Item F2 BOARD OF COUNTY COMMISSIONERS AGENDAITEMSU~ARY Meeting Date: 9-19-01 Division: Public Works Bulk Item: Yes No X Department: Engineering AGENDA ITEM WORDING: Discussion of proposed projects for inclusion in the Florida Department of Transportation upcoming Five Year Work Program. ITEM BACKGROUND: Every year FDOT updates their 5 year Work Program and seeks input from Monroe County. PREVIOUS RELEVANT BOCC ACTION: Last year the Board provided comments to FDOT for their consideration. Attached, please find the Board's comments with some notes made at that time.~ CONTRACT/AGREEMENT CHANGES: None STAFF RECOMMENDATION: After discussion, send FDOT a list of projects requested by Monroe County. TOTAL COST: BUDGETED: Yes NO Cost to County: REVENUE PRODUCING: YES NO AMOUNT PER MONTH YEAR APPROVED BY: County Pj?J _./ ../ OMB/Purchasing _ Risk Management Item Prepared by: V0 ~ David S. Koppel, P.E., county~. u::2? _ DIVISION DIRECTOR APPROVAL: ~ ~ Dent Pierce, Division Director ?/?~/ , DOCUMENTATION: Included X To Follow Not Required AGENDA ITEM # J" p~ DISPOSITION: MEMORANDUM DATE: December 12,2000 TO: James L. Roberts County Administrator FROM: David S. Koppel, P.E. 1{jP County Engineer {;l RE: FDOT Work Program Agenda Item 1F4 BOCC Meeting December 13, 2000 .: Included in the above-referenced agenda item is Resolution No. 615-1999 which made several requests ofFDOT. I have made brief comments next to each item indicating what has been done. Also, I have included FDOT's response to the resolution dated February 14,2000. The FDOT will be present at the meeting if the Board would like to discuss this further. . DSK/jbw cc: Dent Pierce "I Board of County Commissioners RESOLUTION NO. 615 - 1999 A RESOLUTION OF THE BOARD OF COUNTY COMMISSIONERS MAKING CERTAIN REQUESTS OF THE FLORIDA DEPARTMENT OF TRANSPORTATION WHEN CONSIDERING FUTURE PROJECTS IN THE FLORIDA KEYS - CO." o :> c.- ~ :z: C-. r- . 0 ('"):z: :Do. /"T'! BE IT RESOLVED BY THE BOARD OF COUNTY COMMISSIONERS OF M~~ c~NT9, ("'). r- . ! ." FLORIDA: 0("). (.) 0 C::;O ~ . ::::0 %. 0 ~ Section 1. The following are requests made of FDOT regarding th~Oepartme~s work and projects in the Florida Keys: .;i ~ ~.: g /, m .en_. ::0 . h). 0 1. More detailed project descriptions and materials be provided to the County Commission as soon as possible prior to the workshops. ;J: ~J\M:.f c1isc..er^ Cl7 ~t:^O(4 , -1-0 ""'( /nj(<'-f dtSl..nrho~'\.S. 2. A safety action plan to make the current 18 Mile Stretch safer even if the road is not widened. -:Z t:l1'1 /lo+ ~w~rt.. * q,,) serPt'!7 lliC..-h;p... ria",. ~fH,o'/l' "=001"') '> I./Ir-/(~ () " ~ /-fv rn u...( 6,,<>~o.~.... 6.f-.J,? i.J f' JJ.< - .: . 3. Res~onse to concerns ~bout traffic congestion and accidents onJ Big Pine Ker. . - as soon as possible. 1'J..t. eJ\ntilll t.e.J. ,n+trset..--hDI\ ir'lfrovt.l'\b.h ,,+ K~} ()('cr 51", Ore .sc...kc.cl" c! ~ hid$ j"" .;T'c),,-t.. '2-001. Oi"kr ;l"'frOv~",U\-h. an ptl'~'1 tk H-c...f. 4. Safety improvements on Crane Boulevard, where Su~arloCf Elementary. and Middle Schools are located. No 1;t\I(lJI/-(/'~-+$, ddl't ofi..tr *e,.. 1J..... ,n~J..0 s 1~4\. 5. Consideration of traffic signals on US 1 at Big Coppitt Road; East College Road, Stock Island; and High Point Road on Plantation Key at site of proposed Sher;iff's facility. No ;"^ffOlleJ"Ir^--f~ d"r'\~. . 6. The immediate construction of one two-lane bridge over Jewfish Creek on the 18 Mile Stretch. /'\10+ clO1\(' . . 7. Notification by fax or e-mail to the County Commission prior to the placement' of advertisements of hearings. (See attached contact list.) :X~ ~IJ ~..:) wI-) i""IJei"'ti/J.-J.... 8. Realign and/or replace Mile Markers on US 1 which were damaged or destroyed by hurricanes or otherwise. Cot"-' I kk . 9. Approve the placement of "No Wake Zones," as requested by Monroe County Marine Resources and the Board of County Commissioners. Defl.l<:'.J. b} Fi>o,. 0(\'7 a llllVltc\. cJ- hcr..+ rc..t-\f~' .10. Signs in the Big Pine Key area be illuminated or improved in order to make travelers more aware of the need for protection of the Key Deer population. ..,A/oS I~ ~I"'\ ev<<I\Je..+-~J. CIS pArt 0+-..J1.-( I-tc...r. '-J 11. Repair non-working lights on Boca Chica bridge. ()t\c1trw,/ . 12. Le"el out the bumps on the old Seven Mile Bridge. }l\rk .dor'\.t.. . ,,' Section 2. The Board would like to thank FDOT for its efforts to make the US 1 corridor safer for non-motorized users in the proposed $12 million design and construction of the Overseas Heritage Trail. . Section 3. The Clerk is hereby requested to forward a copy of this Resolution to the Florida Department of Transportation. PASSED AND ADOPTED by the Board of County Commissioners of Monroe County, Florida, at a regular meeting of said Board held on the 8th day of December, 1999. yes yes yes I yes yes BOARD OF COUNTY COMMISSIONERS OF MONROE COUNTY, flORIDA BycS'~-f~ Mayor/Chairperson Jresffidot PLNC + PRCM9 + PR IO: 3~5 37759B7 OEC~12-00 11:23 FROM: FOOT DB ~ Florida I)epartment of Transportation Office of Planning a!1d Programs 602 South Miami Avenue Miami, Horida 33130 PACE :2 JEB BUSH GOVI!:H.NOlt February 14,2000 'CIIOM,\S F. !lARRY, J re. SJo:CRY.TA.lty James L. Robens, Monroe County Administrator Public Service Building, Wing II S I 00 College Road, Stock Island "Key West, Florida ]3040 Dear Mr. Roberts: RE: Monroe County Resolution No. 615--1999 First) I would like to take this opportunity to thank you Bnd your ljtafi' fbr the continued support and input concerning the transportation projects identified for Monroe County in the .... Department's tentative S-year work program. Secondly. the Department has reviewed the December 8. 1999, Board ofeounty Co~issioners Resolution No. 61S~1999 and offers the following comments. 1. MOI"t! detailed p,oject descriptions and mater/Ills be pnwided to the County ConitnWion as 600II lIS possible prior to the worlc$hopJ. Response: This is an issue that the District has realized needs to addressed not only to provide morc detailed information concerning our tentative work program to the Board but also to the public. The District intends to have our Offices of Work Program, Public Information. and Planning address this issue during tbe upcoming months. The Department wants to insure that our customers are being provided the most detailed infonnation available for them to be informed on the transportation prOjects being planned for their communities. 2. A safety action plan to make the ClttTCnt 18 mile Atretch sf1.!e, e:veh if the rtHl.(/. is not widen~d. Response: The Department ofComm\Uuty Affairs, the US Anny Corps of Engineers. and the Department of Transportation. in cooperation with stafffrom Monroe County, is in the process of conducting a I1unicane Evacuation Study update. This updated st'udy will reconfinn or refute the need for additional lanes on the I8-mile stretch. The study should be completed by the faU of this year. The Department continues to believe the current plans fOT the 18-mile stretch afters the safest alternative for the public and any plans (3-1ane. safety, etc.) will stitJ require a total reconstruction of the roadway aud the envelop ofimpacts will be the same. 3. Raponse tf) ctJncems abou.t traffic cQfJgej1ion and accidents on Big Pine Key as $ODlIII." poaible. Respome: The Department is already responding to both the issues concerning traffic congestion, www.dot.stotc.fl.us (!) R'CY~1 fn I'A!'C" OEC~12-00 11,24 FROM, FOOT OS PLNC + PRCMS + PR 10, :3R15 3775987 PACE :3 FDOT Response'to County Commissioners Resolution No. 615-1999 February 14,2000 page .2~ and Key Deer road kills. First, the Department has progranuned in the tentative S-year Work Program interim intersection improvements on US-l and Key De<:r Boulevard and this project is scheduled for construction in fiscal year 2000/2001. Also programmed in the tentative S-year Work Program is the Key Deer Crossing and related improvemen, projects which are currently in the final design phase with construction scheduled in fiscal year 2000/2001. These improvements wiD help to alleviate some of the traffic congestion problems as well as providing the Key Deer herd a safer path hy crossing under US-to Finally, the Dcpartrnen1t is in the process of conducting, along with various governmental and environmental partners, the Big Pine Habitat Conservation Plan (RCP) which once completed will provide additional recommendations for highway improvements as well as working on nU1J!.crous environmental and wild life issues of concern to the residents of Monroe County. - 1/. Safety Improvements (In Ovne Boulevtlt'd, where Sllgarloaf ElementtU'J IIIJd Mitl4le Schools (l1'e located. Re3ponse: The recently completed US~ 1 Keys Turn-lane Master Plan'identified imprevements at this location. Some of the recommended improvements have already been implemented., such as the school zone flashers. Other recommended improvements, such as increasing the northbound left-turn lane, have been sent to our production unit for a further review of the project scope of work, assignment of a design project manger and the development of a production schedule. Once the schedule is tlnaIi%ed, the Department will look to progf/un the appropriate funds. s. Consideration 0/ trqffic s;glrtlls tm US-J at Big ("oppi" RotlIl; East College Road, Stock Island,- and High Point Road on P/antaticm Kq at the site ofproposed Sherlffsf4dllty. , Response: Our Traffic Operations Office will review these potential signalized intersection locations and respond in a separate letter concerning this issue. 6. The Immedime construction of one two.lune bridge over Jewjiih Creek on the l/lv",ile stretch. Response: See my previous comments to Resolution Item NO.2. 7. NotiftCtJtlon by Fox or E-IHall to tlte COMty Commi$sion prior to tlte placement of fUlvrisements of hellrings (See attached conltICt list), Response: TIlis is 8 reasonable request for improving communications between the Department and local governmental officials. I will discuss this further with our Public Information Office to insure this request is implemented in time for the next series of work program developmont meetings. OEC:12-00 11:24 FROM: FOOT 06 PLNC + PRCMS + PR 10. 3215 3775867 PACE 4 FOOT Response to County Commissioners Resolution No. 615-1999 February 14.2000 page -3- 8. Realign tUtdlor replace Mile Mttrken on liS-I w/,ieh wen! tk'tlhtlgell tJ1' {/utroyed by hu17'ictlnef or othuwlse. Response: Our Traffic Operations Office recently responded (lettElr enclosed) to tlUs issue. 9. Approve the pltlCMfat 01 "No W. ZDrI6:I" fZ$ requested by MonrOt! eormO' MIlrine Resourct$ tmd the Bon of Cou~ a..mI.uIoners. Response: The Department responded to this request in an August 3, I 999-1etter (enolosed) from our District Traffic Operations EnJJineer ,to Commissioner Williams. The Department decided that the placement of the ~o Waite Zones" aisns on US-l Was inappropriate, but Monro~ County could apply for a permit to install the subject gigns at statt: owned ramps. 10. Signs in the Blg Plne K.", II1't!8 be illumlnlltl4 Dr lmprtWed in ordel'to nuJke travekn "'on m.,are ollhe needfol' prot~ctI(IIJ of the Kq /her populfltion. Response; As I mentioned in my response to Resolution Item No.3, the Department has programed a number of projects on Big Pine Key to begin construction in fiscal year 200012001. M part of these projects, roadway striping and signing will occur. As you are awue. all roadway signs normally are coated with a reflective &beet that enables the motorist to be able to clearly read a sign message day or night. So I believe any signs proposed for these projects will provide a satisfactory illumination for travelers through the Big Pine Key area. Any existing signs which need to be replaced can be handled through our maintenance office in Marathon. It 11. Repair non-working Ilgllts 0fJ Boca CIIIca Bridge. Response: The project to address the lighting from Stock Island to MP 5.9 is currently under constnJction and is scheduled to be completed In February 2000.' The project to replace the . lights on the Boca Chica Bridge (MP 5.9 to MP 6.9) will receive bids on January 27,2000. The Department anticipates the construction ofthi. project to begin in April 2000. 11. lAvel out the bumps on the old Sew!It MUe Bridge. Response: The old seven-mile bridge is a historical structure. therefore, federal enhancement funds may be a potential source of funds for this project. Ifthe meaning of the request "Level out the bumps" is to provide a smoother surface (i.e.) resurface of the bridge deck or replacement of the bridge joints) then the county may want to include and prioriti~e an old seven-mile bridge project on their annual enhancement priority list. I believe the county needs to further clarifY this issue. DEC-12~00 11.25 FROM. FDOT D8 PLNG + PRGMS + PR ID. 305 3775887 PAGE 5 FDO,. Response to County Conunissioners Resolution No. 615"1999 February 14.2000 page "4- I hope this letter serves to answer some of the requests which were outlined in County Commission Resolution No. 615-1999. If you would like to discuss these issues further, please give me a call at (305) 377-5900. . enclosure It cc: Jose Abreu, District Six Secretary SE'!p .25 01 03: 1Sp MonroE'! Count~ p. 1 OK~~ErY ~o2~~~E (305) 294-4641 Engineering Department 5100 College Rd. Key West, FL 33040 September 20, 200 I 3052954321 (,.,,-- BOARD OF COUNTYCOMMISSIONERS Mayor George Neugent, District 2 Mayor Pro tern Nora Williams, District 4 Dixie M. Spehar, District I Charles "Sonny" McCoy, District 3 Murray E_ Nelson, District 5 Mr. Gary L. Donn, P.E. Director of Planning and Public Transportation Office of Planning and Programs Florida Department of Transportation 602 South Miami Avenue Miami, FL 33130 RE: FDOT Five Year Work Program Dear Mr. Dorm: On September 19, 200 I the Monroe County Commission discussed proposed projects for inclusion into FDOT's upcoming Five-Year Work Program. Some of the comments have been expressed to FDOT in the past, however, we would like to reiterate our desire to pursue those projects_ I. We understand that FDOT has been working on expanding the infonnation contained in the work program to provide more details that would benefit the public. We hope that this will be implemented in the upcoming work program. 2. The County has developed an interim hurricane evacuation plan which allows us to respond to a fast approaching major storm. Several small construction projects would eliminate potential bottlenecks and result in smoother traffic flow during these events. The nature of the work would involve paving portions of the median and shoulders. This work is needed as soon as possible. Please budget $1.5 million for various locations. 3. The County wants to reemphasize its desire to include stonnwater management in all future projects. Please indicate which projects will contain stonnwater management and advise us of any stonnwater management projects that have been completed in the last two years. Attached for your infonnation are excerpts from our Stormwater Master Plan which contain some FDOT projects that we would like to see done. 4. Construct a culvert by Shark Key Channel that will restore flow to the canal system in the area. Additional infonnation will be sent to you at a later date. 5. The County still believes that a traffic signal at Crane Blvd. on USl is needed for SugarloafElementary and Middle Schools. I have personally witnessed cars stopping on US I to let vehicles and buses out of Crane Blvd. onto US I. This situation is bad right now and will surely get worse. Since it is inevitable that a signal will be installed here one day, let's be creative and see how we canjustity its installation now without having to wait for more accidents to occur. SeF" 25 01 03:1710 Monroe Count~ 3052954321 10.2 Mr. Gary Donn Page Two September 20, 200 I 6. Other traffic signals have been requested in the past, namely at, Boca Chica Rd_ and East College Road, Please reevaluate these locations during March, 2002. 7. Safety improvements to USI on Big Pine Key and the modernization of the Big Pine traffic signal is requested. 8. Consideration of extending the East Coast Greenway Trail along the I8-mile stretch. The County Commission will be discussing this at a future meeting and will provide FDOT with additional input at that time. 9. Milling and resurfacing of the Old 7 Mile Bridge. The historic bridge is currently used for recreation and limited vehicular traffic. It contains numerous bumps, which could be considered a potential trip hazard. The bridge joints will probably need to be reworked to prevent this problem from reoccurring. 10_ The Pigeon Key ramp is a historic structure used during the construction of Flagler's Railroad_ It needs to be rehabilitated. Thank you for this Opportunity to comment in advance on the preparation of the tentative work program. We hope you can include as many of our requests as possible. Please feel free to call me if you have any questions or would like further infonnation. ~:;y/C- DaVid S. Koppel, P.E. County Engineer DSKljl FDOTFive YrPrgmGaryDonn.DOC Cc: All County Commissioners James L Roberts Dent Pierce Tim McGany Sep. 25 I I I I I I I I I . I . I I II I I I I 0103:17p Monroe Count~ 3052954321 Table 5.1~1 (continued) Monroe County Stormwater Management Master: Plan Summary of Implementation Costs Project/Element 2 Total Cost FY04 Fiscal Year' FY03 FY02 Florida Department Of Transportation Indian Key Bays ide Parking $2,100 Design $315 Construction $1,785 Ocean/Bay Side Parking MM 77.5 $2.600 Design $390 Construction $2,210 Bayside Parking MM 66 $16,900 Design $2,535 Construction $14,365 Sombrero Beach Road $536,400 Design $80,460 Construction $227.970 $227,970 RocKland to Shark $543,500 Design $81.525 Construction $461,975 Big Cop pitt Boat Ramp $43.000 Design $6.450 Construction $36.550 Boca Chica to Rockland $1,128,700 Design $169,305 Construction $479,698 $479,698 North Harris to Park $418,000 Design $62,700 Construction $355,300 Bow to Kemp $1,045,100 Design $156.765 Construction $888,335 Total for FOOT $3,736.300 $330,030 $1,526,173 $1,880,098 ~ . - - - . . -'.-~~--;''''~-'r~~.'(',:.o:..;..:._.~...:c.____( ',..-..II. j.:.-...f_-k.:;.;J~.A::.:e,'M.. .._,.~;,~"'.~",.;,.,. '_\~7,.,_....';"..".:......_ :....,.;.-. "..~t:...~~; Notes: I Design costs are 15% and construction costs are 85% of total project costs. (; County and city fiscal fears are from October to September; State fiscal years are from July to June. CDM C'...3mp [)'~ut't & .\.1c:K~~ inc. $;ILIONROE\Ta.tlle S.I.1.Xl.S .. -.. --.....-'n p.3 5.1-5 Sep II I I II I I . . . . . . . . . . . I I -- 25 01 03:17p Monroe Count~ 3052954321 Table 5.1-1 (continued) Monroe County Stormwater Management Master Plan Summary of Implementation Costs Total Proiect'Element Z Cost Florida Department of Environmental Protection Fiscal Year 1 FY02 FY03 FY04 Saddlebunch Bike Trail. Big Coppitt $678,100 Design $101,715 Construction $576,385 Bahia Honda Bike Trail $912.000 Design $136,800 Construction $n5.200 Saddlebunch Bike Trail. Saddlebunch $250.800 Design $37.620 Construction $213,180 Total for FOEP $1,840.900 $814.900 $812.820 $213.180 .,. . .~........."_.,;,................ ~~"""""'"'v"""'-~<<"'''''':''''''''~~'~'''-~~~",,,,,,,,",_...,,,,,,,,,,-......=:..:.,.-=--,,.. Notes: 1 Design costs are 15% and construction costs are 85% of total project costs. 2 County and city fiscal years are from October to September; State fiscal years are from July to June. CDM C.lmp Drftl~r &. Ml;K~e Inc. S:'AlONROE\TabIB 5.1-1.XLS p.4 5.1-6 Sep 25 Sl 03:17p Monroe Count~ 3052954321 p.5 .'. '. . ---. Monroe Counly Stormwater Management Master Plan Executive Summary Table ES-3b - Summary of Retrofit and Rehabilitation Costs for City of Marathon Problem Area Study Area Estimated Cost Marathon $22,400 Marathon $147,900 Marathon $3,500 Marathon $22,400 Total Estimated Costs $196,200 Table ES-3c - Summary of Retrofit and Rehabilitation Costs for mOT and IDEP 27th Street Sombrero Isles 24th Street 52nd Street (Palm Place) - Marathon Problem Area Indian Key Bayside Parking Ocean/Bayside Parking at MM 77 .5 Bayside Parking at MM 66 Sombrero Beach Road Rockland Channel to Shark Channel Big Coppitt Boat Ramp .oca Orl.ca Channel to Rockland Olannel North Harris Olannel to Park Olannel Bow Channel to Kemp Channel Saddlebunch Bike Trail - Big Coppitt Bahia Honda Bike Trail Saddlebunch Bike Trail - Saddlebunch Study Area Ram Rod Key Lower Matecumbe Long Key Marathon Big Coppitt Big Coppitt . Boca Chica Lower Sugarloaf Cudjoe Key Big Coppitt Bahia Honda Saddlebunch Total Estimated Costs Estimated Cost $2,100 $2,600 $16,900 $536,400 $543,500 $43,000 $1,128,700 $418,000 $1,045,100 $678.100 $912,000 $250,800 $5,577,200 . CDM Camp Ore....,. & McKee Inc. EX-10 9~ecuMe SIdMII)',dDc Sep. 25 01 03: 19p Monroe Count~ 3052954321 p. 1 . e.-. . .- Monroe County StonnW8ter Management Master Pllln Execulive Summary Figure ES-3 - Suggested Implementation Schedule for SMMP. Responsible Agent 2001 2002 Pro'eel A SON 0 SON 0 2003 FMAMJ 2C ASONDJFM . Monro! Coun P .eels Marathon Government Center Veterans Park Card Sound Road Burton Drive In Tavernier Parle Education on Sollm! ControJs 52nd Street 24th Street - Boot 27th Street Sombrero Isles Harbor Rockland to Shark Boca Chica !C' ~!:'~k!~~::! North Harris to Park Bow to . Saddlebunch Bike Trail. Bi Bahia Honda Bike Trail Saddlebunch Bike Trail - Saddlebunch - -- ----- ?;,..~~ ~'~,' -," ---- CDM Camp Dresser & McKee Inc_ $'__'8__ EX-11