Change Order No. 01-017-008 C H A N G E 0 R D E R To Contractor: D.L. PORTER CONSTRUCTION, INC. 1100 GILLESPIE AVE SARASOTA, FL Change Order Number: 01-017-008 Change Order Date: 11/17/93 Project: KJ - NEW DETENTION FACILITY Architect's Project #: 34236 Contract For: CONCRETE Contract Date: 06/10/92 You are directed to make the following changes in this contract; all other provisions of the contract shall, except as specifically changed herein, remain in full force and effect. Issue: 186 - ASI #39/40R - FIRE WATER PUMP Supply and install for the pre-engineered package fire water ~, an 8'-9" x 15'-0" x 0'-6" mesh reinforced, 3,000 psi concrete slab, with a thickened edge, and extending 1" above existing grade as located by the CM at the wastewater treatment plant. The work shall include any excavation and backfi II to accoqJl ish same.............................................................. .$1 ,247.00 In accordance with Contract Drawing 1.08A dated 10/18/93, supply and install the U/G piping and tie- in from the building to the existing 6" effluent line including but not limited to all sawcutting, concrete demolition, offsite disposal, excavation, dewatering, backfill, thrus~blocks, testing, concrete, dowels and repair of the vehicle detection loop. The specification for ~e U/G piping shall match that currently installed (C-900 PVC) and shall terminate 12" above the ~1)~rJate slab at colllll"l 23G. The work shall include the coordination of the precise location of tl1$)~.iser at colllll"l 23G with the work of the Fire Sprinkler Contractor................................$!2~~69.00 All of the above work shall be coqJleted prior to December 10, 1993, and the contractor sMl:l- furnish all labor and/or services such as overtime as may be necessary to meet this miles~e date. \Q VJ c:J no r A ~" -- -'- a Contractor agrees to accept this LUMP SUM CHANGE ORDER as due to this contract change for the LUMP SUM AMOUNT of $ (f, ,..-. FINAL SETTLEMENT for this extra work and all related 13,316.00 and 38 days. iq>acts The Original Contract Amount was .................................................................... $ Net Change by Previously Authorized Change Orders .................................................... $ The Contract Amount prior to this Change was ......................................................... $ The Value of this Change Order is .................................................................... $ The New Contract Amount including this Change Order will be .......................................... $ The Contract Time wi II change by ............ ......... .......... ...................................... The Date of Substantial CoqJletion as of the Date of this Change Order is ............................ 1,079,410.00 -35,041.00 1,044,369.00 13,316.00 1,057,685.00 38 days 12/09/93 Recommended by Construction Manager: Approved by Architect: Morrison-Knudsen/Gerrits 5090 College Road Key West Fla 040 '9J Agreed to by Contractor: Authorized by Owner: D.L. PORTER CONSTRUCTION, INC. 1100 GILLESPIE AVE 0n: ~I ~ By l/l/~?3 / Da County Board of County Commissioners hitehead r~et s 3 ItPah? Mayor/Chairman Date' By Attest: Danny L. Kolhage, Clerk By ~f~) De Cler DateJ,.\OV~""m'Y 30 J ,q 0? I Approved As To F t County Attorney's Office (~ \000 V Date Not valid unless signed by the Owner, the Architect, and the Construction Manager. Signature of the Contractor indicates agreement herewith, including any and all adjustments in Contract Sum and/or Contract Time.