Loading...
12th Change Order 04/19/2006 Clerk oIl11e Circul coun Danny L. Kolhage Office (305) 295-3130 Fax (305) 295-3663 Memorandum To: David S. Koppel, County Engineer Facilities Development Attn: Ann Riger ~ .1J Isabel C. DeSantis, Deputy Clerk .~ From: Date: Tuesday, May 02, 2006 At the BDCC meeting on April 19, 2006, the Board granted approval of the following item: Change Order No. 12 to the Tower Group for the Freeman Justice Center, in the amount of$572,329.95 as amended. (The Change Order was reduced to 5% overhead and profit from 10% originally, and the 1 % bond amount was removed as that was included in the overhead and profit figure.) Enclosed please find a fully executed duplicate original for your handling. Should you have any questions concerning this matter, please do not hesitate to contact this office. Copies: Finance County Attorney File./'" MONROE COUNTY / ENGINEERING /FA CILITIES DEVELOPMENT CONTRACT CHANGE ORDER PROJECT TITLE: (Name and address) Freeman Justice Center CHANGE ORDER NO: INITIATION DATE: :t: 0 9 "P" ~- If"" n~." 0,- APriI19~~~ C}n:..._ June 16 Sm4:~; , :~ .() ~:. ~;-{ ~::, , I~.i J:> ~ -n ~ - r- ~ t'1'\ ~ 0 ..." , 0 N ?J ~ ;0 rn C"") ce 0 z:- ~ CO CONTRACT DATE: TO CONTRACTOR: The Tower Group, Inc. 405 SW 148th Avenue Suite One Davie, FL 33325 The Contract is changed as follows: The original (Contract Sum) (Guaranteed Maximum Price) .................................... $13,804,000.00 ~ Net change by previously authorized Change Orders ........................................... 311,340.19 . The (Contract Sum) (Guaranteed Maximum Price) prior to this Change Order was..... ...14,115,340.19 ' The (Contract Sum) (Guaranteed Maximum Price) will be (increased) 5?~ 3;;9.9.5 by this Change Order......................... ..-$664,434.81 / The new (Contract Sum) (Guaranteed Maximum Price) including this Change Order is $~7'5':e&- 1'1/ t-f?;t- ?O~.jY The Contract Time will be increased by ....................................................................... ..21 0 days The date of Substantial Completion as of the date of this Change Order is ............... .January 25, 2007 Detailed description of change order and justification: Revisions to Buildinq Security Equipment. Doors, Walls and Ceilinqs. and the addition of Fire Rated Doors and Hardware. Security revisions are requested by the Sheriff's Office and the 16th Judiciary. The price Raid for security equipment and fire doors will be that shown in the backup documentation included with this C.O. or that stated on the actual invoice from the supplier which ever is less. After June 29, 2006. (the substantial completion date before this Chanqe Order), Monroe County will provide Builders Risk Insurance for this proiect. Monroe County can purchase Builders Risk Insurance at a much reduced rate. This time extension is inclusive of all delays on this proiect up to and includina April 19. 2006. The Tower Group, Inc. reserves its riqhts to seek com~ensory damages as a result of the additional 210 calendar days Contract Time Extension at the project as referenced above. ARCHITECT: N/A ow ds, Aguila, Architects Date CONTRACTOR: The Tower Group By n i. ","'- /:, 80ARD OF COUN OF MONROE CO Date Arr 12 06 02:37p Anthony Burke 305-296-2587 p.1 .> " ~~,.. ~ TOWER .G.RQUl? The Tower Group, Inc. 405 SW 148'10 Avenller Suite One Davie, Florida 33325 Pl1one: 954-476-3200 Fax: 954-474-3111 To: Monroe County Facil ities Development From: John S. Chandler Attn: Clark Briggs Tel/Fax: (305) 296-2521 I (305) 296-2587 Fax: (305) 2954321 Pages: 4 Phone: (305) 2954306 Date: April 12, 2006 Re: Freeman Justice Center (FJC) CC: TTGlMO (COR-23), FF {COR-23) 0417 - 01822 Subiect: Cham!e Order Reauest #23-Rl o Urgent o For Review 0 Please Comment 0 Please Reply o Please Recycle . CommeDts: Dear Clark, Please find enclosed Change Order Request (COR) Summary Page for COR #00023Rl and Proposed Change Order (PCO) Summary Page for pca #PPC014Rl incorporating the changes mutually agreed in our meeting yesterday with Jerry Barnett. COR #00023RI proposes to furnish and install the Building Security Changes for a Contract Price increase of$604,434.81 and a Contract Time Extension of210 calendar days. Though TTG and PPC have agreed to remove the extended general conditions costs for the 21 O-day Contract Time Extension associated with COR #00023Rl, TTG & PPC yet reserve our right to pursue this compensation at a later date. Additionally, COR #00023RI includes terms to end the Contractor's responsibility to furnish Builders Risk Insurance effective June 29, 2006. Costs and responsibility for Builders Risk Insurance after this date will be addressed under a separate Change Order. I will send the full revised COR package under separate cover. ~Z~L John Chandler, Project Manager i i .. /"A_<-.jc-" ~, I;} I' ~ J<.A r ,A t7;:"t, .....J1:1&... .-. ~ECE)VEC \ , .; F ()._.~......t.L-:[U,.y \.Ol-(-<-".!'':'J!.r~'-~ APR 1 2 2006 /..,. Lt~.(~::~.~,,~ "'-,,~ ) P. .Ll J ili- ero....,:," Apr 12 06 02:37p Anthony Burke 305-296-2587 p.2 . The Tower Group~ Inc. 302 Fleming St. . (Jobsite Trailer) Key West, FL 33040 CHANGE ORDER REQUEST No.00023Rl Phone: (305) 296-2521 Fax: (305) 296-2587 TITLE: Building Security Changes DATE: 4/11/2006 JOB: 0417 CONTR.-\CT NO: 1 PROJECT: Freeman Justice Center (FJC) TO: Attn: Clark Briggs Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Phone: (305) 295-4306 Fax: (305) 295-4321 RE:PCO To:TTG DESCRIPTION OF PROPOSAL Change Order Request No. 23-RI summarizes the costs to implement the changes to the Building Security System for the Freeman Justice Center, as described in TTG Letter #0417-01638 to Currie Soward Aguila Architects, dated February 27,2006 (copy attached, 2 pages). The Contract Time Extension is based on the enclosed Primavera P3 Time Impact Analysis, Filename IA23, entitled "Impact Analysis for Security Modifications (COR #23)". From: PPC Number: PPC014Rl Contract Price Increase associated 'W'ith this change is $604,434.81. Contract Time ElCtension associated with this change is 210 calendar days (from June 29,2006 to January 25, 2007). The Tower Group reserves our right to compensation for extended general conditions costs arising from this changed condition, as well as that for our affected subcontractors. This Change Order Request includes teons to end the Contractor's responsibility to furnish Builders Risk Insurance effective June 29, 2006. Extension of Builder:. Risk Insurance coverage beyond this date will be addressed under a separate Change Order. Item Description Stock# Quantity Units 00001 I'll Add'l Security Eqpt. (peo 1.000 LS ilPl'CO 14R 1 less sales tax) 00002 Furnish WoodlHM Doors & 1. 000 LS Hdwe. Chnnges (PCO IIFDOO3 less sales tllX) 00003 Furnish Security Door Changes LOaD LS (peo #SSOOI) 00004 I'll Glass Door & Storefront 1.000 LS Changes (peO :tCGMOO!) 00005 FII Hi-Cmpact Wallboard & 1. 000 LS Wire Mesh in Holding Rooms In lieu ofOypsum Board 00006 Add cabk:s in Elevators for 1.DOO LS Add'l Security Devices Unit Price $456,881.29 Tax Rate Tax Amount Net Amount 0.00% $0.00 $456,881.29 $48,392.00 0.00% $0.00 S48,39200 ($2,316.00) 0.00% $0.00 ($2,316.00) $6,150.00 0.00% $0.00 $6,150.00 $ll,256.00 0.00% $0.00 51l,256 00 $2,044.00 0.00% $0.00 $2,044.00 Unit Cost: $522,407.29 Unit Tax: $0.00 Unit Total: $522,407.29 Subtotal: $522,407.29 Description Overhead Profit Sales Tax 1% Bond /@ s-~1L Total Cost: Markup Percent Markup Amount 5.000% $26,120.36 5.000% -nQ,-rztr.36- $23,802.30 _ $5,9~4.50 _.._.__-~,4'3;t.n-- Apr 12 06 02:37p Anthony Burke PROPOSED CHANGE ORDER No. PPC014Rl . Patrick Power Corp. 5691 N.E. 14th Avenue Ft. Lauderdale" FI. 33334 Phone: 954-491-7745 Fax: 954-772-2126 305-296-2587 p.3 DATE:4111/2006 JOB: 0417 CONTRACT NO: 0417-002 TITLE:Building Security Changes PROJECT: Freeman Justice Center (FJC) TO: Attn: John S. Chandler The Tower Group, Inc. 302 Fleming St. (Jobsite Trailer) Kev West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 RE: COR To: MCCM From: TTG DESCRIPTION OF PROPOSAL Patrick Power Proposal dated April 3, 2006 revised to exclude mark-up on sales tax and to exclude general conditions add for 60 days in accordance with the Contract Requirements and based on discussions with Jerry Barnett and Clark Briggs of Monroe County Facilities Development. "2-O/,?Z,,'?O 3/ (, 1,'. ~o C:- PI.("~ dows - 1-~1 ~o ],..,oD Item Description Stock# Quantity Units 1 Rough Materials plus 2% waste 1.000 LS factor 2 Revised Navarro P.O. .'''mount 1. 000 lS (less sales tax) 3 Deduct Original Navarro P.O. 1. 000 LS Amount less sales tax 4 Materinls frtlm Farrey (less 1.000 LS sales ta~) 5 Labor 1,000 [.S Description Overhead Profit Sales Tax +"'" +S'~I <6 COL 2.. C, 2.-D / I ryl., 'TO f')?/ D~4-,/7 By: I van Casamayor Date: -10+"( ~'fO ~ -r E:'C';:Il~:1illc:n l!: Number: Unit Price $25,169.40 Tax Rate Tax Amouot Net Amount 0.00% SO,OO $25,169.'10 5510,452.15 0.00% SO.OO 5510,452.15 ($201,300.47) 0.00% so.oo (S20l,300.47) S644.00 0.00% SO.OO S644.00 580,3 S 1.55 0.00% SO.OO S80,38 us Unit Cost: 5415,346,63 Unit Tax: $0.00 Unit Total: S415,346.63 Subtotal: S415,346.63 Markup Percent Markup Amount 5.000% $20,767.33 5.000% $20,767.33 $20,172.90 Total Cost: 5477,054,19 By: John S. Chandler Date: Apr 12 06 02:37p Anthony Burke 305-296-2587 pA ,.,.~ ,/ I / h~;~c~~c~,?r=~~~:-~~E;R;-------- ---- -- - - -~-~.Ot4RL__ 5691 N.E 14th Ave PHONE (954) 491-7745 FORT LAUDERDALE, FL 33334 FAX (954) n2-2126 r PROPOSAL REQUEST SUMMARY TO: THE TOWER GROUP 405 SW 148th Avenue Suite 1 . Davie, Florida - 33325 ArrENTION: JOHN CHANDLER REQUEST DESCRIPTION: COR #23 (Securltv RevisIon) DATE: 4/312006 PROJECT: Freeman Justice Center OUR J08 #: 04-007 REQUEST #: COR #23 ~ ~;I~~~~ARRjER"" :::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::::: : I $ 24.675.881 3 WASTE FACTOR ....-.....-- I 2.00% I OF LINE 1 .................................. = $ 493.52 4 STORAGE FEE ....... .... --..........., ..... ......, , ..... ......." ...... ........ ... ......... ...... - 5 QUOTES ..,..................................,............................................. = $ 309,795.68 6 EQUIPMENT RENTAL ........~.....................................I..................................._.................. = 7 TOTAL (LINES 1-6) .................................................................................... = $ 334,965.08 8 FLORIOASALES TAX ..........,. i 7.S00/a /OFUNE7.................................. = $ 20,172.90 9 TOTAL (LINES 7 & 8) ............ .................................................................... = S 355,137.98 10 SERV1CE CHARGE ............ I I OF LINE 9 .................................. = $ 11 TOTAL MATERIAL (LINES 9 &.10)..................................................................... = $ 3~5.137.98 12 LABOR HOURS STRAJGHT TIME 1458.17 HOURS @ $45.00 RATE = $ 65,617.65 13 LABOR HOURS OVERTIME HOURS @ $62.32 RATE = S 14 FOREMAN HRS STRAIGHT TIME 218.73 HOURS @ $55.00 RATE = $ 12,030.15 15 FOREMAN HOURS OVERTIME HOURS@ $76.41 RATE = $ 16 PROJECT MANAGERS HOURS 36.45 HOURS @ $75.00 RATE = $ 2,733.75' 17 WAREHOUSEMAN HOURS HOURS@ RATE = S 18 EQUIPMENT OPERATOR HRS HOURS @ RATE = $ 19 TOTAL (LINES 12-18) ..................... ......................................................... = $ 80,381.55 20 TESTING & CLEANUP ............ 0.00% OF LINE 19 .................................. = $ 21 lOST TIME FACTOR --.......... 0.00% OF LINE 19 .................................. = $ 22 TOOL REPLACEMENT 0.00% OF LINE 19....:...:......................... = $ 23 TOTAL (LINES 19-22) ..................... ......................................................... = $ 80,381.55 24 LABOR ESCALATION ............ I 0.00% I OFLlNE 23.................................. = $ 25 TOTAL LABOR (LINES 23 & 24)........................................................................ = $ 80,381.55 ;~ =~~~~~~;~ENERAl CONDIT,-ONS@60DAYS.-....._..::d;;;;;;;;-::::: : I $ 33,93aoo,-1 2B AS BUILT DRAWINGS .................................................................................... = $ - 29 SITE VEHICLE ...." ......, I 0.00% IOF LINE 12.......... ...... .................. = $ 30 TOTAL COST (LINES 11. & 2~,:29,.... ..... ...... u_p.. .......dB _.U..IO 1O .... ..qu........ ........... = $ 469~449,53 31 I 5.o0%IOVERHEAD .................".........r..e.v.!.s.~d...t"P....~9Jl.':'~l.L3.~... = $ .zB,41'2.4e 32 SUB-TOTAL (LINES 30 & 31) ...u.u.........H...............u.....u.....................n........., = $ 492.922.01 33 I 5.0D%)PROFIT .....................................r.~'-!.!.~~{/..:I:.t?.....~.9J.~~l:..~.~... = $ ~3,472.48- 34 SUB-TOTAL (L!NES 32 & 33) .....H..................u..........u......-...h...U..u.....h......, = $ 516.394.49 35 I O.OO%IBOND = S 36 QUOTATION TOTAL (LiNEs.3~.&..3.5).......:::::::::::t~~f:~~!I.::~::::~i1.4b~~i:':;':9:: = $ ~ Lll~ 0$"'1.19 04-007 Freeman Justice 04-007 Security COR#23 REV Date : Mar 30, 2006 Tune : 12:30PM Page: 1 Description aty u Net Labor U Total Mat($) Total Hours 1 314" EMT CONDUIT 13,600 C 107.35 6.20 C 14,599.60 843.20 2 314" EMT DC SS CONN 700 C 64.28 12.00 C 449.96 84.00 3 3/4" EMT DC SS CPLG 1,360 C 67.80 6.00 C 922.08 81.60 4 3/'1' EMT 1-H STEEL STRAP 3,000 C 33.48 5.00 C 1,004.40 150.00 5 #12 THHN 2,300 M 190.62 7.50 M 438.43 17.25 6 CONDUIT MEASURING TAPE 14,280 M 23.97 0.00 M 342.29 0.00 7 4x2 1/8" sa BOX COMB KO 350 C 680.54 35.00 C 2,381 .89 122.50 8 4" sa BLANK COVER 170 C 158.89 9.00 C 270.11 15.30 9 4 11/16" sa 1G PLSTR RING 5/8" R 54 C 333.04 20.00 C 179.84 10.80 10 20,\ 125V 3W SGL REC (SG) 27 C 1,390.00 37.50 C 375.30 10.13 11 P-1000 1 5/8" STRUT 500 C 483.90 15.00 C 2,419.50 75.00 12 TAPCONS 3,000 C 18.75 0.01 C 562.50 0.30 13 1/4-20 HEX NUT (PLATED) 700 C 2.79 5.25 C 19.53 36.75 14 20,\ 1 P BREAKER BOLT-ON 27 E 19.05 0.42 E 514.35 11.34 15 AIR BOTTLE 10 E 19.61 0.00 E 196.10 0.00 D Totals I] o 24,675.881 1,458.17[ IVAN CASAMA YOR From: Louis Sorrentino [mailto:sorrentino@navarrosecurity.com] Sent: Wednesday, March 29, 20069:11 AM To: 'JOSE CLAUSELL' Subject: Navarro Technical Services.doc Revision1.doc NAVARRO TECHNICAL SERVICE INC. Project: Freeman Justice Center / Key West, Florida Navarro Technical Services will provide as requested, twelve days of technical training and programming on the following systems. 1. Duress Alarm System 2. Access Control, Card Reader System 3. CCTV System, Panel, and Monitors 4. Intercom Communication System 5. Training and Programming Training and programming per day: Total: $ 1,500.00 $ 18,000.00 $ 22,823.08 $276,698.86 $165,312.96 $ 27,617.25 $ 18,000.00 Duress Alarm System Access Control, Card Reader System CCTV System, Panel, and Monitors Intercom Communication System Training and Programming Sub Total Taxes Cretl/-I of ~"'~/izol/ ^-J ol V<l f'"f'"" ro.C7.;::% 4 a 01 I 300. '" Total $541,079.28 Louis Sorrentino, Director All work will be done in accordance with National Fire Protection Codes (NFPA), Florida Building Codes (FBC), and the local authority having jurisdiction over the property. All equipment will be UL approved and installed in accordance with manufacturer specifications. All wall penetrations will be sealed and junction boxes covered at the completion of each night and or day's work. 4 RO-RAS9170PC 1 RO-RH1RT 1 RO-RJ6SN 4 ADSP1 16 RO-ADC732' 16 RO-LD35814CS 16 RO-ADMC1362 1 ASP16 4 UL-KZ0224UW 2 RO-D60031P03 22A-X174 1 RO-ADTT16E 2 APS2416UL 2 ASP16 4 WG-50011108 4 WG-11181109 2 WG-49781109 100 CD-CP882 1 CCTVNOTE 1 1 NC-WINPAK2 1 NC-N485PCI2 4 NC-N1000K4 14 NC-NR5 100 NC-PVCM2 1 WG-12161109 1 NC-2021GYA 1 WG-11181109 127939GY RAS9170PCW COLOR 60HZ OUTDOOR REMOVAL TOOL JBOX INDR 6POS SNSRNET 120/230 SURGE PROTECTOR MODULE 24 V AC CAMERA 330TBL LENS 4-8MM 1/3" CON BEIGE WALL MOUNT 7.5" POWER SUPLL Y 160UTPUT 24 V UL DOME POWER SUPPLY D60031 P032 -PREMIER INTELLEX 17.4" COLOR MON BLACK CABINET TOUCH TRACKER 16 CAM PS UL LISTED SRG PRTCTR, BAT BCKUP UNIT RG59/U 20G COAX 95% BLK BX 1M I8/2STR JKT 1M BX GRY 24/4 C5E CM GRY BOX 1M 2PC CRIMP PLUG F/RG-59, 62 DISCLAIMER NOTE FOR CCTV QUOTE ACCESS CONTRIOL OP SYS RS485 PC INTRFCE VERSION 2 N-1000-IV, S-4 AND X-4KIT WIDE GAP MAGSTRIPE READER MAG STRIPE CARD PLAIN WHITE 18/6 STR OAS 1M BX GY 24/2 LO CAP WIRE 1M 18/2 STR JKT 1M BX GRY SURFACE MOUNT REED CONTACT, GY HUB2SA MOMTRY HLD UP SCREW DISCLAIMER NOTE FOR ACCESS 48 US-HUB2SA 1 ACCESSNOiE1 Desktop Master Station 1 9453D Desk Station wlLCD Disp 1 96120 24 Btn Electronics only 1 1119 Power Sup, 12V DC, 1.2A 1 96490 Handset & Coil Cord 1 96570 Basic MDF Connector Blk 1 96580 Cable & Con, (25pr, 20ft) Ceilinq Substation 9 9626 9 1830 9 1831 4" Ceiling Speaker Sub Ceiling Back Box Ceiling Mnt for 4" Spkr Weather Resistant Substation * 2 96257 Security Substation 2 62991 . Weather Resistant Box 1 V128BP-KT1 V128BP, 6160 1 VISTA-128BP CONTROL, BURG PLUS, COMMERCIAL 1 6160 ALPHA ENGLISH KEYPAD 1 6160 ALPHA ENGLISH KEYPAD 1 1M-1270 12V7AMPBATTERY 4 4 US-HUB2A 4 4 4293SN 3-SCREW TERM HOLD-UP BUTTON MINI SIM 1 ZONE ALL DURESS ALARMS WILL BE POINT 10 AT KEYPADS DURESS BUTTONS SHALL BE FIXED LATCHING WITH POINT 10 If you have any question please do not hesitate to call. louis Sorrentino, Director Equipment List 2tt~ake' ~del 10.00 Ultra Electronics .. YA.NP712 2!Y M~ke. Model 1,00 Ultra Electronics - M9005-761MED Qtt.Mlt~e' Model 200.00 Northern Computers - PVC.H4 2!Y Make. Model 40.00 GRI. .. a..OC.29AW .2n ~!!ke. Model 10.00 Northern Computers. PRQ22E1EN 2tt Make- Model 8,00 InteIHSense/Ademco -lS-310WH Qtt Ma~' Model 1.00 Nortl1emComputers .. NC.WPPFS201 1.00 Northern Computers - WPPWS!()1 1.00 Northern computers - WPPWS235DO Qtt Ma~ .~.~9d,el 10.00 Northem Computers.. NC.PR022IN 6.00 Northern Computers .. Pro-220UT Equipment List .2!I Make - Mooel 51.00 Northem Computers - NC-PR022R2 2tt M!ll!~ . Model 3.00 HID corporatiOn(27822) -6005BGBOO 4.00 HIOCorporation(27822). HU- 5355AGKOO 2.00 HID Corporation(27822) - HU- 5355:AGKOO 1.00 HID Cof'PQr~tion(27822)- Maxi Pfox 48.00 Northem Computers ~ NG:...OP40HONE 29.00 Northern Computers - NC.OP40HONE 2ttl\Jake.- Model 4,00 Ademco Group(27068) - 968-2 5,00 G.R.1. - EYOC...29AW 47.00 Sentrol- B-HUP-3040",W Q.tt I\tl$ke- M~~.del 3.00 HoneywellVideo Systems - HFDVR161201T Q.tt Make _ Model 1 ,00 P~ICo - CCC139H-6 28.00 Paleo - IC811 O-CRV39A 6.00 Peleo - ICS210-CR3 5.00 Pelea ,. S053CaW.p~eo Q!1 Milke,. Model 1.00 Paleo. DF8...PG-O Equipment List ~ Make - M~~l 1.00 Paleo -13V03.8 Q!IMake - MoqeJ 3.00 Honeywell Video Systems - HMLC017 !hI Make.. Model 4.00 Paleo - CM....OO 8.00 Paleo - ICS110,;.PG 1.00 Paleo - lCS110-PG 6.00 Paleo - lCS210-CM 5.00 Paleo - lWM--GY 2.00 Paleo - MRCA 1.00 Peleo - SP99-321 8.00 Paleo - SWM.GY Wl ~llke~. Model 3.00 Paleo - MCS16.20 1.00 Paleo - WCS1-4 1.00 Paleo - WCS4-20 Q!! Make. Mod4(1 1.00 Peleo - CM9760-COU-T WI Mak.e. Model 1.00 Paleo - OF5-0 3.00 Peleo. IC5-2CRV39A 1.00 Peleo - SP01.118.0 1.00 Paleo - SP01-1468 2.00 Winste<f . V8801 Rack for Video & Access QUOTATION 03/29/06 1850 N.E. 146 Street - Miami, Florida 33181 USA Corporate Office: (305) 947-5451 - FAX (305) 940-3450 www.farreys.com - E-Mail: farreys@gate.net Date: Quote: Project: Page: FREEDMAN mSTICE CENTER 1 Quotation submitted by: Manny Maceiras Direct Line: (305) 919-0151 Cellular: (305) 812-1313 Prices quoted: Prices valid for: Lead time: F.O.B. Miami 90DA YS 60DA YS (Based on availability as of above date) QUANTITY TYPE CATALOG NUMBER AND DESCRIPTION UNIT PRICE TOTAL PRICE NEW FIXTURES 4 CA' MLX VT2-232-EB81-UNV $89.00 $356.00 4 2- STRIP MLX VT2-217-EB81-UNV $72.00 $288.00 ALL LAMPS INCLUDED SUBTOTAL $644.00 COMPLETE QUOTE MUST BE USED, NO PARTIALS TAX $41.86 ALL QUOTATIONS ARE SUBJECT TO APPROVAL. TOTAL $685.86 PA TRICK POWER ATTN: IVANCASAMAYOR 5691 NE 14 AVE FORT LAUDERDALE,FL 33334 Terms: Prices quoted are based upon quantities listed. Any changes will invalidate quote. Order will be processed upon receipt of (1) Signed approved quotation; (2) Purchase Order confirming quantities Presented to: Apr 13 06 03:10p THE TOWER GROUP., General Contractors Construction Management Construction Design-Build Planning Site Development Infrastructure Consulting Estimating Schedu ling Value Engineering Post Construction CGCA38309 Anthony Burke 305-296-2587 p.1 April 13, 2006 (}417-01823 Artn: Clark Briggs, Senior Project Manager Monroe County Facilities Development 1100 Simonton Street Key West, FL 33040 Fax: (305) 295-4321 Re: Freeman Justice Center (FJe) Subject: Change Order Request #23-Rl Building Security Changes Dear Mr. Briggs: Please find enclosed Change Order Request (COR) #23-RI for the Building Security Changes requested by the Monroe County Sheriff's Department (MCSD) and the 161h Judiciary Circuit of Florida. COR #23-RI supersedes COR #23 and incorporates mutually agreed adjustments by Monroe County Facilities Development (MCFD) and The Tower Group (TTG) that remove extended general conditions costs and extended Builders Risk Insurance costs from this Change Order Request. TTG agreed to these adjustments with the condition that TTG retains our right to pursue compensation from the Owner for the extended overhead costs, and with the condition that TTG is relieved of the responsibility to furnish Builders Risk Insurance coverage for this project effective June 29,2006. COR #23-R 1 proposes a Contract Price Increase of$604,434.81 and a Contract Time Extension of 210 calendar days for the extra work and schedule impacts associated with the Building Security Changes. The enclosed Change Order Request package (33 pages) includes a summary page and supporting documentation, detailing the specific components of this change. TTG was initially notified of the Building Security Changes by Gonzalez Architects (GA) in Weekly Meeting #19, April 14, 2005. In that meeting, GA instructed TTG to suspend work on the security systems pending forthcoming changes requested by the MCSO. In a subsequent meeting, Patrick Power Corporation (PPC) notified GA that the security components specified in Divisions 08 and 16 of the Contract could not be integrated, which served 10 increase the scope of the security changes. As of their termination by the Owner in October 2005, GA had not produced any design documents for the pending security changes. MCFD introduced Currie, Sowards, Aguila Architects (CSA) as the replacement Architect in Weekly Meeting #48, November 3,2005. CSA conducted several building security coordination meetings with Judiciary, ~CSD, MCFD and TIG representatives, and issued revised dravl'ings and specifications in Weekly Meeting #64, February 23, 2006. These documents are the basis for the scope of COR #23-RI, The scope of changes to address the security concerns of the MCSD, to address the security concerns of the 16[~ Judiciary Circuit, and to address component integration issues may be generally illustrated by comparison of the quantities and types of security components relative to the original design. cc: ITG/MO (COR-23), FF (COR-23) CSAIH.GoJdman 405 S.W 14B1hAvenue. Sui1eOne. Davie, Florida 33325. Tel: 954.476.3200. Fox: 954.474.3111 7601 S.W. Lost River Road. Stuart, Florida 34497 . Tel: 772- 287. 7525 - Fox: 772.287- 7524 9440 Phil ps Highway; Suite#5 . Jacksonville, Florida 32256 - Tel: 904.292-1811 . Fax: 904.292.4865 Apr 13 06 03:10p THE TOWER GROUE Anthony Burke 305-296-2587 p.2 Aprill3, 2006 04 17 -01 823 Monroe County Facilities Development Change Order Request #23-Rl, Building Security Changes Original Design Ouantity 17 6 39 14 o o Security Component Integrated Cameras Integrated Card Readers Non-integrated Card Readers Integrated Door Contacts Integrated Electric Locks Integrated Door Strikes Revised Design Ouantity 38 95 o 21 19 17 More security monitors, recording equipment, card reader panels, and conduit and wire were necessarily added as weB to accommodate the enhanced security network. As previously stated, the replacement Architect joined the project on November 3,2005 and produced revised security design documents 77 working days later, on February 23,2006. Please find enclosed print of Primavera P3 File GA23 entitled, "Impact Analysis for Security Modifications by the Replacement Architect" (2 pages). This impact analysis shows that the revised security design documents would have been issued August 4, 2005, 77 working days after April 14, 2005, had GA taken on their responsibilities in the same manner as tbe replacement Architect. Instead, months of requests were made to GA for security revisions, and were met with indifference and neglect. Looking back, it is bewildering that GA's indifference exceeded even the lowest expectations of project interest and performance with regard to this issue. Please issue a Contract Change Order to increase the Contract Price $604,434.81 and to extend the Contract Time 2 I 0 calendar days for the extra work associated with COR #23-Rl. Please act promptly as there are many areas of work yet on hold pending approval of these changes. Sincerely, ~ John S. Chandler Project Manager Encl. Change Order Request No. 00023RI (33 pages) Primavera P3 Schedule "Impact Analysis for Security Modifications by the Replacement Architect", P3 File GA23 (2 pages) Page 2 of2 THE TOWER GROUP-, General Contractors Construction Management Construction Design-Build Planning Site Development Infrastructure Consulting Estimating Scheduling Value Engineering Post Construction CGCA38309 February 27, 2006 0417-01638 Attn: Hank Goldman Currie, Sowards, Aguila Architects 134 N.E. 1st Avenue Delray Beach, Fl. 33444 Fax: 561-243-8184 Re: Freeman Justice Center (FJC) Subject: Scope of Security Modifications (TTG Change Order Request #23 ) Dear Mr. Goldman: We forward this letter to confirm verbal direction from CSA Architects, during the February 23,2006 Weekly Progress Meeting, to proceed with our proposal for the Security Modifications based on the following documents: 1) Door Hardware shall be based on Specification Section 08710, "Finish Hardware", received from CSA via e-mail dated February 23, 2006, which supersedes the original door hardware schedule in Specification Section 08711 except as follows: a) We assume door hardware for the Mechanical Equipment Room (Penthouse) is unchanged by these security modifications. b) We assume that Hardware Group No. 01 from the original Specification Section 08711 (balcony doors), is unchanged by these security modifications except as shown in Hardware Group 1 in the new Specification Section 08710. c) The hardware for the doors in Hardware Group 2 of the new Specification 08710 was originally defined by Hardware Group Nos. 10, 11 and l1A in Specification 08711. We assume that these doors will have hardware as originally defined for Hardware Group No. 10 from Specification 08711 except that the Power Transfer, Lock, Power Supply, Controller and Prox-Entry Reader are superseded by security devices listed in Item 3 below and the Southern Steel Model #10300E-l electro-mechanical dead latch specified by CSA via fax from Bob Stone of MCSD dated 12/19/05. d) All locks shall be equipped with Best cylinders, and the doors in Hardware Group 2 from Specification 08710 shall be keyed in one common group and the remaining doors shall be keyed in a separate common group. 2) Door construction, location and fire-rating shall be based on CSA Drawing #A9.01 dated 2/22/06 (Ground Floor), CSA Drawing #A9.02 dated 2/22/06 (1 st Floor), and CSA Drawing #A9.03 dated 2/22/06 (2nd Floor). a) We assume door construction, door locations and door fire-ratings for the Mechanical Equipment Room (Penthouse) are unchanged by these security modifications. 3) Security devices and locations shall be based on PPC Drawing #04-007-ELS-Ol dated 2/20/06 (Ground Floor), PPC Drawing #04-007-ELS-02 dated 2/20/06 (1 st Floor), and PPC Drawing #04-007-ELS-03 dated 2/20/06 (2nd Floor). All security devices shall be as cc: TTG/MO (COR-23), FF (COR-23) MCFD/C.Briggs PPCIl.Clausell Firedoor/E.Ramos 405 s.w, 1 48th Avenue . Suite One . Davie, Florida 33325 . Tel: 954' 476' 3200 . Fax: 954' 474' 3111 7601 S.w. Lost River Road' Stuart, Florida 34497 . Tel: 772'287' 7525' Fax: 772'287.7524 9440 Philips Highway, Suite#5 . Jacksonville, Florida 32256 . Tel: 904' 292' 1811 . Fax: 904' 292' 4865 THE TOWER GROUP.c February 27, 2006 Attn: Hank Goldman, CSA Architects 041 7-0 I 63 8 Freeman Justice Center (FJe) Scope of Security Modifications indicated in our original Security Submittal, #16750-01, unless otherwise requested by the Architect or the Owner or Sheriff's Department representatives or Judiciary Circuit representatives, which deviations shall be specifically itemized in the proposal. a) The functionality of all security devices shall comply with all fire code requirements, particularly with regard to elevator operations and building egress. 4) Security wall and ceiling changes shall be based on CSA Drawing #A2.01 dated 2/8/06 (151 Floor) and CSA Drawing #A2.02 dated 2/8/06 (2nd Floor) and Hi-Impact 2000 Brand Wallboard data sheets received from CSA on 2/2/06. a) Fire-rated wall systems affected by the security changes shall only be constructed as specified in the Hi-Impact Wallboard data sheets to achieve the required rating. b) These security modifications do not change the original scope of bullet-resistant fiberglass panels: Level 3 by Armortex or equal for Wall Type "QSlMI" (Re: Dwg. #A6.02), for Judges' Benches (Re: Dwg. #A7.01), and for Type "E" and "0" doors: except that all Type "0" doors have been deleted and replaced with Type "E". c) These security modifications do not change the original scope of bullet-resistant glazing: TP300 by Armortex or equal for all Holding Room and Control Room doors and windows (Re: Dwg. #A4.05 and Dwg. #A6.05). 5) The storefront in the main entry lobby (Room #G026) shall be based on CSA Drawing "LOBBY" dated 2/24/06, and sent by CSA via e-mail on 2/24/06. Change Order Request (COR) #23 will exclude any remedial work, such as concrete chipping and patching, that may be necessary to incorporate the above changes. We respectfully request that these activities be compensated separately on a time and material basis as they arise. Except to the extent of the affect on doors, door hardware and security devices, COR #23 will also exclude: Sally Port modifications, ingress/egress modifications at Stair #2 and #3, overhead door additions and related modifications along Thomas Street, and sliding gate and grillwork additions and related modifications along Fleming Street. We will address these revisions under separate Change Order Request(s). The Tower Group is proceeding with our proposal according to the scope outlined above. Please send written notice as soon as possible if you perceive any errors and/or omissions in this scope. Sincerely, clelL John S. Chandler Project Manager Page 2 of2 @ ~ 3 Q) < co ii3 ,(I) ,'< 'en lii 3 I.en =oJ 'n j' ~ ~ ~ ~ ~ ~ ~ 0 ~ 0 ~ ~ ~ 0 ~ 0 ~ g ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ o ~ So ~ ~o ~o ON g ~ ~ - ~ 8 ~ ~ ~ ~ 6 000 rn rn 0 rn 0 ~ ~ ~ ~ ~ ~ N ~ ~ Q ~ ~ ; ~ g i ~ ~ i ~ g ~ ~ !:i~ oS.~:J . ,,~~~~~~~~~~~ ~ o ~ ~ ~ ~ . ~ ~ ~ ~ 0 ~ QQ~~~~QQo~~~~ ~ S' ,.,. <0 <0 -o:::E <0 S10 <0 ~ ~ <0 i ~ i ~ i i ~ ~ ~ ~ ~ ~ 0 : ~"~"9:<O S'~"":::E",,Ql 5 r 5 r ~ ~ r 5 r ~ r ; ~ ~~~~~ ~~ii~i~~ o CD S10 ~ (J)." OJ 3 CD '" ;:UO"TlU> C aJ 3' ro :J (ll (ii"::1 00 :J'" 0 W Dl 0 OJ ro ro m ro m ~ N N <0' ::J ::J ~ C. c. 003"3"~:!):!} o O.j!J .j!J CD ~ CD CD ~ g g. O' :J::J ~ '" en " " " " S' S' S' 5' ~ ~ ~ ~ s: cO ~ 0 0 0 ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ s: s: s: s: s: s: ~ ~ ~ ~ ~ ~ ~ ;JJ 0000000 en en C>l Ol en C>l C>l <.0> ~ ;l)o aq~ ~ ~ ex> ... NO <nO> '- Z )>0 Z < 00 .... ... o <D s: ~ -< o C>l )> N <.0> (I) m CJ c ::0 ~~ s::)> 00 0-1 -)> :!!z 0)> ~!:( -(I) 0- zen (I)-n ~o 8::0 ::0 "*' N ~ N rn <- ~ Z o ~ -n CD Cll -i CD::T 3 (1) ~d <-:E c co '" ~ gG) COo CJc CO"C :J ~ N ~ N rn OJ OJ ~ )> s: -0 -0 )> ;0 ;0 ;0 000 en C>l C>l ~ <JI " m OJ o C>l ~ ~ ~ o " " m m m o OJ OJ 000 <JI C>l en N N o m o o (J1 o OJ o m o o (J1 ~I~ o 0 N N 'f'f o 0 (J1 W o 0 ~ ~ CD CD n n ~ ~ ~~ o 0 ~ ~ Ql Ql ~ 1<5 ~ I~ " ~ -0 ~ 5- a 03"8 CD .:+ en ~ g ~ ~ ~ -0 n 0 g ~. @ CD ~ i en ~ JI'" b 0 ::0 ;U o 0 N N W W 6 6 N ~ o 0 (f) ~ CD Cll n n ~ I~ ;:::+: ;+ '< '< o 0 ::T ~ ll) Ql => ~ <0 <0 CD CD In ,'" (j) -\, N N 000101 N N N N ~ -\, 0 ~ ~ w -\, -\, 0 N 0 ~ N -\, ~ ~ 0 w ~ t t t t ~ ~ b ~ ~ ~ ~ ~ ~ 0 )> ~ ~ s: ~ ~ ~ ~ ~ ~ )> )> ~ )> ~ m moo 0 0 ~ 0 C C C ~ C ~ )> )> z z z z z Z Zoo < < < < -0 ~ 0 0 0 ~ 0 -< -< ::0 000000000 0 0 0 000 0 0 0 000 0 0 ~ ~ ~ ~ ~ ~ ~ en C>l C>l en C>l en en en en en en en en en en C>l , , 0 ~ ~ ~ OJ OJ OJ o 0 0 en ;;r CD !Ii ~....... o , , ~ .... .... OJ 0> OJ 000 o ~ s: ~ ;u o C>l o .... .... en -I> c.:> <- " s: ~ m )> Z OJ ;0 000 C>l C>l en ~ ~ ~ ~ ~ ~ ~ g g <- <- 0 0 Z Z Z Z 0 )> ~ m moO 0 0 0 5 5 g g a a a a d ~ ~ en en en C>l en en en I I I I I I -\, ~ -\, -\, -ll. -\, 0) CJ1 co .,J::l. CD co o ....... 0 -..I 0 0 -I ~i__" ......-...,......- ......, ~ -0 -I m 0 ll) ~ ;::;: tCl 0' <0 -< !!!.. Cil !2. OJ )> '" to ~ '" $l. OJ ~ <' ~ ~ '11' '11-;l]-f ~ ~ ~ ~'3: i: ~ i:' 'i:'Ii')'" G'>'O .. ..g:.. , '~,. ..~. ""8".~. ..~..i...~.....~....'=. g....~ .~.. 'o>5-_~ ~...'ii1il o o ..,o.~ o c.... ;0 en ';0 i:' C> 0 o 0 tl Ul -tl..~,o ..,~ b ....,~ 0 0 C>>o'Ut........ C2J',!(jd ... ...... . .....",.. c.... "T1 en c;;; 0' i: ~.. o 0 (XI 0 N c.:> <- )> Z o en ~ o m o o (J1 ....1.0 OJ ~ ~I(J) m m -0 -0 o 0 en Ol ~f5-lg~~~ )> ~ )> s: ;;:: s: C C C )> ~ ~ gi~ ~ 3 a a Ol en en en en en I I I I ~ -" -" -" ~ OJ 0 OJ CJI CD o c.:> 0 Ol 0 ........0 8'T1d'~" o ;a tn 0 ,O"'~'O'O .1>) ~ !.fg ~.. .~.. ..~ ll~ "~'. ~...~. ...... C2Jr,"l 'ii1il , , .... .... en -I> ~ OJ '0.0 0'0 0 ...o...;:c ;0. ;0 ~ ~ C'''W'''W'' tl 6 6 o"';j:i;"'C/i'" en 0 0 'f21" :~ " 0 -Jr. ..... ..... ~ CD~C:OC:O o ()) 0 0 o o o ~ o N ~b .~.i... '.' Firedoor, LLC PROPOSED CHANGE ORDER No. FD003 1350 NW 74th Street Miami, FL 33147 Phone: 305-691-1500 Fax: 305-836-4797 TITLE:Building Security Changes PROJECT: Freeman Justice Center (FJC) TO: Attn: Gregory F. Galmin The Tower Group, Inc. 405 Southwest 148th Avenue Davie, Florida 33325 Phone: 954-476-3200 Fax: 954-474-3111 DATE: 3/30/2006 JOB: 0417 CONTRACT NO: 0417-010 RE: COR To: MCCM DESCRIPTION OF PROPOSAL Building Security Changes From: TTG Number: 00023 Item Descdp,tiQu 0000 I Add for Security & Fire-Rating Change Proposal dated March 28,2006 00002 Deduct for Fire-Rating Change Proposal dated December 23, 2004 (Part of Contract Change Order #5) 1.000 LS $11 0,382.00 0.00% $0.00 $110,382.00 1.000 LS ($61,990.00) 0.00% $0.00 ($61,990.00) Unit Cost: Unit Tax: Unit Total: Subtotal: $48,392.00 $0.00 $48,392.00 $48,392.00 7.5% Sales Tax 7.500% $3,629.40 Total Cost: $52,021.40 By: By: Julio Marino Gregory F. Galmin Date: Date: Expedition @ 03/30/2005 08:04 305835"-~7 FIREDOOR PAGE 01 ,. FIREDOOR Hollow Mt:l'tet a..re one'M 1350 Northwest 74th Street Miami. Fl 33147 Ph: (305) 691-1500 Fax~ (305) 836-4797 REQUEST FOR CHANGE ORDER TO CONTRACT Transmitted B}'. Fax: 1/305/296-2587 Date: March 28, 2006 The Tower Group 405 S.W. 14Sfll Avenue Suite One Davie, FL 33325 Job Number: 9508 Job Nam.e: Freeman Justice Center Attn: Gregory Galmin lob Location: Key West, FL Proposed Change Order: RFP I Rev.! Page 1 of 8 .....--..-----.----.-.......----.----.---------------------------....--.-----........------......,,--...--------------..----..-........----- J.n accordance with AlE submittal revision dated 11/17/04, we quote you to revise our. scope of wOt'k, per the fonowing: NOTE: Changes to Finlsb Hardware wjJJ follow under a separate RFP Tags 1120, 1137,1159,2116 and 2137 Revise five, (5) Wood frames and five, (5) Stile and Rail 6-panel door from non rated to 45-m;nute fire rated @ $1,694.00 ea. Prep frame/door for Sec. switch Add $ 8,895.00 Tags ll44 and 2131 Revise two, (2) Wood frames and four, (4) Stile and Rail Wood doors from no" rated to 4S-minute Rte rated @ $11,357.00 ea. NOTE: Exit Dn-ices need to be revised to model 9827L-F, wllieh is fire rated Add S 22.,714.00 Tag 1155 Revise one, (1) Wood frame and one Flusb Wood door from non rated to 45- minute fIre rated HM .frame and HM door NOTE: Finisb Hardware as specified is fin rated Add $ 45.00 Tag 1182 ReVise one, (1) Wood fram.e and two, (2) Stile and Rail Wood doors from non rated to 90-minute fire rated NOTE: Exit Devices Deed to be revised to model 9827L-F, which is fire rated Add $ 16,485.00 Tags 1205,2155 and 2180 Revise three, (3) Wood frames and six, (6) Stile and Rail Wood doors from non rated to 45-minutc tire rated @ $5,044.00 ea. Add NOTE: Exit Devices need to be revised to model 9827L-FI which is fire rated S 15,1.32.00 Grou'Illd '..eve! 1. Opening tag ClOt Ext HM ~ HM 3' 0" x 7' 0" x ; %" x XB must be flush type C not 6~pal'lel type A as specified x 90-minu.te 450Q TR hdg 43 03/30/2005 08:04 30583EiPCl7 F IRE DOOR PAGE 02 Freeman Justice Ce.nter Key West, FL Page Z of 8 Revise from RHR (LH) to LHR (RH) swing with ~ n security switch prep. Door frame furnished, door not furnished Replacement material for new door frame as LHR (RH) swing. Add S 156.00 2. Opening tag G101A (stair #3) Added single HM x HM LHR (RH) 3' 0" x 7' 0" x 5 V,." x XB x must be FVS not 6-panel w/Vision t)'Pe M as specified x B label 90-minute 450" TR. Openjng to receive security swi.tch, card reader and electric strike preps Add $ 544.00 3. Opening tag GI03 (part of unapproved RFP 1) Ext HMF w/22" Transom inclu.ding HM Flush panel x HMn 3' 0" x 7' 0" x 5W';It 6P :x no label x hdg. 45. Revised to receive %" security switch, card reader and electric strike pr.eps. Door frame furnished, door not furnished. Replacement material for new door frame Add $ 405.00 4. Opening tag GI04 mten.ot' HM x HM 3' 0" x 7' 0" flush X no label. Deleted from. our contract. Door frame furnished, door never furnished. Credit for door Credit <5 291.00> 5. Opening tag GlOS Interior HM x HM 6' 0" x 7' 0" x flush x no label Deleted from out' contract Door fram.e furnished, door never fu.tttished Credit for d.oor Credit <$ 582.00> 6. Opening tlg GIO' Interior HM x HM 3' 0" x 7' 0" x flush 4S-rnjnute Revised from C label 45-minute to B label 90-minute Door frame furnished, door not furnished Add $ 45.00 7. Opening tag Gl09 Exterior HM x HM 3' 0" x 7' 0" x 6-panel w Vision type M x no label Deleted from our contract Door frame fumishc~ door not furnished Credit for door Credit <$ 29".00> 8. Opening tag Gll.2 (control room toilet) Added single HM x HM RH 3' 0" x 7' 0" x 5 %" x XB x F, type C x no label Add $ 544.00 9. Op.:ning tag Gut Interior HM x HM 3' 0" x 7' 0" x 6-panel type M x B label 90-minute Revise to receive security switch and electric loek preps Door frame furnished, door not furnished Replaoement material for new door frame Add $ 156.00 to. Opening taR GU2 Interior RM x HM 3' 0" x 7' 0" X 6-pa11cJ w/vision, type M x no label Revised from LHR (RH) to RHR (J",H) swing Revised from 6-panel witb Ivision door type M to 6-panel door type A x B label 90-minute 03/3@/2005 08:04 3058354797 FIREDOOR PAGE 03 rreemal, Justice Center Key West, FL Page 3 of 8 Revised to receive card reader prep. Door frame furnished., door rIOt furnished Replacement material for new door frame as RHR (LM) swing Add $ 156.00 11. Opening t.ag G123 Interior HM x HM 3' 0" it T 0" x 6-panel w/vision, type M x B label 90-minute Revised from 6-panel with lvision door type M to 6-panel door. type A Revised to receive card reader prep. Door frame furnished, door not .furnished Replacement material for new door frame Add S 156.00 12. Opening tag 0124 Exterior HM x HM 3' 0" X 7' 0.' X must be flush type C not 6~panel type A x B-90-minute.450. TR Revise from Urn. (Rtf) to RHR (LH) swing Revise to receive security switch prep. Door frame furnished, door. :o.ot furnished Replacement material fOT new door frame as RHR (LH) swing Add S 156.00 13. Opening ta~ GU4A (stair 4) Added single HM x HM LHR (RIl) 3' 0" X 7' 0" x 5 W' x XB x must he FVS not 6-panel w/vision type M as specified x .B .Iabel 90~minute 450" TR ' Opening to receive security switch, card render and electric strike preps Add $ 544.00 14. Opening tag GIZ5 Exterior HM x HM 3' 0" x 7. 0" x 6-panel type A x A label180~minute Revi.se to receive security swi.tcb, car.d reader and electric strike preps. Door ftame furni.shed, door not fumished Replacement material for new door frame Add $ l56.00 15. Opening tag GU6 Exterior HM x HM 3' 0.' x 7. 0" x must be flush type C not 6~panel type A x B-90-rninute 450" TR Revise from RHR (L1:!) to LHR (RH) swing Revise to receive security switch and card reader pl:'eps Door framc furnished, door not furnished Replacement material for new door frame as LHR (RH) swing Add $ 156.00 16. 17. Opening ta.g G127 Interior H!v.[ x 11M 6' 0" x" 0" x FLF type J x C label 45-minute Revise from RHA to RHRA (LH act) swing Revise .fr.om C label 45-minute to B label 90~minllte Door frame furnished, door not furnished Replacement material for new door frame as RHRA (Ui Act) swing Add $ 234.00 Opening tag 6129 (parking lobby G(26) Added single HM X HM LH 3' 0" X 7' 0..:11. 5 %" X XB x F type C x B label 90-minute O{)ening to receive security switch and card reader preps. Add $ 544.00 18. Opming tag GJ.33 (stair II Z) Exterior HM x HM 3' 0" x 7' 0" x must be flush type C not 6-panel type A x B label 90=minute 450" TR. Revise from LHR (RH) to RHR (LH) swing Revise to r.cceive security switch and card reader preps s. 03/30/2005 08:04 305835....''17 FIREDOOR PAGE 04 Freeman Justice Center Key West, FL Page 4 of 8 Door frame furnished, door not furnished Replacement material for new door frame as RHR (LH) swing Add $ 156.00 19. Opening tag G 134 Interior HM x HM 3' 6" x 7' 0" x F type C x C label 4S-minute x heading 60 Revise from LHR (RH) to RHR (Ul) swing Revise from C label 4S-minute to B label 90-minute Revise to receive card reader pr.ep Door frame furnished, door not furnished Replacement material for new door frame as .RHR (LH) swing $ 156.00 Add 20. Opening ta.g GI35 Interior HM x aM 3' 6" x 7' 0" x flush type C X. C label 45-minute Revise from C label 4S-minute to B label 90-minutc Door frame furnished, door not furnished Revise hardware and door. at submittals $ 45.00 Add First Level 1. Opening tags 1101 (stair 3), 1118 (stair 4), 1175 (stair 1.) and 1201 (stair 2) Interior HM x HM 3' 0" x 7' 0" x must be FVS not 6-panel w/vision type M x B labe190-minute 4501' TR Revise to receive security switch, card reader at.'d electric strike preps Door frame furnished, door not furnished Replacement material fOf new doO!' frames Add $ 624.00 2. Open.lng tags 1113 and 1114 WDF x WOD 3' 0" x 7' 0" x 4-panel Dutch type N x 45-minute Revise from 4-panel Dutch type N to 6.panel type A Door frames and, doors not furnished Revise door frames and dOQt:9 at submittals Add $ 0.00 3. Opening tags 1126 WDP x WOD 3' 0" x 7' 0" x 6-panel type A x no label Delete from our contract Door frame and door never furnished Credit for door frame and door <: $ 344.00> Credit 4. Opening tllg 1131 WDF x WDD 3' 0" x 7' 0" x 6-panel type A x 45-mtnute Delete from our contract Door frame and door never furnished Credit for door frame and door <: $ 1,1.27.00> Credit Opening tag 1148 WDF x WOD 3' 0" x 7' 0" x 6~panel type A x 45-minute Revise to receive security switch, card reader and electric strike preps. Door frame and door never furnished Revise door frame and door at submittals Add $ 95.00 6. Opening tag 1150 WDF x WDD :3' 0" x 7' 0" x 6~panel type A x 4S minute 14. 03/30/2005 08:04 3058354797 FIREDOOR Freeman Justice Ce1l'lte't Key W cst, FL Page 5 of fl Delete from our contract Door frame and door never furnished Credit for door frame and door 7. Opening tag 1163 WDF x won 3' 0" x 7' O":x: 6-panel type A x no label Delete from our contra.ct Door frame and door never furnished Credit for door frame and door 8. Opening tag 1167 (attorney 1058) Added single WDF x WOO LHR (RH) 3' 0" x 7' )" 7 Y4" X 6-panel Opening to receive card reader prep 9. Opening tag 1170 WDF x WDD 3' 0" x 7' 0" x 6-panel type A x no label Revise from 110 label to 45-minute Door frame and door not furni.shed Revise door frame and door at submitt.als Credit Credit Add Add Opening tags 1171 thru 1173,1181,1183,1184,1194, a9S, 1199 and 1201. thru 1103 WDF X WOD 3' 0" x 7' 0" x 6-panet type A x no label Revise from no label to 4S-minute Door frame and door not furnished Revise door frame and door at submittals Add 10. 11. Opening tag 1174 WDF x WDD 6' 0" x 7' 0" x 6-panel type P x 45-minutc Revise from no label to 4S-minute Door frame and door not furnisbed Revise door frame and door at submittals 1.2. Opening tag 1178 WDP x WDD 3' 0" X 7' 0" x 6-panel type A x no label Delete from our contract Door frame and door never furnished Credit for door frame and door 13. Opening tag 11 79 WDF x WDD 6' 0" x 7' 0" x 6-paneI type P x 45-minute Revise from 6 panel type P to 6-panel w/vision. type K door .Door frame and door not furnished Revise door framc and door at submittals Opening tag 1180 HM x WD 3' 0" x 7' 0" x 6 panel type A x 4S-minute Revise from 1 %" thick 6 panel x 4S-minute to 2 Y-J" thick 6 panel 90-minute EM door frame furnished, door not furnished Replacement ma.terial for new door frame to fit 2 I(.t door, revise door at submittals Add Credit Add Add F'AGE 85 < S 344.00> < $ 344.00> !Ii 1,503.00 $ 1,159,00 S 13,908.00 $ 2,318.00 < $ 344.00> $ 124.00 $ 4,486.00 03/30/2005 08:04 3058354797 F IRE DOOR PAGE 05 Freeman Justice Center KeyWcst,FL Page" of 8 15. Opening 1186 ind 1138 HM x. HM 2' 6" x 7' 0" x 6 panel type A x 45-minute Revise from HM x HM to WDF x WDD HM door furnished, door not furnished Revise dOOT frame and door at submittals $ 1,503.00 Add 16. Opening tag 1191A.{attomey I08lA) Added single WDF x WDD RHR (LH) 3' 0"." 7' 0" x 7 \14" x 6 panel type A x 45-minute Open to receive card reader pIep Add !Ii I ,503.00 17. Opening t-Slg 1197 WDP x WDD 3' 0" x 7' 0" x 6 panel type A x no label Delete from our contract Door frame and door never furnished Credit for door frame and door 344.00> Credit <$ 18. Opening tag 1198 HM x WD 3' 0" x 7' 0" x 6 panel type A x 4S-minute Revised from 1 W' thick 6 panel x 45 minute 2 y." tl:1ick 6 panel x 90 minute HM door frame furnished, door not furnished Replacement material for new door frame to fit 2 W' door, revise door Subm(ttals Add $ 4.486.00 19. Opening tag noo WDF X WDD 3' 0" x 7' 0" x 6 panel type A x no label Revise from no label to 45-l11inute Door frame and door not furnished Revise door frame and door at submitt."lls S 1,159.00 Add Second Level 2. 3. 1. Opening tag :UOl (stair 3), U14 (stair 4), US", (stair 1) and 2179 (star 2) Interior HM x HM 3' 0" x 7' 0" x must be pVS 1I0t 6 panel w/vision typc M x B label 90-nUnute 450n TR x hdg. 1. Revise to receive security switch, card reader, and electric strike preps. Door frame furnished, doors not furnished Replacement material for new door frames, revise doo.rs at submittals Add $ 624.00 Opening tags 2U2 and 2143 WDF x WO.D 3' 0" x 7' 0" x: 6 pan.cl type A x no label Delete from our. contract Door frames and doors never furnished Credit for door frames, doors ~d hardware Credit <$ 688.00> Opentng tag 2156 WDF x WDD 3' 0" X 7' 0" x 6 panel w/halfglass type Nl x no label Revise from 6-pan.el wlhalf glass to 6-panel type a door w/45-miuutc label Door frame and door not furnished Revise door frame and door at submittals Add $ 1,159.00 4. Opening tAg 2157 HM x Wd 3' O":It 7' 0" x 6 panel type A l{ 4S.minute 7. 8. 9. 10. 11. 03/30/2005 08:04 FIREDOOR 305835(,1 Freeman Justice Center KeyWest,FL Pagt7 of II Revise from 1 y.." thick 6-panel.x. 4S minute to 2 W' thick 6-pancl x 90 minute HM door. frame furnished, door not furnished Replacement material for new door frames to fit 2 '/4" door, revise door at submittals Add 5. OpeJ:ling tag 1159 H.M:x w.O lUl Act 5' 0" X 7' 0" X 6 paoel type A"){ 45-minute Revise from HMF to WDF x 7 W' .TW Revise from pair to single 3' 0" x 7' 0" LHR (RH) swi1'1g Revise from 1 W' thick 64panel x 45 minute to 2 '4" thick 6-pane) x 90-m;nute Revise to r.eceive card reader prep HM door frame furnished, door not furnished Revise door frame and door at submittals Add 6. Opening tag 2160 HM x HM 2' 6" x 7" 0" x 6-panel type A x 4S-minute Revise from HM x HM to WDF x WOO HM door frame fumished, door not furnished Revise door frame and door at submittals Add Opening tag 1162 WOF x WOD 3' 0" x 7' 0" x 4 panel dutch type N x 45-minute Delete from our c01\tract Door frame and door n.cver furnished Credit for door frame and door Credit Opening tag 2164 WDF x WOD 3' 0" x 7' 0" x 6 panel type A x 4S-minute Revise from t W' thick 6-panel x 4S minute to 2 W' thick 6-panel x 90 minute Door frame and door not furnished Revise door frame and door at submittals Add Opening tag 2165 WDF x WOO 3' 0" x 7' 0" x 6 panel type A x 45-minute Revise to receive security switch and card reader prep Door frame aod door not fun1ishcd Revise door frame and door at submittals Add Opening tag 2172 WDF ;It WOD 3' 0" X 7' 0" x 6 panel w/vision type T x 90-minute Delete from our contract Door frame and door never furnished Credit for door frame and door Credit Opening tag 2176 HM x HM 3' 0" x 7" 0" x 6-pat.'lel type Ai< 45-minute Revise from !-1M x HM to WDF X WDD HM door frame furnished, door not furnished Revise door frame and door at submjttals and hardware . Add PAGE 07 $ 4,486.00 $ 4,486.00 $ 1,503.00 <$ 344.00> $ 4,486.00 $ 95.00 <::: $ 3,365.00> $ 1,503.00 03/30/2BB5 88:04 3058354797 Freeman Justice Center Key West, FL P~g~ 8 of8 FIREDiJDR Price 7~ % tax Total PAGE 88 $110,382.00 $ 8.278.65 $118,660.65 We will I'i.ot proceed with this 'Work until such tim.e as 'We receive authorization from Your office. If vou wish us to p'roceed. kindlv fax a signed CODY of this DroDosed cban2e order to Oil... office for our records. AMOUNT OF THIS PROPOSED C.HANGE ORDER: 5118,660.65 tax Included This pl"iceJs valid for 60 days, and ill subject to our standud Tenus and Conditions, including payment term! of Net 30 days, no retainage. FJREllOOR LLC J lio H. Marino Vice PresidentlBranch Mgr. .JHM/ma c... hClIIJe. 0 rc:k.r ACCEPTANCE: By: Signature: Title: Date: 12.. ~ '101'/ .& IJD; !>Sz. ,0'0 'I '170' 0 D / ..f 4-~ /2> '} 2 ,0\) ~l'- ~ ~I z.l]g k)' +/(,4-1. z..)" 3/ (, ~i,fD L~~ 'rW~) cJ.-a'Ul:. er~if C; ) Safeguard Services, L J P ,POSED CHANGE ORDER No. 88001 5926 Corridor Parkway Schertz, TX 78154 Phone: 800-880-8306 Fax: 210-661-8308 TO: Attn: John S. Chandler The Tower Group, Inc. 302 Fleming St. (Job site Trailer) Key West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 DATE: 3/21/2006 JOB: 0417 CONTRACT NO: 0417-030 TITLE: Security Modifications PROJECT: Freeman Justice Center (FJC) RE: COR To: MCCM From: TTG Number: 00023 Change to scope of work for the Building Security Changes. It(5m 00001 Security Modifications 00002 Original P.O. I. 000 LS 1.000 LS $124,913.00 ($127,229.00) 0.00% 0.00% $0.00 $124,913.00 $0.00 ($127,229.00) Unit Cost: Unit Tax: Unit Total: ($2,316.00) $0.00 ($2,316.00) By: By: Yvonne Meza John S. Chandler Date: Date: Expedition @ ~ Cherokee Glass & ML ~ or 2200 4th Avenue, North Ste. I Lake Worth, FL 33461 P~ POSED CHANGE ORDER No. CGMOOl Phone: 561-586-7060 Fax: 561-586-4009 TITLE: Building Security Changes PROJECT: Freeman Justice Center (FJC) TO: Attn: John S. Chandler The Tower Group, Inc. 302 Fleming St. (Jobsite Trailer) Key West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 DATE: 3/30/2006 JOB: 0417 CONTRACT NO: 0417-009 RE: COR To: MCCM From: TTG Number: 00023 Please note some hardware items are not per the manufacturer's NOA tests. These items will be provided in accordance with the NOA's & not the specs (butt hinges, closers). 00001 Furnish & install Doors,Frames & H.Ware as specified in most recent proposal. 1. 000 LS $6,150.00 0.00% $0.00 $6,150.00 Unit Cost: Unit Tax: Unit Total: $6,150.00 $0.00 $6,150.00 By: By: Dean Latta John S. Chandler Date: Date: Expedition @ ~3/38/20e5 15:53 55158540P~ CHEROKEE GLASS PAGE 01/Ell Cherokee Glass & Mirror 2200 4th Avenue N. - Suite 1 - Lake Worth, FL 33461 Phone: 561-586-7060 Fax: 561-586-4009 FAX COVER PAGE DATE: March 30, 2006 TO: The Tower Group FAX #: 305-296-2587 ATTENTION: John Chandler NUMBER OF PAGES 1 INCLUDING COVER PAGE RE: Freeman Justice Center FROM: Dean Latta COMMENTS: The net ADD to our existing contract amount to furnish and install the doors, frames and hardware as specified in the most recent proposal is . . . $6, t 50.00, complete. Please note some hardware items are .not per the manufacturers' NOA tests. These items will be provided in accordance with the NOA's and not the specs (butt hinges, closers). Yours truly, 03/27/2006 13:00 FAX 30559497~' TOWER GROUP ~~ J ~~eJL II'__~- Project Name: Date: Freeman Justice Hi-Impact Add 3/27/2006 Description Amount Check Framing Total $ Drywall f Sheathing Total $ Hi.lm act XP Holdin Rm. $ D all Ceilin Total $ HHm act XP Ceilings $ Ceiling Insulation $ . . Carpentry Total $ Hollow Metal $ Wood Doors $ Finish Hardware $ Door Labor $ Hardware Labor $ Bathroom Ace Labor $ Bathroom Accessories $ Int. Paint Total Exterior Paint lifts (Paint) Fire CaulkinglSafing Interior Supervision Scaffolds (OW) Backing/Cabinets & RRoom Stock & Clean Per Diems Freight & Deliveries 9.504.00 OW Add Total: 1,752.00 OW Cellin Add: $1,752.00 Total Add: $ ir [4)001 ~ Schindler Elevators 13800 NW 2nd St. Suite 140 Sunrise, FL 33325-6232 Phone: 954-626-5555 Fax: 954-626-5599 TITLE: Building Security Changes PROJECT: Freeman Justice Center (FJC) TO: Attn: John S. Chandler The Tower Group, Inc. 302 Fleming St. (Jobsite Trailer) Key West, FL 33040 Phone: (305) 296-2521 Fax: (305) 296-2587 RE: COR To: MCCM From: TTG Furnish and install cables for card readers and cameras. Ph.JPOSED CHANGE ORDER No. SEC002 DATE: 3/13/2006 JOB: 0417 CONTRACT NO: 0417-008 Number: 00023 00001 Add cables for securtiy devices 1.000 LS $830.00 0.00% $0.00 $830.00 to Elevators # 1 & #2 00002 Add cables for securtiy devices 1.000 LS $370.00 0.00% $0.00 $37000 to Elevators # 3 00003 Add cables for securtiy devices 1.000 LS $237.00 0.00% $0.00 $237.00 to Elevators #4 00004 Add cables for securtiy devices 1.000 LS $370.00 0.00% $0.00 $370.00 to Elevators # 5 00005 Add cables for securtiy devices 1.000 LS $237.00 0.00% $0.00 $237.00 to Elevators #6 Unit Cost: $2,044.00 Unit Tax: $0.00 Unit Total: $2,044.00 By: Dennis Russell Date: Expedition @ By: John S. Chandler Date: --..-..---.. -_,-"""~,, --"-'.....'-'--.I...........J IV ~!.,Jt::.J...Jc..:::JOc..:JO( r-'.t:::::lc: Schindler Elevator Corporation March 13, 2006 sc.. cx:n-:>~ .;':'1 ,- Schindler Mr. John Chandler The Tower Group 405 S.W. 148th Avenue-suite one Davie, Florida 33325 Re: Freeman Justice Center Security Upgrades Dear John: Reference your fax memo of March ~, 2006 identifying the additional wiring requirements for adding security cameras and card readers. The following are the additional costs: 1) elevators #1 & 2 2) elevator #3 3) elevator #4 4) elevator #5 5) elevator #6 total $830.00 $370.00 $237.00 $370.00 $237.00 $2,044.00 Please note the above pricing includes the cost to furnish a pre-designed upgraded travel cable from the equipment room to the elevator cab incorporating the RG..e coax cable as well as 12 additional shielded twisted pair of wires for each of the 6 elevators. Pricing also includes the cost to provide interfacing of the controls with a card reader system. Pricing is based upon incorporating the changes prior to the materials being released to manufacturing. The card readers that are to be located inside the elevators are to be surtace mounted on the front returns above the car push buttons. Card readers at the landings are to be located adjacent to the push button fixtures. Card readers and cameras to be furnished and installed by others. Please advise if we are to proceed with the above changes. Very truly yours. Schindler Elevator Corporation ~~~~ ^m ~ Dennis M. Russell . " i :0 Suile 140 , 3800 ""ort""'est 2nd Slreet Sunrioe. FL 33325-6232 TEll: (954) 62&-6555 Fax: (1IS<l) 626-9$911 www.u$.schindler.C<lm tiR\ ~ ** TOTAL PAGE.02 **