Item G2 TIME APPROXIMATE BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July 26. 2000 Division: Public Works Bulk Item: Yes No x Department: Engineering AGENDA ITEM WORDING: Update from Jose Gonzalez for work being perfonned at the Jackson Square Project. ITEM BACKGROUND: Gonzalez Architects is providing the architectural services for the renovation of the Lester Building, Old Courthouse, Judicial Building, and the Annex Building. The Board of County Commissioners requested that the architect provide them with periodic updates on the status of work at Jackson Square. PREVIOUS RELEVANT BOCC ACTION: Jose Gonzalez presented updates on the Jackson Square Complex on April 8, 1998, September 3, 1998, October 21, 1998, January 13, 1999, April 14, 1999, July 21, 1999, October 13, 1999, January 13,2000, and April 19, 2000. STAFF ~ECOMMENDATION: No action required. TOTAL COST: N/ A BUDGETED: Yes Account # N/A NO Cost to County: N/ A REVENUE PRODUCING: YES NO l AMOUNT PER MONTH YEAR APPROVED BY: Co OMBlPn,ehas;ng' N!A ~JeK-- N!A ction Manager David S. Koppel, P.E., County Engineer c%-<?-.~/<p~ ? //Ao Dent Pierce, Division Director Item Prepared .by: DIVISION DIRECTOR APPROVAL: DOCUMENTATION: Included DISPOSITION: To follow Not required AGENDA ITEM # x '-b~ TIME APPROXIMATE BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: July 26. 2000 Division: Public Works Bulk Item: Yes No x Department: Engineering AGENDA ITEM WORDING: Update from Bert Bender of Bender & Associates Architects, P.A. on the status of the Gato Building Renovation Project. ITEM BACKGROUND: Bender & Associates Architects, P.A. is providing the architectural services for the renovations of the Gato Building. PREVIOUS RELEVANT BOCC ACTION: On March 13, 1997, BOCC approved contract with Bender & Associates Architects, P.A. for architectural services at the Old Navy Commissary Building (Gato Building). On July 18, 1998, October 21, 1998, and January 13, 1999, Bert Bender presented an update to the Board of County Commissioners. On November 12, 1998 the Board granted approval and authorized execution of a contract with Cross Environmental Services, Inc. for the selective Demolition & Abatement program (Phase I). On March 10, 1999, BOCC approved to reject all bids for the renovations (Phase II), and authorized to re-bid. On April 14, 1999, July 21, 1999, and October 13, 1999 Bert Bender presented another update to the BOCC, and on July 21, 1999 BOCC approved to accept Lodge Construction as the responsive low bidder for the renovation. On February 22, 2000, Lodge Construction was terminated. On April 19,2000, the Board heard an update from Bert Bender and granted approval to award bid and enter into contract with DL Porter Constructors as the next lowest, responsive bidder. STAFF RECOMMENDATION: No action required. TOTAL COST: N/A BUDGETED: Yes Account # N/A NO Cost to County: N/ A REVENUE PRODUCING: YES NO -X... AMOUNT PER MONTH YEAR APPROVED BY: Co OMBlPurchas~g - dJ.r~ , Co struetion &/~., County Engineer DIVISION DIRECTOR APPROVAL: ~ 7// / )e'D Dent Pierce, Division Director Item Prepared by: DOCUMENTATION: Included To follow Not required X AGENDA ITEM # ~ DISPOSITION: Time Approximate BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: Julv 26.27.2000 Division: Public Works Bulk Item: Yes No x Department: Public Facilities Maintenance AGENDA ITEM WORDING: Update BOCC on various options available to replace plastic turf grids and authorization to advertise for replacement as per selection of the Board. ITEM BACKGROUND: Existing plastic grids are deteriorating and posing a safety risk. Coordination with the City of Key West Tree Commission and Historical & Architectural Review Commission to protect the existing Kapok trees is established for the designing of project specifications. PREVIOUS RELEVANT BOCC ACTION: At the February 16,2000 BOCC meeting, motion was carried to postpone the installation of new turfstone type pavers to the next Key West Board meeting, providing a sample of product. and coordination with an Arborist. On April 19, 2000 the Sr. Director of Public Facilities Maintenance, Landscape Coordinator for the City of Key West, Bender & Associates Architects, P.A., and the County Engineer, held a discussion with the Board to advertise for bids to replace plastic turf grids and install new turfstone type pavers. Motion was carried to table the item to the next Key West BOCC meeting, in order to provide various options available. STAFF RECOMMENDATION: Approval as stated above. TOTAL COST: ADDroX. $600 for Advertisements Cost to County: Same as above BUDGETED: Yes X NO Account # 20501-530-498 (Advertising) REVENUE PRODUCING: YES NO l AMOUNT PER MONTH YEAR OMBlPurchasing _ Risk Management DIVISION DIRECTOR APPROVAL: 7 DOCUMENTATION: Included -L To follow Not required AGENDA ITEM # J'-~ DISPOSITION: March 24, 2000 Mr. Carlos Zarate, Sr. Director Monroe County Public Works Division Facilities Maintenance Department 3583 South Roosevelt Boulevard Key West, FL 33040 RE: Harvey Government Center Site Work Dear Carlos, .,~\ R CHIT TEe T S ,.a. As requested, I have analyzed the site work required at the Hcuvcy Govcrmnent Center. Based on our meeting and subsequent site visit with Cynthia Snell. the scope of work can be estimated as follows: Site demolition & disposal (lump sum) Pervious pavers with river rock (6,000 sf@ $1O-$12/sf) Concrete sidewalk repairs (lump sum) New concrete sidewalk (400 s.f @ $10-$12/5f) Sub Total General Conditions & Overhead @ 12% Contractor's Profit @ 10% Sub Total Pennit Bond @ 1.5% TOTAL $3,500 $3,500 $60,000 $72,000 $2,500 $2,500 $4,000 $5,000 $70,000 $83,000 $8,400 $9,960 $7,000 $8,300 $85,400 $101,260 $2,000 $2,400 $1,300 $1,500 $88,700 $105,160 Based on the above, bids should range from $90.000 to $110.000. I recommend that you budget $100,000 minimum for construction plus whatever additional costs are anticipated for professional fees, testing, or administration. Please call if you have any questions. Sincerely, ~)"-&"A/d Bert L. Bender. Architect BLB/ddk \IOAnplaSlrlll KqWell.FIQrld~33040 T <leD b on. ( 3 0 S I 296 . 1 H 7 f n 11m II. ( 30 5 ) 29 6.27 27 FI 0 r/ d<< L, c t" U A A CO 0 1 011 ..~ ~'" ~,po E!kCJti) .. Zarate-Carlos From: Sent: To: Subject: Teasdale-Priscilla Thursday, January 13, 2000 1:18 PM Zarate-Canos RE: Harvey Govt. Center-Plastic Turfpavers Carlos. 1 will be down to Key Wesl Tuesday. Wednesday and probably Thursday next week. Anyone 01 those days would be fine with me Any time after 9:00 am. It is your turn to pick a tiem and date. From: Sent: To: Subject: Zarate-Carlos Monday, January 10. 2000 10:24 AM Teasdale-Priscilla Harvey Gov!. Center-Plastic Turfpavers Priscilla: The plastic turfpavers installed at the above referenced county facility have become a potential risk for slip and fall, they continually uplift creating an uneven walk surface, also, the smooth plastic surface creates a walking hazard to the .public and building occupants_ PFM staff has obtained preliminary cost estimated to replace the plastic with turfstone pavers. We've coo.rdinated with Cynthia Snell, City of Key West and she approves of same, she also indicated stone pavers were first recommended for this project but due to budget restrictions plastic was used. The parking area located on the Northwest section of the property requires a concrete walkway be installed to allow safe passage to the building. I would like to meet with you on site to address these issues and obtain your recommendation regarding existing safety conditions posed by these plastic pavers. Please advise when we can meet. Thanks, Canos. Page 1 . County of Monroe (105) 292-4456 FAX 295-4364 BOARD OF COUN1Y COMMISSIONERs Off ice> of: Monroe County Safety 5100 College Rd. Key West, FL 33040 Mayor Emeritus Wilhelmina Harvey, DisL 1 Mayor Pro Tem Ge>orge Neugent, District 2 Mayor Shirley Freeman, District ~ Nora Williams, District 4 Mary Kay Rl'ich, DIstrict :> TO: FROM: RE: DATE: MEMORANDUM Carlos Zarate, Facilities Maintenance Director ("". Priscilla Teasdale, Safely Administrator ~~ Driveway al Harvey Govemment Center January 18,2000 This shall confirm our meeting with Mark Anderson, Facilities Maintenance Senior Technician at the Harvey Government Center Parking Lot. The lot is paved with plastic grids within the drip lines of the trees to provide the Kapok trees with water on the drip line. These plastic grates'are placed in an area that cars use constantly as a thoroughfare. These grates are typicalIy used in an area that does not get frequent traffic creating an excessive use for their intent. The plastic grate has caused many concerns for the safety of the public and the employees. Some of the issues we agreed were hazards to the public include: . In some areas of the parking lot the grates have been run over so many times they disintegrated and have been removed creating a dirt & mud area to drive and walk. The plastic grates are slippery in the areas where their surface is exposed. The grids have many uneven surfaces and are difficult to walk on. The grates move with the traffic flow causing buckling of both the grates and the pavement. The roots of the Kapok trees raise the grates to cause a tripping hazard in some places. Re-bars have been used to hold down the grates and now the re-bars are protruding to cause a trip hazard in some places. The public has a tendency to drive on the sidewalk at the front entrance of the building. A bumper of some type should be placed at the edge to prevent the traffic from flowing onto the sidewalk. . . . . . . It is my understanding that you have met with Cynthia Snell, Key West Biologist to discuss replacing the grids. She has agreed to the concept of replacing the grates with an interlocking brick with small open holes filled with sand to allow water to penetrate through the pavers. It is my recommendation to remove the grids as they are and replace them with pavers. Redoing the present plastic grids would be an ongoing process every few years and would not solve some orthe safety issues. Thank you for your Cooperation in this matter. 'J !{ ~.r".,.. ~', . ": '\~'':'':~:n~ -, :::;::::;::::::::::::::::::::::: :..:. ':"::::~;:;::::::.-=:=t::r:m::=::::~::.::::::.~::::;:-::::::::::::: ::, :": ::.:::;::::~:::::: ::::.:: :.:::;::::::::::;:::::::::;:::::::::::;:::::: ~::::::;;:::;:. :~:;:;:;: ::;.;_: ..;;;:::::::::::_ INTEROFFICE MEMORANDUM .'.---'-'-."-."-'-' .~._....L........._ . <::;::::-~'~""----_..::":':::~~: .......-.....-..--..--.. . . .... u.-. _...._..__ -.--..........-........-.......... .........-.... ._.._........h..... .................._.._ _._._. TO: FROM: SUBJECT: HGC TURFSTON[ ESTIMATE CARLOS ZARATE, SR DIRECTOR OF PUBLIC FACILITIES MAINTENANCE JOHN W KING, SR ADMINISTRATOR BLDG. MAINTENANCE ~ . ~_______~__ DATE: CC: 01/07/00 Fll.!' AS REQUESTED, I HAVL BEEN WORKING WITH MARI\ ANDERSON AND CYNTHIA SNUI OF THE CITY OF KEY WEST 10 COMPILE A SCOPE OF- WORK AND COST ESTIMATES TO INSTALL APPROXIMATEL Y 5,000 SQUARE FEET OF TURFSTONE PAVERS AT THE HARVEY GOVT CENTER THE TYPE OF: PAVERS AND MATERIALS TO BE USED AND THE METHODOLOGY OF THE INSTALLATION, HAS BEEN APPROVED, BY CYNTHIA SNELL OF THE CITY OF KEY WEST HER MAIN CONCERN WITH THE REMOVAL OF THE EXISTING PLASTIC TURF CONTAINERS AND THE SUBGRADE SOIL. IS THE POSSIBILITY THAT THE TREES ROOT SYSTEM COULD BE DAMAGED THERE IS A LIST OF. .. ITEMS OF SPECIAL CONCERN", IN THE SCOPE OF WORK THAT HA:=; RECEIVED HER APPROVAL THE QUANTITIES SHOWN IN THE ATTACHED PROPOSAI(S) WILL HAVE TO BE CHANGED fROM 4,000 SQUARE FEET TO 5,000 SQUARE FEET, DUE TO 1 HE ADDITION OF THE REAR DRIVEWAY SECTION. THE ATTACHED WORI\ SHEETS AND PREVIOUSLY REQUESTED PROPOSALS, ARE TO BE CONSIDERED, "FOR ESTIMATING PURPOSES ONLY" IF THE FOLLOWING ESTIMATE IS EXCEPTED AND THE PROJECT ALLOWED TO GO FORWARD, THEN PROPER BID DOCUMENTATION WILL HAVE TO BE COMPILED, AS PER POLICY AND PROCEDURE I ESTIMATE THAT THIS PROJECT, USING A CONTRACTOR FOR ALL WORK AND MATERIALS WILL COST BETWEEN $28 -32,000.00 THIS WORK WILL REQUIRE A PERMIT FROM THE CITY OF KEY WEST AND WILL AFFECT PARKING AND EGRESS AT THE HARVEY GOVT CENTER FOr-\ THE DURATION OF THE WORK THIS AMOUNT WILL WARRANT BOARD APPROVAL, ETe AND MORE THAN LIKELY MAJOR JUSTIFICATION WHY WE ARE REPLACING THE EXISTING SYSTEM I KNOW THAT SAFETY. DUE TO TRIP AND FALL IS A CONCERN AND THAT SOME OF THE INTERLOCKING PANEL ARE UPLIFTING AND CRACKING. PLEASE FEEL FREE TO CONTACT ME IF YOU HAVE ANY QUESTIONS CONCERNINC THIS MATTER ~ -~~- " __.~ _ ~_7_.-~ :'7.~.=~''''~ '_ _ '. ,T -.~/ '--:-:- _--r ~ " - ." , .: 1_ - -- . July 10, 2000 Bender & Associates 1,\ H 1_-'[( I "I' r:' T ~ poli Mr. Carlos Zarate, Sr. Director Public Facilities Maintenance Monroe County Public Works Division 3583 South Roosevelt Boulevard Key West, FL 33040 RE: Harvey Government Center Site Development Attachments: Sheets AE, AI, A2, AJ, A4 Site Plan Alternatives Preliminary Cost Estimates, Alternates I through 3 Reference Map Dear Carlos, We have evaluated alternate site proposals for the Harvey Government Center, as requested by the RO.C.C. Each is discussed below with general cost analysis following. The labels correlate to each plan's sheet number. PLAN AE; This is the existing site plan Under this option no changes would occur and you would simply perform continued maintenance there is no construction cost. As I understand the project, your concern with this option is one of potential liability, maintenance, and the visual appearance of the site. PLAN AI: This option was presented to the RO.C.C. on April 19, 2000. Their concern was one of cost, approximately $100,000. Under this option, you would retain the current parking configuration and circulation, but clean up the site through the use of pervious concrete pavers and river rock. This approach will eliminate the mud and weeds, allow water to perc to the trees, and provide a surface that has the appearance of a driveway. PLAN A2: Under this option, the driveway is moved north of the Kapok trees. Costs should be comparable to Plan AI: the major advantage is that vehicular traffic is moved away from the pedestrian entrance, driveways are visually enhanced, and maintenance is simplified. The major disadvantage is the loss of 2 on site parking spaces. ~ 410AngelaSlreel KeyWesl, Florlda33040 Telephone(30S)296-L347 FacsIITIlle(30S) 296-2727 Floridll Licel1scAAC002022 "~ PLAN A3: Under this option, the driveway and sidewalk are moved further north into the FDOT right of way at Truman Avenue. This approach allows us to pave the driveway in asphalt since we have moved beyond the drip line of the Kapok trees. The major advantages of this plan are, separation of pedestrian and vehicular circulation, increased landscape space, clarity of vehicular circulation, reduced on site paving costs, and visual enhancement of the site. The major disadvantages are a loss of 4 on site parking spaces and 4 off site parking spaces. Additionally, special permits will be required from FDOT, but our preliminary meetings with City and State officials indicates that this approach would have some support. Development of these three alternative plans requires further investigation of alternatives to provide additional parking, either on or off site. Additional on site parking can be accommodated by relocating the existing Senior Citizens Center, off site or to a new building on site with parking below. The existing Senior Citizens Center appears to be twice the size of what is actually needed. The following options are presented for consideration. Each is substantially more expensive but may present better overall value. Four sites close to the Harvey Government Center were investigated. (See enclosed map for reference) We eliminated the Biscayne Chemical building from consideration because it recently sold and have assumed it is not available. The remaining 3 sites are shown on the attached tax assessors map. Site "A" consists of two parcels which may need to be acquired together, and fronts on Truman directly north of the Harvey Government Center. The rear parcel is vacant and the front parcel includes a 2 story wood frame house with a one story CB S addition in front. If acquired, the addition could be removed and the facade restored. The balance of the property would be used for parking, approximately 10 at the rear lot and 8 at the front lot. Parcel "B" is the Jehovah's Witness Church at Eliza and White Streets. This lot currently has 37 parking spaces and is vastly under utilized with the lot chained and empty during weekdays. This property, if not available for purchase, may be available on a lease basis to supplement county parking needs. Parcel "C" is the Top Florist shop at the comer of Catherine and White Street. The building has no historic value and could be demolished for parking. This lot should accommodate twenty cars. It is our understanding that this parcel is currently under contract for sale. The following options are presented as a means of increasing parking with each having the potential for modification by utilizing different combinations of the above sites. PLAN A4: This option assumes that the existing senior Center can be relocated. Under this plan, the existing building would be demolished and a new building would be constructed on site with parking below. Our observations lead us to believe that the existing building is approximately twice the size needed, and we have assumed that a new building would be half the size of the existing. The balance of the site retains the configuration shown in Plan A3. Under this option, total parking is increased by 13 on site spaces (17 new minus 4 existing) and decreased by 4 off site spaces, for a net increase of 9 spaces. Harvey Government Center Site Development July 7, 2000 Page 3 of 5 Other site features are the same as Plan A3. The major advantages of this plan are, separation of pedestrian and vehicular circulation, increased landscape space, clarity of vehicular circulation, increased on site parking, and visual enhancement of the site. The major disadvantage is increased cost. Additionally, special permits will be required from FDOT, but our preliminary meetings with City and State officials indicates that this approach would have some support. PLAN A4.1: (See enclosed map for reference) Under this option, the Senior Citizen Center is relocated to Site "A". Renovation of the existing building at site "A" would be undertaken, but no new construction would be included at the Harvey Government Center other than the parking lot. The existing historic building at 1205 Truman Avenue would be renovated and the facade restored. This site would provide approximately 24 additional parking spaces to those obtained in Plan A4 for a net increase of33 parking spaces. Other site features are the same as Plan A3. The major advantages of this plan are the enhancement of the historic district, separation of pedestrian and vehicular circulation, increased landscape space, clarity of vehicular circulation, additional parking spaces, and visual enhancement of the site. The major disadvantage is increased cost. Additionally, special permits will be required from FDOT, but our preliminary meetings with City and State officials indicates that this approach would have some support. Under any of the above options, a joint use agreement for parking at the Jehovah's Witness site is possible and we recommend entering into negotiations with the Church to determine if this is agreeable to the congregation. COSTS: The following costs are intended to provide an order of magnitude comparison only. Obviously, more accurate estimates will be provided once a viable scope is determined. PLAN AE: No cost. This plan maintains the status quo and you continue to maintain the site as in the past. PLAN AI: $100,000 (see enclosed cost breakdown) PLAN A2: $100,000 (see enclosed cost breakdown) '0"'" - Harvey Government Center Site Development July 7, 2000 Page 4 of 5 PLAN A3: $100,000 (see enclosed cost breakdown) PLAN A4: Plan A3 costs Demolition of existing buildings 4,000 s.f. @ $1 O/s.f. Additional paving 6,500 s.f. @ $3/s.f. New building 2000 s.f @ $175/s.f Elevator Landscaping Allowance TOTAL COST PLAN A4.1: Plan A3 costs Demolish existing building 4,000 @ $1 0/ s. f. Additional paving 6,500 s.f. @ $3/s.f. Renovate existing historic buildings 2400 s.f. @ $O/s.f Elevator Site development @ 1205 Truman (estimate) Landscaping Allowance Total Development costs Property purchase price Total Cost $100,000 $40,000 19,500 350,000 75,000 10,000 $594,500 $100,000 $40,000 1 9,500 72,000 75,000 56,000 10,000 $372,500 850,000 $1,222,500 The State of Florida has preservation grant money available for rehabilitation of historic properties and acquisition. Therefore a substantial portion of these costs may be available from the State. ."" . Harvey Government Center Site Development July 7,2000 Page 5 of 5 This project began as an upgrade of site conditions at the Harvey Government Center and at the request of the B.O.C.C. was expanded to investigate alternative site circulation and other options. Plan Al presented on April 19, 2000 to the B.O.c.c. and options A2 and A3 are similar in costs. Plan A4 and A4.I are both substantially more expensive, but provide additional benefits. Ofthese two Plan A4.I provides the most community benefit through it's contributions to the Historic District, additional parking, and close proximity to the Harvey Government Center. There are three possibilities, with the most dramatic difference in each being money. The most intriguing option, and the most expensive, is Plan A4.1. However, when considering the availability of grant funding, this option may be feasible while providing a high cost benefit ratio. If this option is deemed to be not feasible, either now or after further study, and improvements are desired, we recommend Plan A3. This plan offers benefits over A I and A2 for about the same cost. Finally, if the Board feels the costs of these improvements are not warranted, then simply maintain the property as you have been doing. Please call if you have any questions or need further clarification. As you know, I will be out of town from July 14 through July 30 and David Salay will represent this project at the July 26 B.O.C.c. meeting. Sincerely, -/nfJ; ~ Bert L. Bender, Architect BLB/ddk r_'"?':_ HARVEY GOVERNMENT CENTER SITE WORK PRELIMINARY COST ESTIMATE SITE PLAN At July 10, 2000 Site demolition & disposal (lump sum) Pervious pavers with river rock (6,482 sf@ $1O-$12/st) Concrete sidewalk repairs (342 @ $12/s.f) New concrete sidewalk (1342 s.f @ $10-$12/st) Sub Total $3,500 $3,500 $64,823 $77,784 $2,500 $2,500 $3,420 $4,104 $74,243 $87,888 $8,909 $10,547 $7,424 $8,789 $90,576 $107,224 $2,000 $2,400 $1,359 $1,608 $93,935 $111,232 General Conditions & Overhead @ 12% Contractor's Profit @ 10% Sub Total Permit Bond @ 1.5% TOTAL IIARVEY GOVERNMENT CENTER SITE WORK PRELIMINARY COST ESTIMATE SITE PLAN A2 July 10, 2000 Site demolition & disposal (lump sum) Pervious pavers with river rock (6,749 sf@ $10-$12/sf) Concrete sidewalk repairs (342 @ $12/s.f.) New concrete sidewalk (183 s. f @ $1 0-$ 12/sf) Sub Total $3,500 $3,500 $67,490 $80,988 $2,500 $2,500 $1,830 $2,196 $75,320 $89,184 $9,038 $10,702 $7,532 $8,918 $91,890 $108,804 $2,400 $2,400 $1,378 $1,632 $95,668 $112,836 General Conditions & Overhead @ 12% Contractor's Profit @ 10% Sub Total Permit Bond @ 1.5% TOTAL IIARVEY GOVERNMENT CENTER SITE WORK PRELIMINARY COST ESTIMATE SITE PLAN A3 July 10, 2000 Site demolition & disposal (lump sum) Pervious pavers with river rock (4873 sf@ $10-$12/sf) Concrete sidewalk repairs (342 @ $12/s.f) New concrete sidewalk (768 s.f @ $10-$12/sf) New asphalt (1095 s.f @ #3/s.f) $3,500 $3,500 $48,730 $58,476 $2,500 $2,500 $7,680 $9,216 $3,285 $3,285 $5,000 $5,000 $70,695 $81,977 $8,483 $9,837 $7,070 $8,198 $86,248 $100,012 $2,400 $2,400 $1,294 $1,500 $89,942 $103,912 New landscaping (estimate) Sub Total General Conditions & Overhead @ 12% Contractor's Profit @ 10% Sub Total Permit Bond @ 1.5% TOTAL ,,"vE. o r<) o z W <9 <: 0... Z'o): o-~ w ~ Z I- Z o u ~ r -o!> ,,--" <D r<l o Z W <9 <( a.. z.". o~;- :~ ~ '\.1.J .u...., '~~ .t.... .2:.'. .... FIlE:O' "".f.O FtF ICI..tllS KLAU S ICI..AUS aw<: ~ act 'b ! 4 '0 1OEIlII€Il G. geEJl II STEA<<N G, . 6 lIIStO' ~ s ____~!~R - . 'l'-"'" ~ t4.~. NEAL E, HIRSCH RE2-439 ,,'.c" It[ '44)... - 5f""" , _.1e, 13 12 ~,~ RE;..~.~Q RE~~41 .. - ,-r is 11 JJ) }) 'l'-"'" ,'\.'\.l 't.~ -.::q 'l'-"'" """'c, 6 8 10 -"""""4 '0 RElt,110 REt...41f2 ~t~.4 foF;20488. ::~}) 1 B lJ rl ' '~'1 is f f -r ~s .n 0CTtll L _ _0 I ._~i4J;~ ~'"::) 4 8 --2-- .. ~-.n A.'~ :: 2 6 IItUUS~. ~.. .-. ': :: 3 RE 2460 . " II.' .e' S') ~.. L...r TflAC'T 7 NO"TtI ltM( TRACT '4 r) y r' J') 1J r "'3-..)":"30.( ------ r' ("'-- 1: ~ ~ "00 TK BOARO OF c.cJU'(T'r a:>>MNrsSI'ONCRS or MQ\IROE COUNTY. n.. Harvey Government_ ! RE' 3360 :...caAC. , .Center. '\.'\..7 100', .tU.IC..I"fUrC)~ ~~ f'I'\.I'C .....,. 1'-..sT ...:W"" '. - M:llR:lE CWNr1 R ZU;- 8 CORALIE RE3387 ./EStIS E..GOIlZAU:Z IL. SYL ttlA I CAS" C;,lTo. . COQO ~ o o ::.:: IEAO(IIl NO. >>..-000100 i ::3 ..... RE3385 RE3386 DlORT 0. IIOvo.s - ...~ V J H fj 1 11 lJl ./ -:---- '\.'LJ '\..'\..) 10 c= .. . I ~ RE3393 u ;-..-.---g-- :.____?l__ ~ IW..I'l4 IIE'lt:R ~ '" _ 0 ..:)~ ---...._-::::r--- ~ ~ ';:..."";) ; RE3393 .0' 'o~ -c (' ~ 2 "0 ~N:. . 3 :G-~---' . RE3446 , 0' ":.Ll.'''~' ~. ,J!.U..", .,: It,,""&) GC04l , 6 RE34~ .., ':ro' c" 10 14 :rdJ:' ..' ..' .,.: C }) 'J }J f Jl j j) f :~ l:r~., '11. ......; ."...,..... ),' matt?';" 6 0(RT1( OAtC[.A '.. 6 RE!:<104 CriA iltiH. . .... ~~ e8l-nTt( "fte(""R " .1 nD.9~ wc:~~;:;; tL~ru, m' 1m In'' IB: ~ ,"c. ~ 1 Ii I.... I: Re:3:!1B9 -; I ' " : RE3390 : , I T( MIS COURTS I ~ e&:: ~ H sorTe.Al.L DIAlCOMD ~ ~ BAYVIEW PARK I ill THE CITY OF KEY WES PT.TR.14 C'l '-'LJ ~ RC391 sre".c. ~~1'~~~1' -:---- '\.'-1 '\."-) ,........ -~ ~ ':;.,"":) '0' """ .,e. Il' ." -ot -. :r S'.) .-. MJf~1 eo ':'~-. __m~5_e ,4, " , Roe RT 1... "ARY AIlI( 'T DO '"'" w. so..., .A "'-"'tC ---= ~~ .~..~3 oICK ~. -<.. -~- , . RE:!I457 2 ;..- .l'CSSICA HIfUCH ~ _ J: MOCACL o...ARK . :1E34 :\C;. I 5 ' 7 RE:!I..:e, ~. " . 9 &IT:13 RP.A64 - RE3466 "0' "s.... .~ ..~ ~ '" . IClOlllll'tl5"'"_~e , ..-.,. ',iHU< ~~ AF3532 .,.~,' 5AAA.. A :.. WCRr-ucorr , I. I....." RQ:>z? 5..:.rw_ A .Wf~("o" Ioo(~ ::...,' ~ '\.'t.:l . -.::q .. 'l'-"'" ;; . ~"':) . to 0, ". .:: aIR C\J r<> o z W <9 <( n. , .z -~~O o w ::> z t- :z e -~ :., ;;1 ftl I , &2 .p B COf'r '0' ~~ / ... ~4..'" ",. _co ~"CU ....11' ~ "'liCit '\."-) 5 RE3< \..'\.1 ~ . ::> ~ j .; . ~ ~ c 6 Ad,or / ~ o~ ..% o~ -,:> ",'" , 4W, UU .'. . ...) 4 RCH76 e' 5 .~.to . ("""11>(\ _w""" . uDA'-' (. Ot..~ )> m ~ '"' ~ !it' ~ l ~ 1 " ~, . i--- , I , I ,. 1 , I \ , , ---~r---'+-r-'--'-~- ~-~'T-- --.-,-, /~.' /~ /;_._~;---._-~~ - --/;:-~--/~---/~---/~---/-;"'"', / /~) /~) /~) /~) /~) /~~ ') 00/, ",,;;-"-.......)/"___ ),,/ ),,/ ),,/' ),,/ ~,,/ ),,/ ),,/ '~) ~/ ~/ ~/ ~/ ~/ ~ / / ,; / / / ,; / ,; II ,; // // // // // // // // // // // ../ // // // // // / // /' // // ,// ,,/ ,,/r ../ L~___J/ ,/ ../ / ,1 ,/ ____~~ _ _~~_._ _~__,~ ~_:::_J/ - - - - -:=..=..-:" ---- - -- - --- 't -GtoRcTA-STRt:tT150'. RlW) - - ----- - 'al'l ~i ':l o 00 l' / / I / .--J -- - , "' /' r-r \ el' T I ....,- ,- e e \ _..J______..J___ ----1-__ f f I I f I I- - / 225.0' --,.... 1-- Vl .., z 6 ;0 If n r1 ~ Z -< r1 --, ;0 I ..J [] CJl I"'. I ~ \ 1.: j ::-:.:; : ; , \ I \ I ~i \ I !:I / / ~ i /' ~ I r~ r ... ~ I' -, I' 11;1 -i .J ,U, '\ !::;{) I, 0 i'lj )>C I: ;0 !III -!:: ~ ,II, II Z)> Ii I 'H' CIJZ I' J! 1111 '\ I: ;0 1111 SU1 c :H: ro q CD OI I' .., r !I;I 20 , 0 'II' C)O U =: \,' r ',I I' i!l) iO '" I illl ~ , I,., I I r -.-- 1-- f-- o 1-- 1-- Ill! 12 ~ \ \ " I-- I \ I \ I \ '\ II '\ is - - - - - - - - - - - ~00.0" - - - - - - mu1tl , --.J. I .L I .L , / L/ i I ---+---- -- --.-- I , I , I _ __ ____ _ _ _ 4-W_H!JL_SIREET 0 jQL_RjWL_ - - - -- - - - - - - - - - - - p.a. i;';;'..... a~- . !:i-: t';ilC~ I 88ii2;. t:-..tJl g iHii~" ... ,!.,1.t1~ e S~~.- Harvey Government Center Monroe County Facilities Key West, Florida 33040 " Bender &- Associates ARCHITECTS ~ ", \ I ,I I I I I G ,C s:: I~ ,< rTJ I~ ,......... r -0 I: )> ill ~ !1! ]<. Z r ' -l " j n ~ z ::i . ~[g ~ 1-- 1- _ )> ~ )>- ~~ ,Q "'11 S@ <<:'111 .!,a q~ -l 111 11 r )> Z I )> r -l 111 10 Z )> -l 111 q "\ ~ ~ --_I t I ! t I I \ \ , 00 r----,...---r---r---Y---7' /~ /~ /t- /~ /~ /~, ~/ / / ,. / ~/ / / / / r-n--r ""'-----""---"--__7_ /~ /~ /~ /~ /~ /~ 00 ...L.-...4.-_---.L........-~_ '" ,) '" ~ ~ ;/ ;/ ;/ ~ // ~/ ;/ ;/ ;/ ;/ ;/ I',/,/ ,/ / / / /,. / / / / / / I''',/,/,/ ,/,/ ,/,/,/ ,/ / / / / I',/ / -~ t. G'EORGI~-STREET (50~R/W)~--- -- - -- ---7---7---~--_~~ /~ /<:- /<:- /~, '" )~/ ~>:)/ )~/ '" ~~) / / / ,/ ,/ / ,/ // // // // ,,/ / ~----' / / '''0 '- , ji j:;;t". ) Bender &- Associates 'I~;; I Truman School r-:irJi ARCHITECTS I ~~il';. \ Monroe County Facilities -,. ~ ii=-~ /' Key West, Florida 33040 p.a. a I l~::: ~ ~i2'- ,... """'0 - - -------- --~ _._------~~-- / / / / / .- ~ /1 / I / T I ~I!l ~~ 9 .-1- /' I ,-r I III T I T I T I o 225.0' I I I I I I 1-- r-------, L____.' (,TOP !;:~> III '" ~'" Ox "'Vi n::! "'z zC"l --< '" '" .., I -' ., 01 I~ ./ - - -- - - - - - - 4-W_HITE SIREET 0 J~R/"Y1- _ ____ _ _ ______ __ _ _ _ _ _ __ _ __ f i ri r b I)N: Y 1-- . /1..D \ "-1- \ \ \ I \ \:! \ u; -l II ~ \ ~ "' l \ ~ \ \ \ ~ 25.0' [] 1-- 1-- 1-- 0 1-- '" 0 ~ 1-- I II ril) I' ;11, -i I: 'HI \ s:::::O 0 :11: )>C ,: '" -s:: ~ ,III I~ Z)> q I ~I: (DZ II ~ I '" I", \ S(/) II c 1"1 ro 'I CD III, OI I, '" r IIII zO I 0 Idl 00 I; ~ :/!: r , 1,1: 1-- 1-- /" '- I~ 9L \ \ " -- -, \-- \ \ \ \ \ \ \ \ \ \ \ L--- \ 11 iff' \ ~l \ ---- ,t" l.' \. 200.6' mllm I "-I. I I / J.,/ , 1. , 1. r 11 :l> ill ~ !!! 7': C i ~ ~ Z -i 1 u lJl , ~I:D~ ~~ rO rTl1) s~ ~m ~o q~ -l m 1) r > z I > r -l m ~ z > -l m IV c. ". ~ J ----1 )> I\.) I r-~~--------l ~ ~li" 'I i ~l I '" ~ - ~ - ----.------------ . -----1 I -__J I , 1 I 1 I T-' , I I I I I I I r I I I I j , 1 , ~ ,c ~ I: r< I~ ,~ I: i~ , I I I / I / 1 I I , I I I I t--- /~ / I I Bender & Associates ARCHITECTS ~- \-- \ \ \ \ \ \ r-- ~- L - -----._- - ~ ------ -- r---r---r---r--_7___7~ r---r---r---r---r---r___7___7___7___~~ /.. /.. /.. /.. /.. /.., 00 /.. /.. /.. /.. /.. /.. /.. /.. /.. /.., / ~/ ~/ ~/ ~/ ~/ ~ / ~/ ~/ ~/ ~/ ~/ ~/ ~/ ~/ ~/ ~ / / / / / / / / / / / / / / / / / / / / \ / / / / / / / / / / / / / / / / / / / '---___J/ / / / / / / / / / / / / / / / / / / - - - - - - - :. -----'- ct G'EORGI~-ST~EET (SO-R-/W) -~-- - - - --7'~ - - -- - --=--=~ _ ~'" 9 00 o /f / / / ..J- /' r ,--r I !II T " T / r - .....T ..... o 0 \ -.J______..J___ I I I I I I 1-- 2250' --"o--=---=-~___'W'__= _~_______.. _ -~ [ll] ~~:;,:::;. STOP ~ r O~~'t It, Vl '" ~'" 0>< "'Vi n::! "'z ze") ;;l :0 . 0.;" ~ ~~~~.~;~ ...J ~- [] CD Itft. I r-- - r-- r-- o r-- '" o tft. I II:. --1 ,: "Ii \ '!:;:{) 0 1"/ )>c '" 11'1 -~ I ~ ri I' z)> i' I III' mZ J! 'Ill .-.\ S;(JJ I' :0 I) C :jj: rn " CD S2I I, '" r- 'II' zO / 0 'II/ 00 Ii ~ :fI: r I' III' , 1'1' I 'I "', co '" q I I . Ul .. ~ . r- .-< -: .< :~ 1.).\ (), II U \ f~ \.-- . '., I / ~ Ii \ I \ ' \ I \ .\ I --I. I .L I .L I I 1../ - - - -- - - - ~W_HITE .sIREEToJ~R!~ _ _u_ _ __ _ _ _ _ _ _ _ _ ___ p.a. f;:'~lI'll'" F g~ c; ,:~rii i uS';' -~. ~:i=-~ :!: '.!.~~ e 35:'- Truman School Monroe County F acUities Key West, Florida 33040 /"\ I ) ~---_/. r 11 )> ;0 ~ !!! ]I Z , ~ " ~ " Z m ::l .. !Jl ~u;t l ~~ ,0 m1) s@ ':.m .!,O qUI -; m 1) r }> z I }> r -; m ;U Z }> -; m UJ I ~---~---~---T---7---7____ ~"-'r- / -~'--:;'~'--,,~---,,~---,,-;:---,,~---,,~---, 0 00 "'" "'" "'" "'" "'" """ 00 "'" "'" ,_~ "") r "'\ r "'" r \ r " r " r \ r \ ) " " ,>" ,>" ,>" '>" ,>" ~ / ~" ~" ~" ~" ~" ~" ~" ~" ~" "",, " I """"",, /"""" /"" / """ " t- \ ",," ",," ",," ",," ,,~" ",," ,(,," ,,/ // // // // // // // /" // ,(~---,,," - -- - -- -- ------=c:. -- --- -- '-- C ---"" GEOI<GIA-ST~EET (50)l;7W)- -- - -- -zm - - _ __ _ __ ___ r-r T T T T S ~T ,_ --{ - - "- I ell , 1 I, _ ~ _ _ _ _ _ _ ..J _0_ _\ ,/ I I _ _~ J I / / . ' 225.0' ----I I I I I I I I I I , I , I , I I G ,c ;!: I: 1< ", I~ 1...--. I: r I I , q I I "! 0:, I I <- I .. I I I I I I I I I I I I 1-- f I\, C,~.:';-~.- Sf~P (F::> ONLY (J) ,., ;;,., Ox "'Ui ()~ ,.,z z" ~ ,., '" ., , -' f-- [] - (Jl I~ I f-- f-- \ , \ I I '/ , f-- "- I " / II1I I II1I '(1 -i I: 'M' \ ;!:AJ 0 II !!! )>c '" jll, 0 '. \ I ~ ,"I I~ i -;!: l Z)> " , 'Ii' .~ . rnZ I, -< IIII I \ '" '"I ., SVl I c 1'1' '" a ro " III '!' Or I, ,., r- iI/I .. 20 0 IIII '" I, ~ 0 00 :1/: r I III' Ill) " ( ~ ~ ..- ~~ ~i . .- .. ) /\ "1'" d \ II \ 200.0' -, 1 '-I. 1 1. , 1. , I .L/ -- -- - -- -~ -- - -- - -- - -- - -- 4_XHITE SIREEToJ~Rf~ __ ____ ,.._~ ) I I ----_n_________ ( r-- f;:t;,r:r~ /' .. -~ irrr--/: / Bender &- Associates . SJ'i 0 I Truman School !-f"> )> ~.. h ARCHITECTS I BSiJl;. \ Monroe County Facilities -~ J W ~ ii~~ / Key West, Florida 33040 p.a.. ... '.!.t::g / ~;: l_.....__..J ;:: a~~- .r ,/ .......... ..- ---- - .. " , ~II ~iO rO 11111 5~ ~fT1 ~O , qUI -l fT1 II r )> Z I )> r -l fT1 iO Z )> -l fT1 .b. f; I~ 1____ ~\: bl~ ~ -l Ul ]I ~ - Z r ;;: " Ul ('\ ~ ~ ~ ~ Ul lil(i:~ I , I , - .- .._----- - - - - - - I 00 /;---;;:--~~---/~---/~---/~', 0 /;:--;;.--._.,;~--/;---;-~--~~---/~---/-;---/-;.---/~~, C I 0 _/ '" / 1 ' \ / \ ' 1 ' 1 / 1 ' , -) I ,.. ~/ ~/ ~/ ~/ ~/ ~ ,.. ~/ ~/ ~/ ~/ ~/ ~/ ~/ ~/ ~/ .. '\ // // // // // // // // // // // // // // // // // /" ,/ T" // // // // // // // // // // // // // // // // // // /' ...------" , , , 'L" ~___.J , , " , , , , , " i'___-, - - - - - - - - - - - - - -- 'E GEO~GIA STREETtSO"'K7Wf -- - - - -~; _ _ _ _ _ _ _ _ ~; /f J-~ r' ,-r T T T l--~ ~T ., I // I ,/' I ""' I " I III I I I I, 0 0 \ -..1______..1___ i I ! I [ I I I , q "\ .... '" I , I I I , I , I I I I I I G IC '5:: I~ I~ I~ 1--- I~ F 225.0' STOP rrY ONLY an an c / / / / / I 1--- ..- " ~=====/ I \ . J '-~ .. 1-- i <J~::~: J .1 i~' " ~'. 1-- QI I~ I 1-- "'I: ~~ ~ ii" n \ I \ I I '/ i 0 1-- ....... ... J.: 1.1 I ! to 1(1 6 I~ \ J OJ m a I~ ! .. m ~~ 0 ~_~J I \ /:'" -. "- "- ( \:! iji .. ~~ -~ ~l ~ ... ) II ,: Ill! rll! -i I~ ~I \ '5::;:0 0 '"I }>C , '" ~ " -'5:: II ~ # II Z}> 'I I CDZ II i! ~ 'I ~(JJ , '" \ I' c I", ro q m 'H' gI I' ,., r- I'll zO , 0 'ill 00 I' :e :,~ r ,i I'" .D , \,1 '" I II 0. , I lr 'If \ II \ ~\.~/ 200.0' I '-.I. I .L , .L I I L/ ~-~-i--~-~-~-~-~~ITEs~mo1~Ri~_~_~_~_~_~_~_~_ (r~~-=~~~~--=-~-~~~-=~~~-=-~- -- - - -- -- i - - - .----- - - ------- ------------ ~ I '! I I i', -II i ~~... /) Bender & Associates ' 5~:; !11 ~ k'1 i,'f-> ~I !i $' /1 r-:ifl~ ~, ~ ~ ARCHITECTS i iiHH';' , .. ~ J~ i ~ I ,!:~ ! p.a. ~ 3~ ~ "'0 Harvey Government Center Monroe County Facilities Key West, Florida 33040 time Approximate BOARD OF COUNTY COMMISSIONERS AGENDA ITEM SUMMARY Meeting Date: Julv 26. 27. 2000 Division: Public Works Bulk Item: Yes No x Department: Public Facilities Maintenance ~ AGENDA ITEM WORDING: Update the BOCC on space allocation requirements and establishing rate structure for excess space rentals. ITEM BACKGROUND: Monroe County Board of County Commissioners in conjunction with the Monroe County Sheriff's Office reached an accord to construct a new Juvenile Facility with funding from the Monroe County Sheriff Department forfeiture awards, and State Department of Juvenile Justice. PREVIOUS RELEVANT BOCC ACTION: On April 14, 1999, BOCC approved Resolution No. 181- 1999 supporting construction of a Juvenile Detention Facility in Monroe County. On April 19, 2000, Sheriff Roth, Mr. Zarate, Sr. Director of Public Facilities Maintenance, and representative of Elements-Architects Interior Designers made a presentation to the Board on the construction status. The Board took no official action. STAFF RECOMMENDATION: Same as noted above TOTAL COST: N/A BUDGETED: Yes Account # N/A NO Cost to County: N/ A REVENUJj: PRODUCING: YES _ NO l AMOUNT PER MONTH YEAR DIVISION DIRECTOR APPROVAL: APPROVED BY: County Atty. OMBlPurchasing _ Risk Management Item Prepared by- ~U-~_/D -GO ~~ D:rector, Public Facilities Maintenance ~~~~- Dent Pierce, Division Director DOCUMENTATION: Included ----X- To follow Not required AGENDA ITEM # k6.5 DISPOSITION: " .. County Attorney a ~~ ;:On:7.: Or-: 0 ("1 ::': _ c')o I Qr c:- ..- :;J~. ~~I= ~ :-' :-i :::: ~ ".-. CQ A Resolution of the Board of County Commissioners of ~o'ihq!i County, Supporting the Constlfuction of a] uvenile Detention Facility in Monroe County and Committing in Principle to the Granting of a Long-term Lease to the State of Florida Depanment uf Juvenile Justi{;e Whereas, the Monroe County Board oJ County Commissioners n~(;ogniz.e that juvenile crime is a social problem that affects all aspects of society, and Whereas, Monroe COUnty lacks appropriate facilities for thOe temporary detention, longer term ('ommitmf"nt :Jnct trf":1tmf"nt of jllvt"nilt" nfft"nctt"r.., :tnci Whereas, the State of Florida Department of Juvenile Justice has secured state funding for the construction of a detention and commitment facility to be constructed in Monroe County, and Whereas, the youth of this county, their families and society at large will benefit from the eon:;truction of such a facility in Monroe COUnty, both now and for the foreseeable future, Now Therefore Be It Resolved by the Board of County Commissioners of Monroe County, that: The Monroe Board of COUnty Commissioner.. <;lIpporr.. th,. cit'v,.lopmt'nf hy the Florida Department of Juvenile Justice (UDJ]") of a juvenile detention and commitment facility to be constructed as an addition to the Sheriff's Office Main VetentlOn Facility on ~tock Island. The Commission is willing to enter into a fifty- year lease with D1J for a Suitable parcel of land for the nominal rate of $1.00 per year, hnwt"vt"r, th,. fin:lll"lr:lf, of <;uch le;l<;c must be reviewed by the COUnty Administrator. approved by the County Attorney and brought before this Commission [or [inaJ review and approval. This resolution is passed based upon the understanding that the cost of construction and operation of the facility shall be paid entirely by D11 or from other ,- ~ .. \0 \0 3:- ):)0 -< I en .,.., - r- ,." o ~ C) ;0 ::::J no, (J <:> ::Q CJ 'I. t . ... funding sources. No COUnty funding is available for this project, nor does the COUnty hy passage of this resolution undel10lke to seek such funding. PASSED AND ADOPTED by the Board of County Commissioners of Monroe COUnty, Florid:l, ;It ;l rcguhr meeting of thc Board held On the 1 '1'h day of April, 1999. Mayor Wilhelmina Harvey Commissioner Shirley F rcernan ~ COIt1!1:1,issioner George NeuGcnt comm~ss;' ner Mary Kay Reich .r -- _ Conu~u,~sio r Nora WilliOlrns f' ,_. ....,. (. ,~L). . -'": ;, )-;{ . Al 'l~~,~~'r:-,~~1i-lLAGE, Clerk :.~:".~;! L ..;.;'/y ~~ ~ By-Oo "'-',~ Co. A~~ Dt'p\Il y Clt-rk " yes yes yes Je~ yes BOARD OF COUNTY COMMISSIONERS Or: MONROE COUNTY. FLORIDA ~~\\~~ By \~ M:lYQr!Ch;urman 8 ROBERT N. W OA7E ~3t:) ~~ eriff RICHARD n. ROTU · SHERIFF 0.. MONRO" ( Of!Nn' H2S COU.HiF f{()AI) . KJ Y WI."" _ II OIUIM l11140 (.lUS) 29(,.2424 · I-AX (.\W;) ;'<J.',71170 . ).IW(l.,'7 \.( ()I'~ MONROE COU~ SHERIFF'S OFFICE 5525 COLLEGE ROAD KEY WEST, FLORIDA 33040 PUON!:: NUMBER OF PERSON SENDING FAX: FAX PHONE NlJMUER: (305 ) __!!...lI J.. .I<J~--L- (305) 292-7070 . FACSIMiLE TRANSMISSION COVER SHEET nil 6"'_~.( (~ Jd'JV'~.__._. --. ..___..__5./ I () I () 0 NUMBEH OF PAGES: &, (INCLlJDING THTS COVER SHEET) FROM: DA'l'E: ROCUMENTS BEING S~NT TO: C a.r J') 5 70., /"..... f e- N AM t-; : DEPARTMI-:NT: fo'AX NtTMRER: _.-d...q s - 3G7 7~~ pt;S.CJU.PJ:;'ON Of OOCUMENT(S): ---.....---.-.-- / .. rrr ,..." ~..(UtU :Ul.l.ttf....,..,..~ It...,.. .......... "r, t"I.".,",_ ',n.a% .I'.,j 11.-lIM'. \\ tlll'l' II', lJiol M.r..hn" ~1.U,," 31030...,&.... U..y.. rot.r..""", Fludol. J)O~ I.He.) 2RO.'..n .:. \ 1"1".. 'lAu ...~~.., Spoil........ !t.all_ ~!.7.0.~:f"_r~~~"~~)' . T."crruf'r, t'lo"hl. lJ(J70 If on Plpa .1. no! rwt...,vtd p!e1lH alii 8' 3-25 '056!i Elenlcnts ::L::M::NTS 1\,..I..I.:1',I";,',.r-t II 1." ...,fle:I'. Fax ~~~~~111" Z."""'I' l, ..~\- " ~ ~\.., ,~- ~ \~~~\q~ - '-\~~.I-~ \,~..~ " 1"'J r,tJ"*' ,'r tt...lrlru. (,Of) '.."..t~ V;.1"'= I :'W'"'l ::"'1'," ; ~;l IlItfI:I(' ,.I,.!JU "'bUt, ,"",t.",. eft. ~l I:;' "',f,', Ira tit" 1J 1")1.0',(.' Tac ShAnfr Richard Roth (Michella) onroe County Shtlriffs Oftice ra,.. an P~..vath'Brot R Auarelh Faa: nd Floor tenal'lts for Mooroe FaCIlity 10100 Phonr. .... ".Mo6tvn DJJ M 0007.W, U U....nr n for "''''1tW a ".... Comnwnt 0 ....... It.,., o ,..... ~.. --- Sheriff Roth. Attached 13 thu 1/&1 of potential temmttt and spaces for the wcond floor I apolog~e for not getting this to you yeaterday 36 promi6ed It you have any questions pleas& let us know Viln I'har.lsavath J Bret R. AlZarelli Esttmated Program SpaeD R.quirements for Second Floor State Attorney's Office Public Dofondor'& Offle, SpoeJal Investigatlon8 Civilian (MCSO) P.A.C.E. Program e.N-FIN Ment..1 Health Program - Clre Center A Poaltlvo Stop Meso Maintenance Storage Meso CI~rk Knight and DJJ Offices Ahernativo Education Juvenile Saker Act and Substance Abua. T ota. Estim-.t8d Sp~e. RoqUlrt.m.~_'!t RocQntly AJfq..~ 1H16ur. or squ~rw fQQtaqll n~eds Rural Hludlh Unit PhYSical Exam Rooms Dental Fxam Rooms 1,2828.f. 810 8.t. 1,728 I.f. 4,880 a.f. 150 s.f. 300 a.f. 1,282 ...t. 1,185 s.f. 3,099 8".' 2,106 a.f. 7428.f. 210 ..t. 17.774 sJt Eetlmatod Program Spice Requlrementw for Second Floor S~18 AUorne1'. ames Administration Offices Conference Room (Shared) State Attornev" OffIce Public; Def.neler'1 Office Administration Offices Access to shared Conference Room 4 @ 150 s.f. 600 sf 360 sJ. 850 a.f. X1.3i 1.282 ..t. 4 @ 150 u.f. 600 sf. X1.35 8108.f. Specia' Inv~tiptJon. Civieian (MeSO) Investigator Offices S @ 120 sJ. Future Offices 3 @ 120 s.f. Rp.~epfioni"f f lie Room ACC6~S to shared Conference Room Special'nv..tlgatfon8 Olvl,'on (MeSO) P.A.C.E. Program Administrative Offices Counselor Offices Secretary Clas!lronm Multi-purpose Room Conference Room t ood Prep. Instructional Material Storage Copy/File Area lobhylVValting Staff Rostroom Girl's Restroom P.A.C.E. Program CINFIN Counselor office 2 @ 150 rd. e @2 150 s.f. 2 @ 300 s.f. 720 s f 360 s.f. 100 sf 100 s.f. 1,280 8.f. X1.35 1,728 B.f. 300 sJ 900 sJ. 100 s.f. 600 ,..f. 700 s.t. 350 s.f. 100 sJ. 200 s.f. 1205J 100 Q.f. 45 sJ. 100 sJ. 3,616 aJ. X 1.35 4,880 ISJ. 150s.f MentlI Health Progntm - c.re Centsr Counselor 0Mce 2 G 150 ..1. A Poaitiv. St8p Counselor Office Group Room Seaetary A Pu.itlv. St8p 300 $,f. 3 @ 160 s.f. 2 @ 200 ..t. 450 6.1. 400 6.1. 100 sf 8&0 ..f. nB. 1.282 a.f. Meso Maln'-mlnce Stol'lge omce& Toilet Tool Storage MeIO Malnt.n.nce StoNge 2 G 120 I.f 240 S. f. 46 s.t. 1.315 sJ. 1.600 ..f. X1.35 1.18& a.f. MelD Historical Uats Storage Adminiatrabon Storage Records Storage Forensic CSiB Manager Office Work Releaae OffIce SOCiIII Worker MeSO 500 s.f. 500 s.f. 900 ~.f. 132 S.t 132 s.f. 132 s.f. 2.286 B.f. X1.35 3,019 ..t. CI.rk Knight and DJJ Offtcn Delinquency Cue Mgt. Counaelor Suparvi60r 1506.1 Sr. 08'- Case Mgt Counselor 150 s.f Del. Caae Mgt Counselor 3 @ 160 450 s.f. Staff assi&tant 120 s.1. Secl'fltary Special/st 1205.f. Administration Unit (Separate entrance - near detention facility) Program administrator 150 sJ. Secretary SpecialiatlReceptionl&ts 120 5.1. Additional OPS Staff JPO COPS) for Aftercare Cia" Knight and DJJ OfficN 2 em 150 300 sJ. 1.110 a.t. X1,35 2.106..f. Total t=ltlrrlfted Proqr.", Spav. R....ulremeqt 1'.822..t. Eatlmltad Space Requirements for Poas'ble Program Tenants Att.mlttve Edualtlon Claaroom 2 @ 200 &,f. 400 5". (Could po..ibly be the 8amo apace i6 "Group Rearm." fDr A PDsitive Step) T ellCher Pllnning 150 s. t. Alternative Education 1&0 a.f. X1,31 742 ..f. Juvenile Baker Act .nd 8U&>>.tllna8 AbuH Patient Rooms 3 @ 70 s.t. 210 s. f. \fIfrll require space for a program that WIll provldo 24 hour moniloring and 8upervision. Total eatjmated Iplae S8Q11I"'rn8nt 11.~74 ..f. Rec,ntly Added unaUN of square footave needs Rural H..1ttI Unit Physical Exam Rooms Dental Exam Rooms ,- JUVENILE JUSTICE BUILDING COST AND SPACE SUMMARY July 26, 2000 ESTIMATED MAINTENANCE BUDGET: $153,450 TOTAL ESTIMATED SQUARE FOOTAGE 2nd FLOOR CURRENT DESIGNATED SPACE PER ARCHITECT 22,000 17,774 SF CURRENT NON-DESIGNATED SPACE 4,226 NON-PAYING DESIGNATED SPACE 8,104 S.F. REVENUE PRODUCING DESIGNATED SPACE 9,670 S.P. COUNTY'S A VG. S.P. COST PAID FOR COMMERCIAL SPACE $19.00 S.P. SUMMARY: County's estimated cost for facility maintenance will require a budgeted increase of $153,450. This cost can be fully absorbed by the owner (BOCC) and or fully subsidized by charging and collecting rents leased to non-governmental agencies intending to occupy space on the 2nd floor. Agencies declaring interest are identified within the attached documents. Note that government agencies designated for space allocation shall produce no revenue to assist the owner in recuperating necessary maintenance cost expenditures. In order to fully offset cost, the owner has an option to lease available space at or below market comparable rates to non-government agencies. Under the architect's current designated space for paying occupants, the square footage lease price required to fully offset cost is $16.00. Increase increments based on the yearly CPI will appear for all proposed leased space. Gtaffrecommends a rate structure of$16.00 s.f for all non-government agencies leasing space at this proposed facility. Upon approval from the BOCC all interested agencies will be notified of cost associated with leased space. G-5 JUVENILE JUSTICE BUILDING SPACE ALLOCATION REQUIREMENTS FOR SECOND FLOOR PROPOSED PAYING OCCUPANTS AGENCY: P.A.C.E. Program (Practical, Academic, Cultural, Education) CONTACT: Julie Smith, Executive Director 293-1892 COMMUNITY FUNCTION: Non-residential program offering girls between 12 and 17 years old who are at risk academically and unsuccessful in public schools. Funded primarily from the Department of Juvenile Justice, and the Department of Education. Non-for-Profit Organization. MONROE COUNTY FUNDING: Yes AMOUNT: Currently $20,000 per year Proposed increase to $23,000 per year by the Human Services Advisory Board ,.....", AGENCY: CIN-FIN (Children in Need, Families in Need) CONTACT: Kathy Tuell, Executive Director, 852-4246 COMMUNITY FUNCTION: Provides non-residential counseling services for at risk students and families that seek help (school setting); residential counseling (up to 35 days); and Crisis Intervention Services (call-in help while experiencing a crises). The CIN-FIN Program falls under the Florida Keys Childrens Shelter, (a non-for-profit organization), and is contracted and funded by the Department of Juvenile Justice. MONROE COUNTY FUNDING: Yes AMOUNT: Currently $23,912 per year (Florida Keys Childrens Shelter) Proposed increase to $30,000 per year by the Human Services Advisory Board ,.....", AGENCY: Mental Health Program - Care Center CONTACT: Marsh Wolfe, CEOlExecutive Director, 292-6843 COMMUNITY FUNCTION: Provides substance abuse treatment and mental health services countywide. Provides Monroe County employees with the Employee Assistance Program (EAP) giving confidential, no cost professional assistance to help employees and their families resolve problems that adversely affect their personal lives and job performance. MONROE COUNTY FUNDING: Yes AMOUNT: $184,140 per year (Includes only BOCC contribution. EAP services are an additional $66,288 per year.) ~ AGENCY: Juvenile Baker Act and Substance Abuse CONTACT: Marsh Wolfe, CEO/Executive Director, 292-6843 COMMUNITY FUNCTION: To provide involuntary hospitalization for mental illness stability. A committee consisting of non- for-profit organizations is coordinating this program, to most likely be run by the Care Center for Mental Health. MONROE COUNTY FUNDING: Committee to coordinate future funding AMOUNT: N/A ~ AGENCY: A Positive Step CONTACT: Billy Davis, 292-7288 COMMUNITY FUNCTION: Private enterprise, aiming for non-for-profit status. Funded by the Department of Juvenile Justice. Programs are for the prevention of drug and alcohol abuse. Proposing a program for counseling fathers in parental skills, employment, childcare, etc. A Positive Step seeks grants to provide services not otherwise available. MONROE COUNTY FUNDING: No AMOUNT: N/A ~ AGENCY: Alternative Education (A Positive Step) CONTACT: Billy Davis 292-7288 COMMUNITY FUNCTION: Program falls under A Positive Step, private enterprise owned by Billy Davis. Program offers after care programs for youths between 12 _ 21 who are committed by substance abuse or criminal justices to attend a rehabilitation program, funded by the Department of Juvenile Justice. The length of the program is from 4 to 6 months. Provides rehabilitation, education, employment, and Case Management Services that tracks the progress of an individual. Example: A student will attend the program after school. The case manager will provide tutoring, reading, etc. from 4:00pm to 5:15pm. From 5:30 to 6:15, student eats dinner. From 6:30 to 7:30 the student attends a therapeutic group session. The program continues on Saturdays and Sundays. MONROE COUNTY FUNDING: No AMOUNT: N/ A '"""'"' f"Oo,J AGENCY: Clark Knight and DJJ Offices CONT ACT: Clark Knight, Program Administrator, 292-6787 COMMUNITY FUNCTION: Clark Knight is the Head of the Department of Juvenile Justice. Space requirements for the second floor are for Community Correction Services including supervision of juveniles placed on probation and screening for detention. Works in conjunction with the State Attorney's Office, Law Enforcement, and the Public Defender's Office. MONROE COUNTY FUNDING: No AMOUNT: N/A JUVENILE JUSTICE BUILDING SPACE ALLOCATION REQUIREMENTS FOR SECOND FLOOR PROPOSED NON-PAYING OCCUPANTS AGENCY: SQUARE FOOTAGE: State Attorney's Office Administration Offices, Shared Conference Room 1,282 '"'" AGENCY: Public Defender's Office Administration Offices 810 SQUARE FOOTAGE: '"'" AGENCY: Monroe County Sheriff's Office Special Investigations Division 1,728 SQUARE FOOTAGE: '"'" AGENCY: Monroe County Sheriff's Office Maintenance Storage 1,185 SQUARE FOOTAGE: '"'" AGENCY: Monroe County Sheriff's Office Historical Storage, Administration Storage, Records Storage Forensic Case Manager Office, Work Release Office, Social Worker 3,099 SQUARE FOOTAGE: TOTAL MONROE COUNTY SHERIFF'S OFFICE 6,012 Square Feet JUVENILE JUSTICE BUILDING SPACE ALLOCATION REQUIREMENTS FOR SECOND FLOOR PROPOSED PAYING OCCUPANTS AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: AGENCY: SQUARE FOOTAGE: P .A.C.E. Program 4,880 -.; CIN-FIN (Children in Need, Families in Need) 150 -.; Mental Health Program - Care Center 300 -.; Juvenile Baker Act and Substance Abuse 210 -.; A Positive Step 1,282 -.; Alternative Education 742 -.; Clark Knight and DJJ Offices 2,106