n Sub-
paragr2ph 8.1.3. including authorized adjustments :~ereto.
8.1.2 The da Ie oi com mencement of the \\'or:'; is the
date established in a notice to proceed. If there is no no-
tice to proceed, it shall be such other date as may be
e<tabll,hed in the Ol\ner-Contractor Agreement or else-
where in the Contract Documents
8.1.3 The D.;:e of Sub~tantial Completion of tre Work
or designated portion thereof is the Date certified by the
Architect I\hen construction is sufficientlv complete, in
accordance with the Contract Documents, so that the
Owner or separate contJacto~s coin occupy or utilize the
\Vork or a designated portion thereof I"'or the use for
which it is intended.
8.1.4 The Date of Substantial Completion of the Project
or designated portion thereoi is the Date certified by the
Architect when construction is suificiently complete so
the Owner can occupy or utililc the Project or designated
portion thereof for the use for which it was intended.
8.1.5 The term day as used in the Contract Documents
shall mean calendar day unless specifically designated
otherwise.
8.2 PROGRESS AND COMPLETION
8.2.1 All time limits stated in the Contract Documents
are of the essence of the Contract.
8.2.2 The Contractor shall begin the Work on the date
of commencement as defined in Subparagraph 8.1.2. The
Contractor shall carry the Work forward expeditiously
with adequate forces and shall achie\"e Substantial Com-
pletion of the \Vork within the Contract Time.
8.3 DElAYS AND EXTENStONS OF TtME
8.3.1 If the Contractor is delayed at any time in the
progress of the V\'ork by any act or neglect of the Owner,
the Architect, the Construction Manager, any of their em-
ployees, any separate contractor employed by the Ol\ner,
or by changes ordered in the Work, labor disputes, fire,
unusual delay in transportation, .1d\'erse weather condi-
tions not reasonably anticipatable, unavoidable casualties,
any causes beyond the Contr,lctor's control, delay author-
ized by the Owner pending arbitration, or by any other
cause 1\ hich the Construction ,\\.1I1ager determines ma\
justify the delay, then the Contract Time "hall be ex-
tended by Change Order for such reasonable time as the
Construction \1anager may determine.
8.3.2 Any claim for extension of time shall be made in
writing to the Construction Manager not more than
!llenty days after the commencement of the delay; other-
wise it shall be waived. In the ca~e oi ,1 continuing dela\
only one claim is necessary. The Contr.1c1or shall prOlide
an estimate of the probable elleet of 'uch dela\" on th('
progres' of the Work.
8.3.3 Ii no agreement is made stating the dates upon
which interpretations as prOl'ided in Subparagraph :.'3.11
shall be furnished, then no claim for delay shall be
.,llowed on account of failure to iurni,h 'uch interpreta-
tion~ until iilteen da~ s Jfter II rlttcn request is made fa;
them, and not then unless such cl.1im i~ reason..ble.
8.3.4 This PMagr,'ph 8.3 doe, not e"\clude the recO\en
of damages for delay bv either p.lrl\ under oiher prr1\i-
~ions oi the Contract Document<,
ARTICLE 9
PAYMENTS AND CO,\1PLETION
9.1 CONTRACT SUM
9.1.1 The Contract Sum is 'tolled in the Owner-Contrac-
tor Agreement and, ;ncludlng .HJthori7ed adjustment<
thereto. is the total amount p.]\ able bv the O\\ner to the
Contractor for the performance oi the \\'ork under the
Contract Documents.
AlA DOCl.,ME:<O;T A:Ol.CM . GE'-ERAL CO'-011!0'-S OF THE CC'-lR~CT FOR CO'-STRL:CTIO:-';
CO'-STRLCTiO,- '.,A'-AGE.\\E:<O;T EDITIOS . JL'-E 1980 EOITIC' . AIA$ . <D i980 . THE
A\\[RIC\' I'S111. -E Of ARCHITECTS. 1733 'EI\' YORK AVE..' '.\ . WASHI'GTO', D.C. :'000(,
A201/C'v\-1980 14
9.2 SCHlDULE OF VALUES
9.2.1 Before the ii;<t Application for Payment, the Con-
l~"ctor "hall cubmit to the Construction .\1anager a
schedule of values allocated to the various portions of the
Work, prepared in such form and supported by such data
to cub<tantiate its ,'C([Hac}' as the Architect and the Con-
q'uction tv1anager may require. This schedule, unless
objected to by the Comtruction .\1anager or the Architect.
sh.,'1I be used onl\' as a basis for the Contractor's :\pplica-
lions for Payment.
9.3 APPLICATIONS fOR PAYMENT
9.3.1 At least iiiteen days beiore the date for each
progress payment established in the Owner-Contractor
....slecment. the Contractor shall submit to the Construc-
tion .\~anager an itemized Application for Payment, notar-
ized if required, supported by such data substantiating
the Contractor's right 10 payment as the Owner, the Ar-
chitect or the Construction Manager may require. and re-
ilecting retainage, if any. as plOvided elsewhere in the
Contract Documents. The Comtruction Manager will as-
,emble the Application with "imilar applications from
other contractors on the Project into a combined Project
Application for Payment and forward it with recommen-
d2tions to the Architect within "e\en days.
9.3.2 Unless otherwise prO\'ided in the Contract Docu-
rolents, payments will be made on account of materials or
equipment not incorporated in the Work but delivered
and suilably stored at the site and, if approved in advance
by the Owner. payments may similarly be made for mate-
rials or equipment suitably stored at "ome other loca-
lion Jgreed upon in writing. Payments for materials or
equipment stored on or off the site shall be conditioned
upon submission by the Contractor of bills of sale or
such other procedure5 5atisfaclory to the Owner to estab-
!ish the Owner's title to such materials or equipment or
otherwise protect the Owner's interest, including applica-
ble insurance and transportation to the site for those
m"lerials and equipment storea on the site.
9.3.3 The Contractor warrants Ihat title to all Work.
/11Jterials and equipment covered by an Application for
Pal ment will pass to the Owner either by incorporation
in the construction or upon rC'ceipt of payment by the
Contractor. whiche\er occurs first. free and clear of all
liens, claims, <E"curit\, interests or encumbrances. herein-
;,;:er rderred to in this .....rticle 9 as "liens"; and that no
\\ ark, material< or C'quipmen! cOle:ed bv an .....pplication
;,-- Pa\ment \liI! b,-.'.e !Ken acc;~..rC'd b\ the Contractor,
O' by any other per,on periorming \\'ork at the site or
furnishing materials and equipn~ent for the Projec\. sub-
ject to an agreement under which an interest therein or
an encumbr,jnce thereon is retained by :he seller or oth-
erwise imposed bv the Contractor or "uch other per'-on.
9.4 CERTIFICATES fOR PAYMENT
9.4.1 The Architect will, within seven cays after the re-
ceipt of the Project Application ior Payment with the rec-
C>:1~mendations of the Constructic'n .\lanager, re\ ie\\' the
P'oject Application ior Payment 2nd either issue a Project
Certificate for Payment to the Owner \\ith a copy to the
CO:lstruction 1\~;lIlager for distribGtion to the Contractor
for such amounts as the Architect determines are prop-
er:v due. or notify the Construction ""1anager in writing of
the reasons for withholding a Certificate as pro\'ided in
Subpa ragraph 9.6.1. Such notification will be forwuded
to the Contractor by the Construction -'1anager.
9.4,2 The issuance of a Project Certilicate for Payment
will constitute a representation by the Architect to the
Owner that, based on the Architect's obsef\'ations at the
site as provided in Subparagraph 2.3.4 and the data com-
prising the Project Application for Payment, the Work has
progressed to the point indicated; that, to the best of the
Architect's knowledge, information and belief, the quality
of the Work is in accordance with the Contract Docu-
ments (subject to an e\aluation of the \\'ork for conform-
ance I\ith the Contract Documents upon Substantial
Completion of the Work. to the results of any subsequent
tests required by or performed under the Contract Docu-
ments, to minor deviations from the Contract Documents
correctable prior to completion. and to any specific quali-
fications stated in the Certificate); and that the Contrac-
tor is entitled to payment in the amount certified. How-
ever. by issuing a Project Certificate for Pa\ ment, the Ar-
chitect shall not thereby be deemed to represent that the
Architect has made exhaustive or continuous on-site in-
spections to check the quality or quantity of the \Vork,
has reviewed the construction means, methods, tech-
niques, sequences or procedures. or has made any exam-
ination to ascertain how or for what purpose the Contrac-
tor has used the monies previously paid on account of the
Contract Sum,
9.5 PROGRESS PAYMENTS
9,5.1 After the Architect has issued a Project Certificate
for Payment, the Owner shall make payment in the man-
ner and within the time provided in the Contract Docu-
ments.
9,5.2 The Contractor shall promptly pay each Subcon-
tractor upon receipt of payment from the Owner, out of
the amount paid to the Contractor on account of such
Subcontractor's Work. the amount to which said Subcon-
tractor is entitled, reflecting the percentage actually re-
tained, if any, from payments to the Contractor on ac-
count of such Subcontractor's Work. The Contractor ,hall
by an appropriate agreement with each 5ubcontr;ctor:
require each Subcontractor to make pa\ments to their
Sub-subcontractors in similar manner.
9.5.3 The Architect may, on request 2nd at the Archi-
~ect's discretion, furnish to any Subcontractor, if prac-
ticable. information regarding the percentages of com-
pletion or the ar:;ount" applied for b\ :he C:.'ntractc~ and
the action taken thereon by the Architect on account of
Work done by such Subcontractor.
9.5.4 "either the Owner. the Architect nor the Construc-
tion .\\anager shall have any obligation to pc\ or to ,ee to
the pavment of any monies to any 5ubcont~actor except
;'" may otherwise be required by law.
9.5.5 ~o certiiication of a progress payment, any prog-
ress pa\ment, or any partial or entire use or occupancy
of the Project b\ the Owner, shall constitL:te an accept-
ance of any \\fork not in accordance with the Contract
Documents.
9.6 PAYMENTS WITHHELD
9.6.1 The Architect, following consultation with the
Construction 1\lanager, may decline to certify payment
15 A201/CM --1980
"A DOCUME~T A201,CM . GE'ERAL CO'OITIO'-5 OF THE CO.'TRACT fOR CO'STRL'CTIO.'l
CO-..;ST;;UCTIO, ,'\A"GE.'\EST EDITIOS . JU~E 1980 E0l110N . AIA~ . CD i980 . THE
,\\\ERIC',", I'STI1UTE Of ARCHITECTS. l-})'EI\' YORK AVE. ','IV.. \IASH"GTON, D.C. ~0006
- , 'r '~.-
and may \\ ithhold the Certificate in whole or in parI to
the extent necessar, to reasonably protect the O\\ner, if,
in the Architect's opinion, the Architect is unable to make
representations to the Owner as provided in Subpara-
graph 9.4.2. If the Architect is unable to make representa-
tions to the Owner as provided in Subparagraph 9.4.2,
and to certiiy payment in the amount of the Project Ap-
plication, the Architect will notify the Construction !'v\an-
ager as pro\ided in Subparagraph 9.4.1. If the Contractor
and the Architect cannot agree on a revised amount. the
Architect \\ ill promptly issue a Project Certificate for Pay-
ment for the amount for which the Architect is able to
m.1ke such representations to the Owner. The Architect
may also decline to certify payment or, because of subse-
quently discovered evidence or subsequent obsefl'ations,
the Architect may nullify the whole or any part of any
Project Certificate for Payment previously issued to such
extent as may be necessary, in the Architect's opinion, to
protect the Owner from loss because of:
.1 defective \\fork not remedied;
.2 third party claims filed or reasonable evidence in-
dicating probable filing of such claims;
.3 failure of the Contractor to make payments prop-
erly to Subcontractors. or for labor, materials or
equipment;
.4 reasonable e\'idence that the Work cannot be com-
pleted for the unpaid balance of the Contract Sum;
.5 damage to the Owner or another contractor;
.6 reasonable evidence that the \\Iork will not be
completed \\ithin the Contract Time; or
.7 persistent failure to carry out the \\Iork in accord-
ance with the Contract Documents.
9.6.2 \\'hen the grounds in Subparagraph 9.6.1 above
are removed, payment shall be made for amounts with-
held because of them.
9.7 FAilURE OF PAYMENT
9.7.1 If the Construction Manager should fail to issue
recommendations \\ ithin seven days of receipt of the
Contractor's Application for Payment, or if, through no
fault of the Contractor, the Architect does not issue a
Project Certificate for Payment within seven days after
the Architect's receipt of the Project Application for Pay-
ment, or if the Owner does not pay the Contractor within
seven days after the date estab!ished in the Contract Doc-
uments any amount certified bv the Architect or awarded
b)' arbitration, then the Contractor may, upon se\'en addi-
tional days' written notice to the Owner, the Architect
and the Construction !\1.1nager. stop the \\lork until pay-
ment of the amount owing h2s been received. The Con-
tract Sum shall be increased bv the amount oi the Con-
tractor's reasonable costs of shut-down, delay and start-
up. which shall be effected by appropriate Change Order
in accordance with Paragraph 12.3.
9.8 SUBSTANTIAL COI...,PlETlON
9.8.1 When the Contractor considers that the Work, or a
designated portion thereof "hich is acceptable to the
Owner, is substantially complete as defined in Subpara-
graph 8.1.3. the Contractor shall prepare for the Construc-
tion Manager a list of items to be completed or cor-
rected. The failure to include any items on such list does
not alter the responsibility of the Contractor to complete
all Work III accordance With the Contract Documents.
When the Architect, on the baSIS oi inspection and con-
sultation with the Construction ,....'anager. determines that
the V.'ork or designated portion thereof is substantially
complete. the Architect will then prepare a Certificate of
Substantial Completion of the Work which shall establish
the Date oi Substantial Completion of the Work, shall
stale the responsibilities of the Owner and the Contractor
for security, maintenance, heat. utilities. damage to the
Work and insurance, and shall fix the time within which
the Contractor shall complete the items listed therein.
The Certificate of Substantial Completion of the Work
Skl/1 be submitted to the Owner and the Contractor for
their written acceptance of the responsibilities assigned to
them in such Certificate.
9.8.2 Upon Substantial Completion of the Work or desig-
nated portion thereof, and upon application by the Con-
tractor and certification by the Architect. the 0\\ ner shall
make payment, reflecting adjustment in retainage. if any.
for such Work or portion thereof as prQ\ided in the Con-
tract Documents.
9.8.3 When the Architect, on the basis of inspections,
determines that the Project or designated portion thereof
is substantially complete, the Architect will then prepare
a Certiiicate of Substantial Completion of the Project
which shall establish the Date oi SubsLlntial Completion
of the Project and fix the time \\ ithin \\ hich the Contrac-
tor shall complete any uncompleted items on the Certif-
icate of Sub5tantial Completion of the Work.
9.8.4 \Varranties required by the Contract Documents
shall commence on the Date of Substantial Completion of
the Project or designated portion thereof unless other-
wise provided in the Certificate of Substantial Comple-
tion of the \\'ork or designated portion thereof.
9.9 FINAL COMPLETION AND FINAL PA y/'.iENT
9.9.1 Following the Architect's issuance of the Certificate
of Substantial Completion of the \\ork or designated por-
tion thereoi. and the Contractor's completion of the
Work, the Contractor shall forward to the Construction
.....1anager a written notice that the Work is ready for final
inspection and acceptance, and shall also fomard to the
Construction ,"-\anager a final Application for Payment.
Upon receipt, the Construction "'anager will make the
necessary evaluations and forward recommendations to
the :\rchitect who will promptl\' make <uch in-pection.
\\'I':en the ,-\rchitect linds the '.\ork acceptable under
the Contract Documents and the Contract fully per-
formed. the Architect will issue a Project Certificate for
Payment which will approve the final payment due the
Contractor. This apprm'al will cono'titute a representation
that. to the best of the Architect's knowledge, informa-
tion and belief, and on the basis of observations and in-
spections, the Work has been completed in accordance
with the Terms and Conditions of the Contract Docu-
ments and that the entire balance found to be due the
Contractor. and noted in said Certificate, is due and pay-
able. The Architect's approval of said Project Certificate
for Payrl1ent will constitute a further representation that
the conditions precedent to the Contractor's being en-
titled to final payment as set forth in Subparagraph 9.9.2
hz\e been fulfilled.
AlA DOCUMU,T A201.C~\ . GENERAL cm.mmo"'s OF THE CO'TRACT FOR CO<;STRL:CTIO.'<
COi'STRUCTIOS MAi'ACE.\\Et-.:T EDITION . JUNE 1980 EDITIO,", . AIA~ . @ 1980 . THE
AMERICAN Ii'STITUTE OF ARCHITECTS. 1735 NEW YORK AVE.. N\\'.. \\'ASHI'GTOi'. DC. ~0006
A201/CM - 1980 16
9.9.2 Neither the final payment nor the remaining retain-
ace ~hall become due until the Contractor ~ubmits to the
-\<:chitect, through the Con~truction Manager, (1) an affi-
d2\ It that all payrolls, bills for materials and equipment,
and other indebtedness connected with the Work for
\\ hlch the Owner or the Owner's property might in any
"ay be responsible, have been paid or otherwise satis-
fied, (2) con~ent of surety, if any, to final payment, and
'3 if required by the Owner, other data establishing pay-
ment or satisfaction of all such obligations, such as re-
ceipts, releases and waivers of liens arising out of the
Ccoltract, to the extent and in such form as may be desig-
n2:ed by the Owner. If any Subcontractor refuses to fur-
ni-;, a release or waiver required by the Owner, the Con-
trector may furnish a bond satisfactory to the OV-.'ner to
indemnify the Owner against any such lien. If any such
lien remains unsatisfied after all payments are made, the
Contractor shall refund to the Owner all monies that the
letter may be compelled to pay in discharging such lien,
including all costs and reasonable attorneys' fees.
9.9.3 If, after Substantial Completion of the Work, final
completion thereof is materially delayed through no fault
of the Contractor or by the issuance of Change Orders
affecting final completion, and the Construction Manager
so confirms, the Owner shall, upon application by the
Contractor and certification by the Architect and without
terminating the Contract, make payment of the balance
due for that portion of the Work fully completed and
accepted. If the remaining balance for Work not fully
completed or corrected is less than the retainage stipu-
lated in the Contract Documents, and if bonds have been
furnished as provided in Paragraph 7.5, the written con-
sent of the surety to the payment of the balance due for
that portion of the \\lork fully completed and accepted
shell be submitted by the Contractor to the Construction
M2naser prior to certification of such payment. Such pay-
ment shall be made under the Terms and Conditions gov-
err.ing final payments, except that it shall not constitute a
waiver of claims.
9.9.4 The making of final payment shall, after the Date
of Substantial Completion of the Project, constitute a
wai\er of ell claims by the Owner except those arising
from:
.1 unsettled liens;
.2 faulty or defective Work appearing after Substan-
tial Completion of the Work;
.3 failure of the Work to comply with the require-
ments of the Contract Documents; or
A terms of any special warranties required by the
Contract Documents.
-9.9.5 The acceptance of final payment shal', after the
Date of Substantial Completion of the Project, constitute
a \'.eiver of all claims by the Contractor except those
pre'. ,ously made in writing and identified by the Contrac-
tor <S unsel1!ed at the time of the final Application for
Payment.
9.9,6 All provisions of this Agreement, including with-
out limitation those establishing obligations and proce-
dure;. shall remain in tull force and effect notwithstand-
ing the making or acceptance of final pavment prior to
the Date of Substantial Completion of the Project.
ARTICLE 10
PROTECTION OF PERSONS AND PROPERTY
10.1 SAFETY PRECAUTIONS AND PROGRAMS
10.1.1 The Contractor shall be responsible for initiating,
maintaining and supervising all safety precautions and
programs in connection with the \Nork.
10.2 SAFETY Of PERSONS AND PROPERTY
10.2.1 The Contractor shall take all reasonable precau-
tions for the safety of, and shall provide all reasonable
protection to prevent damage, injury or loss to:
.1 all employees on the Work and all other persons
who may be affected thereby;
.2 all the Work and all materials and equipment to
be incorporated therein, whether in storage on or
off the site, under the care, custody or control of
the Contractor or any of the Contractor's Subcon-
tractors or Sub-subcontractors;
.3 other property at the site or adjacent thereto, in-
cluding trees, shrubs, lawns, walks, pavements,
roadways, structures and utilities not designated
for removal, relocation or replacement in the
COurse of construction; and
.4 the work of the Owner or other separate contrac-
tors.
10.2.2 The Contractor shall give all notices and comply
with all applicable laws, ordinances, rules, regulations
and lawful orders of any public authority bearing on the
safety of persons or property or their protection from
damage, injury or loss.
10,2.3 The Contractor shall erect and maintain, as re-
quired by existing conditions and the progress of the
Work, all reasonable safeguards for safety and protection,
including posting danger signs and other warnings against
hazards, promulgating safety regulations and notifying
owners and users of adjacent utilities.
10.2.4 When the use or storage of explosives or other
hazardous materials or equipment is necessary for the
execution of the \"'ork, the Contractor shall exercise the
utmost care and shalf carry on such activities under the
super\'ision of properly qualified personnel.
10.2.5 The Contractor shall promptly remedy all damage
or loss (other than damage or loss insured under Para-
graph 11.3) to any property referred to in Clauses 10.2.1.2
and 10.2.13 caused in whole or in part by the Contrac-
tor. anv Subcontractor. any Sub-subcontractor. am'one di-
rectl~ or indirectly employed by any of them. or by any-
one for whose acts any of them may be liable, and for
which the Contractor is responsible under Clauses 10.2.1.2
and 10.2.1.3, except damage or loss attributable to the
acts or omissions of the Owner, the Architect, the Con-
struction Manager or anyone directly or indirectly em-
pia) ed by any of them. or by anyone for whose acts any
of them may be liable, and not attributable to the fault
or negligence of the Contractor. The foregoing obliga-
tions of the Contractor are in addition to the Contractor's
obllgctions under Par2graph 4.18.
10,2.6 The Contractor shall designate a responsible
member of the Contractor's organization at the site
whose duty shall be the prevention of accidents. This
person shall be the Contractor's superintendent unless
17 0\201/CM -1980
AlA DOCl'\\ENT A201!CM . ([',ERAl co.'mITIO'S Of THf CO.':TRACT fOR CO"STRLJCTIO~
CO~STRL CliO/\: MA/\:AGE\'E~T EDITlO!\: . JLJ!\E 1980 EDITION . AIA~ . (f.1980 . THE
.."',ERIC",' INSTITLJTE Of M:CHIHCTS. 1735 NEW YORK AVE. .': W.. \\'ASHI.'iCTO'l. DC. "0001.
V;AGN!~~G: Unliccrsed pl')!ocopyi!ig \';ol;:"!r::: U.S. c('::-yri~~',l i?~'!: Ec',d is SUh:f'ct 10 If';c' r,;o~ecufio~
othe~\\ise designated by the Contractor in writing to the
0\\ ner and the Construction .\1anager.
10.2.7 The Contractor shall not load or permit any part
of the Work to be 10,1ded so as to endanger its safety.
10.3 EMERGENCIES
10.3.1 In any emergency ai{ecting the safety of persons
or property the Contractor shall act, at the Contractor's
discretion, to prevent threatened damage, injury or loss.
Any additional compensation or extension of time
claimed by the Contractor on account of emergency
work shall be determined as provided in Article 12 for
Changes in the Work.
ARTICLE 11
INSURANCE
11.1 CONTRACTOR'S LIABILITY INSURANCE
11.1.1 The Contractor shall purchase and maintain insur-
ance for protection from the claims set forth below which
may arise out of or result from the Contractor's opera-
tions under the Contract, whether such operations be"by
the Contractor or by any Subcontractor, or by anyone di-
rectly or indirectly employed by any of them, or by any-
one ior whose acts any of them may be liable:
.1 claims under workers' or workmen's compensa-
tion, disability benefit and other similar employee
benefit acts;
.2 claims for damages because oi bodily injury, occu-
pational sickness or disease, or death of the Con-
tractor's employees;
.3 claims for damages because of bodily injury, sick-
ness or disease, or death of any person other than
the Contractor's employees;
A claims for damages insured by usual personal in-
jury liability coverage which are sustained (1) by
any person as a result of an offense directly or
indirectly related to the employment of such per-
son by the Contractor, or (2) by any other person;
.5 claims for damages, other than to the \",'ork itself,
because of injury to or destruction of tangible
property, including loss of use resulting therefrom;
and
.6 claims for damages because of bodily injury or
death of any person or property damage arising
out of the 0\'. ilershlP, maintenance or u,e of any
motor vehicle.
11.1,2 The insurance required by Subparagraph 11,1,1
shail be written for not less than any limits oi liability
specliied in the Contract Documents or required by law,
whichever is greater.
11.1.3 The insur;;nce required by Subparagraph 11.1.1
shall include contractual liability insurance app!icable to
the Contractor's obligations under Paragraph 4.18.
11.1.4 Certificates of Insurance acceptable to the O\',,'ner
shall be ,ubmilted to the COl1Struction Manager ior trans-
mitlalto the Owner prior to commencement of the Work.
These Certificates shall contain a provision that coverages
ah'orded under the policies will not be canceled until at
le2st thirty days' prior written notice has been given to
the Owner.
11.2 OWNER'S LIABILITY INSURANCE
11.2.1 The Owner shall be rC'sponsible for purchasing
and maintaining Owner's liability insurance and, at the
Owner's option, may purchase ,)Ild maintain insurance
for protection against claims which may arise' from
operations under the Contract.
11.3 PROPERTY INSURANCE
11.3.1 Unless otherwise provided, the 0\\ ner shall pur-
chase and maintain property insurance upon the entire
Work at the site to the full insurable \alue thereof. This
insurance shall include the interests oi the Owner, the
Construction Manager, the Contractor, Subcontractors
and Sub-subcontractors in the Work, and shall insure
against the perils of fire and extended coverage and shall
include "all risk" insurance for physical loss or damage
including, without duplication of coverage, theft, van-
dalism and malicious mischief. If the Owner does not
intend to purchase such insurance for the full insurable
value of the entire Work, the Owner shall inform the
Contractor in writing prior to commencement of the
Work. The Contractor may then effect insurance which
Will protect the interests of the Contractor, the Contrac-
tor's Subcontractors and the Sub-subcontractors in the
Work, and by appropriate Change Order the cost thereof
shall be charged to the Owner. If the Contractor is dam-
aged by failure of the Owner to purchase or maintain
such insurance and to so notify the Contractor. then the
Owner shall bear all reason<lble costs properly attributa-
ble thereto. If not covered under the all risk insurance
or otherwise provided in the Contract Documents, the
Contractor sha II effect and maintain similar property in-
surance on portions of the \o\Iork stored off the site or in
transit when such portions of the Work are to be in-
cluded in an Application for Payment under Subpara-
graph 9.3.2.
11.3.2 The Owner shall purchase and maintain such
boiler and machinery insurance as ma\, be required by
the Contract Documents or by law. This insurance shall
include the interests of the Owner, the Construction .\1an-
ager, the Contractor. Subcontractors and Sub-subcontrac-
tors in the V'/ork.
11.3,3 Any loss insured under Subparagraph 113.1 is to
be adjusted with the Owner and made payable to the
OIl ner as trustee for the insureds, as their interests may
appear, subject to the requirements of any applicable
mortgagee clause and of Subparagraph 11.3.8. The Con-
tractor shall pay each Subcontractor a just share of any
insurance monies received by the Contractor, and by ap-
propriate agreement, written where legally required for
lalidlty, shall require each Subcontractor to make pay-
ments to their Sub-subcontractors in similar manner.
11.3.4 The Owner shall file a copy of all policies with
the Contractor before an e:>-posure to loss mal occur.
11.3.5 If the Contractor requests in writing that insur-
ance for risks other than those described in Subpara-
graphs 11,3.1 and 11.3.2, or other special hazards, be
included in the property insurance poliC\', the Owner
shall, if possible, include such insurance, and the cost
thereof shall be charged to the Contractor by appropriate
Change Order.
AlA DOCUMENT A201!CM . GU-':ER~l CO"DI~ 10'lS OF T HE CONTRACT FOR CO"51 Rl'CTIO"
CO"STRUClION MANAGL,\ENT ED!TION . JUNE ,980 EDITION . AIA~ . (01980 . THE
A"ERICAN INSTITUTE OF ARCHITECTS, 1735 NEI\' \ORK AVE. ".\\'., \\',~SHI"GTO", D.C.:'()(l(\6
A201/CM --1980 18
11.3.6 The OIl ner and the Contractor waive all rights
agaimt (1 J each other and the Subcontractors, Sub-sub-
CO;1tractors, agents and employees of each other, and (2)
the Architect, the Construction Manager and separate con-
tractors, if any, 2nd their subcontractors, sub-subcontrac-
tors, agents and employees, for damages caused bv fire or
other perils to the extent covered bv insurance obtained
fHwcuantto this Paragraph 11.3 or any other property in-
surance applicable to the VVork, except such fights as
they may have to the proceeds of such insurance held
bl the Owner as trustee. The foregoing waiver aiforded
the Architect. the Construction Manager, their agents and
employees shall not extend to the liability impo<.ed by
Subparagraph 4.18.3. The Owner or the Contractor, as
appropriate, shall require of the Architect, the Construc-
tion Manager, separate contractors, Subcontractors and
Sub-subcontractors by appropriate agreements, written
where legally required for validity, similar waivers each
in favor of all other parties enumerated in this Sub-
paragraph 11.3.6.
11.3.7 If required in writing by any party in interest, the
Owner as trustee shall, upon the occurrence of an in-
sured loss, give bond for the proper performance of the
Owner's duties. The Owner shall deposit in a separate
account any money so received, and shall distribute it in
accordance with such agreement as the parties in interest
mal' reach. or in accordance with an award by arbitration
in ;vhich case the procedure shall be as provided in Para-
graph 7.9. If after such loss no other special agreement
is made, replacement of damaged Work shall be covered
bv an appropriate Change Order.
11.3.8 The Owner, as trustee, shall have power to adjust
and settle any loss with the insurers unless one of the
parties in interest shall object. in writing within five days
aiter the occurrence of loss, to the Owner's exercise of
this pOller, and if such objection be made, arbitrators
shall be chosen as provided in Paragraph 7.9. The Owner
as trustee shall. in that case, make settlement with the
insurers in accordance with the directions of such arbi-
trators. If distribution of the insurance proceeds by arbi-
tration is required. the arbitrators will direct such dis-
tribution.
11.3.9 Ii the Owner finds it necessary to occupy or use
a portion or portions of the Work prior to Substantial
Completion thereof, such occupancy shall not commence
prior to a time mutually agreed to by the Owner and the
Contractor and to which the insurance compam' or com-
r;.'.nies prO\'id'~g the property insurance have c(1r1sented
bl endorsement to the policy or policies. This insurance
shall not be canceled or lapsed on account of such partial
occupancy. CO'1sent of the Contractor and of the insur-
ance C0'T1pam or companies to such occupancy or use
shall not be unreasonably withheld.
11.4 LOSS OF USE INSURANCE
11.4.1 The Owner, at the Owner's option, may purchase
and maintain insurance for protection against loss of use
of the Owner's property due to fire or other hazards,
howeler caused. The Owner wailes all rights of action
a"ainst the Contractor for loss of use of the Owner's
p~opelty, including consequential losses due to fire or
other hazards however caused, to the extent covered by
insurance under this Paragraph 11.4.
ARTIClE 12
CHA~GES IN THE WORK
12.1 CIiA~GE ORD[RS
12.1.1 A Chanfe Older is a written order to the Con-
trdctor <igned to .holl the recommendation of the Con-
struction Manase' the appro\'al of the I\rchitect and the
authoriz"tion 01 t~e Owner, issued after execution oi the
Contract, authorizing a change in the Work or an adjust-
ment in the Co~tract Sum or the Contract Time. The
Contract Sum a~d the Contract Time may be changed
only by Change Order. A Change Order signed by the
Contractor indica:es the Contractor's agreement there-
with, including ::-:e "djustment in the Contract Sum or
the Contract Time.
12.1.2 The O\\ner, lIithout Invalidating the Contract,
may order chanEes in the Work within the general scope
of the Contract consisting of additions, deletions or other
rel'isions. the COrltract Sum and the Contract Time being
adjusted accordingly. All such changes in the Work shall
be authorized bl Change Order, and shall be performed
under the applicable conditions of the Contract Docu-
ments.
12.1.3 The cost or credit to the Owner resulting from a
change in the Work shall be determined in one or more
of the following \lays:
.1 by mutuel acceptance of a lump sum properly
itemized cr1d <upported by sufficient sub<.tanti2.ting
data to pe:mit evaluation;
.2 by unit prices stated in the Contract Documents or
subsequently agreed upon;
.3 by cost to ~e determined in a manner agreed upon
by the pa'tles and a mutually acceptable fixed 0
percenta /=e fee; or
.4 by the method provided in Subparagraph 12.1.4.
12.1.4 If none of the methods set forth in Clauses
12.1.3.1,12.1.3.2 or 12.1.3.3 is agreed upon, the Contrac-
tor, pro\'ided a \\ ritten order signed by the 0\\ ner is re-
cei\'ed, shall promptly proceed with the \\lork in\'olved.
The cost of suc;, Work shall then be determined bl' the
Architect, after consultation with the Construction .'\an-
ager, on the basis of the reasonable expenditures and
salings of those periorming the Work attributable to the
change, includi"~ in the case of an increase in the Con-
tract Sum, a reasonable allowance for olerhead and
profit. In such case. and also under Clauses 12.1.3.3 and
12.1.3.4 ,1bOlE' '~e Contractor shall keep and present. in
such form as tr:, O,'.ner. the Architect or the Construc-
tion Manager mal prescribe. an itemized accounting to-
gether with ap;:'opriate supporting data for inclusion in
a Change Order. Unless otherwi<e provided in the Con-
tract Documents cost shall be limited 10 the falla\', ing:
cost of materials. including sales tax and cost of delil er~':
cost oi labor. ir1cluding 'ocial "ecurity. old age 2~d
unemployment i~surance. and fringe benefits required bl'
agreement or custom; workers' or workmen's compensa'-
tion insurance; bond premiums; rental value of equip-
ment and mad-.:ner\'; and the additional cO<.ts of super-
\'ision "nd field oilice personnel directly attributablc to
the change. Pef'ding final determination of cost to the
Owner. payments on account shall be made on the Ar-
chitect's approlel of a Project Certificate for Payment.
19 A201/CM --1980
AlA. DOCUMENT A201/CM . GE~ERAL CC'-:JITIO<':S OF THE C01'>TR,\CT FOR COSS1RLCTIO
CO<':STRUCTION MAt-!AGEMEI'T WIlIO' . JL'SE 1950 EDIT lOt-! . AlA'" . 01960 . TIiE
.^.'.\ERICA"i Ii'>STI1LTE Of ARCHIHC1S. ",5 ,-,\\, YORK AVE. 1'11'., \\ASHIi'>GTOi'>, D.C COOO:";
V/f'.RI"NG: Un!iCfn~"cl pholocopying violales 1)5. copyrighllaws end ;~ su~--cllo legal r'csecu!ion.
The amount of credit to be allowed by the Contractor to
the O\\ner for any deletion or change which results in a
net decrease in the Contract Sum will be the amount of
the actual net cost as confirmed by the Architect aiter
consultation with the Construction Manager. When both
additions and credits covering related Work or substitu-
tions are involved in anyone change, the allowance for
0\ erhead and profit shall be figured on the basis of the
net increase, if any, with respect to that change.
12.1.5 If unit prices are stated in the Contract Docu-
ments or subsequently agreed upon, and if the quantities
originally contemplated are so changed in a propo.sed
Change Order that application of the agreed unit prices
to the quantities of Work proposed will cause substantial
inequity to the Owner or the Contractor, the applicable
unit prices shall be equitably adjusted.
12.2 CONCEALED CONDITIONS
12.2.1 Should concealed conditions encountered in the
performance of the Work below the surface of the ground
or should concealed or unknown conditions in an existing
structure be at variance with the conditions indicated by
the Contract Documents, or should unknown physical
conditions below the surface of the ground or should
concealed or unknown conditions in 'an existing struc-
ture oi an unusual nature, differing materially from those
ordincrily encountered and generally recognized as in-
herent in work of the character provided for in this Con-
tract. be encountered, the Contract Sum shall be equita-
bly adjusted by Change Order upon claim by either party
made within twenty days after the first observance of the
conditions.
12.3 ClAIMS FOR ADDITIONAL COST
12.3.1 If the Contractor wishes to make a claim for an
increase in the Contract Sum, the Contractor shall give
the Architect and the Construction Manager written no-
tice thereof within twenty days after the occurrence of
the e\ ent giving rise to such claim. This notice shall be
gi\'en bv the Contractor before proceeding to execute the
\Vork. except in an emergency endangering life or prop-
erty in which case the Contractor shall proceed in ac-
cordance with Paragraph 10.3. No such claim shall be
\alid unless so made. If the Owner and the Contractor
cannot agree on the amount of the adjustment in the
Contract Sum, it shall be determined by the Architect
after consultation with the Construction Manager. Any
change in the Contract Sum resulting from such claim
,I-,a!: ::;e authorized by Change Order.
12.3.2 If the Contractor claims that additional cost is in-
\'olved became of, but not limited to. (11 an\' \\ritten in-
terpretation pur~uant to Subparagraph 2.3.11. 121 any or-
der b\ the Owner to stop the \Vork pur'uant to Para-
graph 3.3 where the Contractor was not at fault. or any
~uch o~der by the Construction Manager as the Owner's
agent. i3l any written order for a minor change in the
\\'ork i~sued pursuant to Paragraph 12.4, or (41 failure of
payment by the Owner pursuant to Paragraph 9.7. the
Cont'ector shall make sllch claim as pro\'ided in Sub-
p<;ra~-2ph 12.3.1.
12.4 MINOR CHANGES IN THE \VORK
12.4.1 The Architect will have authority to order minor
chant:es in the Work not involving an adjustment in the
Contract Sum or extension of the Contract Time and not
inconsistent with the intent of the Contract Documents.
Such changes shall be effected by written order issued
through the Construction Manager, and shall be binding
on the Owner and the Contractor. The Contractor shall
carry out such written orders promptly.
ARTICLE 13
UNCOVERING AND CORRECTION OF WORK
13.1 UNCOVERING OF WORK
13.1.1 If any portion of the \\Iork should be covered
contrary to the request of the Architect or the Construc-
tion Manager, or to requirements specifically expressed in
the Contract Documents, it must, if required in writing by
either, be uncovered for their observation and shall be
replaced at the Contractor's expense.
13.1.2 If any other portion of the Work has been cov-
ered which the Architect or the Construction Manager
has not specifically requested to observe prior to its being
covered, either may request to see such \\lork and it shall
be uncovered by the Contractor. If such Work be found
in accordance with the Contract Documents, the cost of
uncovering and replacement shall, by appropriate Change
Order, be charged to the Owner. If such Work be found
not in accordance with the Contract Documents, the
Contractor shall pay such costs unless it be found that
this condition was caused by the Owner or a separate
contractor as provided in Article 6, in which event the
Owner shall be responsible for the payment of such costs.
13.2 CORRECTION OF WORK
13,2.1 The Contractor shall promptly correct all Work
rejected by the Architect or the Construction Manager as
defective or as failing to conform to the Contract Docu-
ments whether observed before or after Substantial Com-
pletion of the Project and whether or not fabricated, in-
stalled or completed. The Contractor shall bear all costs
of correcting such rejected Work, including compensa-
tion for the Architect's and the Construction .\1anager's
additional services made necessary thereby.
13.2.2 If, within one ~ear after the Date of Substantial
Completion of the Project or designated portion thereof,
or within one ~ear after acceptance by the Owner of
designated equipment, or within such longer period of
time as may be prescribed by law or by the terms of any
applicable special warranty required bv the Contract Docu-
ments, any of the \,\'ork i~ found 10 be defccti\e or nol in
accordance with the Contran Documents, the Contractor
shall correct it promptly after receipt of a \\ ritten notice
from the Owner to do '0 unless the Owner has previ-
ously gi\'en the Contractor a \\ rrtten acceptance of such
condition. This oblig,'tion ,hall 'lIrvive both final pa\ ment
for the Work or de'ignaled porIon thereof and termi.'1a-
lion of the Contract. The Owner shall give such notice
promptly aiter disco\ef\ of the condition.
13.2.3 The Contractor shall remove from the site all
portion' of the \\'ork \\hich are defective Or nonconiorm-
ing and which f','.\ e not been corrected under Suhpara-
graphs 4.5.1, 132.1 "no 13.2.2, unless lemO\al is wai\ed
by the Owner.
13.2.4 If the Contractor jails to correct defecti\e or non-
conforming Work as pro\'ided in Subparagraphs 4.5.1,
AlA DOCUMENT A201/CM . GE'ER~l CO'DI110'S OF THE CO"1R~CT fOR CO'STRUCTION
CO"SE~ CTION \\ANAGEMENT EDITION . JLJSE 1980 ED1110:-': . AlA'!, . (fJ 1980 . lHE
~"[R;~~" I'STI1LJH OF ARCHITEC1S. 1735 SEW 'ORK .WE. ,,\\' \\ ~SHI'GTO". D.C. 20006
\.'::-' 1',~ ) I;.... 1"'.- cc--'
A201/CM --1980 20
. _ , " 'co _~. '~\''':'~ L , ';~\' ,-
13.2.1 and 13.2.2, the Owner may correct it in accordance
with Paragraph 3.4.
13.2.5 If the Contractor does not proceed with the cor-
rection of such defective or nonconforming \Vork within
a reasonable time fixed by written notice from the Archi-
tect issued through the Construction Manager, the Owner
may remove it and may store the materials or equipment
at the expense of the Contractor. If the Contractor does
not pay the cost of such removal and storage within ten
days thereafter, the Owner may, upon ten additional
days' written notice, sell such Work at auction or at pri-
vate sale and shall account for the net proceeds thereof,
after deducting all the costs that should have been borne
by the Contractor, including compensation for the Archi-
tect's and the Construction Manager's additional services
made necessary thereby. If such proceeds of sale do not
cover all costs which the Contractor should have borne,
the difference shall be charged to the Contractor and an
appropriate Change Order shall be issued. If the payments
then or thereafter due the Contractor are not sufficient to
cover such amount, the Contractor shall pay the differ-
ence to the Owner.
13.2.6 The Contractor shall bear the cost of making
good all work of the Owner or separate contractors de-
stroyed or damaged by such correction or removal.
13.2.7 Nothing contained in this Paragraph 13.2 shall be
construed to establish a period of limitation with respect
to any other obligation which the Contractor might have
under the Contract Documents, including Paragraph 4.5
hereof. The establishment of the time periods noted in
Subparagraph 13.2.2, or such longer period of time as
may be prescribed by law or by the terms of any warranty
required by the Contract Documents, relates only to the
specific obligation of the Contractor to correct the \"'ork,
and has no relationship to the time within which the
Contractor's obligation to comply with the Contract Doc-
uments may be sought to be enforced, nor to the time
within which proceedings may be commenced to estab-
lish the Contractor's liability with respect to the Contrac-
tor's obligations other than <pecifically to correct the
Work.
13.3 ACCEPT ANCE OF DEFECTIVE OR
NONCONFORMING WORK
13.3.1 If the Owner prefers to accept defecti\e or non-
conforming Work, the O\\ner may do so instead of requir-
ing its removal and correction, in which case a Change
Order will be issued to reflect a reduction in the Contract
Sum where appropriate and eqUitable. Such adjustment
shall be efiected whether or not final payment has been
made.
14.1
14.1.1
under
ARTICLE 14
TERMINATION OF THE CONTRACT
1ERMINAlION BY THE CONTRACTOR
If the Work is stopped for a period of thirty days
an order of any court or other public authority
having jurisdiction, or as a result of an act of government
such as a declaration of a national emergency making
materials unavailable, through no act or fault of the Con-
tractor or a Subcontractor or their agents or employees or
any other persons performing any of the Work under a
contract with the Contractor, or if the Work should be
<topped for a period of thirty days by the Contractor be-
cause of the Construction Manager's failure to recom-
mend or the Architect's failure to issue a Project Certifi-
cate for Payment as provided in Paragraph 9.7 or because
the Owner has not made payment thereon as provided in
Paragraph 9.7, then the Contractor may, upon se\en addi-
tional days' written notice to the Owner, the Architect
and the Construction Manager, lerminate the Contract and
recover from the Owner payment for all \Vork executed
and for any proven loss sustained upon any materials,
equipment, tools, construction equipment and machinery,
including reasonable profit and damages.
14.2 TERMINATION BY THE OWNER
14.2.1 If the Contractor is adjudged a bankrupt, or
makes a general assignment for the benefit of creditors,
or if a receiver is appointed on account of the Contrac-
tor's insolvency, or if the Contractor persistently or re-
peatedly refuses or fails, except in cases for which exten-
sion of time is provided, to supply enough properly
skilled workers or proper materials, or (ails to make
prompt payment to Subcontractors or for materials or
labor, or persistently disregards laws, ordinances, rules,
regulations or orders of any public authority having juris-
tlon, or otherwise is guilty of a substantial violation of a
provision of the Contract Documents, and fails within
seven days after receipt of written notice to commence
and continue correction of such default, neglect or viola-
tion \\Jlh diligence ,md promptness, the Owner, upon
certification by the Architect ,liter consultation with the
Construction :\1anager that suf1'icient cause exists to justify
ouch action, may, after seven days following receipt by
the Contractor of an additional 1\ ritten notice and with-
out prejudice to any other remedy the Ol\ner may have,
terminate the employment of the Contractor and take
possession of the site and of all materials, equipment,
tools, construction equipment and machinery thereon
owned by the Contr.lctor and may finish the Work by
whatever methods the Owner may deem expedient. In
,uch case the Contractor shall not be entitled to receive
any further payment until the \Vork is finished.
14.2.2 If the unpaid balance o( the Contract Sum ex-
ceeds the costs of iinishing the \\'ork, includ ~g compen-
sation for the Architect's and the Construction "anager's
"dditional services made necessary thereby, such excess
,hall be paid to the Contractor. If such costs exceed the
unpaid balance, the Contractor shall pay the difference
to the Owner. The amount to be pilid to the Contractor
()r to the 01\ ner, as the case mav be. ,b,111 be certified by
the Architect. upon application, in the manner provided
in Paragraph 9.4, and this obligation for payment shall
cUr\'ive the tprmination ()( the Contract.
21 A201/CM --1980
AlA DOCU\\ENT ~~Ol.CM . CENERAL CO:>;01110NS OF THE CaNT RACT FOR CONS1 RlCTION
CONSTRl'CTION ".\NACE\\ENT EDITION . JL:NE 1980 EDITION . AIA~ . ;f; 1980 . THE
.\\\LRI(o\N INSTill TE OF .o\RCIiIHCTS. 1~3) NEIl YORK AYE,. N 1\. II'ASHINCTO,N, D,C. :'0006
SECTION 00805
SUPPLEMENTARY GENERAL CONDITIONS
Information contained in this Supplementary Conditions amends,
supplements or clarifies the "General Conditions of the Contract
for Construction, Construction Management Edition, AlA Document
A201/CM dated June 1980 Edition.
In cases of conflict between the General Conditions and these
Supplementary Conditions, wording of this section shall govern.
ARTICLE 1
1. Subparagraph 1.1.3 - third line-after the word
"construction," delete the remaining words and insert the
following:
"and all supplies, tools, construction equipment and
machinery, water, heat, utilities, transportation, and other
facilities, services, and incidentals necessary for the
proper execution and completion of such construction; except
as expressly noted in the Scope of Work or the General
Requirements of the Contract."
2. Subparagraph 1.2.1 - delete in its entirety.
3. Subparagraph 1.2.3 - after the last word "meanings" in the
paragraph add the following sentence:
"In case of discrepancy or disagreement in the contract
documents, specifications, and/or drawings, the ORDER OF
PRECEDENCE shall be:
Contract Agreement
The addenda as issued
The Supplementary General Conditions
General Conditions
The General Requirements
The Technical Specifications
The Drawings (Large scale detail drawings take
precedence over smaller scale general drawings).
Note: Do not rely on scaled dimensions on drawings,
and any discrepancies found shall be brought to the
attention of the A/E through the CM.
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 1
4. Add new subparagraph 1.2.5 as follows:
"Where on any of the drawings a portion of the Work is drawn
out and the remainder is indicated in outline, the parts
drawn out shall also apply to all other like portions of the
Work."
5. Add new subparagraph 1.3.2 as follows:
"Unless otherwise provided in the Contract Documents, the
Trade Contractor will be furnished, free of charge, all
copies of Drawings and Specifications reasonably necessary
for the execution of the Work."
ARTICLE 2
1. Subparagraph 2.2.1 - after the word "representative", add:
"The Construction Manager is not the General Contractor and,
unless otherwise expressly provided in the Contract
Documents, does not assume any of the traditional duties of
a General Contractor. The term Construction Manager means
the Construction Manager acting through his authorized
representative."
2. subparagraph 2.3.4 - first sentence after the word
"Architect," add "along with the Construction Manager."
3. Subparagraph 2.3.7 - after the word "properly," add:
"It is the intent of the Contract Documents to allow the
Construction Manager to schedule the performance of all Work
and the contractors are expected to follow all such schedule
direction. Should a contractor, either in person or through
his subcontractor, supplier, or vendor, fail to maintain
progress according to the Project Schedule and approved
Contractor's Schedule, or cause delay to another Contractor:
he shall furnish additional labor and/or services such as
overtime as may be necessary to brinq his operations up to
schedule, all at no additional cost to the Owner."
4. Subparagraph 2.3.15 - delete in its entirety.
5. Subparagraph 2.3.18 - delete the word "reasonable" in the
sixth (6th) line. After the word "promptness", add
"consistent with the constraints of the project schedule so
as to cause no delay."
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 2
6. Subparagraph 2.3.23 - delete the phrase "against whom the
Contractor makes no reasonable objection and." Also, delete
the last sentence in the subparagraph in its entirety.
ARTICLE 3
1. Subparagraph 3.3.1 - delete from the last sentence the
phrase, "..., except to the extent required by Subparagraph
6.1.3"
2. Subparagraph 3.4.1 - substitute three (3) days notice in
each case for the seven (7) day notices stipulated. Add at
end of subparagraph the following: "In the event of clean-
up issues, Owner has right to provide a minimum of 24 hours
notice. In the event of safety issues determined to be of a
serious nature, as determined by the CM, notice will given,
and contractor is required to rectify deficiency
immediately."
3. Subparagraph 3.2.1 - delete in its entirety.
ARTICLE 4
1. Subparagraph 4.1.1 - delete in its entirety and insert the
following:
"The Contractor is the same person or entity identified as
the Trade Contractor. A Trade Contractor is the person or
entity identified as such in the Agreement between the Owner
or Construction Manager and a Trade Contractor. The term
Trade Contractor includes one who furnishes material worked
to a special design but does not include one who furnishes
material not so worked and is referred to throughout the
Contract Documents as if singular in number and masculine in
gender. The term Trade Contractor means the Trade
Contractor or his authorized representative."
2. Add new subparagraph 4.4.3 as follows:
"The Contractor is responsible for the conduct of his
employees at all times. Misconduct, destruction of
property, unsafe practices, or violation of any Federal or
State regulations including abuse of alcohol or drugs, will
be cause for permanent dismissal from the project. If any
Contractor employee is determined to be detrimental to the
Project, as deemed by the Construction Manager, the
Contractor will remove and/or replace the employee at the
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 3
request of the Construction Manager. Employees dismissed
from the project will be transported from the jobsite at the
Contractor's expense.1I
3. Add new subparagraph 4.4.4 as follows:
"The Trade Contractor shall be totally responsible for the
security of his work, materials, equipment, supplies, tools,
machinery, and construction equipment.1I
4. Add new subparagraph 4.4.5 as follows:
"The Trade Contractor shall be responsible for complete,
timely and accurate field measurements as necessary for
proper coordination, fabrication and installation of his
materials and equipment. The Trade Contractor agrees to
cooperate with the Construction Manager, if required, to
accommodate any discovered variations or deviations from the
Drawings and Specifications so that the progress of the Work
is not adversely affected.1I
5. Subparagraph 4.9.1 - add the following sentence:
"The superintendent shall be satisfactory to the
Construction Manager and shall not be changed except with
the consent of the Construction Manager, unless the
superintendent proves to be unsatisfactory to the Trade
Contractor or ceases to be in his employ."
6. Subparagraph 4.10.1 - add the following sentence:
"This schedule, to be submitted within three (3) days after
Contract Award, shall indicate the dates for the starting
and completion of the various stages of construction, shall
be revised as required by the conditions of the Work, and
shall be subject to the Construction Manager's approval.1I
7. Add new subparagraph 4.10.2:
"The Construction Manager will conduct a weekly scheduling
meeting which the Contractor shall attend. At this meeting,
the parties can discuss jointly such matters as progress,
scheduling, and problems. II
8. Add new subparagraph 4.12.9:
"If materials specified in the Contract Documents are not
available on the present market, the Trade Contractor may
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 4
submit data on substitute materials through the Construction
Manager to the Architect/Engineer for approval by the
Owner."
9. Subparagraph 4.14.1 - add at line 3 after "properly":
"He shall also provide protection of existing work as
required."
10. Subparagraph 4.14.2 - at end of paragraph, add:
"When structural members are involved, the written consent
of the Architect/Engineer shall also be required. The Trade
Contractor shall not unreasonably withhold from the
Construction Manager or any separate contractor his consent
to cutting or otherwise altering the Work."
11. Add new subparagraph 4.14.3:
"The Trade Contractor shall arrange for any blockouts,
cutouts, or opening required for the installation of his
materials and equipment and the execution of his work,
whether or not shown or indicated on the Drawings. The
Trade Contractor shall be further responsible for sealing
and/or finishing, in an acceptable fashion and meeting any
applicable code requirements, any such blockout, cutout
opening, or other hole in any fire-rated floor, ceiling,
wall, security wall, or any other finished surface".
12. Subparagraph 4.15.1 - at end of paragraph, add:
"Clean up shall be performed to the satisfaction of the
Owner or Construction Manager."
13. Add new subparagraph 4.16.2:
"The Trade Contractor shall promptly return telephone calls
or respond to any other form of communication initiated by
the Construction Manager. Failure to promptly do so shall
be considered a lack of performance on the part of the Trade
Contractor, and may be considered grounds for replacement of
site personnel."
14. Add new Subparagraph 4.16.3:
"All written correspondence to the Construction Manager
shall be serialized, dated, and signed by an authorized
representative of the Trade Contractor. The correspondence
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 5
15. Subparagraph 4.2.1 - at the end of the paragraph, add the
following:
liThe Owner and the Architect have acknowledged that
nothing in the Architect's engagement implies any
undertaking by the Architect for the benefit of or
which may be enforced by the Contractor, its
subcontractors, or the surety of any of them; it being
understood that the Architect's obligations are to the
Owner and that, in performing such obligations, the
Architect may increase the burdens and expenses of the
Contractor, its subcontractors, or the surety of any of
them. Neither the Contractor, any Subcontractor, nor
the surety of any of them shall bring any civil suit or
other legal action against the Architect arising out of
or in connection with the Project."
03/02/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 6)
00805 -5a
16. Subparagraph 4.18.1 - delete from the 10th line, the phrase,
"... (other than the h'ork itself)...1I
At the end of the paragraph add the following paragraph:
liThe first ten dollars ($10) of remuneration paid to the
CONTRACTOR is for the indemnification provided for above."
SUPPLEMENTARY GENERAL CONDITIONS(ADD. 10) 00805 -5B
04/16/92
shall be directed to:
Morrison-Knudsen/Gerrits
P.O. Box 5283
Key West, Florida 33040
Attn: Doug Fuller
or hand delivered to Morrison-Knudsen/Gerrits' office
located at 5090 Junior College Road, stock Island, Florida
33040.
serialization procedures will be provided to the Trade
Contractor in the pre-construction meeting."
Each trade contractor shall be required to check his
designated mailbox regularly. This mailbox will be made
available, and located by the Construction Manager.
ARTICLE 5
1. Subparagraph 5.2.3 - delete in its entirety and insert the
following:
"If the O~~er or Construction Manager refuses to accept any
person or entity on a list submitted by the Trade Contractor
in response to the requirements of the Contract Documents,
the Trade Contractor shall submit an acceptable substitute;
however, no increase in the Contract Sum shall be allowed
for any such substitution."
ARTICLE 6
1. Subparagraph 6.1.1 - delete the last sentence.
2. Subparagraph 6.1.3 - delete in its entirety, and insert the
following:
"It shall be the responsibility of each contractor to
coordinate his work with the work of other contractors
on the site. The Owner, A/E and Construction Manager
shall be held harmless of any and all costs associated
with improper coordination."
3. Subparagraph 6.2.5 - sixth line, after the word "initiates,"
delete the words "an arbitration proceeding" and substitute
"a claim;" tenth line, delete the words "at the Owner's
expense, and"; thirteenth line, after the words "and court
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 6
or,lI delete the word lIarbitrationll and substitute "claim."
4. Add new subparagraph 6.2.6:
IIShould the Contractor contend that he is entitled to
an extension of time for completion of any portion or
portions of the work, he shall, within (72) hours of
the occurrence of the cause of the delay, notify the
Construction Manager in writing, of his contention:
setting forth (A) The cause for the delay, (B) A
description of the portion or portions of work affected
thereby, and (C) all details pertinent thereto. A
subsequent written application for the specific number
of days of extension of time requested shall be made by
the Contractor to the Construction Manager within (72)
hours after the delay has ceased to exist.
It is a condition precedent to the consideration or
prosecution of any claim for an extension of time that
the foregoing provisions be strictly adhered to in each
instance and, if the Contractor fails to comply, he
shall be deemed to have waived the claim.
The Contractor agrees that whether or not any delay,
regardless of cause, shall be the basis for an
extension of time he shall have no claim against the
Owner, A/E or Construction Manager for an increase in
the contract price, nor a claim against the Owner, A/E
or Construction Manager for a payment or allowance of
any kind for damage, loss or expense resulting from
delays: Nor shall the Contractor have any claim for
damage, loss or expense resulting from interruptions
to, or suspension of, his work to enable other
contractors to perform their work. The only remedy
available to the Contractor shall be an extension of
time."
ARTICLE 7
1. Subparagraph 7.1.1 - delete in its entirety and insert the
following:
"The contract shall be governed by the laws of the State of
Florida. Venue for any claims or disputes arising under
this contract shall be in the Circuit Court of the 16th
Judicial Circuit of the State of Florida."
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 7
2. Subparagraph 7.2.1 - delete in its entirety and insert the
following:
"The Owner or Construction Manager (as the case may be) and
the Trade Contractor each binds himself, his partners,
successors, assigns, and legal representatives of such other
party in respect to all covenants, agreements, and
obligations contained in the Contract Documents. Neither
party to the Contract shall assign the Contract or sublet it
as a whole without the written consent of the other."
3. Add new Subparagraph 7.2.2:
"The Trade Contractor shall not assign any monies due or to
become due under this Contract without prior written consent
of the Owner or Construction Manager. II
4. Subparagraph 7.8.1 - delete in its entirety.
5. Paragraph 7.9 'Arbitration' and all associated subparagraphs
7.9.1, 7.9.2, & 7.9.3 - delete in their entirety.
ARTICLE 8
1. Subparagraph 8.3.1 - delete in its entirety and insert the
following:
"If the Trade Contractor is delayed, at any time, in the
progress of the Work, by any act or neglect of the Owner,
Construction Manager, or the Architect/Engineer, or by any
employee of either, or by any separate contractor employed
by the Owner, or by changes ordered in the Work, or by fire,
unusual delay in transportation, adverse weather conditions
not reasonably anticipatable, unavoidable casualties or any
causes beyond the Trade Contractor's control, or by delay
authorized by the Owner, Construction Manager, or by any
other cause which the Construction Manager determines may
justify the delay, then the Contract Time shall be extended
by no cost Change Order for such reasonable time as the
Construction Manager may determine, in accordance with
subparagraph 6.2.6."
2. Subparagraph 8.3.2 - replace the remainder of the Paragraph
after the word "waived" in line 4 with the following:
"Any claim for extension of time shall state the cause of
the delay and the number of days of extension requested. If
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 8
the cause of the delay is continuing, only one claim is
necessary, but the Trade Contractor shall report the
termination of the cause for the delay within twenty (20)
days after such termination; otherwise, any claim for
extension of time based upon that cause shall be waived."
3. subparagraph 8.3.4 - delete in its entirety and insert the
following:
"It shall be recognized by the Trade Contractor that he may
reasonably anticipate that as the job progresses, the
construction Manager will be making changes in, and updating
Construction Schedules. No claim for an increase in the
Contract Sum for either acceleration or delay will be
allowed for extensions of time pursuant to this Paragraph
8.3 or for other changes in the Construction Schedules which
are of the type ordinarily experienced in projects of
similar size and complexity."
4. Add new subparagraph 8.3.5:
"If the project is delayed as a result of the Trade
Contractor's refusal or failure to begin the Work on the
date of commencement as defined in paragraph 8.1.2, or his
refusal or failure to carry the Work forward expeditiously
with adequate forces, the Trade Contractor causing the delay
shall be liable, but not limited to, delay claims from other
Trade Contractors which are affected."
ARTICLE 9
1. subparagraph 9.3.3 - add at line 14 after the word "person":
"All Trade Subcontractors and Trade Subsubcontractors shall
execute an agreement stating that title will so pass, upon
their receipt of payment from the Trade Contractor."
2. subparagraph 9.5.1 - add:
"From the total of the amount determined to be payable on a
progress payment, 10 percent of such total amount will be
deducted and retained by the Owner until final payment is
made. The balance (90 percent) of the amount payable, less
all previous payments, shall be certified for payment. When
not less than 95 percent of the work has been completed, the
Owner may, at his/her discretion (and with the consent of
the surety), prepare an estimate from which will be retained
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 9
an amount not less than twice the contract value or
estimated cost, (whichever is greater), of the work
remaining to be done. The remainder, less all previous
paYments and deductions, will then be certified for payment
to the Contractor.
It is understood and agreed that the Contractor shall not be
entitled to demand or receive progress payment based on
quantities of work in excess of those provided in the
proposal or covered by approved change orders, except when
such excess quantities have been determined by the
Construction Manager to be a part of the final quantity for
the item of work in question.
No progress payment shall bind the Owner to the acceptance
of any materials or work in place, as to quality or
quantity. All progress payments are subject to correction
at the time of final paYments.
3. Add new subparagraph 9.5.6:
"All material and work covered by partial payments made
shall thereupon become the sole property of the Owner, and
by this provision shall not be construed as relieving the
Trade Contractor from the sole responsibility for the
materials and work upon which payments have been made or the
restoration for any damaged material, or as a waiver to the
right of the Owner or Construction Manager to require the
fulfillment of all the terms of the Contract."
4. Add new subparagraph 9.5.7:
"Except in case of bona fide disputes, or where the Trade
Contractor has some ether justifiable reason for delay, the
Trade Contractor shall pay for all transportation and
utility services not later than the end of the calendar
month following that in which services are rendered and for
all materials, tools, and other expendable equipment which
are delivered at the site of the Project. The Trade
Contractor shall pay, to each of his Trade Subcontractors,
not later than the end of the calendar month in which each
pay~ent is made to the Trade Contractor, the representative
amount allowed the Trade Contractor on account of the work
performed by his Trade Subcontractor interest therein. The
Trade Contractor shall, by an appropriate agreement with
each Trade Subcontractor, also require each Trade
Subcontractor to make payments to his suppliers and Trade
Subsubcontractors in a similar manner. II
01/06/92 SUPPLEMENTARY GI~ERAL CONDITIONS (ADD. 2)
00805 - 10
5. Subparagraph 9.6.1 - delete in its entirety and insert the
following:
"The Construction Manager/Architect may decline to approve
an Application for Payment if, in his opinion, the
application is not adequately supported. If the Trade
Contractor and Construction Manager cannot agree on a
revised amount, the Construction Manager shall process the
Application for the amount he deems appropriate. The
Construction Manager may also decline to approve any
Applications for PaYment or, because of subsequently
discovered evidence or subsequent inspections, he may
nullify, in whole or part, any approval previously made to
such extent as may be necessary in his opinion because of:
(1) defective work not remedied; (2) third party claims
filed or reasonable evidence indicating probable filing of
such claims; (3) failure of the Trade contractor to make
payments properly to Trade Subcontractors or for labor,
materials, or equipment; (4) reasonable evidence that the
work cannot be completed for the unpaid balance of the
Contract Sum; (5) damage to the Construction Manager, the
Owner, or another contractor working at the project; (6)
reasonable evidence that the Work will not be completed
within the contract time; (7) persistent failure to carry
out the Work in accordance with the Contract Documents.
9.6.1.1 No payment shall be made to the Trade
Contractor until certificates of insurance or other
evidence of compliance by the Trade Contractor, within
all the requirements of Article 12, have been filed
wit~ the Owner and Construction Manager. Further, no
pa}~ents on the basis of work performed by a Trade
Subcontractor shall be paid until copies of all bonds
re~Jired by Paragraph 7.5 and any certificates of
insurance required of the Trade Subcontractors under
Article 12 have been filed with the Owner. II
6. subparagraph 9.7 - delete in its entirety.
ARTICLE 11
1. Add new subparagraph 11.1.2.1:
The following coverages are required to be maintained by all
Trade Contractors and subcontractors in any tier throughout
the entire length of the contract and any extensions
thereof.
01/06/92 SUP?LEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 11
1. Premises and Operation Liability Insurance:
commercial General Liability Insurance shall be
obtained in amounts of not less than $1,000,000 each
occurrence.
Coverage shall specifically include:
a. Bodily injury and property damage liability
coverage for premises and operations.
b. Products and completed operations.
c. Independent contractor's exposures.
d. Property damage resulting from explosion,
collapse, or underground (x,c,u) exposures.
e. Blanket contractual liability covering this
contract.
f. Personal injury liability.
g. Broad form property damage liability.
2. Automobile Liability Insurance:
Comprehensive automobile liability insurance shall
include coverage for bodily injury and property damage
liability for a minimum limit of $1,000,000 each
occurrence and shall cover use of owned, non-owned, and
hired vehicles, and include employers' non-ownership
liability coverage.
3. Workers Compensation and Employers Liability Insurance:
statutory Workers' Compensation coverage including
Employers Liability coverage with limits of not less
than $100,000 per person per accident and $500,000 per
person per occurrence for disease. Coverage shall be
provided to cover operations in the state of Florida
and the Voluntary Compensation endorsement shall be
provided. Coverage for deferally enacted benefits
shall be provided where applicable.
All insurance policies except the Workers Compensation and
Employers Liability Insurance policy, are required in the
name of Monroe County Board of County Commissioners and
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 12
Morrison-Knudsen/Gerrits as Additional Insured, and provide
a minimum of sixty (60) days notice in L~e event of
termination, non-renewal or reduction in coverage. Policy
language shall be modified to provide liability coverage for
Cross Liability suits between insureds ~ithout increasing
the total policy limi~s. Monroe County reserves the right
to require additional insurance as may be deemed necessary
for any specific project or work.
Insurers providing coverage(s) must be financially stable
and authorized to do business in the state of Florida. The
Monroe County Board of County Commissioners reserves the
right to reject any insurer that it believes to be
unacceptable.
Failure to maintain required insurance coverage in effect
will provide Monroe County, Florida with the option of
terminating the contract upon written notice to the
Construction Manager.
certificates expiring during the term of the contract shall
be replaced with new certificates prior to the expiration of
the original certificates.
Complete and certified copies of all insurance contracts
shall be furnished to The Monroe County Board of County
Commissioners if requested.
The certificate Holder on all insurance policies is required
to be as follows:
Monroe County Board of County Commissioners, or Monroe
County,
c/o Morrison-Knudsen/Gerrits
P.o. Box 5283
Key West, FL 33040
2. subparagraph 11.3.7 - second sentence, delete the phrase,
"..., or in accordance with an award by arbitration in which
case the procedure shall be as provided in Paragraph 7.9"
3. Subparagraph 11.3.8 - first sentence, delete the phrase,
".. .arbitrators shall be chosen as provided in Paragraph
7.9"
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (AJD. 2)
00805 - 13
4. Subparagraph 11.3.1 - delete in its entirety, and insert the
follo",.,1ing:
II Throughout the term of the CONTRACT, the OHNER shall
purchase and maintain property insurance on the
completed value of the permanent facility only. The
completed value is defined as all material, labor,
supplies, and equipment intended to be incorporated in
and to become a permanent part of the completed
facility. Such insurance shall include perils of fire,
lightning, and extended perils. The facility as
defined for 11.3.1 includes structures as defined in
the contract drawings and specifications.
Notwithstanding any provisions contained in this
paragraph, the CONTRACTOR shall be responsible for the
first $10,000 on any loss governed by this section.
The CONTRACTOR understands that the O\'lNER I S property
insurance policy contains certain exclusions which are
available upon request from the CONSTRUCTION MANAGER. II
04/16/92
SUPPLEMENTARY GENERAL CONDITIONS(ADD. 10) 00805 -13A
ARTICLE 12
1. Subparagraph 12.1.3 - under item .1, add the following at
the end of the sentence, II as set forth in subparagraph
12.1.6"
2. Subparagraph 12.1.4 - replace the remainder of the
paragraph, after the word "change" in line 25, with the
following:
IIpending final determination of cost, payments on account
shall be made as determined by the Construction Manager.
The amount of credit to be allowed by the Trade Contractor
for any deletion or change, which results in a net decrease
in the Contract Sum, will be the amount of the actual net
cost as confirmed by the Construction Manager. When both
additions and credits covering related Work or substitutions
are involved in anyone change, the allowance for overhead
and profit shall be figured on the basis of the net
increase, if any, with respect to that change."
3. Add new subparagraph 12.1.6:
liThe actual cost of Changes in the Work may include all
items of labor or material, power tools, and equipment
actually used, utilities, pro rata charges for foreman, and
all payroll charges such as Public Liability and Workman's
Compensation Insurance. No percentage for overhead and
profit shall be allowed on items of Social Security and
Sales Tax. If deductions are ordered, the credit shall be
the net cost. Items considered as overhead shall include
insurance other than that mentioned above, bond or bonds,
superintendent, timekeeper, clerks, watchmen, use of small
tools, incidental job costs, and general office expenses.
The actual cost of Changes in the Work (other than those
covered by unit prices set forth in the Contract Documents)
shall be computed as follows:
12.1.6.1 If the Trade Contractor performs the actual
Work, the percentage mark-up for overhead and profit
shall be a maximum addition of fifteen percent (15%).
12.1.6.2 If the Trade Subcontractor performs the
actual Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen percent
(15%). If the Trade Contractor does not enter into the
Work, the maximum mark up for managing this work will
be ten percent (10%).
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 14
12.1.6.3 If the Trade Subcontractor performs part of
the actual work, his percentage mark-up for overhead
and profit shall be a maximum addition of fifteen
percent (15%) on his direct work only. If the Trade
Contractor performs part of the actual work, his
percentage mark-up for overhead and profit shall be a
maximum addition of fifteen percent (15%) on his direct
work only.
4. Add new subparagraph 12.1.7:
"The Trade contractor shall furnish to the Owner through the
Construction Manager, an itemized breakdown of the
quantities and prices used in computing the value of any
change that might be ordered."
5. subparagraph 12.3.1 - delete in its entirety and insert the
following:
"If the Trade Contractor claims that any instructions given
to him by the Construction Manager, by drawings or
otherwise, involve extra work not covered by the Contract,
he shall give the Construction Manager written notice
thereof within three (3) days after the receipt of such
instructions and before proceeding to execute the work,
except in emergencies endangering life or property, in which
case the Trade Contractor shall proceed in accordance with
Paragraph 10.3."
Should it not be clear to the Trade Contractor that a change
will involve extra work, written notice given within three
(3) days that the change may involve extra work will be
sufficient notice. If it is later determined that the work
involved in such instruction shall be recognized as an
extra, the amounts of additional compensation to be paid
therefore should be determined in accordance with Paragraph
13.1.
Except as otherwise specifically provided, no claim for
additional cost shall be allowed unless the notice specified
by this subparagraph is given by the Trade Contractor. If
the Contractor considers that the changed work involves
extra costs, the costs shall be accounted for, and presented
in accordance with subparagraph 12.1.3. All claims shall be
submitted to the Owner through the Construction Manager."
6. subparagraph 12.3.2 - change the word 'agent' in the 7th
line, to 'representative'. Also, delete item (4).
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 15
7. Add new subparagraph 12.3.3:
"Unless otherwise agreed in writing, the Contractor
shall carryon the Work and maintain its progress
during any dispute or claim proceeding, and Owner shall
continue to make payments to the Contractor in
accordance with the Contract Documents. Disputes
unresolved shall be settled in accordance with
subparagraph 7.1.1."
ARTICLE 14
1. Subparagraph 14.1.1 - starting at the 8th line, delete the
phrase, "..., or if the Work should be stopped for a period
of thirty days by the CONTRACTOR because of the CONSTRUCTION
MANAGER's failure to recommend or the ARCHITECT's failure to
issue a Project certificate for Payment as provided in
Paragraph 9.7 or because the OWNER has not made payment
thereon as provided in Paragraph 9.7"
2. Subparagraph 14.2.1 - change the words 'seven days' in the
13th and 18th line, to '72 hours'.
01/06/92 SUPPLEMENTARY GENERAL CONDITIONS (ADD. 2)
00805 - 16
SECTION 00970
PROJECT SAFETY AND HEALTH PLAN
1.1
REGULATIONS AND POLICIES
1.1.1
1.2
1.2.1
Every Trade Contractor and Trade Subcontractor employed
on the Project shall comply with all applicable local,
state, and Federal safety and health regulations and
with Morrison-Knudsen Company, Inc. safety and health
policies as described herein.
PROJECT SAFETY AND HEALTH REQUIREMENTS
It is recognized that it is good business and evidence
of competent leadership to prevent the occurrence of
incidents that lead to occupational injuries or
illnesses. Safety and health requirements on this
project include, but are not limited to, the following:
.1 In general, this accident prevention policy is
based on a sincere desire to eliminate personal
injuries, occupational illnesses, and equipment
and property damage; and to protect the general
public exposed to or associated with the work.
.2 The importance of the safety of all workers on the
project shall be recognized and accident
prevention shall be an integral part of all
operations.
.3 Each Trade Contractor and Trade Subcontractor
shall conduct work in a safe and practical manner
in conformance with the OSHA Safety and Health
Regulations and the latest edition of the Manual
of Accident Prevention, Associated General
Contractors of America.
.4 Each Trade Contractor and Trade Subcontractor
shall observe all applicable Federal, State, local
and project laws and regulations pertaining to
safety and health, pollution control, water
supply, fire protection, sanitation facilities,
waste disposal and other related items.
.5 The Mandatory Safety and Health Rules shall be
posted in a conspicuous location along with the
OSHA and Emergency Phone Number posters.
11/21/91
00970 - 1
PROJECT SAFETY AND HEALTH PLAN
.6 A record of all occupational injuries and
illnesses shall be maintained. Medical and lost
time cases shall be properly recorded on the OSHA
log, and reported to MORRISON-KNUDSEN/GERRITS. A
copy of the insurance report for workmen
compensation cases shall be provided to MORRISON-
KNUDSEN/GERRITS.
.7 Each Trade Contractor and Trade Subcontractor
shall provide or arrange for adequate first aid
facilities, emergency transportation and persons
qualified in first aid.
.8 Each Trade Contractor and Trade Subcontractor
shall cooperate fully with all other contractors
in their respective safety and health programs.
.9 Good housekeeping shall be observed at all times.
Waste, debris, and garbage shall be removed daily
or placed in appropriate waste containers. All
materials, tools, and equipment shall be stored in
a safe and orderly fashion. Each contractor shall
donate 10% of their staff to a crew that will
convene every Friday at 1:00pm for a joint site
clean-up effort not to exceed a duration of three
hours.
In summary, there will be a 3-part clean-up plan.
The first part consists of the contractor cleaning
up on a daily basis, his workstations, and his
trade work. The second part consists of the
general clean-up, the concerted effort by all
trade contractors working on the project. A
minimum of (1) crew is to be utilized by each
contractor, or 10%, whichever is more. The third
part consists of the Owner cleaning up for a
particular trade contractor should adequate notice
not compel him to clean up his work. In this
case, the appropriate contractors will be
backcharged.
.10 This project shall be a Hard Hat job and all
supervisors, employees and visitors shall be
required to wear a suitable hard hat while on the
project site.
.11 other appropriate personal protective equipment
shall be provided and worn as required including
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 2
but not limited to long pants, shirts with sleeves
and appropriate leather work boots.
.12 Temporary construction aids such as ladders,
scaffolds, stairs, railings, etc. shall be
provided to facilitate access or working
conditions in a manner that shall conform to the
safety standards specified by Federal, state,
Local or manufacturer's recommendations or
stipulations.
.13 Each Trade Contractor and Trade Subcontractor
shall be expected to indoctrinate his employees as
to the safety and health requirements of this
project and to enforce adherence to safe work
procedures.
.14 If MORRISON-KNUDSEN/GERRITS notifies any Trade
Contractor of any noncompliance with the
provisions of this program, the Trade Contractor
shall make all reasonable efforts to immediately
correct the unsafe conditions or acts.
Satisfactory corrective action shall be taken
within the specified time. If a Trade Contractor
or Trade Subcontractor refuse to correct unsafe or
unhealthy conditions or acts, MORRISON-
KNUDSEN/GERRITS shall take one or more of the
following steps:
a. Cease the operation or a portion thereof.
b. stop payment for the work being performed.
c. Correct the situation using other forces and
back charge the Trade Contractor expenses
incurred.
d. Increase withholding in proportional
increments for that given pay period.
.15 All Trade Contractor's Superintendents shall be
required to attend and participate in all general
project safety meetings. These meetings will be
included in the weekly coordination meetings as
previously specified or on an as needed basis.
.16 All Trade Contractors shall conduct Weekly Tool
Box Safety Training Meetings, and shall document
11/21/91
00970 - 3
PROJECT SAFETY AND HEALTH PLAN
1.3
1.3.1
1.4
1. 4.1
the minutes on the forms provided. These forms
are to be transmitted to Morrison-Knudsen/Gerrits
on a weekly basis. All employees working at the
project site shall be required to attend and
participate in the meetings.
.17 Shortly after the award of the contract and prior
to the beginning of work, an Activity Hazard
Analysis (phase plan) shall be prepared by the
contractor and submitted to Morrison-
Knudsen/Gerrits for approval. The analysis will
address the hazards for each activity to be
performed in that phase and will present the
procedures and safeguards necessary to eliminate
the hazards or reduce the risk to an acceptable
level. A phase is defined as an operation
involving a type of work presenting hazards not
experienced in previous operations or where a new
subcontractor or work crew is to perform work.
The analysis will be discussed by the contractor
and Morrison-Knudsen/Gerrits on-site
representatives at the Preparatory Inspection
Meeting. Work will not proceed on that phase
until the Activity Hazard Analysis (phase plan)
has been accepted by Morrison-Knudsen/Gerrits.
.18 No personal radios or stereos will be allowed on
the job-site.
FIRE PROTECTION
Every Trade Contractor and Trade Subcontractor employed
on the Project shall exercise good construction
practices to prevent fire. It shall be the
responsibility of the Trade Contractor to insure that
general fire protection facilities are adequate for his
work and to provide additional fire protection
facilities and devices, including fire extinguishers as
required by their scope of work.
WORK NEAR ENERGIZED ELECTRICAL LINES OR OTHER UTILITIES
It shall be the Trade Contractor's sole and exclusive
responsibility (a) to provide personnel capable of
working adjacent to energized electrical lines or other
utilities; (b) to provide adequate, safe and properly
maintained equipment; (c) to conduct all of his work in
accordance with the safety rules and regulations
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 4
1.5
1.5.1
1.5.2
1. 5.3
prescribed by the National Electric Code, National
Electric safety Code, H30, and Safety Rules for
Installation and Maintenance of Electrical supply and
Communication Lines Hand Book 81, Occupational Safety
and Health Act of 1970, as well as other safety codes
in effect at the site of construction and as specified
elsewhere herein, or as are generally applicable to the
type of work being performed; and (d) to continuously
supervise and inspect the work being performed to
assure that the requirements of (a), (b), and (c) above
are complied with and nothing in these Contract
Documents shall be held to mean that any such
responsibility is the obligation of the Owner or the
Architect or the Construction Manager.
BARRICADES, WARNING DEVICES AND LIGHTING
The Trade Contractor shall be solely responsible for
providing temporary ladders, guard rails, warning
signs, barricades, night guard lights, and deck or
floor closures required in connection with his work to
comply with Federal, State and local safety
requirements. The Trade Contractor shall be solely and
exclusively responsible for the design, construction,
inspection and maintenance of such facilities at all
times.
It shall be the responsibility of the Trade Contractor
to provide additional temporary lighting, if needed to
maintain safe conditions.
It shall be the sole and exclusive responsibility of
the Trade Contractor to provide a safe place to work
for all laborers and mechanics and other persons
employed on or in connection with the project, and
nothing in these Contract Documents shall be construed
to give any of such responsibility to the Owner, the
Architect, or the Construction Manager.
11/21/91
PROJECT SAFETY AND HEALTH PLAN
00970 - 5
SECTION 00980
CONTRACTOR QUALITY CONTROL PLAN
1.1
1.1.1
1.2
1.2.1
1.2.2
1. 2.3
1.2.4
MORRISON-KNUDSEN/GERRITS' DUTIES AND RESPONSIBILITIES
The Morrison-Knudsen/Gerrits' superintendent will
monitor all work performed by the Trade Contractor and
assist the Trade Contractor with his conformance of the
work to the Contract Drawings and Specifications.
TRADE CONTRACTOR'S DUTIES AND RESPONSIBILITIES
The Trade Contractor is responsible for the quality of
the work performed by his work force on this project as
well as the quality of the material, equipment and
supplies furnished by him to be incorporated into the
work.
The Trade Contractor will designate a Quality Control
Representative who will be on site at all times while
the respective Trade Contractor's work is in progress
and will have the authority and responsibility to
accept or reject items of work. The Trade Contractor's
Quality Control Representative may delegate his duties
but the primary responsibility and authority will rest
on him.
The Trade Contractor's Quality Control Representative
will coordinate the submittal of all shop drawings,
product data and samples to Morrison-Knudsen/Gerrits.
Any submittal that is a variance to the contract
requirements must be identified as such and transmitted
to the Construction Manager for submittal and approval
by the Architect/Engineer or Owner. No work requiring
submittal of a shop drawing, product data or sample
shall commence until the submittal has been reviewed
and approved by the Architect/Engineer.
The Trade Contractor will bear the responsibility of
notifying the designated material-testing laboratory,
whether Monroe County or Contractor is required to
perform testing of materials as required by the
contract drawings and specifications in a timely
fashion to prevent needless cancellations and delays of
work activities. Any costs caused by untimely
11/21/91 CONTRACTOR QUALITY CONTROL PLAN ~
00980 - 1
1. 2.5
1.2.6
1.3
1.3.1
notification shall be borne by the Contractor.
The Trade Contractor's Quality Control Representative
will review his drawings, procurement documents and
contracts to insure that the technical information
provided and all work performed is in accordance with
the latest revisions of the Contract Drawings and
Specifications.
The Trade Contractor's Quality Control Representative
will perform an inspection upon receipt at the site of
the work of all materials, equipment and supplies
including those furnished to him by the Owner. Notes
from this inspection will be filled out on the
appropriate form and included with the Contractor Daily
Quality Control Report. Items which are damaged or not
in conformance with the respective submittals, quality
standards, contract drawings and specifications shall
be brought to the attention of Morrison-
Knudsen/Gerrits' representative on site and then will
be identified and segregated from accepted items.
Items thus identified will not be incorporated into the
work until corrective action acceptable to Morrison-
Knudsen/Gerrits is completed. Items determined
unsalvageable will be removed from the job site. These
items shall be noted as deficient in the applicable
section of the Contractor Daily Quality Control Report.
INSPECTION AND TESTING
INSPECTION PLAN
Morrison-Knudsen/Gerrits utilizes a multi-point
inspection plan for each separate feature of work to be
performed under this Trade Contract, i.e., work
described by each division of the technical provision
section of the contract specifications. This plan
consists of the following:
.1 Preparatory Inspection - Prior to commencing the
work, the Trade Contractor's Quality Control
Representative will meet with Morrison-
Knudsen/Gerrits' superintendent and the
Architect's representative if he so desires to
attend and check the following items at a minimum
for conformance:
(a) Approval of shop drawings and submittals.
00980 - 2
11/21/91 CONTRACTOR QUALITY CONTROL PLAN ~ADD. 3)
(b) Approval of inspection and test reports of
materials and equipment to be utilized.
(c) Completion of previous operations of
preliminary work.
(d) Availability of materials and equipment
required.
(e) Potential utility outages.
(f) Any other preparatory steps dependent upon
the particular operation.
(g) Quality standards.
(h) Safety or environmental precautions to be
observed. (Phase Hazard)
Note:
Morrison-Knudsen/Gerrits will record the minutes
to this inspection meeting and distribute
accordingly.
. 2
Initial inspection - Upon completion of a
representative sample of a given feature of the
work, the Trade Contractor's Quality Control
Representative will meet with the Morrison-
Knudsen/Gerrits Superintendent and the Architect's
representative if he so desires to attend and
check the following items at a minimum for
conformance:
(a) Workmanship to established quality standards.
(b) Configuration to contract drawings and
specifications.
(c) Construction methods, equipment and tools
utilized.
(d) Materials and articles utilized.
(e) Adequacy of testing methods.
(f) Adequacy of shop drawings.
(g) Adequacy of safety or environmental
precautions.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (~DD. 3+
00980 - 3
Note:
. 3
Note:
Note:
Morrison-Knudsen/Gerrits will record the minutes
to this inspection meeting and distribute
accordingly.
Follow-up Inspections - The Trade Contractor's
Quality Control Representative will inspect the
work daily to assure the continuing conformance of
the work to the workmanship standards established
during the preparatory and initial inspections.
Additionally, as a part of the follow-up
inspection, sign-off sheets will be utilized as
often as possible. The intent of these sheets is
to achieve concurrence from other trade
contractors and responsible parties that ensuing
work can indeed commence over underlying work.
This will prevent oversights and omissions which
could elevate costs. sign-off sheets shall be
used for, but not be limited to, concrete,
drywall, ceilings, painting, roofing substrates
and flooring. These reports are to be generated
by the applicable Trade Contractor and submitted
to Morrison-Knudsen/Gerrits' Superintendent for
approval prior to the start-up of work.
Failure to generate a sign-off sheet or to attain
proper signatures prior to covering up underlying
work may affect payment for that piece of work if
ensuing problems are detected or not. This
disciplinary action shall be carried out via the
Nonconformance Report. (See section 1.4.2 of this
plan. )
The Trade Contractor shall be responsible to
record these inspections and all other project
related activities encountered throughout the day
on the Contractor Daily Quality Control Report.
. 4
Completion Inspections - Upon completion of a
given feature of the work, the Trade Contractor's
Quality Control Representative will meet with
Morrison-Knudsen/Gerrits' Superintendent, if he so
desires to attend, to perform an inspection of the
completed work. Non-conforming items will be
identified and corrected prior to commencement of
the next operation.
The Trade Contractor shall conduct and report
00980 - 4
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (ADD. 3)
1.3.1.5
1.3.1.6
1. 3.2
1.3.3
corrections of this inspection which shall be a
required submittal.
Follow-On Inspections - Upon execution of the
contractor's completion inspection in elements of the
work which result in concealment; such as, ceiling and
drywall installations, MK/G shall schedule and conduct
multi-trade or singular inspections prior to covering
installation.
Note:
MK/G will record the minutes to this
inspection meeting.
Pre-Final Inspection - Upon substantial completion of
the project work MK/G shall coordinate and conduct a
universal inspection of all areas and elements of the
work. The Architect/Engineer may be represented if he
so desires. This inspection shall be completed at
least (15) days prior to the final substantial
completion inspection which shall be conducted by the
A/E. All deficiencies and incomplete work should be
completed prior to the final substantial completion
inspection.
OPERATION AND CHECK OUT TESTING
The Trade Contractor will provide personnel and
equipment to perform the operational tests and checkout
of the equipment, facilities or equipment constructed,
fabricated or installed under this Trade Contract.
Morrison-Knudsen/Gerrits' Superintendent will
coordinate and witness all such tests. Notification
should be given at least ten (10) days in advance of
the scheduled tests.
FINAL INSPECTION and issuance of the A/E CERTIFICATE OF
SUBSTANTIAL COMPLETION
Morrison-Knudsen/Gerrits' superintendent will
coordinate and attend all final inspections of the work
by the Architect/Engineer. Prior to requesting a final
inspection, all tests for the equipment and systems
must be completed.
Upon completion of the A/E's inspection, the A/E will
publish outstanding items and issue a Project
certificate of Substantial Completion, which will
define the date of 'Turn-Over' to the Owner the care,
11/21/91 CONTRACTOR QUALITY CONTROL PLAN {ADD. 3)
00980 - 5
control and custody. Reference section 00800,
Substantial Completion.
1.4
REPORTING
Maintaining accurate and retrievable records is
extremely important in the Quality Assurance Program.
These records will act as a main source of information
in the present and in the future for the entire project
management team. The main report that will be utilized
to provide this information is the Daily Quality
Control Report. Nonconformance Reports may also be
issued.
1.4.1
DAILY QUALITY CONTROL REPORT
The Daily Quality Control Report shall be used to
document the summary of daily inspection activities
performed by the Trade Contractor's designated Quality
Control Representative. It shall include any of the
steps of inspection that are performed that day, all
test monitoring and any rework of nonconforming items.
The daily Quality Control Report section of the Daily
superintendent's Report will be routinely used for
daily reporting requirements. When the magnitude or
complexity necessitates such, a more separate and
comprehensive form will be used. Reference
Contractor's Daily Report, and as needed Contractor
Daily Quality Control Report, section 01385.
1.4.2
NONCONFORMANCE REPORT
Nonconformance Reports will be issued for work that is
found to be in nonconformance with the contract
documents or the referenced quality standards. The
report will be issued by Morrison-Knudsen/Gerrits.
It is not the intent to routinely and repeatedly issue
nonconformance reports, but to issue them only after
normal enforcement standards have been exhausted, or if
the work performed is a detriment to the project.
A copy of the Nonconformance Report will be forwarded
to the Project Manager for his information and/or
action. It should also be included in the Trade
Contractor's Daily Quality Report package for general
review.
-
11/21/91 CONTRACTOR QUALITY CONTROL PLAN {ADD. 3)
00980 - 6
Nonconformance Reports will be signed off once the
deficient item or items have adequately been corrected.
This will be done by the issuing Superintendent and
Project Manager. These sign-offs will be included with
a corresponding corrective action taken. Significant
nonconformances need to be addressed to prevent
recurrence. The signed-off report will also be
submitted for review.
Work activities affected by a Nonconformance Report
will proportionally counteraffect paYments. Whether
that be partial or full retainage will be left up to
the discretion of Morrison-Knudsen/Gerrits' management
team.
1.5
NOT USED
1.6
AUDITS
1.6.1
Morrison-Knudsen/Gerrits may choose at its option to
perform Trade Contractor audits of their Contractor
Quality Control Plan at any time. Reports of these
audit results will be forwarded to the Project Manager
for his action. Any action items noted during an audit
for the Trade Contractor will be followed up and
documented to insure compliance and avoid recurrence.
1.7
SUMMARY
The intention of this plan is to create a system of
checks and balances that will minimize delays caused by
rework and a lack of planning and maximize production
and insure that the finished product is one that the
entire construction team can pride themselves in.
These goals can be achieved by giving the Owner exactly
what he has bought. The owner will expect no more and
through Quality Assurance, the construction team will
provide no less.
11/21/91 CONTRACTOR QUALITY CONTROL PLAN (~DD. 3)
00980 - 7
SECTION 00800
SUBSTANTIAL COMPLETION AND OWNER ACCEPTANCE
Bid Group 2, and Bid Group 3 Contractors shall turn over care,
custody and control of their work to the Owner as defined in the
issuance of the A/E's certificate of Substantial Completion of the
Project. All contracts in these bid groups shall exchange as a
group and in unison, possession, maintenance and security
responsibilities with the Monroe County Officials. Any portion of
the work which is in non-conformance with the contract documents or
elements which prevent the Owner's use of the facilities for its
intended use shall be excluded from acceptance. The contractor
shall be responsible for all work performed, equipment, and
materials furnished to, or by the contractor under this contract
until the contractors work is completed and has been accepted by
the Owner as stated in the certificate of Substantial Completion.
In the event of loss, damage or destruction of such work,
equipment, or materials, the contractor at his sole expense shall
promptly repair, restore, or replace such, to the conditions
required by the contract documents.
All warranties and guarantees shall commence as stated on the A/E's
certificate of Substantial Completion.
Substantial Completion certificates for portions of the project or
portions of the work may be used to reduce retention. This partial
certification shall only be used for the purpose of reducing
retention. The implementation and amounts of reduction shall be at
the Owner's sole discretion.
In the event of discrepancy er disagreement in the contract
documents, specifications, and/or drawings, this section will take
precedence over the Supplementary General Conditions, General
Conditions, General Requirements, technical specifications and
drawings.
11/20/91
OWNER ACCEPTANCE
00800 - 1
SECTION 01027
APPLICATION FOR PAYMENT
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Procedures for . preparation and submittal of
Applications for PaYment.
B. Related sections
1. section 00750 - General Conditions
2. section 00900 - AlA G702/G703
2. section 01370 - Schedule of Values
1. . 2 FORMAT
A. AIA G702 - Application and Certificate for PaYment
including continuation sheets when required.
1..3 PREPARATION OF APPLICATIONS
A. Present required information in typewritten form.
B.
Execute certification
authorized officer.
by
notarized
signature
of
C. List each authorized Change Order on the form, including
change order number, date and dollar amount.
D. Prepare Application for Final Payment as specified in
section 01700.
1..4 SUBMITTAL PROCEDURES
A. The initial Application for Payment will not be processed
until the construction schedule, the schedule of values,
and the initial submittal schedule have been received by
the Construction Manager, reviewed and approved by the
Architect.
B. Submit an updated construction and submittal schedule
with each Application for Payment.
C. Payment Period: Submit once per month, during the last
OS/20/91
APPLICATION FOR PAYMENT
01027 - 1
week of the month. Payment will be made by the Owner
within (30) days thereafter.
D. Work Item Update Listing - this work sheet, prepared by
the Construction Manager, shows the work items which are
being considered for progress payments. It is to be
billed from the Contractor's approved schedule of values
and approved changes only. The Contractor must fill in
percentages of work completed on each line item or total
dollar amount of Original Suppliers Invoices. suppliers
Invoices are then attached for paYments on materials
stored.
E. status Meeting - The Contractor's representative and the
Construction Manager review the Contractor's Work Item
Update Listing. Upon agreement between the two parties,
both the Contractor and Construction Manager will sign
off on the form.
F. Estimate Voucher - The Construction Manager will input
the progress into the computer from the Work Item Update
Listing, and will issue the Estimate Voucher to the
Contractor.
G. Submit waivers as required.
H. Submit three (3) copies of each Application for Payment.
1..5 SUBSTANTIATING DATA
A. When the Construction Manager and/or Architect requires
substantiating information, submit data justifying dollar
amounts in question.
B. Provide one copy of data with cover letter for each copy
of submittal. Indicate Application number and date, and
line item by number and description.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01027
OS/20/91
APPLICATION FOR PAYMENT
01027 - 2
SECTION 01028
CHANGE ORDER PROCEDURES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Promptly implement change order procedures.
a. Provide full written data required to evaluate
changes.
b. Maintain detailed records of the work done on
a time and material/force account basis.
c. Provide full documentation to the Construction
Manager with each request.
2. Designate in writing the member of the Contractor's
organization authorized to accept changes in the
Work.
3. The Owner will designate in writing the person who
is authorized to execute Change Orders.
B. Related requirements:
1. Agreement: The amounts of established unit prices.
2. Agreement: The amounts of established allowances.
3. Conditions of the Contract, Article 12 of the
General Conditions:
a. Methods of determining cost or credit to the
Ow~er resulting from changes in the \~ork made
on a time and material basis.
b. The Contractor's claims for additional costs.
1..2 DEFINITIONS
A. Change Order, AIA Document G701/CM: Refer to the General
Conditions.
B. Construction Change Directive: A written order to the
Contractor, signed by the Owner, MK/Gerr i ts and the
Architect, which amends the Contract Documents as
described, and authorizes the Contractor to proceed with
a change which affects the Contract Sum or the Contract
time, for inclusion in a subsequent Change Order.
1..3 PRELIMINARY PROCEDURES
A. A change may be initiated by submitting a Proposal
Request to the Contractor. Request will include:
1. Detailed description of the change, products and
04/30/91
CHANGE ORDER PROCEDURES
01028 - 1
location of the change in the Project.
2. supplementary or revised Drawings and
specifications.
3. The projected time span for making the change, and
a specific statement as to whether overtime work
is, or is not, authorized.
4. A specific period of time during which the
requested price will be considered valid.
5. Such request is for information only, and is not an
instruction to execute the changes, nor to stop the
Work in progress.
B. The contractor may initiate changes by submitting a
written notice to the Construction Manager containing:
1. Description of the proposed changes.
2. statement of the reason for making the changes.
3. statement of the effect on the Contract Sum and the
Contract Time.
4. statement of the effect on the Work of separate
contractors.
5. Documentation supporting change in the Contract Sum
or the Contract Time, as appropriate.
1..4 CONSTRUCTION CHANGE DIRECTIVE
A. In lieu of Proposal Request, a Construction Change
Directive may be issued for Contractor to proceed with a
change for subsequent inclusion in a Change Order.
B. The Construction Change Directive will describe changes
in the Work, both additions and deletions, with
attachments of revised Contract Documents to def ine
details of the change, and will designate the method of
determining a change in the Contract Sum and change in
the Contract Time.
C. The Owner, Construction Manager, and the Architect will
sign and date the Construction Change Directive as
authorization for the Contractor to proceed with changes.
D. At completion of the change, submit itemized accounting
and supporting data as provided in the Article
"Documentation of Proposals and Claims" of this section.
E. The allowable costs of such work will be determined as
provided in the General Conditions and Supplementary
Conditions.
F. The Owner, Construction Manager and Architect will sign
and date the Change Order to establish the change in the
Contract Sum and in the Contract Time.
04/30/91
CHANGE ORDER PROCEDu~ES
01028 - 2
~
G. The Owner and the Contractor will sign and date the
Change Order to indicate their agreement.
1..5 DOCUMENTATION OF PROPOSALS AND CLAIMS
A. Support each quotation for a lump-sum proposal, and for
each unit price which has not previously been
established, with sufficient substantiating data to allow
evaluation of the quotation.
B. On request provide additional data to support time and
cost computations:
1. Labor required.
2. Equipment required.
3. Products required.
a. Recommended source of purchase and unit cost.
b. Quantities required.
4. Taxes, insurance and bonds.
5. Credi t for the work deleted from the Contract,
similarly documented.
6. Overhead and profit.
If the Trade Contractor performs the actual
Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen
percent (15%).
If the Trade Subcontractor performs the actual
Work, the percentage mark-up for overhead and
profit shall be a maximum addition of fifteen
percent (15%). If the Trade Contractor does
not enter into the Work, the maximum mark-up
for managing this work will be ten percent
(10%).
If the Trade Subcontractor performs part of
the actual Work, his percentage mark-up for
overhead and profit shall be a maximum
addition of fifteen percent (15%) on his
direct work only. If the Trade Contractor
performs part of the actual work, his
percentage mark-up for overhead and prof it
shall be a maximum addition of fifteen percent
(15%) on his direct work only.
7. Justification for change in the Contract Time.
C. Support each claim for additional costs, and for the work
done on a time-and-material/force account basis, with
documentation as required for a lump-sum proposal, plus
additional information:
04/30/91
CHANGE ORDER PROCEDURES
01028 - 3
1. Name of the Owner's author i zed agent who ordered
the work, and date of the order.
2. Dates and times the work was performed, and by
whom.
3. Time record, summary of hours worked, and hourly
rates paid.
4. Receipts and invoices for:
a. Equipment used, 1 isting dates and times of
use.
b. Products used, listing of quantities.
c. Subcontracts.
5. signature of Construction Manager's Superintendent,
concurring with quantities.
1..6 PREPARATION OF CHANGE ORDERS
A. The Construction Manager will prepare each Change Order.
B. Change Order form: AlA Document G701/CM.
C. Change Order will describe changes in the Work, both
additions and deletions, with attachments of revised
Contract Documents to define details of the change.
D. Change Order will provide an accounting of the adjustment
in the Contract Sum and in the Contract Time.
1..7 LUMP-SUM/FIXED PRICE CHANGE ORDERS
A. Content of Change Orders will be based on either:
1. The Proposal Request and the Contractor's
responsive Proposal as mutually agreed between the
Owner and the Contractor.
2. The Contractor's Proposal for a change, as
recommended by the Architect or Construction
Manager.
B. The Owner, Construction Manager and the Architect will
sign and date the Change Order as authorization for the
Contractor to proceed with the changes.
C. The Contractor may sign and date the Change Order to
indicate agreement with the terms therein.
1..8 UNIT PRICE CHANGE ORDER
A.
The
1.
content of the Change Orders will be based on either:
The definition of the scope of the required
changes.
The Contractor's proposal for a change, as
recommended by the Architect, or Construction
2.
04/30/91
CHANGE ORDER PROCEDURES
01028 - 4
Manager.
3. Survey of completed work.
B.
The
1-
2.
amounts of the unit prices to be:
Those stated in the Agreement.
Those mutually agreed upon between
Architect and the Contractor.
the
Owner,
C. When quantities of each of the items affected by the
Change Order be determined prior to start of the Work:
1. The Owner, Construction Manager and the Architect
will sign and date the Change Order as
authorization for the Contractor to proceed with
the changes.
2. The Contractor may sign and date the Change Order
to indicate agreement with the terms therein.
D. When quantities of the items cannot be determined prior
to start of the Work:
1. A Construction Change Directive will be issued
directing the Contractor to proceed with the change
on the basis of unit prices, and will cite the
applicable unit prices.
2. At completion of the change, the cost of such work
will be determined based on the unit prices and
quantities used.
3. The Owner, Construction Manager and the Architect
will sign and date the Change Order to establish
the change in the Contract Sum and in the Contract
Time.
4. The Contractor will sign and date the Change Order
to indicate their agreement with the terms therein.
1..9 CORRELATION WITH THE CONTRACTOR'S SUBMITTALS
A. Revise Schedule of Values and Request for Payment forms
monthly to record each change as a separate item of the
Work, and to record the adjusted Contract Sum prior to
submission of Application for Payment.
B. Revise the Construction Schedule to reflect each change
in the Contract Time prior to monthly submissions.
Revise subschedules to show changes for other items of
work affected by the changes.
C. Upon completion of the Work under a Change Order, enter
pertinent changes in Record Documents.
04/30/91
CHANGE ORDER PROCEDURES
01028 - 5
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED
****************
END OF SECTION 01028
CHANGE ORDER PROCEDURES
01028 - 6
04/30/91
SECURITY PROJECT PROCEDURES
PART 1 - GENERAL
1.1 SUMMARY
A. section Includes
1. Electronic automated computerized security
management system.
2. Provide a complete enclosed raceway system for all
wiring for security devices and controls in
compliance with NEC, NFPA-70 1990 and in accordance
with 16050 and 16111.
3. Drawings for this work are diagrammatic, intended
to convey the extent, general arrangement and
locations of the work. Because of the scale of the
drawings, certain basic items such as conduit
fittings, access panels, cabinet sizes, sleeves,
pull and junction boxes may not be shown. Include
such items where required by code, other sections,
and for proper installation of the work.
4. Equipment specifications may not deal individually
with every part, control, or device which may be
required to produce the equipment warranties.
5. Coordinate with other trades in submittal of shop
drawings. Shop drawings shall detail space
conditions to the satisfaction of concerned trades
and is subject to final review by the Architect.
If installation of equipment, raceways, cable trays
or conduit is performed prior to coordination with
other trades and interferes with work of other
trades, make necessary changes to correct the
condition at no additional cost to the Owner.
6. Provide required integration of components to
create an operational computerized security
management system providing control and monitoring
from a touchscreen CRT.
1.2 TESTS
A. Notify Architect and Owner's representative in writing,
1~ days in advance of testing to prevent delays in
construction schedules.
B. Test systems and place in proper and specified working
order prior to demonstration of the systems.
C. Test system grounds to demonstrate that the ground
resistance does not exceed the requirements of the
transient voltage surge suppression (TVSS) or the
National Electric Codes (NEC).
D. Perform tests required by authorities having jurisdiction
11/18/91
SECURITY PROJECT PROCEDURES
01130-1
over the site.
E. Testing shall be in the presence of the Owner's
designated representatives, Contractor and Architect.
1.3 DEMONSTRATION
A. Pr ior to acceptance of the work, the Secur i ty System
Installer shall demonstrate to the Owner, designated
representatives, Contractor and Architect, the features
and functions of the system, and all subsystems and shall
instruct the Owner in the proper operation and event
sequences of the system.
B. Demonstrate each system and subsystem. The demonstration
is to consist of not less than the following:
1. Designate actual location of each component of a
system or subsystem and demonstrate its function
and its relationship to other components within the
system.
2. Demonstrate the systems and subsystems operations
by actual "START-STOP/ON-OFF" cycling showing how
to work controls, reset devices, replace fuses and
conduct emergency operating/operations procedures.
3. Demonstrate communication, signaling and security
equipment/devices by actual operation of such
devices.
C. Demonstration of systems are to include, but not be
limited to the following:
1. UPS Power and Distribution system
2. Touchscreen CRT Operations
3. Alarm Detection and signalling Equipment
4. Door Control/Monitoring System
5. Access Control System
6. situation Alarms (Hardwire)
7. Man-Down Alarms (Wireless)
8. CCTV system
9. Intercom Systems
10. Telephone systems (Inmate/Attorney/Visitor)
11. Lighting Control
12. Fire Alarm Interface
13. Cable Supervision System (Random Points to be
Selected by Architect)
D. Security System Installer/Integrator shall furnish the
necessary trained personnel to perform the demonstration
and instructions and shall arrange to have the
manufacturer's representatives present to assist with the
demonstrations. The Secur i ty system Installer shall
allow a minimum of one week for performing the prescribed
demonstrations.
E. Security Systems Installer/Integrator shall arrange with
the Owner the date and times for performing the
demonstration. The Owner will select date and time for
11/18/91
SECURITY PROJECT PROCEDURES
01130-2
demonstration.
F. Comply with requirements of Section 01670 SYSTEMS
DEMONSTRATIONS.
1. Security System Installer/Integrator shall video
tape in high speed, high quality, VHS format the
demonstration of systems listed.
1.4 QUALIFICATIONS
A. Manufacturer Qualifications: Company specializing in
electronic automated computerized security management
systems of the same type, scope, operation and magnitude
for a minimum of five years. Documented experience shall
include the following:
1. List at least 10 facilities of equal size and
technical requirements utilizing the equipment
submitted.
2. For each facility, list:
a. Name and location of facility
b. Date of occupancy by Owner
c. Owner's representative to contact and
telephone number
d. Construction Manager and/or General Contractor
e. Architect
B. Use the products of a single manufacturer for similar
type equipment, i. e. , motion detectors, magnetic
contacts.
C. Use products made by companies regularly engaged in the
manufacture of the type equipment specified.
1.5 IDENTIFICATION
A. Identify control and sub-control, motor and equipment
controls, remote relay cabinets, address panels, system
interface cabinets, and similar equipment with 1/2" red
lettering or as specified for individual piece of
equipment.
B. Identify pull and junction boxes in service areas,
tunnels, above accessible ceilings, and in accessible
chases with 1/211 red lettering indicating the circuit and
system. Example: Security Alarms "SY", Fire Alarms
"FA", Circuit Number ISY-126".
C. Engraved laminated plastic tags may be used for
identification in lieu of painted lettering.
D. Provide typewritten circuit directories installed in 3
ring binders with transparent page protectors in each
control and sub-control cabinet.
1.6 RECORD DOCUMENTS
A. Provide complete schematic drawings depicting location of
interface, number of conductors, types of connectors,
circuit requirements, and type of enclosure.
11/18/91
SECURITY PROJECT PROCEDURES
01130-3
1.7 PROTECTION OF EQUIPMENT
A. Protect materials stored on the job site. Protect
materials during construction and after installation.
B. Provide and apply protective material immediately upon
receiving the products and maintain throughout the
construction process.
C. Keep products clean and dry or by elevating equipment
above ground and floor.
D. Take precautions to protect apparatus and materials from
damage. Failure to protect materials constitutes
sufficient cause for rejection of the apparatus or
material.
E. Protect equipment and factory finish from damage during
construction operations and until final acceptance.
Restore finishes that become stained, scratched, or
damaged.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
NOT USED
********************
END OF SECTION 01130
11/18/91
SECURITY PROJECT PROCEDURES
01130-4
SECTION 01200
PROJECT MEETINGS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Project meetings
1..2 The CONSTRUCTION MANAGER'S RESPONSIBILITY
A. Construction Manager shall schedule and administer pre-
construction meeting, periodic progress meetings, and
specially called meetings throughout progress of the
Work.
1. Prepare agenda for meetings.
2. Provide notice of each meeting four days in advance
of meeting date, or provide as much advance notice
as possible.
3. Make physical arrangements for meetings.
4. Preside at meetings.
5. Record the minutes; include significant proceedings
and decisions.
6. Reproduce and distribute copies of minutes.
a. To participants in the meeting.
b. To parties affected by decisions made at the
meeting.
c. Furnish three copies of minutes to the
Architect.
B.
Representatives of the Contractors,
suppliers attending meetings shall
authorized to act on behalf of
represents.
subcontractors and
be qualified and
the entity each
C. The Architect and the Owner's Representative may attend
meetings to ascertain that the Work IS expedited
consistent with the Contract Documents and construction
schedules.
1..3 PRE-CONSTRUCTION MEETING
A. Location: A central site designated by the Construction
Manager.
B. Attendance:
1. The Owner's Representative.
11/21/91
PROJECT MEETINGS
01200 - 1
2. The Architect and his professional consultants (as
required) .
3. Construction Manager.
4. The Contractor's Superintendent.
5. Major subcontractors.
6. Major suppliers.
7. others as appropriate.
C. Suggested Agenda:
1. Distribution and discussion of:
a. List of major subcontractors and suppliers.
b. Projected Construction Schedules.
2. critical Work sequencing.
3. Major equipment deliveries and priorities.
4. project Coordination.
a. Designation of responsible personnel.
5. Procedures and processing of:
a. Field decisions.
b. proposal requests.
c. Submittals.
d. Change Orders.
e. Applications for Payment.
6. Adequacy of distribution of the Contract Documents.
7. Procedures for maintaining Record Documents.
8. Use of premises:
a. Office, work and storage areas.
b. The Owner's requirements.
9. Construction facilities, controls and construction
aids.
10. Temporary utilities.
11. Safety and first-aid procedures.
12. Security procedures.
13. Housekeeping procedures.
14. Distribute meeting minutes within (3) days.
1..4 WEEKLY PROGRESS MEETINGS
A. The Contractor's Project Manager and/or superintendent
shall be required to attend a weekly scheduling meeting.
B.
Location of the meetings:
Manager.
Office of the Construction
C. Attendance:
1. The Architect and his professional consultants as
needed.
2. Contractors as appropriate to the agenda.
3. suppliers as appropriate to the agenda.
4. others.
D. suggested Agenda:
11/21/91
PROJECT MEETINGS
01200 - 2
1. Review of Work progress since previous meeting.
2. Field observations, problems, conflicts.
3. Problems which impede Construction Schedule.
4. Review of off-site fabrication, delivery schedules.
5. Corrective measures and procedures to regain
projected schedule.
6. Revisions to Construction Schedule.
7. Progress, schedule, during succeeding Work period.
8. Coordination of schedules.
9. Review submittal schedules.
10. Maintenance of quality standards.
11. Pending changes and substitutions.
12. Review proposed changes for:
a. Effect on Construction Schedule and on
completion date.
b. Effect on other contracts of the Project.
13. Other business.
14. Distribute meeting minutes.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01200
11/21/91
PROJECT MEETINGS
01200 - 3
SECTION 01301
SUBMITTALS
PART 1 - GENERAL
1.1 SUMMARY
A. Section includes:
1. Submit to the Construction Manager, shop drawings,
product data, certifications and samples required
by the technical sections.
2. Prepare and submit a separate schedule listing
dates for submission and dates for review.
B. Related sections:
1. section 00750 - GENERAL CONDITIONS
2 . Individual submittals required: refer to each
specific section, for certifications, shop
drawings, product data and sample requirements.
1.2 SUBMITTAL TRANSMITTAL FORM
A. Attached, and made a part of this section 01301, is a
copy of the submittal Transmittal Form, which shall be
filled out by the contractor and submitted with each and
every submittal. Follow the instruction sheet, also
attached, for directions on this procedure. It is
essential that the submittal Transmittal Forms are filled
out in their entirety for the system to function
properly.
B. Transmittal Form, originals for contractors use, will be
supplied by the Construction Manager, and is a 6-part
form.
1.3 SUBMITTAL SCHEDULE
A. The Contractor shall submit within seven (7) days of
award of the Contract a preliminary "Submittal Schedule"
to the Construction Manager for review, modification and
response. No paYment applications will be processed
prior to finalizing the submittal schedule. The
"Submittal Schedule" shall contain the following
information:
1. specification section number and name.
2. Specification section paragraph identification
which describes submittal requirement.
3. Submittal information required, (i.e., sample, test
data, shop drawing, etc.).
08/20/91
SUBMITTALS (ADD.1)
01301 - 1
B. The Contractor shall also supply the following dates in
order to meet the project schedule.
1.
Date submittal is scheduled to be submitted and
received by the Construction Manager.
Date contractor has scheduled to order material or
equipment or the submittal item.
Date contractor has scheduled delivery to job-site
equipment or the submittal item.
Add any remarks or unique items that the CM or A/E
should be aware of.
2.
3 .
of material or
4.
C. The Contractor shall allow a minimum of (2) weeks for
review of submittal by A/E (in calendar days) .
D. The submittal master record will then be used to track
submittals within the process.
1.4 SHOP DRAWINGS
A. Submit legible shop drawings in the form of positive
pr inting reproducible transparencies, common ly ca lIed
sepia prints, suitable for reproduction use on dry print
diazo type machines. Sepia prints which cannot be
reproduced will be returned to the Contractor for
resubmittal.
B. Provide shop drawings as complete submittals (no partial
sets) on original drawings or information prepared solely
by the fabricator or supplier. Deviation from complete
submittals will only be allowed by pre-arranged method.
C. Do not reproduce the Contract Drawings for shop drawing
submittals.
D. Sheet sizes shall not exceed the size of the Contract
Drawings.
E. Each sepia print shall have blank spaces large enough to
accept 4" x 4" review stamps of the Architect and the
Contractor.
F.
Each
1.
2 .
3.
sepia print shall carry the following
Project name and contract number.
Date.
Names of:
a. The Architect
b. The Construction Manager
c. The Contractor
d. Supplier
e. Manufacturer
information:
08/20/91
SUBMITTALS (ADD.1)
01301 - 2
4. Identification of product or material.
5. Relation to adjacent structure or materials.
6. Field dimensions, clearly stated as such.
7. specification section number.
8. Applicable standards such as ASTM or Federal
specification.
9. Identification of deviations from Contract
Documents.
10. Reference to construction drawings by drawing
number and/or detain number.
G. Submit sepia prints without folds either as flat sheets
if size permits, or rolled in tubes.
H. The contractor shall submit (2) reproducibles and (4)
blueline or blackline sets to the CM. The CM will return
(1) reproducible to the contractor after review/return
from the A/E.
1.5 PRODUCT DATA
A. Product data such as catalog cuts, brochures or
manufacturer's sheets may be submitted in lieu of sepia
prints if adequately identified. Submit seven copies of
product data to the Construction Manager.
B. Modify product data sheets to delete information which is
not applicable to the project. Provide additional
information if necessary to supplement standard
information.
c. Product data sheets that are submitted with extraneous
information not deleted and/or modified will be returned
without review to the Contractor for resubmittal.
D. The contractor shall submit at a minimum, (1) original
and (6) copies to the CM. The CM will return (2) copies
to the contractor after review/return by the A/E.
1.6 SAMPLES
A. Provide samples to illustrate materials, equipment or
workmanship, and to establish standards by which
completed work may be judged.
B. Construct mock-ups as required by the technical sections,
at the Project site in a location designated by the
Construction Manager. Construct mock-ups, including
adjacent work required, to demonstrate the final
appearance of the Work.
08/20/91
SUBMITTALS (^DD.l)
01301 - 3
C. The contractor shall submit (3) samples to the eM, and
(1) will be returned to the contractor after
review/return from the A/E.
1.7 CERTIFICATIONS
A. Provide certifications as required by various technical
sections on the Contractor's letterhead stationary.
certifications shall be identified to this Project, dated
and bear Contractor's signature in the same format used
for the Owner/Contractor agreement.
B. Clearly identify the materials referenced and state that
the material and the intended installation methods, where
applicable, are in compliance with the Contract
Documents. Attach manufacturer's affidavits where
applicable.
C. The contractor shall submit (1) original and (6) copies
to the CM. The CM will return (2) sets to the contractor
after review/return from the A/E.
1.8 THE CONTRACTOR'S RESPONSIBILITIES
A. Before making submittals to the Construction Manager,
review each submittal, make changes or notations as
necessary to conform to the Contract Documents, identify
such review with review stamp and forward reviewed
submittal with comments to the Construction Manager for
review. Return submittals not meeting Contract
requirements to subcontractors and do not forward such
submittals to the Construction Manager.
B. Submit catalog sheets, product data, shop drawings and
where specified, submit calculations, material samples,
color chips or charts, test data, warranties and
guarantees all at t~e same time for each submittal item.
C. Verify field measurements and product catalog numbers or
similar data.
D.
Clearly identify on the
Construction Manager
submittals from the
Documents.
submittal a~d transmittal to the
in writing of deviations in
requirements of the Contract
E. After the Construct ion Manager I s and the Architect I s
review, distribute copies with one copy to be maintained
at the Project site for reference use and other copies
distributed to suppliers and fabricators.
08/20/91
SUBMITTALS (ADD.1)
01301 - 4
F. Do not begin the Work which requires submittals until
return of submittals with the Construction Manager's and
the Architect's stamp and initials indicating review.
G. The Contractor's responsibility for errors and omissions
in submittals is not relieved by the Construction
Manager's or the Architect's review of submittals.
H. The Contractor's responsibility for deviations in
submittals from requirements of the Contract Documents is
not relieved by the Construction Manager's or the
Archi teet's review of submittals unless the Architect
gives written acceptance of specific deviations.
1.9 THE CONSTRUCTION MANAGER'S RESPONSIBILITIES
A. The Construction Manager will return to the Contractor,
without review, all submittals not bearing the
Contractor's review stamp or not showing it has been
reviewed by the Contractor.
B. After the Architect's review, the Construction Manager
will forward submittals to the Contractor and retain one
copy for the Owner. The Contractor shall distribute
copies including other copies distributed to suppliers
and fabricators. The Contractor shall supply copies of
reviewed submittals to the Construction Manager in
sufficient quantity to allow proper coordination of the
Contract.
1.10 THE ARCHITECT'S RESPONSIBILITIES
A. The Architect will review submittals with reasonable
promptness r checking only for conformance with the design
compliance of the Project and compliance with information
given in the Contract Documents.
B. The Architect will make changes or notations directly on
the submittal, identify such review with his review
stamp, obtain and record the Architect file copy and
return the submittal to the Construction Manager.
****************
END OF SECTION 01301
08/20/91
SUBMITTALS (ADD.1)
01301 - 5
[=
I I
~
uJ
~ 0:
i- ::E
oc 0
~ u
0
I I z
<:
----:-~- ~
<: , ::E
f:: ~ 0 <I'l
Z
5f z <
c:l ::>: ~ r.;
;:J c:l ~
Vl ;:J '"
;?; '" ;:J
uJ ::>: 0
;.!...l OC Vl ~
z Ig
I I OC
0-
-
'" I
f:.l
,....
<
_0_
Vl
(--0
Z
t.Q
~
t.Q
>
o
~ ~
3E 6
...... [.L
~~:2 ~
......~~ ...
~g-~
u~~
"---''v: 0""
r ....... Z oc;g,
(--0 < "'_
Z c<-i
~ ~ u;....:
o (--0 c;::
u u~
t.Q ri~
o Q::::>-
;z "',.
~ ::E5;:;?
Z
o Q
~ ~ I '"
~c...____=~__~ __
z
~
~
I
I ~
!
I
ti
.~
'-
~ ~
~ :;
g ~
I " I !!~~ I ~~ r
1-7 I
z z
w ~
2 ~
;:) >
U r---- I
o !;j
Cl '"
wI--
U
Z 0
UJ z
r:;:: <.:>
fi: ~
l:l
~
~
u c..
<: '"
~ ~jl
.!: 0 0
~ u ~
8 ~
'"
~
~
~---",
,. ~
06
>tu
-
..
o
~
"
o
c:
'"
Vl
:,
r.
~-
Z
:..i
It
II
c:
c
U
E
..€
~
z
:2
""
"
,
;:;
~
...
~
I 51
;;;:
~
f-- f--
I ~
I ~
I I I I I I I
--
--
~
c
-
--
-
~
-
~
~
,....
""
"
~
"
'.,
.--
c
E
~
::E--,.
- u
:; U
v: :ri
~ v
~ '6
;:: e
(3 ;{
z ";;j
Q g,
t...., ;..
~t..
...
o
~
C
"""
:<
I
~II
~ I,
I - I
I I I
I
I
-
-
-
~
uJ
~
oc
'"
r--
z
uJ
o
z
~
~
uJ
0-
:J
Vl
-;-
-
---
~
::>:
---
-
--
...
"
Cl
-
~
~
"
..
c
""
en
01:
.!!
~
oJ
e
..
~
I~
~j
-cl3::r~~(j(jV;(jV:j
tJ > Q V ,
..,
(.l
-cI;<;::h~:ErJ(jCl!(j(j)n
a~~fJ.~~r;5~go
n ~ n .... ~ n :::, -' ~ -0 d
R...,~t)~C::1~O ~
c2:~~~-~~~S?:n
ri nSG ;: c.:.:
2?..t:~ n5() ~~
o ;? ~ ~ ~ 3'
c q;
::...
..,.,
0'
~
....
o'
::l
~
~!>,~r,;;::~
g >
2X'-'? ~~
~n~~~=
ss.~~~~
("j > n - =' ~
s??;9...o3i
~ ~. ?;: ~ ~. ~
~11' ~.~
~ ~ ri
~. ~
.r..
"
~
g
<<
'T1C'lQ(jC::l> >
..,
~O>;;:lZ>->'"
(t .... r. 0 -cl -cl ;Q
<::T<....-o-oO
(S' (t ;;:: ~ >; >; <:
:::>;(t-cl~~>
(t ~ -cl n (; t-'
P. 00.0.
::C<:>.lp>n
(t n '" <r. 0
o-o.::l<r.d
C ~g.trl
e. (t:3 Vl
"' 0..:::
n
0.
::l
o
p>
"0
"0
'"'
o
<
::...
'"'
(t
.D
C
::;'
n
0.
o
~
~
5- g
=- :;
'"
,.,
~
~
1~1~~ 'r~Tn rrm II .. ~ i I: >~! --~-
I ,'.~. .L'i 0:\ 11:'.-. 1. i~! ;;' i. :
~ ('I\ I ; i I ; i ~.If1;i ! ~ ~ S; 7
C/ !!" II. ~~d~~-I~-~~;
II 'I I~) ~ ~ ~! : '1 i:= ~ ~
, ,'f' ~- ~I
I I : '~ ~ 0 ~ i
Ii; ~. '~!I@ 6~
l,~', :-
!,....... ~ \~'
\:rot ~
~~ 2
I - ~
I n:;): ~ \'
~1'~. ~',
NY~ ~ Jl'
I~H~ 1
1 - ~_ _~' ......===~="'_==_-~__~===--
"
(~
, I
'-'
{ I
<
:!
i
;
z
:;;
~
@ .~
I I
I
~f-
K" ," ~
I\..: v!
x
'-
')
o
z -
;cj~k
>( T'l ;-
q ~,-
~---
b
~
o
3
~
r:
~
,... t.) N t-... t-'; -' --" ..- --'..- ..- 'X..-J ::-
:,........ ~ ~ F '? ~ :.J ?':-^ f-' .
~.
;? n ; i;;" ?:: 0 ~ ~ Z.,;i v ~ > Z :;"?;::: ~ - - '1...-1 n
!' g ~ _ ~ ;J n:il c -' " " ' 5 ~:i if ~ ~ ~;;-
:, 3 ~ ::: -;- ~ ~ D. 3 X f") - .2 ;:;: ~ :-:" [ ::!'"; r;. ~" ='
~ ~~~-5";~go~'~- ~~ ~~~~~~
~ "" 5 ~
~ ~
=" .
3
"
~
~
~ v=,:7.g C ~::'I ~ :; "" ~- J .
:J'Q ":; c.. ;='" ~ ~ =. :) - 'l ~ ~ zs ~
Hi T HW_: P: :
~~ 0 o~..;~ ~c- ;
~ gn ::;~ g8 ~
~Q ~~ ~I ~~ c
ga g~" ~"~ ~~ ~
::... ~::'I 3 It> =.
[ 5
"
--
~CB
~ ~!
~
!
!
~ :t
=1 ~
~ f(Ji\ f----~
~V I I
@
ii
>
7
!
~
<
>
~ i
~
o
;>
~ ~
~ t,) --
" " . ~
~~
8." .
n
~~ ~d[[S';
~t3?(iQ;;~
~~Z~~n~~
::?F-g~~";"
=- ~ . 3
~~E.~~~;;-
3t2;'~;[
f.n~:3 ,,~
~Q?.~~"~
;; ~ l;l :.n - .,-
~~g~~i
~~gn~:
-- ~.., ..... ""'"
~~~ ~a
2..10-3 ~g.
:;;-g. ~~
..... c: n ~-
~fi [~
!. ~ ~ :;
'" "
fn ~ n
~ ...
:3
'"
...
:'I
~x
~ ~
~
~
..
;~
~ X
..
:l ><
~
:;;x
...
t
~.
~
s.
SECTION 01310
PROGRESS SCHEDULES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Progress schedules
2. Revisions to schedules
B. Related sections:
1. SCOPE OF WORK
C. Description:
1. Progress Schedules:
Promptly after award of the contract, prepare and
submit to the Construction Manager, construction
progress schedules for the work, with subschedules
of related activities which are essential to its
progress. Also incorporate manpower loading
related to each activity on the construction
schedule.
2. Revisions to Schedule:
Submit revised/updated progress schedules with each
payment application.
1. .2 FORMAT
A. Prepare Progress Schedules as a horizontal bar chart with
separate bar for each major portion of Work or operation,
identifying the first work day of each week.
B. Include numeric manpower loading associated with each
horizontal bar, clearly defined.
C.
Scale and spacing:
revisions.
to provide space for notations and
D. Sheet size: minimum 8 1/2" x 11".
1. . 3 CONTENT
A. Indicate complete sequence of construction by activity,
with dates for beginning and completion of each element
of construction.
OS/20/91
PROGRESS SCHEDULES
01310 - 1
B. Show the manpower loading for each activity.
c. Identify each item by specification section ~umber.
D. Identify work of separate stages and other logically
grouped activities.
E. Identify work of separate floors and other logically
grouped activities.
F. Provide sub-schedules to define critical portions of the
entire schedule.
G. Indicate accumulated percentage of completion of each
item and total percentage of Work completed, as of the
first day of each month.
H . Submit separate schedule of submittal dates for shop
drawings, product data, and samples, including the Owner
furnished products and products identif ied under
allowances and dates reviewed submittals will be required
from the Architect. Reference Section 01301
Submittals.
I. Indicate del i very dates for the Owner furnished products.
J. Coordinate content with Schedule of Values specified in
section 01370.
1..4 REVISIONS TO SCHEDULES
A. Indicate progress of each activity to date of submittal,
and projected completion date of each activity.
B. Identify activities modified since previous submittal,
major changes in scope, and other identifiable changes.
1. Major changes in scope.
2. Activities modified since previous sub~ission.
3. Revised projections of progress and COEpletion.
4. Other identifiable changes.
c. Provide a narrative report as needed to define:
1. Problem areas, anticipated delays and tr.e impact on
the schedule.
2. Corrective action recommended and its effect.
3. The effect of changes on schedules of other prime
contractors.
OS/20/91
PROGRESS SCHEDULES
01310 - 2
1..5 SUBMITTALS
A. Submit initial schedules within (3) days after award of
Contract.
1. The Construction Manager will review schedules and
return review copy within ten (10) days after
receipt.
2. If required, re-submit within seven (7) days after
return of review copy.
3. Submit revised Progress Schedules with each
Application for Payment.
1..6 DISTRIBUTION
A. Distribute copies of the reviewed schedules to:
1. Job site file.
2. Subcontractors.
3. Other concerned parties.
B. Instruct recipients to report promptly to the Contractor,
in writing, any problems anticipated by the projections
shown in the schedules.
Note: It is not incumbent upon the Construction Manager
to notify the Trade Contractor when to begin, to
cease, or to resume work nor to give early notice
of faulty or defective work, nor in any way to
superintend so as to relieve the Trade Contractor
of responsibility or of any consequence of neglect
or carelessness.
**************
END OF SECTION 01310
OS/20/91
PROGRESS SCHEDULES
01310 - 3
SECTION 01370
SCHEDULE OF VALUES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Schedule of Values allocated to the various
portions of the Work, submitted within three (3)
days after award of the Contract.
2. Upon request of the Construction Manager, support
the values with data which will substantiate their
correctness.
3. The Schedule of Values, unless objected to by the
Construction Manager, forms the basis for the
Contractor's Applications for Payment.
1..2 FORM AND CONTENT OF SCHEDULE OF VALUES
A. Type schedule on AIA G703 Form; the Contractor's standard
forms and automated printout will be considered by the
Construction Manager upon the Contractor's request.
Identify schedule with:
1. Title of Project and location.
2. The Architect and Construction Manager.
3. Name and Address of the Contractor.
4. Contract designation.
5. Date of submission.
B. List the installed value of the component parts of the
Work (broken down into labor and material and physical
location) in sufficient detail to serve as a basis for
computing values for progress paYments during
construction.
C. Follow the Specifications as the format for listing
component items.
1. Identify each line item with the number and title
of the respective major section of the
Specifications.
D. Itemize separate line item cost for each of the following
general cost items:
1. Mobilization.
2. Bonds, Insurance and Permits.
3. General Conditions spread over project duration on
monthly basis.
04/30/91
SCHEDULE OF VALUES
01370 - 1
4. Clean-up.
5. Submittals.
6. Safety.
E. For each major line item list sub-values of major
products or operations under the item.
2 .
the various portions of the Work:
Include a directly proportional amount
Contractor's overhead and profit for each
For items on which progress payments
requested for stored materials, break
value into:
a. The cost of the materials, delivered and
unloaded, with taxes paid.
b. The total installed value.
Submit a subschedule for each separate stage of
work specified in section 00300.
of the
item.
will be
down the
F.
For
1.
3 .
G. The sum of values listed in the schedule shall equal the
total Contract Sum.
1..3 SUB SCHEDULE OF UNIT MATERIAL VALUES
A. Submit a subschedule of unit costs and quantities for:
1. Products on which progress payments will be
requested for stored products.
B. The form of submittal shall parallel that of the Schedule
of Values, with each item identified the same as the line
item in the Schedule of Values.
C. The unit quantity for bulk materials shall include an
allowance for normal waste.
D. Provide unit values for the materials as follows:
1. Cost of the material, delivered and unloaded at the
site, with taxes paid.
2. Installation costs, including the Contractor's
overhead and profit.
E. The installed unit value multiplied by the quantity
listed shall equal the cost of that item in the Schedule
of Values.
1..4 REVIEW AND SUBMITTAL
A. After review by Construction Manager, revise and resubmit
schedule (and Schedule of Material Values) as required.
SCHEDULE OF VALUES
01370 - 2
04/30/91
B. Resubmit revised schedule in same manner.
*************
END OF SECTION 1370
04/30/91
SCHEDULE OF VALUES
01370 - 3
SECTION 01385
DAILY CONSTRUCTION REPORTS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Requirement for Daily Construction Reports by each
Trade Contractor.
2. Scheduled submission times for Daily Construction
Reports.
1..2 FORM AND CONTENT OF DAILY CONSTRUCTION REPORTS
A. Daily Construction Reports shall be submitted by each and
every Contractor performing work on the project. Forms
to be used will be furnished by the Construction Manager.
Items to be addressed on the Report are:
1. Title of Project
2. Name of Trade Contractor
3. Date and day of Report information. For example,
you performed work on Thursday, April 18, 1991, so
you would therefore use "Thursday, 4/18/91." This
holds true even if you did not complete filling out
the Report until Friday, 4/19/91.
4. Contract designation.
5. Note any major Shipments received on that
particular day.
6. Note major equipment used that day.
7. Note manpower used, and designate what trades. For
example, if you were the mechanical contractor, you
would also list how many insulators, pipefitters,
etc. that you were also managing, even if they were
subcontractors. In addition, list the names of the
subcontractors that were on-site that day.
8. Note any deficiencies in your work, and corrective
actions taken to resolve the deficiencies.
9. Note any safety violations discovered, whether or
not caused by your forces.
10. Provide a full description of work performed that
day, and any problems or unusual conditions
discovered.
11. Report is to be signed by the a\1thorized
representative of the contractor, and should the
signature not be legible, print the name of the
signer next to the signature.
11/21/91
DAILY CONSTRUCTION REPORTS
01385 - 1
1..3 SCHEDULE OF SUBMITTING DAILY REPORTS
A. Daily Reports are to be submitted at the designated
location described in the pre-construction meeting.
Contractors are to submit the original of their report,
and should keep a copy for their records. The
Construction Manager's photocopying facilities are not to
be used in the reproduction for submission of the
reports.
B. Submit Daily Reports no later than 9:00am the day
following the day of the work described in that
particular report. No exceptions to this rule will be
accepted. Should contractor fail to comply with these
instructions, the contractor's payment application for
the following month will be held in abeyance until such
time the contractor properly submits the delinquent
reports.
*************
END OF SECTION 1385
DAILY CONSTRUCTION REPORTS
01385 - 2
11/21/91
~ -- .~ - - co
1\10NROE COUNTY CAPITAL ll\lPROVEJ\1ENT PROJECTS
CONTRACTOR~S DAILY REPORT
PROJECf: DATE: SHEET OF
" .. ~~.siI5K~...~;r~I\'Al 1!!r~<P.r~--_ _~or_~...-.-L-:"--"''W''I'"_
CONTRACrOR: CONTRACNO.:
~",,~~_~~_?-:r-~~'Il "'.,.~~~.,~~; . --
\1AJOR SI1IP\1ENTS RECEIVED TODAY MAJOR EQUIPMENT USED
-
~~~~.lIIlJ"i ~11. :--.-~'-i":JIr:f.~<;~'" zr- -_>iIM>'- ." -~ll"n .wE(~
NUMBER OF PERSONl'\EL O~SITE LIST SUBCONTRACTORS ONSITE
OFC C C C C C C SC SC
T
0
T
^
L
~ - ..,.,.""""-~~, ,--- "- -. .--;,~~'J1t~.a.~~:""~";}:~
DEFJCIE~C]ES NOTED/CORRECTED; I;-';SPECT10NS \t".DE; TESTS CONDUCTED:
QC REPRESENTATIVE:
SAFETY VIOLATIONS NOTED/CORRECTED:
FULL DESCRIPTION OF WORK PERFOR\1ED BY AREA; Il'\CLUDE ANY PROBLE\1S:
--,-----
--" --
-------
>-
--
SITE REPRESENTATIVE:
ATTATIDi'ill SHEET 1Fl\EEDED
21'D SHEET
-- - -- I
CO~TRACTOR'S Dr'\IL Y REPORT SHEET OF
-- ~
,~~~~~~_!PJP:>~~~:.MN&1" . .~~~~--
PROJECT ----------~--- WORK DAY;
CO~TRACT ~O.; DATE;
-~~-~~'" .
DESCRIPTJO~ OF WORK PERFORMED Liq 3(\ i\itics ";'rled, ~C1i\i\jcs completed, del;,)"" reasons for delay" ;,nd
rc.1sons for possihle futurc dcbys.
- ~';a.~~".!I~- I 1.~_,-_o;:_4'1.._i(~'J"c,,,:~
----~-
-
--
-
-~
---
-----
-~
--~----_. ~-,. ---
---
----~-----
'=c c=
SECTION 01395
DOCUMENT CLARIFIC~TION REQUESTS (DCR)
PART 1 - GENERAL
1.1 SUMMARY
A. section includes:
1. Notification of Construction Manager in the event
errors, field conflicts, and omissions are found in
the Contract Documents, or clarifications are
necessary.
2. utilization of OCR form.
B. Related Sections:
1. General Conditions Article 2.3
2. General Conditions Article 8.3.2
3. General Conditions Article 12.3
1.2 FORM AND CONTENT OF DOCUMENT CLARIFICATION REPORTS
A. All errors, field conflicts, and omissions in the
Contract Documents shall be brought to the attention of
the Construction Manager immediately. If clarifications
are necessary, the request is to be conveyed to the CM.
The OCR is a tool established to provide expedient
clarifications of contract drawings, specifications or
field conflicts. It is not meant to be a substitute for
good communication.
B. The OCR is not meant for formal notification of extra
work. Reference General Conditions paragraph 8.3.2 and
12.3, when formal correspondence is required for formal
notif ication of time extensions, and for cost change
notifications.
C. The contractor should propose a solution, and enter on
the form in sufficient detail necessary for the A/E or CM
to confirm the contractor's proposed solution.
D. The contractor is also required to mention all other
trade work which is affected by the problem, and all
trade work which will be affected by the proposed
solution.
11/21/91
DOCUMENT CLARIFICATION REQUESTS
01395 - 1
1.3 UTILIZATION OF OCR FORM
A. The CM will make available the OCR forms for the
contractors use. Attached is a copy of the OCR form, and
the instruction sheet.
*************
END OF SECTION 1395
DOCUMENT CLARIFICATION REQUESTS
01395 - 2
11/21/91
DOCUMENT CL;\RIFICATION REQUEST No.
From: To: Morrison- Knudsen/Gerrits Contract r\o.
P. O. Box 5283
Key West, FL 33045 Receipt
(305) 292-7845 Logged:
Prohlem By: DwglSpe{: NO./Re\'ision/Dctail/Sect No.
NE Project No.
Civil Structural Architectural Security PLB HVAC Electrical Specs .
Subject: . 0
Problem & suggested solution: q.
0 -
,0 . 0
..
--
I MKIG RC\icw:
Solution:
-,
Solution by: T Date: MKIG: I Date:
XRO}
- DOC\!MI:!-. ClARlnCAll0S REQUEST ,",0. (&)
F""", ~i To Momwn-Knudtoe~mu CanraC1 "0, (~,
._@-~ .. P. O. Il<n S2ll'
~C"V Wnl, n ))04~ Rcttlpl G)
{)(i~) 29~.~~ lnwd
I"robk:m B~-: (1- ; DwJ.'5,p<< NoAl.~~ hi>
AI{ ""'.,.:<1 t-iu \10) "1'
'~ CMI ~n.a.r..l An::l\lIClC'\"" s.c.c..n'~ .~ HYAC Do::o:'trlGl .....
....,.., i~)
~".I\l'''''''''''IoOftlUOll
('7
~~
.
.~ -
I ~u.:.1(, Fl.",," '1>-'
.....-.
\1....;
ll!llI. fu.' II!I& r,;--r~----=-:-
l<DlQLh. (15 /1- lalL ,,~
=
A. By Contractor:
1. from: The DCR ....ill a1....3.)'5 be frorn the Frirr,e contractor.
subcontrbctors to the Frir.e contractor shall subrdt OCR's
through their prime contractor.
2. Problem By: This can be the subcontractor, or the prime
contractor, or the est~blished prime contrbctor
representative, or the established subcontractor
representative.
J. Contract No.: This is the approved contract, contract
number.
4. Drawing 'No.: Here insert as much infonr.ation as possible
to describe the location in the contract documents of the
particular problem you are asking clarification. Include
revision level of dra....ings, and date. Include detail
numbers, include section numbers, include specification
section nurr~ers, paragraph locations, all as applicable.
S. civil, structural, etC.: Here note the particular
division of work the OCR applies to.
6. subject: Here insert brief, clear, concise caption
subject, ~hich is representative of problem area.
7. Problem & Suggested Solution: Describe in as much detail
as necessary, the problem to which clarification 15
needed. If additional space is needed, add extra sheets
to back, and reference attachments in this area no. 7.
Drllow sketches if necessary. Make photocopy of particular
drawing detail and attach if necessary.
B. By Morrison-Knudsen/Gerrits:
8. OCR No.: Numbers .,..ill be assigned as follows:
xx-
Project
xxx-
Contractor No.
XXX
Sequential No.
For instance, the first OCR from the contractor of
Contract No. 001 on the New Detention Facility, ~ould be:
KJ-OOl-OOl
As bnother example: The seventh consecutive DCR logged
on the New Detention racilJty, ""as recelved frota the
contractor of Contract No. 005, would be:
KJ-005-007
9. Receipt Lo9ged: This ...ill be the date received by the
eM from the contractor, and will s~rve as the r~ference
date.
10. A/E Project No.: The "IE's project nu:ober "ill be
inserted here, ~here and ~hen applicable.
11. MK/G Review: This will be the signature or initials of
the Construction Y.an.aoer, upon revie'W of t.he problem,
"ith the date of sign-~ff.
12. MK/G Revie....: Tt.is ",'ill be the signature cr initials of
the Construction Manager, upon review of t.he solution.
13. Date: This ",'ill be t..he date of MK/G review and sign-
off.
c. By Architect/Engineer:
14. Solution: The AlE .i:l here insert the solution to the
problem, or ans....er 1n some othEr fashion the
clarific.!ition being requested. The A/r. rr;ay herein
confirm the 'contractor's proposE'd solution.
15. Solution By: The entity providing the solution is to
sign here. This may be the Construct j en Manager ....hen
particular clarifications are b~ing re~~ested thbt can
be ans\.Iered by the ~. Otherw ise, it ....j 11 be the J../E
representative.
16. Date: This ",,'il1 be ttJe date of sigr;-cff, or ans.:ering
the OCR by the ^/E.
D. Part-By-Part Distribution of &-part DCR Forn,:
a. "'Then the contractor SLJ:b;:its OCR, he ....ill retain goldenr_QQ
copy.
b. ...."hen received by the contractor, eM lo.'ill retain E...i.nJs
copy.
c. The DCR then is subwitted to the A/E. Once ans~ered, the
AlE returns to CM, but retains CanarY copy.
d. CM revie~s ans~er, and sends ~ copy back to
contractor. C~ ....ill retain original ~.hite copy for
office files, and Blue copy ~ill go to the job-site.
SECTION 01410
TESTING LABORATORY SERVICES
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Selection and payment
2. The Contractor submittals
3. Testing laboratory responsibilities
4. Testing laboratory reports
5. Limits on testing laboratory authority
6. The Contractor responsibilities
7. Schedule of inspections and tests
B.
1.
2 .
3.
section 00750 - GENERAL CONDITIONS
section 01700 - CONTRACT CLOSEOUT
Individual Specification sections: inspections and
tests required, and standards for testing.
1. . 2 REFERENCES
A.
ASTM 0-3740 -
Practice for Evaluation of Agencies
in Testing and/or Inspection of Soil
and Rock as Used in Engineering
Design and Construction.
B.
ASTM E-329 -
Recommended Practice for Inspection
and Testing Agencies for Concrete,
Steel, and Bituminous Materials as
used in Construction.
1..3 SELECTION AND PAYMENT
A. The Owner will employ and pay for services of an
independent testing laboratory to perform specified
inspection and testing where so indicated to be performed
by the Owner in technical Specification Sections.
B. Employment of testing laboratory shall in no way relieve
the Contractor of obligation to perform the Work in
accordance with requirements of the Contract Documents.
11/21/91
TESTING LABORATORY SERVICES
01410 - 1
1..4 QUALITY ASSURANCE
A. Comply with requirements of ASTM E-329 and ASTM 0-3740.
B. Testing laboratory: authorized to operate in the state
of Florida.
C. Testing laboratory staff: maintain a full time
registered Engineer on staff to review services.
D. Testing Equipment: calibrated at reasonable intervals
with devices of an accuracy traceable to either National
Bureau of Standards (NBS) Standards or accepted values of
natural physical constants.
E. Meet "Recommended Requirements for Independent Laboratory
Qualification", published by American council of
Independent Laboratories.
1..5 TESTING LABORATORY RESPONSIBILITIES
A. Test samples of mixes.
B. Provide qualified personnel at the site. Cooperate with
the Architect, Construction Manager and the Contractor in
performance of services.
C. Perform specified inspection, sampling, and testing of
Products in accordance with specified standards.
D. Ascertain compliance of materials and mixes with
requirements of the Contract Documents.
E. Promptly notify the Construction Manager and the
Contractor of observed irregularities or non-conformance
of the Work or products.
F. Perform additional inspections and tests required by the
A/E and Construction Manager.
1..7 TESTING LABORATORY REPORTS
A. After each inspection and test, promptly submit three
copies of testing laboratory report to the Construction
Manager.
B. Include:
1. Date issued
2. Project title and number
3. Name of inspector
4. Date and time of sampling or inspection
11/21/91
TESTING LABORATORY SERVICES
01410 - 2
5. Identif ication of product and Specif ications
section
6. Location in the Project
7. Type of inspection or test
8. Date of test
9. Results of test
10. Conformance with the Contract Documents
C. When requested by the Construction Manager or A/E,
provide interpretation of test results.
1..8 LIMITS ON TESTING LABORATORY AUTHORITY
A. The testing laboratory may not release, revoke, alter, or
enlarge on requirements of the Contract Documents.
B. The testing laboratory may not approve or accept any
portion of the Work.
c. The testing laboratory may not assume any duties of the
Contractor.
D. The testing laboratory has no author i ty to stop the Work.
1..9 THE CONTRACTOR RESPONSIBILITIES
A.
B.
C.
D.
E.
1. .10
A.
Deliver to the testing laboratory at designated location,
adequate samples of materials proposed to be used which
require testing, along with proposed mix designs.
Cooperate with testing laboratory personnel, and provide
access to the Work and to the manufacturer's facilities.
Provide incidental labor and facilities to provide access
to the Work to be tested, to obtain and handle samples at
the site or at source of products to be tested, to
facilitate tests and inspections, storage and curing of
test samples.
Notify the Construction Manager and the testing
laboratory 48 hours prior to expected time for operations
requiring inspection and testing services.
Employ services of a separate qualified testing
laboratory and pay for additional samples and tests which
are beyond the specified requirements.
RETEST RESPONSIBILITY
Where the results of required inspections, tests, or
similar services prove unsatisfactory and do not indicate
11/21/91
01410 - 3
TESTING LABORATORY SERVICES
compliance with the requirements of the Contract
Documents, the retests shall be the responsibility of the
Contractor regardless of whether the original test was
the Contractor's responsibility.
B. Retesting of the work revised or replaced by the
Contractor is the Contractor's responsibility where
required tests were performed on original work. Costs
and fees for retesting shall be paid by the Contractor.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01410
TESTING LABORATORY SERVICES
01410 - 4
11/21/91
SECTION 01510
TEMPORARY UTILITIES
PART 1 - GENERAL
1.1
SUMMARY
A.
section includes:
1. Temporary utilities required for construction.
PART 2 - PRODUCTS
2.1
MATERIALS - GENERAL
A.
2.2
A.
Mater ials shall be new, adequate in capacity for the
required usage, not create unsafe conditions, not violate
requirements of applicable codes and standards, and
comply with NEC Art. 305 - Temporary Wiring.
TEMPORARY ELECTRICITY
The Temporary Power Contractor shall furnish, install and
maintain, temporary electric. power service for
construction needs throughout the construction period and
shall remove such service on completion of the work.
1. Primary temporary electrical underground feeder
will be provided and installed by temporary power
contractor under Bid Group 1, per drawing 1510- TP.
2. At Front Gate transformer location, the temporary
power contractor under Bid Group 1 has installed a
meter, mast, and main breaker panel Nema 3R, per
Detail "A" attached. The final location of each
panel shall be approved by the Construction
Manager.
3. Distribution panels have been provided by the Bid
Group 1 temporary power contractor per drawing 1510
- TP, and Details A, B, C and D, and as follows:
a. Front gate area serving the construction
manager trailer, guard shack and area lights.
(20 ckt. min.)
4.
Power centers for miscellaneous tools and
used in the Work will be provided by the
1 Temporary Power Contractor as follows:
a. distribution boxes with minimum
of four
equipment
Bid Group
11/21/91
01510 - 1
TEMPORARY UTILITIES
double-duplex 15 Amp, 120-\101 t grounded
outlets, with GFCI Protection for personnel.
See Detail "B".
b. located so that poV.'er IS available at any
point of use with not more than 100 ft. power
cords.
c. minimum: one power center on each floor.
d. circuit-breaker protection for each outlet.
e. One panel each for Building Areas
A,B,C,D,E,F,K,L,M,N,O,P and Q.
5. The capacity of each power center in 4. above shall
be 120/240 volts single phase, minimum 50 Amps.
6. The Trade Contractors shall notify the Temporary
Power Contractor when unusually heavy loads, such
as for welding and other equipment with special
power requirements, will be connected so that the
Bid Group 3 Temporary Power Contractor can notify
the power company.
7. Any Trade Contractor requiring service of capacity
or characteristics other than that specified shall
arrange and pay for the additional service.
8.
The Temporary
install, and
required to
including the
Power Contractor shall furnish,
maintain all equipment and wiring
distribute the power, up to and
power services.
9. The Temporary Power Contractor shall pay all costs
of installation, maintenance, and removal of
temporary services.
10. The Construction Manager will pay the costs of
power needed, including deposits and fees
associated with city Electric except as outlined in
item 13 below
11. l1aterials shall be new, and must be adequate in
capacity for required usage, and must not violate
the requirements of applicable codes and standards.
Materials used for temporary service shall not be
reused in the permanent system.
12. The Temporary Power Contractor shall comply with
all applicable requirements specified in National
Electr ic Code Art. 305 when insta 11 ing the
temporary electr ic power service, sha 11 ma inta in
the system to provide continuous service and shall
modify and extend the service as the progress of
11/21/91
TEMPORARY UTILITIES
01510 - 2
the Work requires.
13. Wiring for Trade Contractor field offices and sheds
shall be installed by the Temporary Power
Contractor and paid for by the Trade Contractor
requiring the service.
14. The Temporary Power Contractor shall completely
remove all temporary materials and equipment at
Project Completion. Underground lines may be
disconnected and abandoned in place with approval
of the Construction Manager. The temporary shed as
shown in Detail "C" shall remain the property of
Benson Electric.
15. Feeders to distribution panels from distribution
shed shall be 400 feet maximum length, with two hot
legs and one neutral of the same size as per NEC
Table 310-16 and Article 210-19a FPN.
16. Circuits to Power Centers from Distribution Panels
shall be installed per NEC Art. 305.
17. Feeders and Branch Circuits in 15. and 16. above
shall be protected from physical damage.
lB. See Detail "C" for temporary power shed
requirements. This shall remain the property of
Benson Electric.
2.3
TEMPORARY SITE LIGHTING
The Temporary Power Contractor shall install and maintain area
lights on the meter poles as shown in Detail "A", 2 lights total.
Temporary Lighting power will be fed from the panels and power
centers covered under section 2.2 TEMPORARY ELECTRICITY.
2.4
TEMPORARY TELEPHONE SERVICE
A.
Each Trade Contractor shall be responsible for arranging
with the local telephone service company to provide
telephone service at the construction site for the use of
his personnel and employees. The Trade Contractor shall
pay all costs for installation, maintenance, removal and
service charges for such service. The Construction
Manager will not act as an answering service for Trade
Contractor's personnel and employees, and Trade
Contractor's personnel and employees will not be
permitted to utilize the Construction Manager's phones
except in cases of an emergency.
11/21/91
TEMPORARY UTILITIES
01510 - 3
2.5
CONTINLING TEMPORARY ELECTRICITY MAINTENANCE
At the option of the Owner, the Temporary Power
Contractor shall provide a minimum of 1 person full time
for the duration of the construction, estimated to be 18
months. This person will maintain, relocate and repair
the ter?orary utilities covered under Articles 2.2, 2.3
and 2.4. The bid for this work shall be based on an
hourly rate for licensed electrician.
2.6 TEMPO~3Y LIGHTING
A. The Electrical Trade Contractor will be responsible for
the installation of the permanent electrical system and
shall also furnish, install and maintain temporary
lighting for construction needs throughout the
constr'\;ction period and shall remove such temporary
lighting on completion of the Work.
1. Temporary artificial lighting shall be provided in
enclosed Work areas and all other work areas when
natural lighting does not meet minimum
re:xuirements. Temporary artificial lighting in
Wcrk areas shall produce uniform illumination of
2C-foot candles.
2. Any Trade Contractor requiring temporary lighting
in addition to that specified, including lighting
for security, temporary offices, storage, shops and
other construction buildings, shall arrange and pay
for such additior.al temporary lighting.
3. Pc~er requirements and source will be coordinated
with Article 2.2 above.
4. The Electrical Contractor shall comply with the
applicable requirements specified in sections of
Division 16 - Electrical. Materials shall be new,
ar1 must be adequate for required usage, and must
nct violate requirements of applicable codes and
standards.
5. Receptacles, fixtures and controls shall be
standard products, meeting UL standards.
6. 'T:-.e Electrical Contractor shall comply with all
arpl icable requirements specif ied in sections of
Division 16 Electrical, when installing the
te=porary lighting, shall locate fixtures to
provide full illumination of required areas, shall
mcintain the system to provide continuous service,
and shall modify and extend the service as the
progress of the Work requires.
7. T~e Electrical Contractor shall completely remove
tE~porary materials and equipment at Project
c:=pletion, except for high voltage underground.
11/21/91
TEMPORARY UTILITIES
01510 - 4
2.7
2.8
TEMPORARY WATER
A.
site Plumbing Contractor will arrange
service company, to provide water for
purposes.
with utility
construction
B.
site Plumbing Contractor will provide temporary water at
locations of two (2) fire hydrants on fire water loop as
directed by Construction Manager; fire water loop will
be charged to provide construction water.
C.
The Construction Manager will pay for water used for
temporary construction purposes.
D.
Building Plumbing Contractor will maintain temporary
water systems, and will remove temporary water
appurtenances at completion of project.
E.
Each Trade Contractor shall be responsible for providing
any additional water (if needed) for construction
purposes. In addition, each Trade Contractor is
responsible for providing potable drinking water for his
personnel and employees, as well as suitable containers,
ice and salt tablets in sufficient quantity to meet the
needs of his labor force.
TEMPORARY HEATING, COOLING AND VENTILATING
Each Trade Contractor shall be responsible for providing, and
operating and maintaining temporary heating, cooling and
ventilating, as required, to maintain adequate environmental
conditions to facilitate the progress of his Work; to meet
minimum condition for the installation of materials; and to
protect materials and finishes from damage due to temperature
or humidity. Each Trade Contractor, subject to the approval
and direction of the Construction Manager, shall:
1. Provide adequate forced venti lation of enclosed
areas for curing of installed materials, to
disperse humidity, and to prevent hazardous
accumulations of dust, fumes, vapors, or gases.
2. If portable heaters are required, utilize only UL
approved units complete with controls.
3. Insure that all safety devices specified for
operation of equipment are functioning properly.
4. Pay all costs of providing, operating, maintaining,
and removing such temporary heating, cooling, and
ventilating equipment as may be required.
11/21/91
TEMPORARY UTILITIES
01510 - 5
The foregoing obligations of the Trade Contractor are in
addition to his obligations under Article 10 of the General
Conditions.
2.9
A.
B.
2.10
TEMPORARY SANITARY FACILITIES
The Owner will provide sanitary facilities in compliance
with laws and regulations.
The Owner will service, clean and maintain facilities and
enclosures.
TEMPORARY FIRE PROTECTION
The Trade Contractor responsible for the installation of the
permanent fire protection system shall furnish, install and
maintain temporary fire protection equipment, materials,
supplies and service wi thin the buildings throughout the
construction period in accordance with the requirements of all
applicable codes and standards. Each floor shall have a
temporary fire protection system. Each Trade Contractor will
be responsible for fire protection required for his own work.
2.11
A.
REMOVAL
Completely remove temporary materials and equipment when
their use is no longer required.
B.
Clean and repair damage caused by temporary installations
or use of temporary facilities.
C.
Restore permanent facilities used for temporary services
to specified condition.
1. Prior to final painting, the
responsible for the permanent
system, shall remove temporary
Trade Contractor
building lighting
lamps and install
new lamps.
2.
Pr ior to final inspection, the Trade Contractor
responsible for the building mechanical system
shall replace filters and worn or consumed parts of
mechanical equipment.
***************
END OF SECTION 01510
11/21/91
TEMPORARY UTILITIES
01510 - 6
SECTION 01520
CONSTRUCTION AIDS
PART 1 - GENERAL
1.1 SUMMARY
A. section includes:
1. Construction aids
2. Temporary enclosures
1.2 REQUIREMENTS OF REGULATORY AGENCIES
B.
Comply with Federal,
regulations.
State and local codes and
PART 2 - PRODUCTS
2..1 MATERIALS - GENERAL
A. Materials may be new or used, suitable for the intended
use and shall not violate requirements of applicable
codes and standards.
2..2 CONSTRUCTION AIDS
A. Each Trade Contractor shall be responsible for
furnishing, installing, maintaining, and removing on
completion of the Work all scaffolds, staging, ladders,
stairs, ramps, runways, platforms, railings, chutes, and
other such facilities and equipment required by his
personnel to insure their safety and facilitate the
execution of the Work.
1. Each Trade Contractor shall comply with all
Federal, State and local codes, laws and
regulations governing such construction aids.
2. Each Trade Contractor shall relocate such
construction aids as required by the progress of
construction, by storage or work requirements, and
to accommodate the legitimate requirements of the
Owner or Construction Manager or other separate
contractors employed at the site.
3. Each Trade Contractor shall completely remove
temporary scaffolds, access, platforms, and other
such rraterials, facilities, and equipment, at the
completion of the Work or when construction needs
can be met by the use of the permanent
construction, provided the Construction Manager has
04/09/91
CONSTRUCTION AIDS
01520 - 1
approved and authorized such use. Each Trade
Contractor shall clean up and shall repair any
damage caused by the installation or by the use of
such temporary construction aids. Each Trade
Contractor shall restore any permanent facilities
used for temporary purposes to their specified
condition.
The foregoing obligations of the Trade Contractor are in
addition to his obligations under Article 10 of the General
Conditions.
2..3 TEMPORARY ENCLOSURES
A. The Trade Contractor responsible for installing the
permanent closure in an opening in an exterior wall shall
be responsible for installing, maintaining, and removing,
as the Work progresses, a temporary weather-tight
enclosure for that opening as necessary to provide
acceptable working conditions, to provide weather
protection for interior materials, to allow for effective
temporary heating, and to prevent entry of unauthorized
persons.
1. Each Trade Contractor shall install such temporary
enclosures as soon as is practical after the
opening is constructed or as directed by the
Construction Manager.
2. Temporary enclosures shall be removable as
necessary for the Work and for handling of
materials.
3. Temporary enclosures shall be completely removed
when construction needs can be met by the use of
the permanent closures.
4. The Trade Contractor responsible for prov iding,
maintaining, and removing the temporary enclosure
shall clean and shall repair any damage caused by
the installation of such enclosure.
5. Each Trade Contractor shall remain responsible for
insuring that his work, material, equipment,
supplies, tools, machinery, and construction
equipment is adequately protected from damage or
theft and shall provide, maintain and remove such
additional temporary enclosures as may be deemed
necessary.
The foregoing obligations of the Trade Contractor are in addition
to his obligations under Article 10 of the General Conditions.
****************
END OF SECTION 01520
CONSTRUCTION AIDS
01520 - 2
04/09/91
SECTION 01550
ACCESS ROADS AND PARKING AREAS
A. Each Trade Contractor shall be responsible for installing
and maintaining, until the completion of his Work any
temporary access roads or parking facilities required by
his Work, other than that which has been provided by the
Owner.
B. Any Trade Contractor excavating across an access road or
parking area shall backfill and compact his excavation
and resurface the road or parking area to match the
existing surface. The Trade Contractor shall comply with
all applicable Specifications when so doing.
*********************
END OF SECTION 01550
04/09/91
ACCESS ROADS AND PARKING AREAS
01550 - 1
SECTION 01560
TEMPORARY CONTROLS
PART 1 - GENERAL
1..1 SUMMARY
A. section Includes:
1. Water control
2. Dust control
3. Erosion and sediment control
4. Pollution control
B. Related sections:
1. SCOPES OF WORK
1..2 WATER CONTROL
A. site Grading Contractor shall grade site to drain.
B.
Protect site from puddling or running water.
water barriers to protect site from soil
Maintain excavations free of water. Provide,
and maintain pumping equipment.
Provide
erosion.
operate,
1..3 DUST CONTROL
A. Execute the Work by methods to minimize raising dust from
construction operations.
B. Provide positive means to prevent airborne dust from
dispersing into atmosphere.
1..4 EROSION AND SEDIMENT CONTROL
A. Plan and execute construction by methods to control
surface drainage from cuts and fills, from borrow and
waste disposal areas. Prevent erosion and sedimentation.
B. Minimize amount of bare soil exposed at one time.
C. Provide temporary r:easures such as berms, dikes, and
drains, to prevent ~ater flow.
D. Construct fill and ~aste areas by selective placement to
avoid erosive surface silts or clays.
E. Inspect earthwork to detect evidence of erosion and
OS/20/91
T&~PORARY CONTROLS
01560 - 1
sedimentation; promptly apply corrective measures.
1..5 POLLUTION CONTROL
A. Provide methods, means, and facilities to prevent
contamination of soil, water, and atmosphere from
discharge of noxious, toxic substances, and pollutants
produced by construction operations.
Two (2) 30 c.y. trash containers will be provided by the Owner.
The Masonry Contractor shall be responsible to provide his own
trash dumpsters for masonry waste disposal. Trash containers shall
be located in trash accumulation areas designated by the
construction Manager. Each Contractor each day shall collect and
deposit in the containers, all rubbish, waste materials, debris,
and other trash from his operations, (excluding masonry), including
any trash generated by his employees during lunch periods or coffee
breaks. Shipping dunnage is to be removed by the receiving
contractor. Paper, boxes and bulk packaging shall be folded or cut
into reasonable sizes and shapes and confined to prevent lost of
trash container volume or wind relocation.
***************
END OF SECTION 01560
OS/20/91
TEMPORARY CONTROLS
01560 - 2
SECTION 01580
PROJECT IDENTIFICATION AND SIGNS
Trade Contractors informational signs on the site shall be limited
to those designating their temporary field offices and sheds. All
such informational signs shall be subject to approval by the
Construction Manager.
*************************
END OF SECTION 01580
11/21/91
PROJECT IDENTIFICATION AND SIGNS
01580 - 1
SECTION 01590
FIELD OFFICES AND SHEDS
A. The Trade Contractor, if he deems it necessary, may
furnish, install, and maintain a temporary field office
for his use and the use of his employees during the
construction period.
B. The Trade Contractor shall furnish, install, and maintain
temporary storage and work sheds to adequately protect
his work, materials, equipment, supplies, tools,
machinery, and construction equipment from damage and
theft.
c. The Trade Contractor shall arrange his field office and
sheds so as not to interfere with the construction. The
locations of field offices and sheds shall be coordinated
with the Construction Manager. The type, size and
location of field offices and sheds is subject to
approval by the Construction Manager.
D. The Trade Contractor shall arrange and pay for temporary
electricity and telephone service for his field office
and sheds, if he should require such services.
E. The Trade Contractor shall relocate his field office and
sheds as directed by the Construction Manager, at no
additional cost to the Owner or Construction Manager.
F. The Trade Contractor shall completely remove his field
office and sheds on completion of the Work or when
directed by the Construction Manager. The Trade
Contractor shall remove all debris and rubbish and shall
place the area in a clean and orderly condition.
G. The Construction Manager as soon as reasonably possible
will establish a field office on the site and will
maintain such an office during the entire construction
period. The Construction Manager's field office will not
be used as field office by the Trade Contractor or his
employees.
**************
END OF SECTION 01590
04/09/91
FIELD OFFICES AND SHEDS
01590 - 1
SECTION 01595
CONSTRUCTION CLEANING
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Cleaning during progress of work.
1..2 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with
codes, ordinances, regulations, and anti-pollution laws.
1. Do not burn or bury rubbish and waste materials on
Project site.
2. Do not dispose of volatile wastes such as mineral
spirits, oil or paint thinner in storm or sanitary
drains.
PART 2 - PRODUCTS
2..1 MATERIALS
A. Use only those cleaning materials which will not create
hazards to health or property and which will not damage
surfaces.
B. Use only those cleaning materials and methods recommended
by manufacturer of the surface material to be cleaned.
C. Use cleaning materials only on surfaces recommended by
cleaning material manufacturer.
D. Sweeping compounds used in cleaning operations shall
leave no residue on concrete floor surfaces that may
affect installation of finish flooring materials.
PART 3 - EXECUTION
3..1 DURING CONSTRUCTION
A. Execute cleaning to keep the Work, the site and adjacent
properties free from accumulations of ~aste materials,
rubbish and windblown debris, resulting from construction
operations.
B. Provide on-site containers for the collection of waste
04/09/91
CONSTRUCTION CLEANING
01595 - 1
materials, debris, and rubbish.
c. Dispose of waste materials, debris and rubbish off the
site.
3..2 DUST CONTROL
A. Clean interior spaces prior to the start of the finish
painting and continue cleaning on an as-needed basis
until painting is finished.
B. Schedule operations so that dust and other contaminants
resulting from cleaning process will not fall on wet or
newly-coated surfaces.
c. Handle materials in a controlled manner with as little
handling as possible; do not drop or throw materials
form heights.
************
END OF SECTION 01595
CONSTRUCTION CLEANING
01595 - 2
04/09/91
SECTION 01600
MATERIAL AND EQUIPMENT
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Products
2. Transportation and handling
3. storage and protection
4. Security
1..2 PRODUCTS
A. Products: means new material, machinery, components,
equipment, fixtures, and systems forming the Work. Does
not include machinery and equipment used for preparation,
fabrication, conveying and erection of the Work.
Products may also include existing materials or
components required for reuse.
B. Do not use materials and equipment removed from existing
premises, except as specifically permitted by the
Contract Documents.
C.
Provide interchangeable components
manufacturer, for similar components.
of
the
same
1..3 TRANSPORTATION AND HANDLING
A. The Trade Contractor shall be responsible for the
transportation of all materials and equipment furnished
under this contract. The Trade Contractor shall also be
responsible for loading, receiving and off-loading at the
site all material and equipment installed un der this
Contract, whether furnished by the Trade Contractor or
the Owner. Unless otherwise provided, the Construction
Manager will not accept delivery on behalf of the Trade
Contractor for his materials and equipment. The Trade
Contractor shall be responsible for coordinating the
installation within the buildings of equipment that is
too large to pass through finished openings.
B. Transport and handle products in accordance with
manufacturer's instructions.
C. Promptly inspect shipments to assure that products comply
MATERIAL AND EQUIPMENT
01600 - 1
04/09/91
with requirements, quantities are correct, and products
are undamaged.
D. Provide equipment and personnel to handle products by
methods to prevent soiling, disfigurement, or damage.
1..4 STORAGE AND PROTECTION
The Trade Contractor shall be responsible for the proper
storage of all materials, supplies, and equipment to be
installed under this Contract. Materials stored on site but
not adequately protected will not be included in estimates for
payment. Except for materials stored within designated and
approved storage sheds, vans, or trailers, the Trade
Contractor shall not bring onto nor store in any manner at the
site any materials and equipment which will not be
incorporated into the permanent Work within seven (7) days
from the delivery date. The Trade Contractor shall be
responsible for arranging and paying for the use of property
off the site for storage of materials and equipment as may be
required.
1..5 SECURITY
A. Each Trade Contractor shall be totally responsible for
the security of his work, materials, equipment, supplies,
tools, machinery, and construction equipment.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
*************
END OF SECTION 01600
04/09/91
MATERIAL AND EQUIPMENT
01600 - 2
SECTION 01630
POST-BID SUBSTITUTIONS
PART 1 - GENERAL
1.1 SUMMARY
A. section includes:
1. Post-bid substitutions
1.2 SUBSTITUTIONS
A. Base Bid shall be in accordance with the Contract
Documents.
B.
After the end of the bidding
requests will be considered only
1. Product unavailability
2. Other conditions beyond
Contractor.
period, substitution
in the case of:
the control
of the
C. Submit a separate request for each substitution. support
each request with the following information:
1. Complete data substantiating compliance of proposed
substitution with requirements stated in Contract
Documents:
a. Product identification, including
manufacturer's name and address.
b. Manufacturer's literature, identifying:
1) Product description.
2) Reference standards.
3) Performance and test data.
c. Samples, as applicable.
d. Name and address of similar projects on which
product has been used and date of each
installation.
2. Itemized compar ison of the proposed substi tut ion
with product specified, listing significant
variations.
3. Data relating to changes in construction schedule.
4. Effects of substitution on separate contracts.
5. List of changes required in other work or products.
6. Accurate cost data comparing proposed substitution
with product specified.
a. Amount of net change to Contract Sum.
7. Designation of required license fees or royalties.
8. Designation of availability of maintenance
services, sources of replacement materials.
04/09/91
POST-BID SUBSTITUTIONS
01630 - 1
D. Substitutions will not be considered for acceptance when:
1. A substitution is indicated or impl ied on shop
drawings or product data submittals without a
formal request from Bidder.
2. Acceptance will require substantial revision of
Contract Documents.
3. In judgement of Architect or Construction Manager,
the substitution request does not include adequate
information necessary for a complete evaluation.
4. Requested directly by a subcontractor or supplier.
E. Do not order or install substitute products without
written acceptance of Construction Manager.
F. Architect will determine acceptability of proposed
substitutions.
G. No verbal or written approvals other than by Change Order
will be valid.
1..3 CONTRACTOR'S REPRESENTATION
A. In making formal request for substitution the Contractor
represents that:
1. The proposed product has been investigated and it
has been determined that it is equivalent to or
superior in all respects to the product specified.
2. The same warranties or bonds will be provided for
the substi tute product as for the product
specified.
3. Coordination and installation of the accepted
substitution into the Work will be accomplished and
changes as may be required for the Work to be
complete will be accomplished.
4. Claims for additional costs caused by substitution
which may subsequently become apparent will be
waived by the Contractor.
5. Complete cost data is attached and includes related
costs under the Contract, but not:
a. Costs under separate contracts.
b. Architect's costs for redesign or revision of
Contract Documents.
1..4 POST-BID SUBSTITUTION FORM
A. The form is attached to this section.
B. Substitutions will be considered only when the attached
form is completed and included with the submittal with
back-up data.
POST-BID SUBSTITUTIONS
01630 - 2
04/09/91
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
04/09/91
POST-BID SUBSTITUTIONS
01630 - 3
TO: Project Architect
HANSEN LIND MEYER INC.
c/o Morrison-Knudsen/Gerrits
P.O. Box 5283 5090 Jr. College Road, Key West, Fl. 33040
(305)292-7845 FAX (305)292-9697
We hereby submit for your consideration the following product inst d c
the specified item for the above project:
DRAWING NO.
DRAWING NAME
SPEC. SEC.
SPEC. NAME
PARAGRAPH
SPECIFIED ITEM
Proposed Substitution:
Attach complete information on changes to Drawings and/or Specificatior
which proposed substitution will require for its proper installation.
Submit with request necessary samples and substantiating data to pro'
equal quality and performance to that which is specified. Clearly mal
manufacturer's literature to indicate equality in performance.
The undersigned certifies that the function, appearance and quality al
of equal performance and assumes liability for equal performance, equc
design and compatibility with adjacent materials.
Submitted By:
signature
Title
Firm
Address
Telephone
Date
signature shall be by person having authority to legally bind his firm ~
the above terms. Failure to provide legally binding signature will resu:
in retraction of approval.
For use by the Architect:
____Recommended ____Recommended as noted
____Not Recommended ____Received too late
InSUfficient data received
By
Date
Fill in Blanks Below:
A. Does the substitution affect dimensions shown on Drawings?
Yes
No
If yes, clearly indicate changes.
B. will the undersigned pay for changes to the building design,
including engineering and detailing costs caused by the requestec
substitution?
Yes
No
If no, fully explain:
c. What effect does substitution have on other Contracts or other
trades?
D. What effect does substitution have on construction schedule?
E. Manufacturer's warranties of the proposed and specified items are:
Same
Different. Explain:
F. Reason for Request:
G.
Itemized comparison of specified item(s)
substitution; list significant variations:
with the proposec
H. This substitution will amount to a credit or extra cost to the Owne2
of: dollars ($ ).
I. Designation of maintenance services and sources:
(Attach additional sheets if required.)
****************
END OF DOCUMENT 01630
SECTION 01650
STARTING OF SYSTEMS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Starting systems
2. Demonstration and instructions
3. Testing, adjusting, and balancing
B. Related sections:
1. SECTION 01700 - CONTRACT CLOSEOUT
1..2 STARTING SYSTEMS
A. Coordinate schedule for start-up of various equipment and
systems.
B. Notify the Construction Manager seven days prior to
start-up of each item.
C. verify that each piece of equipment or system has been
checked for proper lubrication, drive rotation, belt
tension, control sequence, or other conditions which may
cause damage.
D. Verify that tests, meter readings, and specified
electrical characteristics agree with those required by
the equipment or system manufacturer.
E. Verify wiring and support components for equipment are
complete and tested.
F.
Execute start-up under supervision
manufacturer's representative in
manufacturer's instructions.
of responsible
accordance with
G. Execute start-up under supervision of the responsible
contractors' personnel in accordance with manufacturer's
instructions. All in-line and interface trades shall
cooperatively support and coordinate individual
components and systems to faci 1 i tate start-up acti vi ties.
H. When specified in individual Specification sections,
require manufacturer to provide authorized representative
to be present at the site to inspect, check and approve
11/21/91
STARTING OF SYSTEMS
01650 - 1
equipment or system installation prior to start-up, and
to supervise placing equipment or system in operation.
I. Submit a certified written report that equipment or
system has been properly installed and is functioning
correctly.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01650
11/21/91
STARTING OF SYS'I'EMS
01650 - 2
SECTION 01670
SYSTEMS DEMONSTRATIONS
PART 1 - GENERAL
1..1 SUMMARY
A. Section includes:
1. Procedures for demonstration of equipment operation
and instruction of the Owner's personnel.
1..2 QUALITY ASSURANCE
A. When specified in individual Sections, provide
manufacturer's authorized representative to demonstrate
operation of equipment and systems, instruct the Owner's
personnel and provide written report that demonstrations
and instructions have been completed.
B. The Owner will provide list of personnel to receive
instructions, and will coordinate their attendance at
agreed-upon times.
1..3 SUBMITTALS
A. Submit preliminary schedule for the Owner's approval,
listing times and date for demonstration of each item of
equipment and each system, two weeks prior to proposed
dates.
B. Provide operating and maintenance manuals to owner (4)
weeks prior to demonstrations.
C. Submit reports within one week after completion of
demonstrations, that demonstrations and instructions have
been satisfactori ly completed. Gi ve time and date of
each demonstration, and hours devoted to demonstration,
with a list of persons present.
PART 2 - PRODUCTS
NOT USED
PART 3 - EXECUTION
3..1 PREPARATION
A. Verify equipment has been inspected and put into
04/30/91
SYSTEMS DEMONSTRATIONS
01670 - 1
operation;
performed;
operational.
testing, adjusting, and balancing has been
and equipment and systems are fully
B.
Have copies
manuals at
instructions.
of completed operation and maintenance
hand for use in demonstrations and
3..2 DEl10NSTRATION AND INSTRUCTIONS
A. Demonstrate operation and maintenance of equipment and
systems to the Owner's personnel two weeks prior to date
of final inspection. For equipment requiring seasonal
operation, perform instructions for other seasons within
six months.
B. Use operation and maintenance manuals as basis of
instruction. Review contents of manual with personnel in
detail to explain aspects of operation and maintenance.
c.
Demonstrate start-up, operation, control,
maintenance, servicing, trouble-shooting and
each item of equipment at agreed-upon
designated location.
adjustment,
shutdown of
times, at
D. Prepare and insert additional data in operations and
maintenance manuals when need for additional data becomes
apparent during instructions.
3..3 TIME ALLOCATED FOR INSTRUCTIONS
A. The amount of time required for instruction on each item
of equipment and system is specified in individual
sections.
**************
END OF SECTION 01670
SYSTEMS DEMONSTRATIONS
o 167 0 -- 2
04/30/91
SECTION 01700
CONTRACT CLOSEOUT
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Closeout procedures
2. Adjusting
B. Related sections:
1. SECTION 01027 - APPLICATION FOR PAYMENT
2. SECTION 01650 - STARTING OF SYSTEMS
3. SECTION 01730 - OPERATION AND MAINTENANCE DATA
4. SECTION 01740 - WARRANTIES AND BONDS
5. SECTION 08710 - FINISH HARDWARE
6. SECTION 11196 - SECURITY HARDWARE
1..2 PROJECT TERMINATION
A. the Contract requirements are met when construction
activities have successfully produced, in this order,
these three terminal activities:
1. Substantial Completion
2. Final Completion
3. Final Payment
1..3 SUBSTN~TIAL COMPLETION
A. Submi t to the Construction Manager when the Work is
substantially complete:
1. A written notice that the Work, or designated
portion thereof, is substantially complete.
2. A list of items to be completed or corrected (Punch
List).
3. Request Substantial Completion Observation at a
mutually agreeable date.
4. certifications of systems and testing/balancing
final reports.
5. Submit evidence of compliance with requirements of
governing authorities:
a. certificate of Occupancy
b. certificates of Inspection:
1) Elevators
2) Mechanical systems
3) Electrical systems
4) Kitchen equipment
04/09/91
CONTRACT CLOSEOUT
01700 - 1
5) Fire protection system
6) security system
B. within a reasonable time after receipt of such notice,
the Architect, the Construction Manager, the
contractor,and the Owner, will make an observation to
determine the status of completion.
C. Should the work be determined to not be substantially
complete the following will occur:
1. The Construction Manager will promptly notify the
Contractor in writing, giving the reasons.
2. The Contractor shall remedy the deficiencies in the
Work, and send a second written notice of
substantial completion.
3. The Work will be reobserved.
D. When the Work is considered substantially complete, the
following will occur:
1. The Construction Manager will prepare a certificate
of Substantial Completion on AlA Form G704,
accompanied by the Contractor's Punch List of items
to be completed or corrected, as verified and
amended. Contract responsibilities are not altered
by inclusion or omission of required Work from the
punch list.
2. The certificate will be executed by all parties and
distribution made.
E. Complete or correct items identified on the punch list
and required by the Contract requirements within time
limit established by the certificate.
1..4 FINAL COMPLETION
A. To attain final completion, the Contractor shall complete
acti vi ties pertaining to substantial completion, complete
Work on punch list items and submit written request to
the Construction Manager for final inspection.
B. When the Work is complete, the Contractor shall submit
written certification that:
1. The Contract Documents have been reviewed.
2. Work has been inspected for compliance with the
Contract Documents.
3. Hork has been completed In accordance with the
Contract Documents.
4. Equipment and systems have been tested in the
presence of the Owner's representative and are
operational.
5. Hork is completed and ready for final observation.
CONTRACT CLOSEOUT
01700 - 2
04/09/91
C. The Architect, the Construction Manager, the Contractor
and the Owner will make an inspection to verify the
status of completion with reasonable promptness after
receipt of such certification.
D. Should the Work be considered incomplete or defective:
1. The Construction Manager will promptly notify the
Contractor in writing, listing the incomplete or
defective work.
2. The Contractor shall take immediate steps to remedy
the stated deficiencies and send a second written
certification to the Construction Manager that the
Work is Complete.
3. The Work will be reinspected.
E. When the Work is acceptable under the Contract Documents
the Contractor shall make closeout submittals.
1..5 THE CONTRACTOR'S CLOSEOUT SUBMITTALS TO THE ARCHITECT
A.
Project Record Documents:
01720.
to requirements of SECTION
B. Operating and maintenance data, instructions to the
Owner's personnel: to requirements of SECTION 01730.
C.
Keys and keying schedule:
08710 & 11196.
to requirements of SECTION
D. Spare parts and maintenance materials: to requirements
of individual sections.
E. Evidence of payment and release of 1 iens: to
requirements of General and Supplementary Conditions.
1..6 FINAL ADJUSTMENT OF ACCOUNTS
A. Submit a final statement of accounting to the Architect.
B. statement shall reflect adjustments to the Contract Sum:
1. The original Contract Sum
2. Additions and deductions resulting from:
a. Previous Change Orders
b. Allowances
c. Unit Prices
d. Deductions for uncorrected Work
e. Penalties and bonuses
f. Deductions for liquidated damages
g. Deductions for reinspection payments
h. Other adjustments
3. Total Contract Sum, as adjusted
04/09/91
CONTRACT CLOSEOUT
01700 - 3
4. Previous payments
5. Sum remaining due
C. The Construction Manager will prepare a final Change
Order, reflecting adjustments to the Contract Sum which
were not previously made by Change Orders.
1..7 FINAL APPLICATION FOR PAYMENT
A. The Contractor shall submit the final Application for
Payment in accordance with procedures and requirements
stated in the Conditions of the Contract.
PART 2 - PRODUCTS
Not used
PART 3 - EXECUTION
Not used
*****************
END OF SECTION 01700
04/09/91
CONTR~CT CLOSEOUT
01700 - 4
SECTION 01710
FINAL CLEANING
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Cleaning at completion of Work
1..2 DISPOSAL REQUIREMENTS
A. Conduct cleaning and disposal operations to comply with
codes, ordinances, regulations, and anti-pollution laws.
1. Do not burn or bury rubbish and waste materials on
the Project site.
2. Do not dispose of volatile wastes such as mineral
spirits, oil or paint thinner in storm or sanitary
drains.
PART 2 - PRODUCTS
2..1 MATERIALS
A. Use only those cleaning materials which will not create
hazards to health or property and which will not damage
surfaces.
B. Use only those cleaning mater ials and methods recommended
by manufacturer on the surface material to be cleaned.
C. Use cleaning materials only on surfaces recommended by
cleaning material manufacturer.
PART 3 - EXECUTION
3..1 DUST CONTROL
A. Handle materials in a controlled manner with as little
handling as possible.
3. .2 FINAL CLEANING
A. Employ skilled workmen for final cleaning.
B. Remove grease, mastic, adhesives, dust, dirt, stains,
fingerprints, labels, and other foreign materials form
sight-exposed interior and exterior surfaces.
04/09/91
FINAL CLEANING
01710 - 1
c. Wash and shine glazing and mirrors.
D. Polish glossy surfaces to a clear shine.
E. Dust cabinetwork and remove markings.
F. Vacuum as needed.
G.
Broom clean exterior paved surfaces;
surfaces of the grounds.
rake clean other
H. Prior to final completion, or the Owner occupancy,
conduct an inspection of sight-exposed interior surfaces,
exterior surfaces and work areas, to verify that the
entire Work is clean.
I. Clean tunnels and closed off spaces of packing boxes,
wood frame members and other waste materials used in the
Construction.
J. Internally clean the entire system of piping and
equipment. Open dirt pockets and strainers, completely
blowing down as required and clean strainer screens of
accumulated debris.
K. Drain tanks, fixtures and pumps to be free of sludge and
accumulated matter.
L. Remove temporary labels and stickers from fixtures and
equipment. Do not remove permanent name plates,
equipment model numbers and ratings.
M. Thoroughly clean heating and air conditioning equipment,
tanks, pumps and traps. Install or thoroughly clean
filters or filter media, including:
1. The cleaning of permanent f i 1 ters and the
replacement of disposable filters if units were
operated during construction.
2. The cleaning of ducts, blowers, and coils if the
units were operated during construction.
N. Remove from the site all facilities of items installed or
used for temporary purposes during construction.
O. Restore all adjoining areas to their original or
specified condition.
****************
END OF SECTION 01710
04/09/91
FINAL CLEANING
01710 - 2
SECTION 01720
PROJECT RECORD DOCUMENTS
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Maintain at the job site one copy of:
a. Record Contract Drawings
b. Record Project Manual
c. Coordination drawings
d. Addenda
e. Reviewed shop drawings
f. Change Orders
g. Other modifications to the Contract
h. Field test records
1..2 GENERAL
A. store documents in cabinets in temporary field office,
apart from documents used for construction.
B. Maintain documents in clean, dry, legible condition.
C. Do not use proj ect Record Documents for construction
purposes.
D. Make documents available for inspection by the
Construction Manager, the Architect and the Owner.
E. Failure to maintain documents up-to-date will be cause
for withholding pa}'ments.
F. Obtain from the Construction Manager (at no charge) two
sets of the Contract Documents for Project Record
Documents including:
1.
2.
Specifications with
Two complete sets
Drawings.
One complete set of
all addenda.
of black line prints of all
3.
mylar prints of all Drawings.
1..3 RECORDING
A. Label each document "Project Record".
B. Keep record documents current.
01/06/92
PROJECT RECORD DOCUMENTS (ADD. 2)
01720 - 1
C. Do not permanently conceal any work until required
information has been recorded.
D. Contract Drawings:
1. Required information may, as an option, be entered
on a "working set" and then at completion of
Project transfer the information to final submitted
"Project Record" set.
2. Legibly mark to record actual construction:
a. Depths of various elements of foundation in
relation to survey data.
b. Horizontal and vertical location of
underground utilities and appurtenances
referenced to permanent surface improvements.
c. Location of internal utilities and
appurtenances concealed in construction
referenced to visible and accessible features
of structure.
d. Field changes of dimension and detail.
e. Changes made by Change Order or Construction
Change Directive.
f. Details not on original Contract Drawings.
E. Specifications and Addenda:
1. Legibly mark up each section to record:
a. Manufacturer, trade name, catalog number and
supplier of each product and item of equipment
actually installed.
b. Changes made by Change Order or Construction
Change Directive.
c. other items not originally specified.
F. Conversion of schematic layouts:
1. Arrangement of conduits, circuits, piping, ducts
and similar items are in most cases shown
schematically on the Drawings.
2. Legibly mark to record actual construction:
a. Dimensions accurate to within 1" on the
centerline of items shown schematically.
b. Ident ify each item, for example, "cast iron
drain" "galvanized water".
c. Identify location of each item, for example,
"under slab", "in ceiling plenum", "exposed".
3. The Construction Manager may waive requirements of
schematic layout conversion, when in his opinion,
it serves no beneficial purpose. Do not, however,
rely on waivers being issued except specifically
issued by the Construction Manger in writing.
--
01/06/92
PROJECT RECORD DOCUMENTS (ADD. 2)
01720 - 2
1..4 SUBMITTAL
A. At completion of Project, deliver Project Record
Documents as delineated in paragraph 1.2 F. above, to the
Construction Manager prior to request for final payment.
B. Accompany submittal with transmittal letter, in
duplicate, containing:
1. Date
2. Project title and HLM Project number
3. The Contractor's name and address
4. Title and number of each record document
5. Certification that each document as submitted is
complete and accurate.
6. Signature of the Contractor, or his authorized
representative.
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
***************
END OF SECTION 01720
01/06/92
PROJECT RECORD DOCG~ENTS (ADD. 2)
01720 - 3
SECTION 01730
OPERATION AND MAINTENANCE DATA
PART 1 - GENERAL
1..1 SUMMARY
A. section includes:
1. Format and content of manuals
2. Instruction of the Owner's personnel
3. Schedule of submittals
B. Related sections:
1. SECTION 01301 - SUBMITTALS
2. SECTION 01700 - CONTRACT CLOSEOUT
3. Individual specifications sections: specific
requirements for operation and maintenance data.
1..2 QUALITY ASSURANCE
A. Prepare instructions and data by personnel experienced in
maintenance and operation of described products.
1..3 FORMAT
A. Prepare data in the form of an instructional manual.
B. Binders: commercia 1 qual i ty, 8-1/2" x 11" three-ring
binders with hardback, cleanable, plastic covers; 1-1/2"
maximum ring size. When multiple binders are used,
correlate data into related consistent groupings.
C. Cover: identify each binder with typed or printed title
OPERATION AND Y,AINTENANCE INSTRUCTIONS; list title of the
Project and separate building; identify subject matter of
contents.
D. Arrange content by systems under section numbers and
sequence of Table of Contents of these Specifications.
E. Provide tabbed fly leaf for each separate product and
system, with typed description of product and major
component parts of equipment.
F. Text: manufacturer's printed data, or typewritten data
on 20 pound paper.
G. Drawings: provide with reinforced punched binder tab.
Bind in with text; fold larger drawings to size of text
OS/20/91
OPERATION AND MAINTENANCE DATA
01730 - 1
pages.
1. .4 CONTENTS, EACH VOLlJME
A. Table of Contents: provide title of the Project; names,
addresses, and telephone numbers of the Construction
Manager, the Architect, consultants, and the Contractor
with name of responsible parties; schedule of products
and systems, indexed to content of the volume.
B. For each product or system: list names, addresses and
telephone numbers of subcontractors and suppliers,
including local source of supplies and replacement parts.
C. Product data: mark each sheet to clearly identify
specif ic products and component parts, and data
applicable to installation. Delete inappl icable
information.
D. Drawings: supplement product data to illustrate
relations of component parts of equipment and systems, to
indicate control and f low diagrams. Do not use the
Project Record Documents as maintenance drawings.
E. Type text: as required to supplement product data.
Provide logical sequence of instructions for each
procedure, incorporating manufacturer's instructions.
F.
Warranties and bonds:
bind in copy of each.
1..5 V~UAL FOR MATERIALS AND FINISHES
A. Building products, applied materials, and finishes:
include product data, with catalog number, size,
composition, and color and texture designations. Provide
information for re-ordering custom manufactured products.
B. Instructions for care and maintenance; include
manufacturer's recommendations for cleaning agents and
methods, precautions against detrimental agents and
methods, and recommended schedule for cleaning and
maintenance.
c. Moisture protection and weather exposed products:
include product data listing applicable reference
standards, chemical composition, and details of
installation. Provide recommendations for inspections,
maintenance, and repair.
D. Additional requirements; as specified In individual
product specification Sections.
OPERATION AND MAINTENANCE DATA
01730 - 2
OS/20/91
1..6 MANUAL FOR EQUIPMENT AND SYSTEMS
A. Each item of equipment and each system: include
description of unit or system, and component parts.
Identify function, normal operating characteristics, and
limiting conditions. Include performance curves, with
engineering data and tests, and complete nomenclature and
commercial number of replaceable parts.
B. panelboard circuit directories: provide electrical
service characteristics, controls and communications.
.c. Include color coded wiring diagrams as installed.
D. Operating procedures: include start-up, break-in, and
routine normal operating instructions and sequences.
Include regulation, control, stopping, shut-down, and
emergency instructions. Include summer, winter, and
special operating instructions.
E. Maintenance requirements: include routine procedures and
guide for trouble-shooting; disassembly, repair, and
reassembly instructions; and alignment, adjusting,
balancing, and checking instructions.
F. Provide servicing and lubrication schedule, and list of
lubricants required.
G. Include manufacturer's printed operation and maintenance
instructions.
H. Include sequence of operation by controls manufacturer.
T. Provide original manufacturer's parts list,
illustrations, assembly drawings, and diagrams required
for maintenance.
J. Provide control diagrams by controls manufacturer as
installed.
K. Provide the Contractor's coordination drawings, with
color coded piping diagrams as installed.
L. Provide charts of valve tag numbers, with location and
function of each valve, keyed to flow and control
diagrams.
M. Provide list of original manufacturer's spare parts,
current prices, and recommended quantities to be
maintained in storage.
OPERATION AND MAINTENANCE DATA
01730 - 3
OS/20/91
N. Include test and balancing reports.
O. Additional requirements: as specified in individual
product specification sections.
P. Provide a listing in Table of Contents for design data,
with tabbed fly sheet and space for insertion of data.
1..7 INSTRUCTION OF THE OWNER PERSONNEL
A. Before final inspection, instruct the Owner's designated
personnel in operation, adjustment, and maintenance of
products, equipment, and systems, at agreed upon times.
B. For equipment requiring seasonal operation, perform
instructions for other seasons within six months.
C. Use operation and maintenance manuals as basis for
instruction. Review contents of manual with personnel in
detail to explain all aspects of operation and
maintenance.
D.
Prepare and insert additional
Ma i ntenance Manua I when need
apparent during instruction.
data in
for such
Operation and
data becomes
1. .8 SUBMITTALS
A. Submit two copies of preliminary draft or proposed
formats and outlines of contents before start of the
Work. The Construction Manager and Architect will review
draft and return one copy with comments.
B. For equipment, or component parts of equipment put into
service during construction and operated by the Owner,
submit documents within ten days after acceptance.
C. Submit one copy of completed volumes in final form 15
days prior to final inspection. Copy will be returned
after final inspection, with Construction Manager and
Archi tect comments. Revise content of documents prior to
f inal submittal.
D. Submit two copies of revised volumes of data in final
form within ten days after final inspection.
01730 - 4
OS/20/91
OPERATION AND MAINTENANCE DATA
PART 2 - PRODUCTS
Not Used
PART 3 - EXECUTION
Not Used
**************
END OF SECTION 01730
OS/20/91
01730 - 5
OPERATION AND MAINTENANCE DATA